Page 1 of 4 ELMENDORF LAKE PARK IMPROVEMENTS - NORTH PACKAGE ADDENDUM 1 February 3, 2015 The following Addendum modifies and becomes part of the Contract Documents dated December 2014. MODIFICATIONS TO THE SPECIFICATIONS Item 1.01 Delete pages TOC-2 to TOC-7 from the original specifications and replace with the attached pages TOC-2 to TOC-8. Item 1.02 Delete pages P-12 to P-13 from the original specifications and replace with the attached pages P-12 to P-14. MODIFICATIONS TO THE PLANS Item 2.01 Sheet TPN 1.00: Tree Preservation Note, Note 10 has been revised to read: "Contractor shall be responsible for off-site disposal of all tree limbs cleared for construction. Removed tree limbs do not need to be chipped." Item 2.02 Sheet SA 1.00, scale '1"=150'-0' is to read '1"=100'-0'. Item 2.03 Detail 3 in Sheet DT 1.03, callout '12" X 12" X 3/8" Thick Hot Dipped Galvanized Steel Tube' is to read '8" X 8" X 3/8" Thick Hot Dipped Galvanized Steel Tube". Item 2.04 Delete sheet ALT 1.00 from the original plans and replace with the attached sheet ALT 1.00 and add attached sheet ALT 1.04. Item 2.05 Sheet DT 1.07 Detail 4 Section: Monument Wall at Triangle has been added. See attached Sheet AD 1.00. Item 2.06 Bench model, No. 2602-6 Boulevard by 'Timber Form', has been revised to read: "No. 2613-6 Boulevard by 'Timber Form'." CLARIFICATIONS
Transcript

Page 1 of 4

ELMENDORF LAKE PARK IMPROVEMENTS - NORTH PACKAGE ADDENDUM 1 February 3, 2015 The following Addendum modifies and becomes part of the Contract Documents dated December 2014. MODIFICATIONS TO THE SPECIFICATIONS Item 1.01 Delete pages TOC-2 to TOC-7 from the original specifications and replace with the attached pages TOC-2 to TOC-8. Item 1.02 Delete pages P-12 to P-13 from the original specifications and replace with the attached pages P-12 to P-14. MODIFICATIONS TO THE PLANS Item 2.01 Sheet TPN 1.00: Tree Preservation Note, Note 10 has been revised to read: "Contractor shall be responsible for off-site disposal of all tree limbs cleared for construction. Removed tree limbs do not need to be chipped." Item 2.02 Sheet SA 1.00, scale '1"=150'-0' is to read '1"=100'-0'. Item 2.03 Detail 3 in Sheet DT 1.03, callout '12" X 12" X 3/8" Thick Hot Dipped Galvanized Steel Tube' is to read '8" X 8" X 3/8" Thick Hot Dipped Galvanized Steel Tube". Item 2.04 Delete sheet ALT 1.00 from the original plans and replace with the attached sheet ALT 1.00 and add attached sheet ALT 1.04. Item 2.05 Sheet DT 1.07 Detail 4 Section: Monument Wall at Triangle has been added. See attached Sheet AD 1.00. Item 2.06 Bench model, No. 2602-6 Boulevard by 'Timber Form', has been revised to read: "No. 2613-6 Boulevard by 'Timber Form'." CLARIFICATIONS

