+ All Categories
Home > Documents > EJC417.pdf

EJC417.pdf

Date post: 14-Sep-2015
Category:
Upload: rizky-ashary
View: 270 times
Download: 16 times
Share this document with a friend
Popular Tags:
12
Sandvik Mining and Construction Canada Inc. 4445 Fairview Street, Burlington Ontario, Canada L7L 2A4 Tel.: (905) 632-4940 Revision Date: 2006-2-08 Web: http://www.sandvik.com © 2006 Sandvik Mining and Construction Canada Inc. Sandvik Mining and Construction reserves the right to change this specification without notice EJC 417 Technical Specification T06417-1 1/12 General Arrangement 9.8 ft. (3.0 m) 154 (3912) 86 (2184) 56 (1422) 8 (203) 11 (279) 6 (152) 90 (2286) 88 (2235) Note: All vertical dimensions are for an empty unit. Dimensions are in inches, dimensions in brackets are in millimetres. Optional ROPS canopy shown.
Transcript
  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417 Technical SpecificationT06417-1 1/12

    General Arrangement

    9.8 ft.(3.0 m)

    154

    (391

    2)86

    (218

    4)56

    (142

    2)8

    (203

    )

    11 (279

    )

    6(1

    52)

    90(2

    286)

    88 235)

    Note: All vertical dim Dimensions ar are in millimet Optional ROPSRevision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    (2

    ensions are for an empty unit.e in inches, dimensions in brackets res. canopy shown.

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    Technical SpecificationT06417-1 2/12EJC 417

    Standard Unit Specifications

    General Information Power Train

    Systems

    Steering HyFull hydraulic double acting sa gear pump an

    Main DimensionsTotal length 7010 mm 276 inTotal width 2235 mm 88 inOver all height 2286 mm 90 inHeight of dump box 2184 mm 86 inDump height 3912 mm 154 in

    Operating WeightsTotal 15014 kg 33100 lb.front axle 9609 kg 21184 lb.rear axle 5405 kg 11916 lb.

    Loaded WeightsTotal 30436 kg 67100 lb.front axle 10653 kg 23436 lb.rear axle 19806 kg 43664 lb.

    CapacitiesPayload 15.4 tonnes 17 tonsBox volume 8.4 m 11.0 yd

    Dump Box Motion TimesDischarging time 14 sec.Dumping angle 75 sec.

    Driving Speeds Forward and Reverse (Loaded)1st gear 4.7 km/h 2.9 m.p.h.2nd gear 9.8 km/h 6.1 m.p.h.3rd gear 16.9 km/h 10.5 m.p.h.4th gear 29.1 km/h 18.1 m.p.h.

    FrameRear and front frame Welded steel box constructionMaterial G40.21 - 50wt Cat. #3Central hinge full plate, clevis type with

    spherical bearingsDump box Welded steel box constructionMaterial G40.21 - 50wt Cat. #3

    EngineDiesel engine Detroit Diesel Series 40EOutput 156 kW (210 Hp) @ 2 200 rpmTorque 705 Nm (520 lbf-ft) @ 1 500 rpmNumber of cylinders In line, 6Displacement 7.64 l 466 inCooling system Liquid cooledCombustion principle Turbo charged, after cooled,

    direct injected, 4 cycleAir filtration Dry typeElectric system 24 VExhaust system Catalytic purifier with silencerFuel tank capacity 148 l 39 US gal.

    TransverterDana SOH 13.7 LMHR 32421

    4 speed forward and reverse, single stage converter, 2.13:1 stall torque ratio.

    AxlesFront Dana SOH 16D2149, standard differential,

    oscillating 8Rear Dana SOH 16D2149, standard differential,

    fixed

    TiresTire size 14:00 R24Air pressure, fAir pressure, rRevision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    draulicspower steering, centre articulated with ateering cylinder. Open centre system withd pilot operated stick steer control.

    ront 552 kPa 5.52 bar 80 psiear 552 kPa 5.52 bar 80 psi

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417 Technical SpecificationT06417-1 3/12

    Dump Box HydraulicsFull hydraulic open-centre system with one gear pump.Electric push button dump box control located on the steerstick.

    Standard BrakesService brakes are spring applied/hydraulically released,liquid cooled (LCB) multi-disc brakes on all wheels withtwo separate circuits for the front and rear axles. Servicebrakes also function as an emergency brake, when theemergency brake system is engaged.

    Other Standard Equipment Electric shift Central hydraulic pressure test points Central manual lubrication system SAE hose fittings

    ManualsAll manuals are delivered on CD-ROM in web basedformat with Adobe PDF output for printing.

    Optional Equipment Specifications

    Turning RadiusInner 3175 mm 125 inOuter 5893 mm 232 inTurning angle 44

    Main ComponentsHydraulic pump Gear pumpControl valve Pilot operatedSteering cylinder EJC 127 mm bore X 51 mm rod

    (5.0" X 2.0")

    Pressure SettingsMain relief 13.8 MPa 138 bar 2000 psiPort relief valves 13.8 MPa 138 bar 2000 psi

    Main ComponentsDump cylinder 2 stage telescopic 184/152 mm

    (7.25/6.0)Hydraulic pump Gear pumpControl valve Pilot operated

    Pressure SettingsMain relief 13.8 MPa 138 bar 2000 psiPort reliefs 13.8 MPa 138 bar 2000 psiHyd. oil tank capacity 125 l 33 US gal.

