SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
INSPECTION & TEST PLAN FORELECTRICAL
Job No. : 99012Doc No. : INSP 99012 999 8700 0004
Page : 1/23
Rev. 4
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLANFOR
ELECTRICAL
4 07/01/01 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN
3 21/12/00 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN
2 20/12/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM
1 17/11/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM
0 30/09/99 ISSUED FOR APPROVAL M. G. KIM S. Y. KIM Y. H. KIM
REV. DATE DESCRIPTION BY REVIEWED APPROVED
TOTAL SOUTH PARSSOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)
DOCUMENT TITLEINSPECTION & TEST PLAN FOR
ELECTRICAL
INSP 99012 999 8700 0004 4 IAFD NONE 2 1/23
DOCUMENT No. REV STATUS SCALE CLASS PAGE
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
INSPECTION & TEST PLAN FORELECTRICAL
Job No. : 99012Doc No. : INSP 99012 999 8700 0004
Page : 2/23
Rev. 4
TABULATION OF REVISED PAGES
PAGE Rev.1 Rev.2 Rev.3 Rev.4 PAGE Rev.1 Rev.2 Rev.3 Rev.41 45 X2 463 X X 47 X4 X X X 48 X5 X X X 49 X6 X X 50 X7 X X 518 X X 529 X X 53
10 X X X 5411 X X X 5512 X X 5613 X X 5714 X X 5815 X X 5916 X X 6017 X X 6118 X X 6219 X X X 6320 X X X 6421 X X 6522 X X 6623 X 6724 X 6825 X 6926 X 7027 X 7128 X 7229 X 7330 X 7431 7532 7633 7734 X 7835 X 7936 8037 8138 8239 8340 8441 8542 8643 8744 X 88
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FORELECTRICAL
Job No. : 99012Doc No. : INSP 99012 999 8700 0004
Page : 3/23
Rev. 4
CONTENTS
A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------
B. CABLE LADDER INSTALLATION ---------------------------------------------------------
C. CABLE INSTALLATION ----------------------------------------------------------------------
D. EQUIPMENT INSTALLATION --------------------------------------------------------------
E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------
F. HEAT TRACING INSTALLATION ---------------------------------------------------------
G. CATHODIC PROTECTION INSTALLATION -------------------------------------------
H. TELECOMMUNICATION INSTALLATION ---------------------------------------------
PAGE 4
PAGE 6
PAGE 8
PAGE 11
PAGE 18
PAGE 20
PAGE 22
PAGE 23
NOTE :
COMPANY reserves the right to increase surveillance from SW to W and from W to H
depending on results of site surveillance activities.
COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance
of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Earthing and Lightning Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 4 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BYREMARK
SUBCON HDEC/TPA
COMPANY
A
1
1.1
1.2
1.3
2
2.1
2.2
2.3
2.4
EARTHING AND LIGHTNING INSTALLATION
Material Verification(Receiving Inspection)
Verify the Material Type/Size/Quantity
Check the Damage
Review the Test Report
Earthing Installation
Cable Type/Size Location & Routing
Bolts and Nuts Tighting
Compression Type Connection
RP 5561V 9991630 029
PP 99012 9990001 550
RP 5561V 999 1620 001
Related DWG
SP-COM-511 Related STD
: IEC 364
QP 550 002
CPX26
-
-
-
W
W
W
W
SW
SW
R
SW
SW
SW
SW
SW
SW
R
SW
SW
SW
SW
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Earthing and Lightning Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 5 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
3
3.1
3.2
Test
Continuity Test
Earthing Resistance Test
RP 5561V 999 1620 001
TPX26 W
H
SW
W
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cable Ladder Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 6 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
B
1
1.1
1.2
CABLE LADDER INSTALLATION
Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity
Check the Damage & Sharp Edge
Review the Related Document
Cable Ladder Installation Proper Type / Size
Cable Ladder Location / Routing
Cable Ladder Damage, Sharp Edge, Burr
PP 99012 999 0001 550
Related DWG
Related DWG
RP 5561V 999 1630 007
RP 5561V 999 1620 001
QP 550 002
CPX30
-
-
-
W
W
W
SW
SW
R
SW
SW
SW
-
-
-
SW
W
SW
1.3
2
2.1
2.1
2.3
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cable Ladder Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 7 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
2.4
2.5
2.6
2.7
Support(Type/Size/Welding/Anchoring )
Coating(touch up paint) on cut end & damagePortions
Earthing / Bonding
Final Inspection
W
W
W
W
SW
SW
SW
W
W
W
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cable Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 8 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
C
1
1.1
1.2
1.3
2
2.1
2.2
2.3
2.4
CABLE INSTALLATION
Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity
Check the Cable Damage
Review the Related Test Record
Cable Installation Cable Type / Size / Routing
Cable Arrangement
Cable Damage
Cable Pulling Tension
RP 5561V 999 1630 029
PP 99012 999 0001 550
Related DWG
RP 5561V 999 1630 007
RP 5561V 999 1630 008
QP 550 002
CPX08(HV cable)
CPX09(LV power/control)
-
-
-
W
W
W
SW
SW
SW
R
SW
SW
SW
SW
-
SW
-
SW
SW
SW
SW
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cable Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 9 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
2.5
3
3.1
3.2
3.3
3.4
3.5
Cable Installation(In Cable Trenches)
- Cable Trenches Preparation
- Cable Segregation
- Sand Bedding and Depth
Cable Termination Crimping Lug or Plug Size / Bolting
Cable Bending Radius
Gland , Fitting
ID Marker & Wire ID Marker
Cable Splicing( If required )
RP 5561V 999 1630 029
CPX08(HV cable)
CPX09(LV power/control)
W
W
W
W
W
W
W
H
W
SW
SW
SW
SW
SW
SW
W
W
W
SW
SW
SW
SW
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cable Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 10 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
4
4.1
4.2
Cable Test Above 1000V Cable
- Continuity Test
- Insulation Resistance Test
- High-Voltage Test
Up to 1000 V Cable
- Continuity Test
- Insulation Resistance Test
SP-COM-511
RP 5561V 999 1630 029
TPX08
TPX09
H
H
H
W
H
W
H
H
W
W
W
W
H
W
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 11 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
D
1
1.1
1.2
1.3
2
2.1
2.2
2.3
EQUIPMENT INSTALLATION
Equipment Verification(Receiving Inspection) Verify the Equipment Type/Size/Quantity
Check the Physical Damage
Review the Related Document
Generator Installation Foundation/Level/Alignment
Anchor Bolt Setting
Physical Damage/Loose Parts
RP 5561V 999 1630 007
PP 99012 999 0001 550
Related DWG
RP 5561V 999 1630 033
Vendor Spec
QP 550 002
CPX01
-
-
-
W
H
W
SW
SW
R
W
W
W
-
SW
-
-
-
-
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 12 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
2.4
2.5
2.6
3
3.1
3.2
3.3
3.4
Earthing / Bonding
Cleaning
Electrical Test
Power Transformer Installation
Location/Foundation/Level/Alignment
Anchor Bolt Setting
Physical Damage/Loose Parts
Bushing joint / Seal
SP-COM-511
RP 5561V 999 1630 007
RP 5561V 999 1630 021
Vendor Spec
TPX01
CPX02
W
W
H
H
W
H
W
W
SW
W
W
SW
W
W
W
SW
W
W
SW
W
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 13 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
3.5
3.6
3.7
3.8
Oil Level / No Leak
Tap change mechanism
Earthing / Bonding
Electrical Test
- HV Transformer
- LV Transformer
SP-COM-511
Vendor Spec TPX02
TPX03
W
W
W
H
W
W
SW
SW
H
W
W
W
W
H
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 14 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
4.