Page 2 of 4

Item 3.01 See attached Elmendorf Lake Improvement Project Profile Comparison for cross section and profile information through the lake. Item 3.02 Estimated location of TxDOT Retailing Wall has been graphically shaded on the attached Sheets SL 1.04. The TxDOT Retaining Wall (7/DT 1.08, S 2.15 and S 2.16) varies from Landscape Wall with Walk Above (4/DT 1.08) according to the height indicated on grading layout sheets. Item 3.03 Sheet S 2.10, note reading: "Crushed rock french drain with sump pump by others" is to read: "Crushed 2"-3" crushed limestone rock french drain. See detail 7, Sheet PD 1.01 for sump pump detail." Item 3.04 Sheet S2.10, crushed rock will be installed under pool floor only and is not require behind walls. Crushed rock will be 2"-3" screen limestone installed over continuous DMS-6200 TxDot Type 1 filter fabric with joints overlapping 24". Item 3.05 The irrigation controller shall be as follows: Signature Galaxy Drone Wall Mount Decoder Controller with 125 Station Decoder Modulator with Signature Share service- #GALSLWY1DP125X4, include RMM-UMB-1C-BLK-24 2ft Cable, RG-58 w/SMA Plug Black Radome. Item 3.06 The following products/ supplier are approved as equal:

Site Furnishings:

DuMor Site Furnishings, represented by Debbie Finch Paul E. Allen Co. Inc.

1901 Concord Dr. Flower Mound, Texas 75022

Toll Free: 800-259-7244 Fax: 972-355-1857

Email: [email protected] Picnic Table: DuMor Standard Picnic table, #68-935 ADA Picnic Table: DuMor ADA Picnic Tables, #68-935-668 Trash/Recycle Receptacle: DuMor Trash Container, #89-40RC Bench: DuMor Bench, #59-60-M Shade Canopy Manufacturer:

Kelly Holloway Sunveil Sales

Hendee Enterprises, Inc. 9350 South Point Drive

Page 3 of 4

Houston, Texas 77054 Direct Line: (713) 796-6120 Email: [email protected]

Superior Shade Inc., represented by Ramon Garza Kraftsman Commercial Playgrounds & Water Parks

Office: 281-353-9599 Mobile: 210-861-6746

Toll Free: 800-451-4869 Fax: 281-353-2265

Email: [email protected]

Whitney Market Vice President of Sales

Sun Ports USA Shade & Fabric Structures, Inc.

1508-A Ferguson Ln. Austin, Texas 78754

Office: 512-836-5500 Mobile: 512-497-1564

Toll Free: 800-966-5005 Fax: 512-836-5600

Email: [email protected]

Playground Safety Surfacing: Surface America, Inc.

PO Box 157 Williamsville, New York 14231

Phone: 716-632-8413 Toll Free: 800-999-0555

Fax: 716-632-8324 E-mail: [email protected]

www.surfaceamerica.com

Pool Deck Surfacing: KoolCote Commercial

4674 Priem Ln. Ste 105 Pflugervill, Texas 78660 Office: 2512-251-5740 Direct: 210-643-8568 Fax: 512-251-5722 www.KoolCote.com

Page 4 of 4

Item 3.07 Delete sheets D 1.0 and D 2.0 from the original plan and replace with the attached Sheets D 1.0 and D 2.0. ATTACHMENTS

1. Pages TOC-2 to TOC-8 2. Pages P-12 to P-14 3. Sheets ALT 1.00 and ALT 1.04 4. Sheet AD 1.00 5. Elmendorf Lake Improvement Project Profile Comparison 6. Sheets SL 1.04 7. Sheets D 1.0 and D 2.0

Number: PM-C008 Version: 1.3 Date: 11/23/2010

PART II - CONSTRUCTION SPECIFICATIONS Specifications for Elmendorf Lake Park are provided as reference items by item number from the City of San Antonio (COSA) Standard Specifications for Construction - June 2008, San Antonio Water System (SAWS), and latest revisions and the Texas Department of Transportation (TxDOT) Standard Specifications, San Antonio District. These Specifications listed below are available on line and are to be accessed electronically. Pay items for the COSA, SAWS, and TxDOT specifications are as listed on the bid tabulation sheets and will be paid on a lump sum basis. Additional Specifications for Elmendorf Lake Park are supplied as complete documents as detailed on the table of contents sheet pages three, four, five and six of this section.

