Page 1 12 th Esri Eastern Africa User Conference, Martin Kretschmer 11/10/2017 Electrification Planning in Uganda using a GIS based approach Martin Kretschmer, Ministry of Energy, Uganda
Transcript
Page 1: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 112 th Esri Eastern Africa User Conference , Martin Kretschmer11/10/2017

Electrification Planning in Uganda

using a GIS based approach

Martin Kretschmer, Ministry of Energy, Uganda

Page 2: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 2

Background

11/10/2017

▪ Total Number of Households

(2016): 7,751,000

▪ Rural Population (2014): 79%

▪ Number of Domestic Grid

Connections (2016): 936,000

▪ Household Grid Connection Rate:

(2016): 12,1%

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 3: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 3

Electricity Consumption per Capita

11/10/2017

▪ Uganda (2016): 71 kWh/Capita

Source: Nasa Visible Earth

▪ Germany (2014): 7,035 kWh/Capita

▪ EU (2014): 5,909 kWh/Capita

▪ World (2014): 3,128 kWh/Capita

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 4: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 4

Solar Containers for rural communities

11/10/2017

▪ Electrification using solar powered Mini-Grids in rural areas is often faster

and cheaper than extending the National Grid to every corner of the country

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 5: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 5

Goal

11/10/2017

▪ Developing a GIS based decision support Model to decide whether it is

more economical to electrify a village using Solar Home Systems, Mini-

Grid or On-Grid Solutions

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 6: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 6

Workflow

11/10/2017

Building Extraction from Satellite Images

Cluster Buildings to Settlements

Load Transformer and Distribution Line Data as well as Electrification Status Estimates

Creating buffer around distribution lines and transformers according to economic data

Create a Ranking of Villages/Trading Centres to be electrified first

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Sharing this information with investors

Page 7: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 7

Pilot Area: Southern Service Territory

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 8: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 8

Available Data: Existing Grid, Transformers,

Population Density, Villages

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 9: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 9

Buffer calculation around the existing grid

(Buffer depends on the costs of grid extension per km)

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 10: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 10

Data available on our Open Data Site

(Energy Sector GIS Working Group Uganda)

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 11: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 11

Facebook Population Data

11/10/2017

▪ 20 countries

▪ 350 TB

▪ 21,600,000 sq km

▪ 30*30m

Download at https://ciesin.columbia.edu/data/hrsl/

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 12: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 12

Facebook Data – Building Distribution in Uganda

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 13: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 13

Building approximations from Facebook data

In total: around 340,000 houses in Southern Service Territory

11/10/2017 12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 14: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 14

Input data and Assumptions

11/10/2017

▪ Average demand of domestic / community / productive

customers

▪ Capacity of the transformers

▪ Expected electricity reliability at the customer: 80% to 90%

▪ National Grid reliability: 95%, 90%, 85% (base case scenario)

▪ Grid extension costs < 2000 USD/customer

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 15: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 15

Grid Extension Scenario: 85% National Grid Reliability

11/10/2017

17% Grid connections, 56% Minigrids, 27% Solar Home Systems

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 16: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 16

Grid Extension Scenario: 90% National Grid Reliability

11/10/2017

32% Grid connections, 41% Minigrids, 27% Solar Home Systems

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 17: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 17

Grid Extension Scenario: 95% National Grid Reliability

11/10/2017

42% Grid connections, 33% Minigrids, 26% Solar Home Systems

12 th Esri Eastern Africa User Conference , Martin Kretschmer

Page 18: Electrification Planning in Uganda using a GIS based approach Planning... · 2017. 10. 13. · 11/10/2017 12th Esri Eastern Africa User Conference, Martin Kretschmer Page 1 Electrification

Page 18

Conclusion

11/10/2017

▪ The GIS model proves that it is often cheaper to connect

villages to a Minigrid than to the National Grid

▪ The model helps to decide which areas are most suitable for

electrification with Minigrids and for which areas it is more

economical to extend the National Grid

▪ The final result depends largely on the parameters used e.g. the

price per km grid extension and the expected reliability of the

grid

12 th Esri Eastern Africa User Conference , Martin Kretschmer