Date post: | 01-Nov-2014 |
Category: |
Real Estate |
Upload: | azam-fa |
View: | 292 times |
Download: | 1 times |
Entire lift shaft need to be cleaned
Water and debris keep falling from the top need to
be stopped
Scaffolding to be erected
White wash need to be done with in
the Lift shaft
10
LIFT - 2LIFT - 1