City Of San Antonio Standard Specifications for Construction applicable to this project:

ITEM NO. DESCRIPTION

100 Mobilization (TDG) (AR) (UN) 101 Preparing Right-of-Way (TDG) (AR) (UN) 102 Obliterating Abandoned Street (TDG) (AR) (UN) 103 Remove Concrete (TDG) (AR) (UN) 105 Channel Excavation (TDG) (AR) (UN) 106 Box Culvert Excavation and Backfilling (TDG) (AR) (UN) 107 Embankment (TDG) (AR) (UN) 108 Lime Treatment for Subgrade (TDG) (AR) (UN) 109 Portland Cement Treatment for Subgrade (TDG) (AR) (UN) 200 Flex Base (TDG) (AR) (UN) 202 Prime Coat (TDG) (AR) (UN) 203 Tack Coat (TDG) (AR) (UN) 204 Surface Treatments (TDG) (AR) (UN) 205 Hot Mix Asphaltic Concrete Pavement (TDG) (AR) (UN) 207 Asphalt Treated Base (TDG) (AR) (UN) 209 Concrete Pavement (TDG) (AR) (UN) 210 Rolling (TDG) (AR) (UN) 220 Blading (TDG) (AR) (UN) 300 Concrete (TDG) (AR) (UN) 301 Reinforcing Steel (TDG) (AR) (UN) 303 Welded Wire Flat Sheets (TDG) (AR) (UN) 304 Expansion Joint Materials (TDG) (AR) (UN) 305 Membrane Curing (TDG) (AR) (UN) 306 Structural Excavation (TDG) (AR) (UN) 307 Concrete Structures (TDG) (AR) (UN) 308 Drilled Shafts and under-reamed foundations (TDG) (AR) (UN) 311 Special Concrete Surface Coatings (TDG) (AR) (UN) 400 Trenching and Backfilling (TDG) (AR) (UN) 401 Reinforced Concrete Pipe (TDG) (AR) (UN) 404 Corrugated Metal Pipe (TDG) (AR) (UN) 403 Storm Sewer Junction Boxes and Inlets (TDG) (AR) (UN)

TOC-2

Number: PM-C008 Version: 1.3 Date: 11/23/2010

407 Concrete Encasement, Cradles, Saddles, and Collars (TDG) (AR) (UN) 500 Concrete Curb, Gutter and Concrete Curb and Gutter (TDG) (AR) (UN) 502 Concrete Sidewalks (TDG) (AR) (UN) 504 Concrete medians and islands (TDG) (AR) (UN) 505 Concrete Riprap (TDG) (AR) (UN) 506 Concrete Retaining Walls (TDG) (AR) (UN) 507 Chain Link Wire Fence (TDG) (AR) (UN) 509 Metal Beam Guard Rail (TDG) (AR) (UN) 510 Timber Guard Post (TDG) (AR) (UN) 511 Cutting and Replacing Pavements (TDG) (AR) (UN) 512 Adjusting Existing Manholes and Valve Boxes (TDG) (AR) (UN) 515 Topsoil (TDG) (AR) (UN) 516 Sodding (TDG) (AR) (UN) 520 Hydromulch Seeding (TDG) (AR) (UN) 522 Sidewalk Pipe Railing 526 Field Office (TDG) (AR) (UN) 530 Barricades, Signs and Traffic Handling (TDG) (AR) (UN) 531 Signs (TDG) (AR) (UN) 535 Hot Applied Thermoplastic Pavement Markings (TDG) (AR) (UN) 536 Preformed Plastic Pavement Markings (TDG) (AR) (UN) 537 Raised Pavement Markers (TDG) (AR) (UN) 540 Temporary Erosion, Sedimentation and Water Pollution Prevention and Control (TDG) (AR) (UN) 541 Curb Inlet Gravel Filter (TDG) (AR) (UN) 542 Temporary Erosion, Sedimentation and Water Pollution Prevention and Control 543 Construction Exit (TDG) (AR) (UN) 544 Rock Filter Dams for Erosion & Sediment Control 545 Baled Hay for Erosion & Sediment Control 546 Gravel Filter Bags 550 Trench Excavation Safety Protection (TDG) (AR) (UN) 618 Conduit (AR) 620 Electrical conductors (AR) 624 Ground boxes (AR) 628 Electrical services (AR) 636 Aluminum signs (AR) 655 Controller foundation and pedestal posts (AR) 680 Installation of highway traffic signals (AR) 682 Vehicle and pedestrian signal heads (AR) 683 LED Countdown pedestrian signal module (AR) 684 Traffic Signal Cables (AR) 686 Traffic signal pole assemblies (steel) (AR) 687 Pedestal pole assemblies (AR) 688 Pedestrian detectors and vehicle loop detectors (AR)

