Case Study:
Facility Master Records
and the
Global File Room
2
Presenters
• Doug Winning– Bristol-Myers Squibb Company
• Mike McVicar– Bristol-Myers Squibb Company
3
Overview
• Case Study– Understanding the problem – Improve the process – Implement EDMS– Leverage content– Next steps
• Observations• Q&A
4
Hey, how are you managing…
• the local file room?– Paper based, easily disorganized w/o strict control– Difficult to control copies of documents once they have left the room– Difficult to coordinate multiple rooms at one site - at many sites– Need to review multiple projects to derive current condition
5
Hey, how are you managing…
• project documentation requirements?– Documentation turnover appeared to be an after thought, not
an integral part of successful project completion. Why?– What support does the Project Manager have?– Look at project documentation
• A/E, CM and vendor contracts• Drawing Standards• Commissioning Guidelines
6
The journey of a thousand miles…
• Create a team! – Document & Design Integration
• What we plan to achieve– consistent document management practices– alignment with FDA and other regulatory agencies – eliminate silos of data– leverage content w/other applications and corporate partners – reduce A/E cost per project and shorten time line to deliver– better control of our engineering documentation– an Engineering Community User to find and view desired
content on their desktop in less than five minutes
7
The journey of a thousand miles…
• Map the current process– As-Is process flow diagram (PFD) “brown paper” meeting – Review standard guidelines and contracts for documentation
requirements– Prepare gap analysis
• Improve the process– Follow up meeting to generate “optimal” PFD– Determine standard document types / format and delivery methods– Drawing matrix (per building / site)– Update standard guidelines and contracts for consistent electronic
and paper documentation requirements
8
…begins with a single step.
9
…begins with a single step.
New Brunswick Campus Site Drawing Matrix Comments
Site DrawingsNew Brunswick Campus - Site Base Plan (NJ Plane Coordinate)Building Usage PlanSite AerialSite DrainageTopography
Site Utilities North South North South North South North South North South North South
Chilled Water a a a a a a a a a aCity Water a a a a a a a a a aCompressed Air a a a a a a a a a aDPCC / DCR Plan – ( EHS requirement ) a a a a a a a a a aElectric Distribution - 4160v Power a a a a a a a aElectric Distribution - 4160v One Line Diagrams a a a a a a a a a aEmergency Generator a a a a a a a a Site Team to compile data - July 04Fiber Optic Distribution a a a a a a a aGround Water Treatment a a a a a a a a Site Team to compile data - July 04Hydrant Location Plan a a a a a a a a Site Team to compile data - July 04Natural Gas a a a a a a Redlines currently being confirmed - Bob HershNitrogen Site Team to compile data - July 04Pond / Tower Water a a a a a a a a a aSanitary Sewer a a a a a a a a a aSite Lighting Plan a a a a a a a a Site Team to compile data - July 04Speaker Location Plan a a a a a a a a Site Team to compile data - July 04Sprinkler / Irrigation a a a a a a a a Site Team to compile data - July 04Steam & Condensate a a a a a a a a a aSteam Piping History Plan a a a a a a Redlines currently being confirmed - Bob HershStorm Sewer a a a a a a a a a aTelephone / Data a a a a a a a a
*Note: All Quasar drawings also reference to NJPCGS Site Base Plan
aaa
a aaaa
Site Wide
a
Site WideConfirm
field conditio
ns where
aplicable
Utility Drawin
g Managed in
Quasa
r
a
Compile exis
ting data
Redlines gen
eratedCAD d
rafting of red
lines,
1st pass
a
Site Wide Site Wide Site Wide
a a
Review CAD d
rawing
a a a aSite Wide
New Brunswick
10
Challenging the traditional model
• Leveraging Drawings
IntelligentDrawings
AssetTracking
ReviewedIntelligentDrawings
INPUTREVISE
Master Record Model
PROJECT #2
PROJECT #1 DATA FROM PROJECT #2
MasterDrawing
Life Cycle$$$/Time
SavedResult
DATA FROM PROJECT #1
LIFE CYCLE OF FACILITY
11
Challenging the traditional model
DocbaseDocbaseDocbase