    Main ComponentsPressure accumulators Piston type with charging valveBrake pedal valve Modulated

    Electrical EquipmentAlternator 24V 60 A, minBatteries 2 x 12 V, 950 CCAStarter 24 V, Heavy DutyDriving lights 4pcs front, 2pcs rear

    DistributionManual Type Customer Market AreaSpare parts manuals 3 Copies 1 CopyOperators manual 3 Copies 1 CopyService manual 3 Copies 1 Copy

    Available Alternative EquipmentAuto lube system Lincoln modular

    Alternative Dump Box OptionsVolume Width Side Height6.9 m 9.0 yd 2134 mm 84 1905 mm 758.2 m 10.7 yd 2540 mm 100 1981 mm 78

    Available Add-On OptionsDump box Split dump box rework

    Abrasion resistant box linersOperators compartment

    SAE ROPS canopyEnclosed operators cab with A/C

    Fire suppressisystems

    Hand held fireextinguishersEmergency stesystemRevision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    (solid mounts)on Manual - Ansul 6 nozzles, 1 tanks

    Automatic (Checkfire II) - Ansul 6 nozzles, 1 tanks

    4.5 kg 10 lb.9.1 kg 20 lb.

    ering SAE J-1511, electric

  • Additional InformationT06417-1 4/12

    Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417

    Tractive Effort Curve (Metric Units)

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    220

    0 2 4 6 8 10 12 14 16 18

    F

    (

    k

    N

    )

    0 2 4 6 8 0 2 4 6 8

    Rolling resistance (%)

    G

    r

    a

    d

    e

    (

    %

    )

    510

    152025

    5

    10

    15

    20

    25

    ENGINE:TRANSVERTER:

    Payload:14.00 R2416D2149AXLES:

    TIRES:15 422 kg

    CLARK LMHR 32421

    EJC 417Detroit Diesel Series 40E

    EMPTY LOADED

    30

    30Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    0

    0

    6

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    a

    n

    a

    d

    a

    I

    n

    c

    .

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    r

    e

    s

    e

    r

    v

    e

    s

    t

    h

    e

    r

    i

    g

    h

    t

    t

    o

    c

    h

    a

    n

    g

    e

    t

    h

    i

    s

    s

    p

    e

    c

    i

    f

    i

    c

    a

    t

    i

    o

    n

    w

    i

    t

    h

    o

    u

    t

    n

    o

    t

    i

    c

    e

    20 22 24 26 28 30 32 34 36 38 40 42 44 46

    Speed (km/h)

  • Additional InformationT06417-1 5/12

    Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417

    Tractive Effort Curve (US Units)

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    0 1 2 3 4 5 6 7 8 9 10 11

    T

    r

    a

    c

    t

    i

    v

    e

    E

    f

    f

    o

    r

    t

    (

    K

    l

    b

    f

    EMPTY

    0 2 4 6 8

    LOADED

    0 2 4 6 8

    Rolling resistance (%)

    G

    r

    a

    d

    e

    (

    %

    )

    510152025

    5

    10

    15

    20

    25

    ENGINE:TRANSVERTER:

    Payload:14.00 R2416D2149AXLES:

    TIRES:34 000 lbs

    Detroit Diesel Series 40ECLARK LMHR 32421

    EJC 417

    30

    30Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    0

    0

    6

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    a

    n

    a

    d

    a

    I

    n

    c

    .

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    r

    e

    s

    e

    r

    v

    e

    s

    t

    h

    e

    r

    i

    g

    h

    t

    t

    o

    c

    h

    a

    n

    g

    e

    t

    h

    i

    s

    s

    p

    e

    c

    i

    f

    i

    c

    a

    t

    i

    o

    n

    w

    i

    t

    h

    o

    u

    t

    n

    o

    t

    i

    c

    e

    12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

    Speed (mph)

  • Additional InformationT06417-1 6/12

    Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417

    Productivity Curve (Metric Units)

    EJC 417 PRODUCTIVITY

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    170

    180

    0 500 1000 1500 2000 2500 3000 3500 4000 4500

    ONE WAY DISTANCE IN METRES

    T

    O

    N

    N

    E

    S

    P

    E

    R

    H

    O

    U

    R

    0% 10

    Basic data for calculations:Payload tonnesOverall Speed limit km/hFixed Cycle time min

    Fixed cycle time includes the time for filling, dumping, turning and accelerating

    Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20Loaded speed (km/h) Empty speed (km/h)

    15.420

    3.75

    204.46

    208.82020

    20Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    0

    0

    6

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    a

    n

    a

    d

    a

    I

    n

    c

    .

