EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 Agenda Item #4.2
Transcript
Page 1: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

EL CAMINO REALBUS RAPID TRANSIT (BRT)

PROJECT

VTA BOARD WORKSHOP

MAY 1, 2015

Agenda Item #4.2

Page 2: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

ABOUT THIS PRESENTATION

CONTEXT

Existing conditions and planning for growth

WHAT IS THE PROJECT?

Project alternatives

Benefits

Results of environmental analysis

WHAT WE HEARD

Public comments, city positions, questions

HOW WILL VTA PROCEED?

2

Page 3: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

3

CONTEXT

Page 4: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

WHAT KIND OF STREET DO WE WANT?

SANTA CLARA, CA

MOUNTAIN VIEW, CA

SUNNYVALE, CA

PALO ALTO, CA

SAN JOSE, CA

LOS ALTOS, CA4

Page 5: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

EL CAMINO REAL TODAY

• Vehicle delay, measured by level of service (LOS), is within

acceptable levels. Only two intersections at LOS F.

5

0

5

10

15

20

25

30

LOS A LOS B LOS C LOS D LOS E LOS F

INT

ER

SE

CT

ION

S

AUTO LEVEL OF SERVICE, PM PEAK PERIOD

LOS Average Delay

LOS A Less than 10 seconds

LOS B 10 to 20 seconds

LOS C 20 to 35 seconds

LOS D 35 to 55 seconds

LOS E 55 to 80 seconds

LOS F Over 80 seconds

Page 6: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

PLANNING FOR PROJECTED GROWTH

6

• 2040 Santa Clara County projection: +546,000 residents,

+226,000 jobs

• Growth targeted for Priority Development Areas

• City plans endorse bicycle, pedestrian and transit accommodations

• BRT provides a transit alternative to accommodate growth

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

Population Jobs

TODAY

Page 7: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

7

Commercial

R&D/Office

Mixed Use

Multi Family

Single Family

VTA Light Rail

Caltrain

PDA

CITY APPROVED PROJECTS/CONSTRUCTION ON EL CAMINO REAL

Page 8: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

EXAMPLE OF GROWTH ALONG EL CAMINO REAL

SAN ANTONIO CENTER, MOUNTAIN VIEW8

Page 9: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

9

WHAT IS THE PROJECT?

Page 10: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

WHAT IS THE PROJECT?

Upgrade the current 522 Rapid Bus to BRT, resulting in:

• Fast, frequent and reliable transit on El Camino Real

• Transit that is competitive with automobile travel times

• Increased transit ridership

• Increased cost-effectiveness

• Implementation of Grand Boulevard Initiative and city

planning goals

10

Page 11: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

EXAMPLES OF BRT IN THE UNITED STATES

11

EUGENE, OR

LOS ANGELES, CA BOSTON, MA

Page 12: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

12

OAKLAND

SAN FRANCISCO SAN JOSE

FUTURE BRT IN THE BAY AREA

Page 13: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

BRT vehicles begin operating on El Camino Real/SC-AR corridor in 2015

13

VTA BRT PROGRAM

Page 14: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

BRT IN CONTEXT OF TRANSPORTAION CAPITAL PROGRAM

14

Highways

Local System

Rail

BRT

$13.3B over the next 25 years

• $7.5B for Rail

• $3.1B for Highways

• $2.1B for Local Streets, Bike, Ped

• $0.5B for BRT

Streets, Bike, Ped

$7.5B $2.1B

$3.1B

$0.5B

Page 15: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

WORK TO DATE

ENVIRONMENTALANALYSIS

VTA DECISIONCONCEPTUALPLAN/ENG

2010 - 2013 2013 - 2015

NOVEMBER 2012 VTA Board directs staff to evaluatemultiple alternatives

15

FEB – MAR 2013 Scoping period for public comments

OCT 2014 – JAN 2015 Public comment period for Draft Environmental Impact Report

SUMMER/FALL 2015 VTA Board of Directors chooses an optionfor how to proceed

COMMUNITY OUTREACH

Page 16: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

16

Limited stop service15-minute frequency522

Local service12-minute frequency22

Limited stop service10-minute frequencyBRT

Local service15-minute frequency22

BRT IS AN UPGRADE OF THE 522 RAPID BUS

LINE EXISTINGNO BUILD

2018 2040MIXED FLOW2018 2040

DEDICATED LANE2018 2040

522/BRT 3,287 8,159 10,576 9,223 11,736 13,104 21,071

22 9,234 6,429 11,102 6,080 10,492 5,512 9,266

Page 17: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

TWO BRT STREET CONFIGURATIONS

MIXED FLOW WITH BULBOUTS

DEDICATED LANE

17

Page 18: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

ALTERNATIVE 1 – NO PROJECT

18

Page 19: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

BUS RAPID TRANSIT

19

ALTERNATIVE 2 – ALL MIXED FLOW

Page 20: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

20

ALTERNATIVE 3A – SHORT DEDICATED LANE,NO PROJECT WEST OF HALFORD AVE

Page 21: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

21

ALTERNATIVE 3B – SHORT DEDICATED LANE, MIXED FLOW ELSEWHERE

Page 22: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

22

ALTERNATIVE 4A – LONG DEDICATED LANE TO HIGHWAY 85

Page 23: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

23

ALTERNATIVE 4B – LONG DEDICATED LANE TO SHOWERS DRIVE

Page 24: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

24

ALTERNATIVE 4C – LONG DEDICATED LANE TO PALO ALTO

Page 25: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

25

BENEFITS

Page 26: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

BENEFITS OF BUS RAPID TRANSIT

26

AVERAGE WEEKDAY BOARDINGS (RIDERSHIP)

