30
NYC Department of Education Building Condition Assessment Survey 2019-2020 M855 Architectural Inspection Inspection Type Last Edited Time In InspectionId ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, MANHATTAN, NY, 10021 School: 3485 2020-02-11 07:24AM 2020-08-24 04:36PM ARCHITECTURAL - SENIOR 3506 2020-02-11 08:51AM 2020-02-12 02:24PM ARCHITECTURAL - ASSOCIATE Asset Data Question Answer Was the Building Fully Accessible for Inspection? Yes Principal(s) Information Principal Name Dimitri Saliari Principal Organization Eleanor Roosevelt HS - Manhattan Meeting with Principal? Yes Principal Feedback The principal had no comments on the physical condition of the building at this time. Custodian James McKillop Fireman Israel Santiago Building Square Footage 66,000 Comments on the Area (Square Feet) None Comments on the Stories (Floors) plus Basements 5+B Comments on the Year Built 2003 Comments on the Student Population 530 Comments on the Staff Population 56 Comments on the Number of Classrooms 24 Weather Heavy Rain Facade Photo East 76th Street - Southeast view Main Entrance Photo Facade A - East 76th Street Page 1 of 30 Print Date: 9/11/2020 Mobile Validity Version 2.0 (P)
Transcript
Page 1: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Inspection Type Last EditedTime InInspectionId

ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, MANHATTAN, NY, 10021School:

3485 2020-02-11 07:24AM 2020-08-24 04:36PMARCHITECTURAL - SENIOR

3506 2020-02-11 08:51AM 2020-02-12 02:24PMARCHITECTURAL - ASSOCIATE

Asset DataQuestion Answer

Was the Building Fully Accessible for Inspection? Yes

Principal(s) Information

Principal Name Dimitri Saliari

Principal Organization Eleanor Roosevelt HS - Manhattan

Meeting with Principal? Yes

Principal Feedback The principal had no comments on the physical condition of the

building at this time.

Custodian James McKillop

Fireman Israel Santiago

Building Square Footage 66,000

Comments on the Area (Square Feet) None

Comments on the Stories (Floors) plus Basements 5+B

Comments on the Year Built 2003

Comments on the Student Population 530

Comments on the Staff Population 56

Comments on the Number of Classrooms 24

Weather Heavy Rain

Facade Photo

East 76th Street - Southeast view

Main Entrance Photo

Facade A - East 76th Street

Page 1 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 2: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural InspectionRoof Photo

Roof 1 - Southeast view

Have any Systems/Major Building Components been upgraded? Systems: Complete Interior renovation (conversation to school

use); Window/Guards, Roofing replacement (full)

Years: 2003

Systems: Coping, Parapet, Exterior Masonry repairs

Years: 2007

Systems: Coping Flashing, Parapet, Roofing repairs (partial)

Years: 2010

Systems: Window Repairs (partial)

Years: 2012

Systems: Partial Roof repairs, Bulkhead repairs; Library

Upgrades; 2nd Floor Corridor Flooring upgrade.

Years: 2019

Have there been any New Building Additions? No New Construction

Tandem No Tandem

Leased Space? Yes

Year Leased 2003

Inspection Type Full Inspection

Priority ConditionExist

Last Year?

Priority

Category

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

No condition recorded

Structural Engineer Required

Structural

Condition Type

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

Other Floor Structure Floor Structure Corridor adjacent

to Room 415FiremanIsrael

Santiago

Page 2 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 3: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Accessibility

Accessibility Status Question Response

Is the Primary or secondary entrance on an accessible route? Yes

Is the building a multi-story building? Yes

Are All floors of the building accessible through compliant means? Yes

Accessible classrooms exists on each floor? Yes

Boys and Girls or Unisex accessible toilets exist on at least every other floor? Yes