TOC-3

OMIT

OMIT OMIT OMIT

OMIT

Number: PM-C008 Version: 1.3 Date: 11/23/2010

Texas Department of Transportation Standard Specifications applicable to this project: ITEM NO. DESCRIPTION

400 Excavation and Backfill for Structure (UN) 402 Trench Excavation Protection (UN) 416 Drilled Shaft Foundations (405) (421) (440) (448) (TDG) (UN) 420 Concrete Structures (421) (422) (427) (440) (448) (UN) 423 Retaining Walls (421) (440) (445) (458) (456) (UN) 432 Riprap (Rock) (420) (421) (431) (440) (DMS-6200) (UN) 442 Metal for Structures (441) (445) (446) (447) (448) (UN) San Antonio Water Systems Construction Specifications applicable to this project: ITEM NO. DESCRIPTION

812 Water Main Installation (AR) (UN) 818 PVC (C-900, C-905, and C-909) Pipe Installation (AR) (UN) 824 Water Service Supply Lines (AR) (UN) 826 Valve Box Adjustments (AR) (UN) 832 Tapping Sleeves and Valves (AR) (UN) 833 Meter and Meter Box Installation (AR) (UN) 847 Disinfection (AR) (UN) 848 Sanitary Sewers (AR) (UN) 850 Sanitary Sewer Structures (AR) (UN) 851 Adjusting Existing Manholes (AR) (UN) 852 Sanitary Sewer Manholes (AR) (UN) 855 Reconstruction of Existing Manholes (AR) (UN) Site Specifications: SECTION ITEM NO. DESCRIPTION No. OF PAGES DIVISION 1

SECTION 01000 SUMMARY OF THE WORK (TDG) (AR) (UN) 1 SECTION 01027 APPLICATION FOR PAYMENT (TDG) (AR) (UN) 1 SECTION 01028 CHANGE ORDER PROCEDURE (TDG) (AR) (UN) 2 SECTION 01040 COORDINATION (TDG) (AR) (UN) 1 SECTION 01045 CUTTING AND PATCHING (TDG) (AR) (UN) 2 SECTION 01051 GRADES, LINES AND LEVELS (TDG) (AR) (UN) 2 SECTION 01060 APPLICABLE CODES (TDG) (AR) (UN) 1 SECTION 01077 ABBREVIATIONS, SYMBOLS, TRADE 2 NAMES AND MATERIALS (TDG) (AR) (UN) SECTION 01100 ALTERNATIVES (TDG) (AR) (UN) 2 SECTION 01110 SPECIAL PROVISIONS (TDG) (AR) (UN) 3 SECTION 01202 PROGRESS MEETINGS (TDG) (AR) (UN) 1 SECTION 01210 PRECONSTRUCTION CONFERENCE (TDG) (AR) (UN) 2 SECTION 01300 SUBMITTALS (TDG) (AR) (UN) 10 SECTION 01320 PROGRESS REPORTS (TDG) (AR) (UN) 1 SECTION 01380 CONSTRUCTION PHOTOGRAPHS (TDG) (AR) (UN) 2