CURRENT

(2013)

ALT 1

NO PROJECT

ALT 2

MIXED FLOW

ALT 4C

DEDICATED LANE

2018 12,512 14,588 15,303 18,616

2040 12,512 21,678 22,228 30,336

2018 BRT TRAVEL TIME FOR 17 MILE CORRIDOR (MINUTES)

CURRENT

(2013)

ALT 1

NO PROJECT

ALT 2

MIXED FLOW

ALT 4C

DEDICATED LANE

BRT 85 87 81 48

Car 41 41 41 44

Page 27: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

27

BENEFITS OF BUS RAPID TRANSIT

ALT 1

NO PROJECT

ALT 2

MIXED FLOW

ALT 4C

DEDICATED LANE

Capital Cost $0 $91M $233M

Operating Cost $20.4M $18.5M $12.1M

Farebox Recovery 15.5% 19.4% 42.3%

• Annual operating cost decreases as fewer buses are

needed to maintain same frequency of service

• The portion of the cost of providing the trip that is funded

by fares (farebox recovery) increases

Page 28: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

REMAKING EL CAMINO REAL AS A COMPLETE STREET

28

• Supports Grand Boulevard Initiative

• Transforms a car-centric street to a people-friendly street

• Improves bike and pedestrian facilities and safety

• Increases pedestrian safety with shorter crosswalks

• Improves corridor with beautification and landscaping, streetscape improvements

• VTA funds corridor transformation with possible Federal Small Starts funds

Page 29: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

29

COMPLETE STREETS REQUIRE TRANSIT

Page 30: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

ENVIRONMENTAL ANALYSIS

30

Transportation and Traffic

• Transit Ridership, Travel Speed, Farebox, Operating Cost

• Level of service on El Camino Real

• Level of service on off-corridor streets

• Traffic diversion

California Environmental Quality Act (CEQA) and National

Environmental Policy Act (NEPA) analysis

• Aesthetics, Air Quality, Biology, Cultural Resources,

Environmental Justice, Energy, Geology, Hazardous Materials,

Hydrology/Water Quality, Land Use, Noise And Vibration,

Socioeconomics, Transportation and Traffic, Utilities

Page 31: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

VTA TRAFFIC MODEL

31

Standard model used by all cities in Santa Clara County to

project impacts of projects

Model Years: Current (2013), 2018 and 2040

Factors: Land uses, roadway and transit networks, BRTalternatives

Used for: Traffic projections, mode split, auto trip diversion

Page 32: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

• 82 intersections and potential intersections on El Camino Real

• 165 intersections off El Camino Real

32

Studied traffic impacts on over 240 intersections

COMPREHENSIVE TRAFFIC ANALYSIS

Page 33: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

33

OVER 8,000 LEVEL OF SERVICE CALCULATIONS

0

5

10

15

20

25

30

35

LOS A LOS B LOS C LOS D LOS E LOS F

INT

ER

SE

CT

ION

S

247 intersections, AM + PM, 3 years, 7 alternatives

2018 PM Level of Service of Intersections on El Camino Real

LOS Average Delay

LOS A Less than 10 seconds

LOS B 10 to 20 seconds

LOS C 20 to 35 seconds

LOS D 35 to 55 seconds

LOS E 55 to 80 seconds

LOS F Over 80 seconds

Alt 1 – No Project

Alt 2 – All Mixed Flow

Alt 3 – Dedicated Lane

Page 34: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

34

OVER 8,000 LEVEL OF SERVICE CALCULATIONSIN

TE

RS

EC

TIO

NS

247 intersections, AM + PM, 3 years, 7 alternatives

2018 PM Level of Service of Intersections off El Camino Real

0

10

20

30

40

50

60

LOS A LOS B LOS C LOS D LOS E LOS F

LOS Average Delay

LOS A Less than 10 seconds

LOS B 10 to 20 seconds

LOS C 20 to 35 seconds

LOS D 35 to 55 seconds

LOS E 55 to 80 seconds

LOS F Over 80 seconds

Alt 1 – No Project

Alt 2 – All Mixed Flow

Alt 3 – Dedicated Lane

Page 35: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

TRIP DIVERSION ANALYSIS

Trip Diversion is any vehicle trip that no longer occurs on El

Camino Real if dedicated lanes are installed.

• Vehicle trips on other streets (2/3)

• Transit trips on El Camino Real (1/6)

• Bike/walk trips or trips made outside peak hour (1/6)

Trip diversion is measured by the projected change in vehicle

volumes on alternate routes along a specific cross street.

