+ All Categories
Home > Documents > Eliminates having to use quarried road base material saves cost of quarrying, transport and time....

Eliminates having to use quarried road base material saves cost of quarrying, transport and time....

Date post: 30-Dec-2015
Category:
Upload: harry-crawford
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
14
Transcript
Page 1: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.
Page 2: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

BENEFITS OF

Eliminates having to use quarried road base material saves cost of quarrying, transport and time.

Cheaper road construction costs – 20% >

Unique ability to be used with the in situ soil material – including sand, coral, loam, clay and high plasticity clays.

Page 3: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Can be used on new road construction or to renovate old roads – including recycling damaged asphalt roads and existing mining roads

Used with in situ soil material, cement, Renolith and water – including fresh water, brackish water or even salt water.

Provides reduced vibration – reduced wear on vehicles and damage to adjacent structures.

Page 4: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Simplifies road design and specification.

Page 5: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Reduces dust in dry conditions – reduced water spraying ( up to 75% ).

Reduces maintenance by 70% to 85%.

Enables continuous (24/7 if required) road construction.

Page 6: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Faster road construction – up to 8,000m2 per 8 hours, depending on conditions.

Can be worked regardless of climatic conditions, temperature or even light rain events.

Increased life of road – 10 to 20 years on average with low maintenance.

Page 7: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Can be used for a full range of surfaces - private driveways, small local roads, main public highways, mine haulage roads, port hardstands, airstrips, lining agricultural dams, capping for rail lines.

Page 8: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.
Page 9: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.
Page 10: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.
Page 11: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Creates a greater tensile strength than reinforced concrete – eliminates cracking and potholing in most conditions.

f = force a = modulus of elasticity

Page 12: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Can be topped with asphalt, cold mix tar and chip, or gravel rolled in to provide a wearing surface – or left unsurfaced for small local or low traffic roads.

Allows use by traffic within 5 hours of final grading and rolling.

Use of Renolith specified stabilisers enhances and speeds the road construction process.

Page 13: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Renolith personnel available to consult on road design and train local personnel.

Backed by Renolith’s 20 years successful international road construction experience.

International testing results available on request.

Page 14: Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.

Renolith has been used around the world- Australia, PNG, Thailand,

Ireland, France and Indonesia with great success

CHEAPER – FASTER - BETTER