+ All Categories
Home > Documents > Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany...

Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany...

Date post: 14-Dec-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
17
OMV Downstream Electronic Turnaround Optimization Platform eTOP Valencia, October 2018
Transcript
Page 1: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

OMV Downstream

Electronic Turnaround Optimization Platform –eTOP

Valencia, October 2018

Page 2: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

AustriaGermanyRomania

PlanningCoordination

Execution

Petro-chemical

Plants

OMV Turnaround ManagementManaging Complexity, Managing 3.000 People

OMV Downstream, Stefan Krebich & Rene Leitner, October 20182

Fuel Plants

Health, Safety &

Enviroment

Page 3: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Turnaround Execution PhasePaper Based Wallpaper Coordination

OMV Downstream, Stefan Krebich & Rene Leitner, October 20183

Page 4: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Downsides & ConsequencesScrutinize Paper Based Wallpaper

OMV Downstream, Stefan Krebich & Rene Leitner, October 20184

Paper BasedCoordination..

..tool ofchoice in

2018?

►lack reporting quality/mentality

►complex data screening & reporting

►reduntant progress tracking

►stationary info location

?

?

?

►lack of data quality

►realtime status accuracy

►resources coordination efficiency

►TAR goal attainment

Page 5: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Impact of „Gamification“ Change a „No“ to a „Yes“

OMV Downstream, Stefan Krebich & Rene Leitner, October 20185

Page 6: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Performance & Architecture

OMV Downstream, Stefan Krebich & Rene Leitner, October 20186

Process

Arc

hitectu

re

Data SourceOnline Realtime Data& Front End loading

Ad-hoc Reports, TAR process optim.

Qualified IT Resources

familiar with New

Technologies

(e.g. SAP process

integration, iOS App)

Page 7: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 20187

Infrastructure & Availability

RISK: Usage of Devices in Plants

Management of Change

Just allowed in Turnaround Plants

Sub-Equipment for Exp Measurements

Training

Page 8: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 20188

Infrastructure & Availability

RISK: Type of Mobile Hardware

Standard Device in Company

Lifecycle

Update & Security Policy

Availability of Hardware

User Interface with Stylus

Page 9: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 20189

Infrastructure & Availability

RISK: Availability of Network

Upgrade Infrastructure (fiber wire)

Data Cubes & LTE Antennas

Backup Scenarios (Paper, Digital Upload)

Spareparts

Page 10: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 201810

Plug for eTOPNetwork

Infrastructure

Smartphone

Student

Page 11: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 201811

Security

RISK: Theft of Hardware, unauthorized Access

Typing a password in field will not work

User & Identity Management

Smart log on/off at station

Electronic Locks on Container

Remote Lock/ Maintenance for (mobile) devices

Page 12: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 201812

Acceptance

RISK - People have no experience

Training on device

Provide devices well before Turnaround

Simplified User Interface

Support in the field

Page 13: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 201813

Acceptance

RISK – New Processes

Unit Management covered with SAP Standard Processes

QR Technology / no RFID

Risk Based Inspection Methods covered with SAP Standard Processes

Using GPS Data

Page 14: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Statistics & Data Mining

OMV Downstream, Stefan Krebich & Rene Leitner, October 201814

38 Mio

10k

157k

227k1k

Server Calls (Activities)

Log-In (PC & Board)

Log-In (iOS)

Opened DocsInspections

Page 15: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

| OMV Downstream, Stefan Krebich & Rene Leitner, October 201815

Page 16: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

OMV Downstream

ContactOMV Downstream

Trabrennstrasse 6-8

1020 Vienna

www.omv.com

www.omv.com/socialmedia

Stefan Krebich

[email protected]

Rene Leitner

[email protected]

Page 17: Electronic Turnaround Optimization Platform eTOP · eTOP Valencia, October 2018 | Austria Germany Romania Planning Coordination Execution Petro-chemical Plants OMV Turnaround Management

|

Legal Disclaimer

OMV Downstream, Stefan Krebich & Rene Leitner, October 201817

This presentation is prepared in order to outline our expression of interest. Nothing in this presentation shallbe construed to create any legally binding obligations on any of the parties. Neither party shall be obligated toexecute any agreement or otherwise enter into, complete or affect any transaction in relation to thispresentation.

All figures and information in this presentation are strictly confidential, they are by no means binding and thusindicative only.

© 2018 OMV Aktiengesellschaft, all rights reserved, no reproduction without our explicit consent.


Recommended