35

Page 36: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

36

TRIP DIVERSION ANALYSIS

Page 37: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

-416

16

-5

53

7

31

78

6

2

16

6

-4

+121

EXAMPLE TRIP DIVERSION

2018 PM Peak Hour Eastbound

Santa Clara

No Project Alternative

El Camino Real: 1,480 car trips

Dedicated Lane Alternative

El Camino Real: 1,064 car trips

+121 BRT trips

Other Streets: +206 car trips

Bike/Walk/Time: +90 trips

37

Page 38: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

TRAFFIC, GROWTH AND DIVERSIONVEHICLE VOLUMES ON PARALLEL ROUTES AT SAN TOMAS EXPRESSWAY

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

DIVERSION

GROWTH

2013

EASTBOUND PM PEAK HOUR (2018)

RO

AD

WA

Y C

AP

AC

ITY

Page 39: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

TRIP DIVERSION: SANTA CLARA

39

BRT

Page 40: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

40

WHAT WE HEARD

Page 41: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

41

• 2010 to present

• Over 60 public meetings

• Public presentations and

outreach to city officials,

key stakeholders, residents

and businesses

• Four scoping meetings, four public hearings, 700+ comment

letters, response cards, and Draft Environmental Impact

Report/Environmental Assessment statements collected

COMMUNITY OUTREACH

Page 42: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

PUBLIC COMMENTS SUMMARY

42

CategoryNo

ProjectDedicated Lane/BRT

Mixed Flow

No Preference Total

Public (written) 192 366 7 41 606

Public (hearing speaker) 64 34 7 105

Organization 3 12 1 16

Local (cities) 2 1 1 2 6

Business 2 1 3

State 2 2

County 1 1 2

Federal 0

TOTAL 263 414 8 55 740

Page 43: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

“IS EL CAMINO THE RIGHT PLACE FOR TRANSITIMPROVEMENTS?”

Yes. 22/522 is VTA’s highest ridership corridor.

AV

ER

AG

E W

EE

KD

AY

BO

AR

DIN

GS

VTA BUS ROUTES

5,885 on 522 Eastridge to Palo Alto

14,511 on 22 Eastridge to Palo Alto

Page 44: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

“IS EL CAMINO THE RIGHT PLACE FOR TRANSITIMPROVEMENTS?”

MOUNTAIN VIEW

Yes. Cities are planning growth along the corridor.

44

Page 45: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

8781

78 7468

59

48

102 102 103 103 105 106109

41 41 41 41 4243

44

0

20

40

60

80

100

120

Alt 1 Alt 2 Alt 3a Alt 3b Alt 4a Alt 4b Alt 4c

Tota

l Tra

vel T

ime

(m

inu

tes)

BRT

Local Bus

Auto

“CAN WE HAVE EFFECTIVE BRT WITHOUTDEDICATED LANES?”

Speed is the key to attracting riders, increasing cost-effectiveness

45

Page 46: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

“WILL CARS BE ABLE TO MAKE LEFT TURNS?”

Unsignalized intersection

Left turn is closed

Right-in/right-out access only

No pedestrian crossing

Signalized intersection

Left turn and crosswalk

are signalized

• Signal allows left turns, safe dedicated lane BRT operation

• Stops through traffic while allowing turns

• Closed median prevents turning conflicts, improves safety

• Turns will be made downstream at signalized intersections

• Landscaping installed

Yes. Some turns will occur downstream, if unsignalized intersections are closed.

46

Page 47: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

“SHOULD WE INVEST IN NORTH/SOUTH ROUTESINSTEAD OF EL CAMINO REAL?”Cross-town routes being upgraded El Camino Real BRT will complement upgrades

47

Page 48: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

“SHOULD WE INVEST IN NORTH/SOUTH ROUTESINSTEAD OF EL CAMINO REAL?”

North/south routes show lower potential for ridership, cost-effectiveness

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

22/522 54/354

Current

2018

WE

EK

DA

Y B

OA

RD

ING

S

22/522 ROUTESEL CAMINO REAL

54/354 ROUTESMATHILDA AVE

48

Page 49: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

49

HOW WILL VTA PROCEED?

Page 50: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

WHAT KIND OF STREET DO WE WANT?

EL CAMINO REAL & SCOTT BLVD, SANTA CLARA

EL CAMINO REAL & SHOWERS DR, MOUNTAIN VIEW

EL CAMINO REAL & HOLLENBECK AVE, SUNNYVALE

EL CAMINO REAL & CALIFORNIA AVE, PALO ALTO

THE ALAMEDA & JULIAN ST, SAN JOSE

50

Page 51: EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECTvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · Trip Diversion is any vehicle trip that no longer occurs on El Camino Real if dedicated

51

NEXT STEPS

April 22 VTA Advisory Committees Joint Workshop

April 24 VTA El Camino Real Policy Advisory Board

May 1 VTA Board Workshop

Summer 2015 Peer Review of Modeling Results

Fall 2015 Board of Directors Decision