16
EIOPA Insurance Financial Regulation. Pierre-Jean Vouette Aitor Azcoaga
Transcript
Page 1: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

EIOPA Insurance Financial

Regulation. Pierre-Jean Vouette

Aitor Azcoaga

Page 2: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Solvency II • Solvency II and Omnibus II

• Reporting

• XBRL

Page 3: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Timeline

2001 In force

Nov. 2009: Solvency II Directive

1/1/2011

Technical preparation

(advices)

Technical standards

Implementing measures

Omnibus II

TODAY

Page 4: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Solvency II • 4 levels

• Framework Directive [2009/138/CE - 25 november

2009]

• Implementation measures (Commission – Delegated acts)

• Guidelines (CEIOPS)

• Monitoring proper working (Commission)

Page 5: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Solvency II

Page 6: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Level “2.5” ? • Lisbon treaty

– TFEU art. 290 and 291 • Delegated acts • Technical standards

• EIOPA founding regulation, art. 8 – Draft technical standards

• Regulatory • Implementing

• Adopted by COM – Transparent process

• Public consultation • Process delay: at least 8 months

Page 7: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Expected content by levels

• Level 2: Delegated acts (Commission) – Around 40 topics.

• Level 2.5: Technical standards (EIOPA proposal, COM adoption) – Regulatory – Implementing

• Level 3: recommandations and guidelines (EIOPA) – Adressed to NSAs or undertakings – Non legally binding – « Comply or explain »

7 Titre de la présentation

Reporting

XBRL

Page 8: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Preparing for Solvency II

• Consultation on guidelines published on the 27/3: – Open until 19 of june 2013 – 4 consultation papers (CP-13/008 to CP-13/011). – CP-13/10: Proposal for Guidelines on submission of

information to national competent authorities, including Impact Assessment

– Include a subset of the expected final Solvency 2 reporting

– DPM and XBRL taxonomy supporting the proposal simultaneously published

8 Titre de la présentation

Page 9: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

The taxonomy timeline

2011 Jul Sep Nov Jan 2012 Mar May Jul Sep Nov 2012

XBRL Week in Frankfurt Dec-2012

Publication of Solvency II DPM Analyses Oct-2012

Webinar Presenting PoC and DPM analyses

Publication of PoC

Sep-2012

Jul-2012

XBRL Week in Madrid Jun-2012

XBRL SII Seminar in

Tallin Mar-2012

Preconsultation SII Taxonomy Jul-2011

Final Report No 11/009 and 11/011

Publication of the DPM and Taxonomy for the Preparatory phase

2013 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2013

Today

Final Version of Preparatory Package

Dec-2013

Publication of the Preparatory GL

Nov-2013

Publication of the SII Preparatory Taxonomy Nov-2013

First Internal draft full set SII templates Jun-2013

Mar-2013

Publication of the SII Preparatory GL

CP-13/010

Mar-2013

XBRL Conf. in Dublin

Page 10: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

The existing deliveries • The DPM annotated templates for the Solvency II and

documentation • The DPM for the preparatory phase and documentation • The Taxonomy for the preparatory phase:

• A two layer taxonomy. HD and MD. • Some common technical approaches with the EBA’s

taxonomies • The architecture documentation • Complete Solvency II dictionary available in-line https://eiopa.europa.eu/publications/eu-wide-reporting-formats

Page 11: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

The planned deliveries • An update on the preparatory taxonomy (2013 Q2-Q3)

• A filler manual (related to CEN delivery) (2013 Q3)

• A NSA’s manual (2013 Q3-Q4)

Page 12: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

The Tool for Undertakings

Helping the undertakings without XBRL knowledge, providing a tool to easily create complete and valid XBRL instances of the

Solvency II harmonized quantitative reporting

Designing the XBRL tool to be reusable for other projects and specifically extensible for NSA local requirements

Contributing to XBRL community and open source community

Page 13: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

The Tool for Undertakings Goals Distribution

license for all Europe.

Preferable EUPL license

Using the input forms in a

similar layout as the public

reference templates.

Use of XBRL label,

rendering, reference,

formulas, etc.

Allowing reusing or

extension of the tool for national

extensions

Easy to use for administrative

staff with limited IT knowledge

Multiplatform

XBRL syntax and formula validation at client side Easy to

update when the taxonomy

changes

Internationalization: Languages, data

formats, currencies, etc.

2nd level support

Open source, reusable

Easy to deploy

Good performance

with large amounts of

data

Note that these requirements are under discussion and not final

Page 14: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Tool for undertakings OLD timeline

23/7/2012

1st Phase 2nd Phase

21/09/2012 29/03/2012

1.-Project Setup

Establish the members of the project,

general goals, software

methodology, calendar, etc.

2.- Create the first draft of the analysis of

requirements

Identify the scope of the project, analyse the

alternatives, create the draft of the analysis of

requirements.

3.- The open tender

Write and publish a public tender request for an offer

which includes the requirements established

on the analysis.

The interested companies will have 2 months to submit their offers.

Timeline

4/7/2012

4.- Evaluation Process

Analyse the received offers

and choose one of them.

26/10/2012

5 .- Design, implementation,

test and integration

Refine the analysis with the selected

contractor, Implementing phase,

testing phase, integration and NSA

test.

01/01/2014 01/01/2013

3rd Phase

7 .- Production, configuration and change

management

Adaptive maintenance of

the project.

6 .- Publication

Publish a release for public test.

01/05/2014 11/04/2012

Obsolete expected

timeline by June 2012

Page 15: EIOPA Insurance Financial Regulation.archive.xbrl.org/26th/sites/26thconference.xbrl... · Aitor Azcoaga . Solvency II • Solvency II and Omnibus II • Reporting • XBRL . Timeline

Exte

rnal

mile

ston

es

Inte

rnal

pro

ject

tim

elin

e

Tool for Undertakings Timeline

Internal milestone

Legend

IT&DC

BoS

External milestone

2013 2013

Mar May Jul Sep Nov

2014

Jan Mar 2014

First version of the TfU

27-12

Publication of the release

candidate of SII

Preparatory Reporting Package

27-12

Publication

of the Preparatory

GL and Preparatory Taxonomy

1-11

First Beta TfU

30-10

First PoC TfU

18-9

TfU contractor's analyses starts 30-4

Publication of the SII

Preparatory GL, the DPM

and Taxonomy

24-3

Phase 3 Testing & training 12 Weeks

Phase 3 Non-core functionalities construction&testing 22.3 Weeks

Phase 3 Core functionalities construction&testing 13.3 Weeks

Phase 2 (Analysis, design and PoCs) 12.9 Weeks

Phase 1 (First analysis) 8.3 Weeks