If the following spaces exist, are they ALL accessible? Art Room, Auditorium,

Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs

Yes

Physical Breakdown Structure Exists Complies Required DeficiencyAudio

Induction

System

Fire

Alarm

Strobe

FUNCTIONAL ACCESSIBILITY

Exterior Routes

YesExterior Entrances & Exits

NoNoExterior H/C Lifts

NoNoExterior Ramps and Railings

Interior Routes

YesYesCorridor and Lobby H/C Lifts

YesYesInterior Corridor Doors And

Hardware

YesInterior Corridors & Lobbies

YesYesInterior Elevators

YesInterior Lobby Doors And Hardware

YesYesInterior Ramps

Rooms & Spaces

Art Rooms

Yes YesRoom 212

Auditorium

Yes Yes1st Floor Yes Yes

Cafeteria

Yes Yes2nd Floor Yes Yes

Classrooms

Yes Yes2nd - 5th Floors

Computer Rooms

Yes YesRoom 518

NoGymnasium

Library

Yes YesRoom 511

Main Office

Yes YesRoom 108

Multi-purpose Room

Yes YesRoom 218/219 Yes Yes

Nurse's Office

Yes YesRoom 304

NoPool

Science Lab

Yes YesRooms 414 and 417

Toilet Rooms (boys)

Yes Yes1st - 5th Floors

Toilet Rooms (girls)

Page 3 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 4: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Physical Breakdown Structure Exists Complies Required DeficiencyAudio

Induction

System

Fire

Alarm

Strobe

Yes Yes1st - 5th Floors

Toilet Rooms (staff)

Yes Yes1st - 5th Floors

Building Template

Inspection

Question Response

Architectural

ATHLETIC FIELDS Does not exist

EXTERIOR Inspected

Does not existAREAWAY

Does not existAWNINGS AND CANOPIES

Does not existCHIMNEY

InspectedCOPING

Condition 4- Between Fair and Poor

CAST STONE:OPEN TRANSVERSE JOINTS WITH

DAMAGED CAULKING

Deficiency

Deficiency Location/Instance

25Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 4 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 5: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

COPING

Deficiency Photo 1

Facade A

Violations No violations recorded

TERRA COTTA:OPEN TRANSVERSE JOINTS WITH

DAMAGED CAULKING

Deficiency

Deficiency Location/Instance

60Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade B

Violations No violations recorded

TERRA COTTA:CRACKED/BROKEN PIECESDeficiency

Deficiency Location/Instance

100Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE-IN-KIND

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Page 5 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 6: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

COPING

Deficiency Photo 1

Facade B

Violations No violations recorded

CAST STONE:CRACKED/BROKEN PIECESDeficiency

Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE-IN-KIND

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade A

Violations No violations recorded

Does not existCORNICE

InspectedDOORS

InspectedDOOR HARDWARE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDOORS AND FRAMES

Condition 3- Fair

METAL:DETERIORATED DOOR AND FRAME - MINOR

DETERIORATION

Deficiency

Deficiency Location/Instance

3Deficiency Quantity

Quantity Uom EACH

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 6 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 7: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

DOORS

DOORS AND FRAMES

Deficiency Photo 1

Exit 1 shown, similar condition at Exit 3

Violations No violations recorded

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedTRANSOM/SIDE LIGHT

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedEXTERIOR SOFFITS

Condition 2- Between Good and Fair

STUCCO/PLASTER:MINOR CRACKS/SPALLINGDeficiency

Roof Plan Reference

Elevation

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Exit 1

Violations No violations recorded

InspectedEXTERIOR WALLS

MasonryMaterial Type(s)

20,000Replacement Quantity

Replacement Uom S.F.

Instance on All Facades Inspected

Page 7 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 8: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

EXTERIOR WALLS

3- FairInstance Condition

Instance Quantity 20,000

Instance Quantity Uom S.F.

BRICK:MINOR CRACKS AND SPALLINGDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

5Deficiency Quantity

Quantity Uom S.F.