4.1
4.2
4.3
4.4
4.5
4.6
4.7
Bus Duct Installation
Bus Duct Location / Routing Support Type/Foundation/Welding/Anchoring
Bus Duct Level / Alignment
Bus Bar Connection(Bolt tighting) Earthing / Bonding
Cleaning
Electrical Test
Related DWG
RP 5561V 999 1630 007
Vendor Spec
SP-COM-511
CPX07
TPX07
W
W
W
H
W
W
H
SW
SW
SW
W
SW
SW
W
W
SW
SW
W
W
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 15 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
HV/LV SWITCHGEAR/MCC Installation
Location / Level / Foundation Support /Welding/Anchoring/Bolting
Alignment of Total Board
Bus Bar Connection
Physical Damage
Earthing / Bonding
Mechanical operation & CT’s data
Cleaning
Electrical Test
Related DWG
RP 5561V 999 1630 007
RP 5561V 999 1630 022 RP 5561V 999 1630 023
Vendor Spec
SP-COM-511
CPX04(HV)
CPX05(LV)
TPX04(HV)
TPX05(LV)
W
W
H
H
W
H
W
W
H
SW
SW
SW
W
SW
SW
W
SW
H
W
SW
SW
SW
SW
W
W
SW
H
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 16 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
Battery/Charger/Inverter Installation
Location / Level / Foundation Support /Welding/Anchoring/Bolting
Number of Cells Inter-connected
Polarity of Interconnections between Cells
Bolts, Nuts Washer Assembly Tighting
Physical Damage
Earthing / Bonding
Cleaning Electrical Test
Related DWG
RP 5561V 999 1630 007
RP 5561V 999 1630 025 RP 5561V 999 1630 026
Vendor Spec
SP-COM-511
CPX16/17
TPX16/17
W
W
W
W
W
W
W
W
H
SW
SW
W
W
SW
SW
SW
SW
W
W
SW
W
W
SW
SW
W
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Equipment Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 17 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc)
Name Plate
Location / Level / Foundation Support /Welding/Anchoring/Bolting
Bolts, Nuts Washer Assembly Tighting
MCB’s rating
Physical Damage Electrical Test
Related DWG
RP 5561V 999 1630 007
RP 5561V 999 1630 008 Vendor Spec
SP-COM-511
CPX06/15/21/ 23/24/32
W
W
W
W
W
W
H
SW
SW
SW
SW
SW
SW
W
SW
SW
SW
SW
SW
SW
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Lighting and Small Power Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 18 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
E
1
1.1
1.2
1.3
2
2.1
2.2
LIGHTING AND SMALL POWER INSTALLATION
Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity
Check the Physical Damage
Review the Related Document
Lighting and Small Power Installation Lighting Distribution Board Installation
Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation
RP 5561V 999 1640 001
Related DWG
RP 5561V 999 1640 001
RP 5561V 999 1630 029
QP 550 002
CPX 15
CPX18/19/25
-
-
-
W
W
SW
SW
R
W
SW
SW
SW
-
W
SW
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Lighting and Small Power Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 19 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
3
- Cable / Wire installation - Lighting Fixture / Power Socket / Welding Socket Installation
- Final inspection
Test
Continuity Test
Insulation Resistance Test
RP 5561V 999 1640 001
SP-COM-511
RP 5561V 999 1630 029
RP 5561V 999 1640 001
TPX18/19/25
W
W
W
H
H
SW
SW
W
W
W
SW
SW
W
W
W
3.1
3.2
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Heat Tracing Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 20 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
F
1
1.1
1.2
1.3
2
2.1
HEAT TRACING INSTALLATION
Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity
Check the Physical Damage
Review the Related Document
Heat Tracing Installation Heating Cable Installation
RP 5561V 999 1630 007
Vendor spec
RP 5561V 999 1630 007
QP 550 002
CPX22
-
-
-
SW
SW
R
-
SW
-
- Cable Type / Size / Route - Cable Tie or Tape Binding
Related DWG
Vendor spec
W SW SW
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Heat Tracing Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 21 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
2.2
3
Accessory(Junction Box, Thermostats, Sensor)
Test
Insulation Resistance Test ( Before insulation )
Insulation Resistance Test ( After insulation)
Related DWG
Vendor spec
SP-COM-511
RP 5561V 999 1630 007
TPX22
W
H
H
SW
W
W
SW
W
W
3.1
3.2
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Cathodic Protection Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 22 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BYREMARK
SUBCONHDEC/
TPACOMPANY
G
1
1.1
1.2
1.3
2
2.1
2.2
CATHODIC PROTECTION INSTALLATION
Material Verification(Receiving Inspection)
Verify the Material Type/Size/Quantity
Check the Physical Damage
Review the Related Document
Cathodic Protection Installation Anode / Anode Cable Installation
Cable connection/bonding
RP 5561V 9991630 017, 1300 082
Vendor spec
RP 5561V 9991630 007,1300 082
QP 550 002
CPX33
-
-
-
W
W
SW
SW
R
SW
W
SW
SW
-
W
W
2.3
3
Test Box, Reference Electrode, etc
Electrical test - Loop resistance for anode cable - Potential test for reference cell
Related DWG
Vendor spec
SP-COM-511 TPX33
W
W
SW
W
W
W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR SITE
DISCIPLINE : ELECTRICAL
SUBCON :
DESCRIPTION OF WORK :
Telecommunication Installation
ITP No. INSP 99012 999 8700 0004
Rev. No. 4 PAGE 23 OF 23
NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.
OR PROCEDUREREPORTING
FORMAT
PARTICIPATION BY
REMARKSUBCON
HDEC/TPA
COMPANY
H TELECOMMUNICATION INSTALLATION
Above item is separated from ITP for electrical.
ITP for telecommunication will be issued later.
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2