EHSWorldwide
EngineeringFacilities Mfg.DevelopmentQC/QA
TechnicalOperations
PRI GSS/Purchasing
IndividualProjects
12
New challenges
• Culture change– “What do you mean I won’t need the hard copy anymore?”– the Road Show / Marketing / EDMS Guide– Selling the idea of attributes– Searching for documents by attributes, not file name or drill down
13
New challenges
• Using it!– Training
• Developing training modules• Verifying / Tracking user training, required for validated system
– Access• Managing user accounts• Security
– Software• Development and testing• Deploying• Managing
14
New challenges
• Developing an enterprise wide storage model– no small task - like writing an encyclopedia– need alignment with all stakeholders,
greatest common denominator– managing that alignment
15
Cost
• Initial Implementation– Hardware
• Three servers: Development, Test and Production @ $50,000– Software
• Documentum - Existing corporate licensing agreement• CADLink software and support @ $41,000 w/maintenance cost of 18%
– Resources• IM Project Manager, Developer and Plateau Admin (part time)• Client side Project Manager
• Long term– For 2006 the goal is to have capital projects fund related
document management needs, estimated at 1-3% project cost
16
What comes out the box and what doesn’t?
• Out of the box– Version control– Permission levels– Renditions / Publishing– Basic Attributes
17
What comes out the box and what doesn’t?
• Not out of the box– Enterprise wide attribute model
18
The information about the information
• Applying the attribute model
19
Managing change
• Tracking / Auditing change requests– Dictionary Change Request (DCR) is the formal means of
documenting and evaluating the request for an addition or change to current attributes.
• Validation– Hardware– Software– Test scripts
20
Data / bulk loading
• Content population– A Control File is an Excel spreadsheet containing system
attributes used to describe content from outside the system prior to loading.
21
Distribution / standardization of Software
• Does everyone have the current/correct software?– Validated application– Testing of application functionality
• Application Integration– Documentum– AutoCAD– CADLink
22
Security / Permissions
• Viewer– On-line training module used to establish user accounts– Training gives examples geared towards departmental
searches• CAD User
– Hands on class room training emphasizing the management of reference files for Master Records
– Version control• Admin
– Hands on class room training emphasizing on bulk and manual import of content
23
Security / Permissions
• Viewer Log In
24
Searching
• Viewer Criteria Search
25
Searching
• Viewer Results of Search
26
Collaboration with Outside Vendors
• Have the owner of the document attribute it– Populate document attributes up front– Maintain document attributes throughout life cycle of project– Document attributes are utilized to file submittal information
27
Collaboration with Outside Vendors
• Leveraging CADLink
28
Leveraging content
• Regulatory content– What to do with a version that “exits” the system?
Bristol-Myers Squibb Company
PRJ MGR:DESIGNER:FORMAT:DATE:SCALE:
LOG #:
DRAWING #:
CTPM
AutoCAD 200007/31/02
NONE
rev date description by
29
Leveraging content
• Master Records– Anyone else need access to up to date floor plans?– Control the content but share the Joy!
30
Leveraging content
ACT_SUP < ACT_EXH .OR. BAS_SUP < BAS_EXH
ACT_SUP > ACT_EXH .OR. BAS_SUP > BAS_EXH
Show me where:
Show me where:
• CAFM Data / Reporting from Master Records
31
Trending
SITES
2003 2004
15
7
1st Q-2005
16
USERS
2003 2004
200
16
1st Q-2005
364
DOCUMENTS
2003 2004
35,000
19,000
1st Q-2005
42,160
DOCUMENTS IN THE QUEUE
2nd Q-2005
35,000 Documents
145 Projects
32
Where do we go from here?
• Software updates– Documentum 5.28– WebTop– Enterprise Engineer
• Improved project submittal procedures– Active Project integration (Global application)
• Improved application integration– MAXIMO (Global application)
• Enhancements to CAFM software– Share docbase with Corporate Real Estate
33
Questions