Potential Action RESTITCH

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade A

Violations No violations recorded

STONE:OPEN JOINTSDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

20Deficiency Quantity

Quantity Uom L.F.

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 8 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 9: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

EXTERIOR WALLS

Deficiency Photo 1

Exit 1

Violations No violations recorded

BRICK:MASONRY SILLS - OPEN JOINTSDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

15Deficiency Quantity

Quantity Uom L.F.

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Above main entrance

Violations No violations recorded

STONE:CHIPPED/SPALLED/BROKEN PIECESDeficiency

Roof Plan Reference

Page 9 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 10: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

EXTERIOR WALLS

Elevation

Elevation Reference Facade A

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade A

Deficiency Photo 2

Facade A - Street level

Violations No violations recorded

BRICK:DETERIORATED MASONRY SILLSDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

15Deficiency Quantity

Quantity Uom L.F.

Potential Action REPAIR

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Page 10 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 11: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

EXTERIOR WALLS

Deficiency Photo 1

Facade A - 3rd level

Violations No violations recorded

STONE:DETERIORATED CONTROL/EXPANSION JOINTS

WITH DAMAGED CAULKING

Deficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

10Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade A

Violations No violations recorded

Does not existLOADING DOCK

Does not existLOUVER

InspectedPARAPETS

MasonryMaterial Type(s)

6,000Replacement Quantity

Replacement Uom C.F.

Instance on All Parapets Inspected

3- FairInstance Condition

Instance Quantity 6,000

Instance Quantity Uom CF

BRICK:OPEN JOINTSDeficiency

Page 11 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 12: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

PARAPETS

Deficiency Location/Instance

50Deficiency Quantity

Quantity Uom S.F.

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade B

Violations No violations recorded

BRICK:MINOR CRACKS, SPALLINGDeficiency

Deficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade B

Violations No violations recorded

Does not existPLAZA DECK

InspectedROOF

InspectedROOFING

Replacement Quantity 15,000

Replacement Uom S.F.

InspectedLEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedROOF BARRIER

Page 12 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 13: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOF BARRIER

4- Between Fair and PoorCondition

RAILINGS/PANELS:DETERIORATED, MAJOR RUSTINGDeficiency

Deficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 1 - Facade A

Violations No violations recorded

RAILINGS/PANELS:DETERIORATED, MINOR RUSTINGDeficiency

Deficiency Location/Instance

200Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Violations No violations recorded

Does not existROOF CAGE

Does not existROOF FENCE

InspectedROOF HATCH/SMOKE HATCH

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedROOFING

Instance on Modified Bitumen:All Roofs Inspected

3- FairInstance Condition

Instance Quantity 15,000

Instance Quantity Uom S.F.

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 2003

Source of Installation Year Documented

Page 13 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 14: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOFING

No deficiencies recordedDeficiency

InspectedROOFING DRAINS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedSPECIALTIES

InspectedBULKHEAD/PENTHOUSE

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existCUPOLA/ SPIRES/ TOWERS

Does not existDORMER

InspectedDUNNAGE STEEL

3- FairCondition

MINOR RUSTINGDeficiency

Deficiency Location/Instance

250Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 1

Deficiency Photo 2

Roof 1

Violations No violations recorded

Does not existROOF/GRAVITY TANK

Does not existSKYLIGHT/ROOF VENT

InspectedSTAIRS/RAMPS: EXTERIOR

Does not existBUILDING CHEEK/FLANK WALLS

Does not existRAILINGS

Does not existSTAIRS/RAMPS

InspectedWINDOWS

6,000Replacement Quantity

Page 14 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 15: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

WINDOWS

Replacement Uom S.F.

InspectedEXTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWINDOWS

Material Type(s) Aluminum

Instance on Aluminum - Double Hung:All Facades Inspected

3- FairInstance Condition

Instance Quantity 6,000

Instance Quantity Uom S.F.

