WCCUSD Bond Program Construction Update El Cerrito High School Stadium 07/15/2014
Transcript
Page 1: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

WCCUSD Bond Program

Construction UpdateEl Cerrito High School Stadium

07/15/2014

Page 2: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

El Cerrito High SchoolStadium

Conceptual Design

Page 3: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

General Contractor Wright

Contracting

Architect of Record WLC Architects

Construction Manager Hector De Leon

Project Engineer Maria Zupo

Inspector of Record Kris Gilbert

El Cerrito High SchoolStadium

Project Team

Page 4: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

El Cerrito High SchoolStadium

Site Plan

Page 5: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Contract Amount $13,438,000

Notice of Award 11/21/13

Notice to Proceed 01/27/14

Duration 608 days

Completion Date 09/27/15

Change Order $10,285.00

(0.07%)

El Cerrito High SchoolStadium

General Information

Page 6: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Site retaining walls at Ashbury and

Colusa

Fence piers at Colusa

Building retaining walls and foundations

Site grading and compaction

Underground utilities

El Cerrito High SchoolStadium

Progress Update

Page 7: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Backfilling at Ashbury

Page 8: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Site Walls and Foundation

Page 9: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Building Footings

Page 10: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Retaining Wall Construction at Colusa

Page 11: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Retaining Wall Construction at Ashbury

Page 12: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Retaining Wall Construction at Ashbury

Page 13: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

Tree Planting

Page 14: El Cerrito High School Stadium 07/15/2014. Conceptual Design.

El Cerrito High SchoolStadium

Ashbury Avenue Elevation


Recommended