+ All Categories
Home > Documents > EGT Development Overview October 14, 2009. Who is EGT Development?

EGT Development Overview October 14, 2009. Who is EGT Development?

Date post: 30-Dec-2015
Category:
Upload: roderick-casey
View: 228 times
Download: 4 times
Share this document with a friend
Popular Tags:
19
EGT Development Overview October 14, 2009
Transcript
Page 1: EGT Development Overview October 14, 2009. Who is EGT Development?

EGT Development OverviewOctober 14, 2009

Page 2: EGT Development Overview October 14, 2009. Who is EGT Development?

Who is EGT Development?

Page 3: EGT Development Overview October 14, 2009. Who is EGT Development?

What is EGT Development?

• Three partners joined together to build the first Export Grain Terminal (EGT) built in the United States in more than two decades.

Page 4: EGT Development Overview October 14, 2009. Who is EGT Development?

Who is Bunge?

Founded in 1818 in Amsterdam

Traded on NYSE: BG (IPO: 8/2/2001)

Global Headquarters: White Plains, NY

25,000 employees

Offices in 32 countries

2008 Net Sales: $52.5 Billion

Page 5: EGT Development Overview October 14, 2009. Who is EGT Development?

Bunge’s Global Market Segments

• A leader in oilseed processing

• A leader in global grain and oilseed marketing

• Originate commodities in world’s primary growing regions and market them to 75 countries

• South America’s largest fertilizer producer

• Only completely vertically integrated fertilizer company in Brazil

• Wholesaler of fertilizers in North America

•Leading corn and wheat miller in the Americas

•Leading supplier to food service companies and food processors in North America

•Leading producer of consumer bottled oil brands in South America, Europe and Asia

Page 6: EGT Development Overview October 14, 2009. Who is EGT Development?

Bunge’s Balanced Asset Footprint

8Fertilizer Agribusiness Food & Ingredients

Page 7: EGT Development Overview October 14, 2009. Who is EGT Development?

ITOCHU

Founded: 1858

Headquarters: Tokyo, Japan

Offices: 150 offices in more than 70 countries

Employees : 48,657

Annual revenue: $28.6 billion in fiscal year ending 3/31/08

Involved in a wide array of industries including food products, energy, technology, aerospace and logistics services

Page 8: EGT Development Overview October 14, 2009. Who is EGT Development?

STX Pan Ocean (America), Inc.

Headquarters: New York, NY

Wholly owned subsidiary of STX Pan Ocean, Co., Ltd. based in Seoul, Korea

STX Pan Ocean is Korea’s largest bulk carrier and one of the largest worldwide.

Handles 90 MMT per year, including 20 MMT of grain

Involved in shipbuilding, engine manufacture and plant development

Page 9: EGT Development Overview October 14, 2009. Who is EGT Development?

Why build an Export Grain Terminal?

•The Pacific Northwest is the second largest export corridor in North America

– Market access to growing demand in Asia– Origination access to agricultural commodities throughout the PNW, as well as

the Midwest and Western Corn Belt

•EGT helps upgrade aging U.S infrastructure with improved technology and increased efficiency and speed

– Last 2 major U.S. Grain Export Facilities were built in 1982/1983• ConAgra, Kalama, Wash.

• Zen Noh Grain, Convent, La.Grai n i mport by Chi na (1996 - 2017year) - USDA

0

10

20

30

40

50

60

70

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

mln mt

Page 10: EGT Development Overview October 14, 2009. Who is EGT Development?

Why Longview, Wash.?

• Longview advantages– Deep water port capable of handling Panamax vessels

– Access to major railroads and barges via the Columbia River

– Highway flyover provides unimpeded rail access to site

– Acreage to build rail loop capable of supporting unit trains

– Very supportive Port Commissioners and community leaders

Page 11: EGT Development Overview October 14, 2009. Who is EGT Development?

Project Scope

• EGT will handle grain, oilseeds and their by-products (DDGS and meal)– 8 MMT per year

– 200 vessels per year

– 650 barges per year

• $200 million project

• 200 jobs on average during the construction phase

• 50 permanent jobs at the elevator; approximately 35 additional jobs for river pilots, tug assists, barge services and rail operations

Page 12: EGT Development Overview October 14, 2009. Who is EGT Development?

Project Scope

Page 13: EGT Development Overview October 14, 2009. Who is EGT Development?

Project Scope

Page 14: EGT Development Overview October 14, 2009. Who is EGT Development?

Project Scope

• Groundbreaking on August 4, 2009

Between now and then…

Page 15: EGT Development Overview October 14, 2009. Who is EGT Development?

Site Preparation

• Relocated over 730,000 yd3 of sand

• Grading and drainage

• Installed two settling ponds

• Excavation of foundations

• Establishing roadways and railbeds

Page 16: EGT Development Overview October 14, 2009. Who is EGT Development?

Silo Mat Form Construction

Three weeks from start to ready-to-pour

• Two million pounds of steel• 4,000 yd^3 of concrete

• ~600 trucks• ~18 hours

Page 17: EGT Development Overview October 14, 2009. Who is EGT Development?

Dewatering Operations

14 Wells @ 700 GPM = 9800 GPM• Equivalent of filling one Olympic-size swimming pool every

1:07

Page 18: EGT Development Overview October 14, 2009. Who is EGT Development?

Two year project

Scheduled to be ready to handle fall harvest 2011.

Page 19: EGT Development Overview October 14, 2009. Who is EGT Development?

Recommended