Installation Year 2003

Source of Installation Year Documented

ALUMINUM - DOUBLE HUNG:INOPERABLE BALANCEDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade A

15Deficiency Quantity

Quantity Uom EACH

Potential Action REPLACE BALANCES

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Room 219

Violations No violations recorded

ALUMINUM - DOUBLE HUNG:AIR AND WATER

INFILTRATION, OPEN JOINTS WITH DAMAGED

CAULKING

Deficiency

Page 15 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 16: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

EXTERIOR

WINDOWS

WINDOWS

Roof Plan Reference

Elevation

Elevation Reference Facade A

40Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 5Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Room 219

Violations No violations recorded

INTERIOR Inspected

AUDITORIUM

Instance on 1st Floor (240 Seats) Inspected

Ceiling

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed H/C Lift

Instance on 1st Floor (240 Seats) Does not exist

Fixed Seating

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

CONCRETE:CRACKSDeficiency

Near StageDeficiency Location/Instance

40Deficiency Quantity

Page 16 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 17: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

AUDITORIUM

Floor Finish

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Near Stage

Violations No violations recorded

Sliding-folding Partition

Instance on 1st Floor (240 Seats) Does not exist

Stage

Instance on 1st Floor (240 Seats) Inspected

Stage

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtain Rigging

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtains

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on 1st Floor (240 Seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on 1st Floor (240 Seats) Does not exist

CAFETERIA

Instance on 2nd Floor (1200 SF) Inspected

Ceiling

Instance on 2nd Floor (1200 SF) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 2nd Floor (1200 SF) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on 2nd Floor (1200 SF) Does not exist

Floor Finish

Instance on 2nd Floor (1200 SF) Inspected

3- FairInstance Condition

Page 17 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 18: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

CAFETERIA

Floor Finish

VINYL TILES:DETERIORATED SUBSTRATEDeficiency

South Side, East Side, North Side of RoomDeficiency Location/Instance

70Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

North Side of Room

Violations No violations recorded

Sliding-folding Partition

Instance on 2nd Floor (1200 SF) Does not exist

Stage

Instance on 2nd Floor (1200 SF) Does not exist

Walls

Instance on 2nd Floor (1200 SF) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on 2nd Floor (1200 SF) Does not exist

InspectedCLASSROOMS/CORRIDORS/ADMIN SPACES

InspectedCeiling

Condition 2- Between Good and Fair

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

Corridor near Room 515Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Corridor near Room 515

Violations No violations recorded

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 3- Fair

Page 18 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 19: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Floor Finish

VINYL TILES:DETERIORATED SUBSTRATEDeficiency

Corridor near Rooms 201, 220, 325, 415, 518 and othersDeficiency Location/Instance

700Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Corridor near Room 415

Violations No violations recorded

EPOXY FLOORING:DETERIORATED SUBSTRATEDeficiency

Rooms 414, 417Deficiency Location/Instance

120Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Room 414

Violations No violations recorded

InspectedSpecialties

InspectedClassroom Locker(s)

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existFixed Seating

InspectedWalls

Condition 2- Between Good and Fair

GYPSUM BOARD:DETERIORATEDDeficiency

Room 321, Corridor near Main Office, Corridor near Room 516Deficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 19 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 20: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Walls

Deficiency Photo 1

Corridor near Main Office

Violations No violations recorded

Does not existGYMNASIUM

InspectedINTERIOR DOOR HARDWARE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedINTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

KITCHEN

Instance on 2nd Floor Inspected

Ceiling

Instance on 2nd Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 2nd Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on 2nd Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on 2nd Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

LIBRARY

Instance on Room 511 Inspected

Built-in Furnishing

Instance on Room 511 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Ceiling

Instance on Room 511 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on Room 511 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on Room 511 Inspected

Page 20 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 21: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

LIBRARY

Floor Finish

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on Room 511 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