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    r

    e

    s

    e

    r

    v

    e

    s

    t

    h

    e

    r

    i

    g

    h

    t

    t

    o

    c

    h

    a

    n

    g

    e

    t

    h

    i

    s

    s

    p

    e

    c

    i

    f

    i

    c

    a

    t

    i

    o

    n

    w

    i

    t

    h

    o

    u

    t

    n

    o

    t

    i

    c

    e

    % 15% 20%

  • Additional InformationT06417-1 7/12

    Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417

    Productivity Curve (US Units)

    EJC 417 PRODUCTIVITY CURVE

    0

    20

    40

    60

    80

    100

    120

    140

    160

    0 2000 4000 6000 8000 10000 12000 14000

    ONE WAY DISTANCE IN FEET

    T

    O

    N

    S

    P

    E

    R

    H

    O

    U

    R

    0% 10

    Basic data for calculations:Payload short tonsOverall Speed limit mphFixed Cycle time 4.0 min

    Fixed cycle time includes the time for filling, dumping, turning and accelerating

    Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20Loaded speed (mph) Empty speed (mph)

    1712.4

    12.42.73.7

    12.45.512.412.4

    12.4Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    0

    0

    6

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    a

    n

    a

    d

    a

    I

    n

    c

    .

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    r

    e

    s

    e

    r

    v

    e

    s

    t

    h

    e

    r

    i

    g

    h

    t

    t

    o

    c

    h

    a

    n

    g

    e

    t

    h

    i

    s

    s

    p

    e

    c

    i

    f

    i

    c

    a

    t

    i

    o

    n

    w

    i

    t

    h

    o

    u

    t

    n

    o

    t

    i

    c

    e

    % 15% 20%

  • Additional InformationT06417-1 8/12

    Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417

    End Loading with EJC 145

    11 cu.yd. Dump box2

    1

    8

    6

    m

    m

    (

    8

    6

    i

    n

    )

    3

    4

    7

    1

    m

    m

    (

    1

    3

    7

    i

    n

    )Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    0

    0

    6

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    a

    n

    a

    d

    a

    I

    n

    c

    .

    S

    a

    n

    d

    v

    i

    k

    M

    i

    n

    i

    n

    g

    a

    n

    d

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    r

    e

    s

    e

    r

    v

    e

    s

    t

    h

    e

    r

    i

    g

    h

    t

    t

    o

    c

    h

    a

    n

    g

    e

    t

    h

    i

    s

    s

    p

    e

    c

    i

    f

    i

    c

    a

    t

    i

    o

    n

    w

    i

    t

    h

    o

    u

    t

    n

    o

    t

    i

    c

    e

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417 Additional InformationT06417-1 9/12

    Side Loading with EJC 145

    2186

    mm

    (86

    in)

    3471

    mm

    (137

    in)Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    Additional InformationT06417-1 10/12EJC 417

    End Loading with EJC 116

    Side Loading with EJC 116

    3988

    mm

    (157

    in)

    6.9 m (9.0 yd)

    1905

    mm

    (75

    in)

    3988

    mm

    (157

    in)

    6.9Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    m (9.0 yd)

    1905

    mm

    (75

    in)

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    EJC 417 Additional InformationT06417-1 11/12

    End Loading with EJC 90

    Side Loading with EJC 90

    3983

    mm

    (157

    in)

    6.9 m (9.0 yd)

    1905

    mm

    (75

    in)

    3983

    mm

    (157

    in)

    6.9 m (9.Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    0 yd)

    1905

    mm

    (75

    in)

  • Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940

    Additional InformationT06417-1 12/12EJC 417

    End Loading with Toro 151

    Side Loading with Toro 151

    3500

    mm

    (138

    in)

    44 6.9 m (9.0 yd)

    1905

    mm

    (75

    in)

    3500

    mm

    (13

    8 in

    )

    44 6.9 m (9.0 yd)

    05 m

    m (

    75 in

    )Revision Date: 2006-2-08

    Web: http://www.sandvik.com

    2

    006

    San

    dvik

    Min

    ing

    and

    Con

    stru

    ctio

    n C

    anad

    a In

    c.Sa

    ndvi

    k M

    inin

    g an

    d C

    onst

    ruct

    ion

    rese

    rves

    the

    right

    to

    chan

    ge th

    is s

    peci

    ficat

    ion

    with

    out n

    otic

    e

    19

    General ArrangementStandard Unit SpecificationsGeneral InformationMain DimensionsOperating WeightsLoaded WeightsCapacitiesDump Box Motion TimesDriving Speeds Forward and Reverse (Loaded)Frame

    Power TrainEngineTransverterAxlesTires

    SystemsSteering HydraulicsTurning RadiusMain ComponentsPressure SettingsDump Box HydraulicsMain ComponentsPressure SettingsStandard BrakesMain ComponentsElectrical EquipmentOther Standard EquipmentManualsDistribution

    Optional Equipment SpecificationsAvailable Alternative EquipmentAlternative Dump Box OptionsAvailable Add-On Options

    Tractive Effort Curve (Metric Units)Tractive Effort Curve (US Units)Productivity Curve (Metric Units)Productivity Curve (US Units)End Loading with EJC 145Side Loading with EJC 145End Loading with EJC 116Side Loading with EJC 116End Loading with EJC 90Side Loading with EJC 90End Loading with Toro 151Side Loading with Toro 151


Recommended