LOCKER ROOM

Instance on 2nd Floor - Boys (78 Lockers) Inspected

NoAlternative Use

Instance on 2nd Floor - Girls (54 Lockers) Inspected

NoAlternative Use

Ceiling

Instance on 2nd Floor - Boys (78 Lockers) Inspected

2- Between Good and FairInstance Condition

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

South Side of RoomDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South Side of Room

Violations No violations recorded

Instance on 2nd Floor - Girls (54 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 2nd Floor - Boys (78 Lockers) Inspected

3- FairInstance Condition

METAL:DAMAGED LOUVERDeficiency

EntranceDeficiency Location/Instance

1Deficiency Quantity

Quantity Uom EACH

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Page 21 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 22: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

LOCKER ROOM

Door(s)

Entrance

Violations No violations recorded

Instance on 2nd Floor - Girls (54 Lockers) Inspected

3- FairInstance Condition

METAL:DAMAGED LOUVERDeficiency

EntranceDeficiency Location/Instance

1Deficiency Quantity

Quantity Uom EACH

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Entrance

Violations No violations recorded

Floor Finish

Instance on 2nd Floor - Boys (78 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Instance on 2nd Floor - Girls (54 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Locker Room Lockers

Instance on 2nd Floor - Boys (78 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Instance on 2nd Floor - Girls (54 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on 2nd Floor - Boys (78 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Instance on 2nd Floor - Girls (54 Lockers) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

MULTI-PURPOSE ROOM

Instance on Room 218/219 Inspected

Ceiling

Instance on Room 218/219 Inspected

2- Between Good and FairInstance Condition

TECTUM:DAMAGED/MISSINGDeficiency

Center of RoomDeficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Page 22 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 23: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

MULTI-PURPOSE ROOM

Ceiling

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Center of Room

Violations No violations recorded

Door(s)

Instance on Room 218/219 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on Room 218/219 Does not exist

Floor Finish

Instance on Room 218/219 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Sliding-folding Partition

Instance on Room 218/219 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage

Instance on Room 218/219 Does not exist

Walls

Instance on Room 218/219 Inspected

2- Between Good and FairInstance Condition

MIRRORS:BROKEN/DAMAGEDDeficiency

East Side of RoomDeficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

East Side of Room

Violations No violations recorded

GYPSUM BOARD:DETERIORATEDDeficiency

North Side, West Side of RoomDeficiency Location/Instance

60Deficiency Quantity

Page 23 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 24: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

MULTI-PURPOSE ROOM

Walls

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

West Side of Room

Violations No violations recorded

Window Curtains/Shades/Blinds

Instance on Room 218/219 Does not exist

Does not existPOOLS

SCIENCE DEMO ROOM

Instance on Rooms 402, 403, 409 Inspected

NoAlternative Use

Fixed Equipment

Instance on Rooms 402, 403, 409 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

SCIENCE LAB

Instance on Rooms 414, 417 Inspected

NoAlternative Use

Fixed Equipment

Instance on Rooms 414, 417 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

SCIENCE PREP ROOM

Instance on Room 415 Inspected

NoAlternative Use

Fixed Equipment

Instance on Room 415 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Does not existSHOWER ROOM

InspectedSTAIRS/RAMPS: INTERIOR

Do Letter Stair Signs Exist? Yes

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existPartition

InspectedRailings

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Page 24 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 25: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

STAIRS/RAMPS: INTERIOR

InspectedStairs and Landings

Condition 2- Between Good and Fair

VINYL TILES:DETERIORATED SUBSTRATEDeficiency

Stairs A/2, B/2Deficiency Location/Instance

50Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Stair A/2

Violations No violations recorded

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSTRUCTURAL

InspectedCOLUMNS/BEAMS/BEARING WALLS

Condition 3- Fair

STEEL COLUMNS/BEAMS:DETERIORATED CONCRETE

FIREPROOFING

Deficiency

BasementDeficiency Location/Instance

25Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 4Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Electrical Room

Violations No violations recorded

InspectedFLOOR STRUCTURE

Condition 4- Between Fair and Poor

CONCRETE:CRACKS/SPALLED/REINFORCEMENT

EXPOSED

Deficiency

1st floorDeficiency Location/Instance

5Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Page 25 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 26: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

STRUCTURAL

FLOOR STRUCTURE

Deficiency Photo 1

Ejector room

Violations No violations recorded

CONCRETE SLAB ON GRADE:MINOR CRACKSDeficiency

BasementDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Room 132A

Violations No violations recorded

CONCRETE SLAB ON GRADE:THRU CRACKSDeficiency

BasementDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Room 132A

Violations No violations recorded

CONCRETE:CRACKS/SPALLED/REINFORCEMENT

EXPOSED

Deficiency

4th floorDeficiency Location/Instance

180Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 5Urgency of Action

LEVEL 5Purpose of Action

Page 26 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 27: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

STRUCTURAL

FLOOR STRUCTURE

Deficiency Photo 1

Corridor Near Room 415

Violations No violations recorded

METAL DECK AND CONCRETE:DETERIORATEDDeficiency

BasementDeficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 4Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Room 132A

Violations No violations recorded

InspectedFOUNDATION WALLS

Material Type(s) Masonry

Condition 3- Fair

BRICK:OPEN JOINTSDeficiency

BasementDeficiency Location/Instance

25Deficiency Quantity

Quantity Uom S.F.

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Electrical Room

Violations No violations recorded

InspectedROOF STRUCTURE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedVAULTS-BUNKERS

Does not existFoundation Walls

Page 27 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 28: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

INTERIOR

STRUCTURAL

VAULTS-BUNKERS

Does not existSlab Structure

Does not existVault/Ash Hoist Doors and Framing

InspectedTOILET ROOMS - STAFF

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existStalls

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedTOILET ROOMS - STUDENTS

InspectedCeiling

Condition 2- Between Good and Fair

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

Room 407Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Room 407

Violations No violations recorded

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

LIFE SAFETY Inspected

Does not existF.D. HOLDING AREA

Does not existSTEEL STAIRS

Page 28 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 29: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

SITE Inspected

Does not existCONTAINERIZATION

Does not existDRAINAGE SYSTEM FOR ASPHALT

InspectedDRAINAGE SYSTEM FOR CONCRETE

InspectedCatch Basins/Manhole - Surrounded by Concrete

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Concrete Covering

Does not existDRAINAGE SYSTEM FOR SOIL

Does not existDRINKING FOUNTAINS

Does not existFENCES

Does not existIRRIGATION SYSTEM

InspectedPAVING

InspectedDOT Sidewalk

Does not existAsphalt

InspectedConcrete

3- FairCondition

DAMAGED/DETERIORATED/MISSING SECTIONSDeficiency

Along East 76th StreetDeficiency Location/Instance

125Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Along East 76th Street

Violations No violations recorded

HEAVINGDeficiency

Along East 76th StreetDeficiency Location/Instance

25Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Along East 76th Street

Violations No violations recorded

Does not existPavers

InspectedSite Sidewalks & Walkways

Does not existAsphalt

InspectedConcrete

Page 29 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 30: ELEANOR ROOSEVELT HS - MANHATTAN, 411 EAST 76 STREET, … · 2019. 7. 3. · NYC Department of Education Building Condition Assessment Survey 2018-2019 Architectural Inspection M855

NYC Department of Education

Building Condition Assessment Survey 2019-2020

M855Architectural Inspection

Question Response

SITE

PAVING

Site Sidewalks & Walkways

Concrete

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existPavers

Does not existStudent Non-Use

Does not existStudent Use

Does not existPLAYGROUNDS

Does not existPLAYING SURFACE

Does not existRETAINING WALLS

Does not existSEATING

Does not existSITE WALLS (NOT RETAINING WALLS)

Does not existSTAIRS/RAMPS: EXTERIOR

Page 30 of 30 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)