TOC-4

Number: PM-C008 Version: 1.3 Date: 11/23/2010

SECTION 01400 QUALITY CONTROL (TDG) (AR) (UN) 2 SECTION 01420 SUBSURFACE INVESTIGATION (TDG) (AR) (UN) 1 SECTION 01500 STORMWATER POLUTION PREVENTIO PLAN 14 SECTION 01510 TEMPORARY UTILITIES (TDG) (AR) (UN) 1 SECTION 01516 TEMPORARY SANITARY FACILITIES 1 (TDG) (AR) (UN) SECTION 01576 CONSTRUCTION IN PUBLIC PRIVATE 3 RIGHT-OF-WAY (TDG) (AR) (UN) SECTION 01610 JOB SITE SECURITY (TDG) (AR) (UN) 1 SECTION 01710 CLEANING (TDG) (AR) (UN) 1 SECTION 01720 PROJECT RECORD DOCUMENTS (TDG) (AR) (UN) 3 SECTION 01730 OPERATION AND MAINTENANCE DATA 3 (TDG) (AR) (UN) SECTION 01740 GUARANTEES AND WARRANTIES (TDG) (AR) (UN) 2 SECTION 01780 CONTRACT CLOSEOUT (TDG) (AR) (UN) 2

DIVISION 2 SECTION 02060 MOBILIZATION 1 SECTION 02060 DEMOLITION (TDG) (AR) (UN) 6 SECTION 02140 DEWATERING (TDG) (AR) (UN) 2 SECTION 02210 GRADING (TDG) (AR) (UN) 7 SECTION 02212 CONCRETE REMOVAL (TDG) (AR) (UN) 1 SECTION 02220 EXCAVATING, BACKFILLING AND COMPACTING 8

FOR SITE (TDG) (AR) SECTION 02223 STRUCTURAL EXCAVATION (TDG) (AR) 2 SECTION 02231 TREE PROTECTION AND TRIMMING 5 (TDG) (AR) (UN) SECTION 02631 BIORETENTION AREAS (TDG) (AR) (UN) 5 SECTION 02795 POROUS HOT-MIX ASPHALT PAVEMENT 12 (TDG) (AR) (UN) SECTION 02810 IRRIGATION SYSTEM (TDG) (AR) (UN) 8 SECTION 02811 AERATION FOUNTAINS AND DIFFUSERS 8 (TDG) (AR) (UN) SECTION 02950 TREES, PLANTS, AND GROUND COVER 8 (TDG) (AR) (UN) SECTION 02970 LANDSCAPE MAINTENANCE (TDG) (AR) (UN) 6

DIVISION 3

SECTION 03100 CONCRETE FORMWORK (TDG) (AR) (UN) 5 SECTION 03163 DRILLED CONCRETE PIERS AND SHAFTS 5 SECTION 03170 SHOTCRETE (TDG) (AR) (UN) 11 SECTION 03200 CONCRETE REINFORCEMENT 4 SECTION 03213 INTEGRAL COLORED CONCRETE (TDG) (AR) (UN) 3 SECTION 03250 SWIMMING POOL (TDG) (AR) (UN) 10 SECTION 03280 INTERACTIVE FOUNTAIN (TDG) (AR) (UN) 6 SECTION 03300 CAST IN PLACE CONCRETE (TDG) (AR) 9 SECTION 03301 CONCRETE 10

OMIT

OMIT

OMIT

OMIT

OMIT

TOC-5

Number: PM-C008 Version: 1.3 Date: 11/23/2010

DIVISION 4 SECTION 04230 REINFORCED UNIT MASONRY (TDG) (AR) (UN) 5 SECTION 04400 STONE MASONRY (TDG) 7 SECTION 04450 STONE VENEER AND STONE WALLS (TDG) 4 SECTION 04720 CAST STONE (TDG) 11

DIVISION 5

SECTION 05118 STEEL & WELDING (TDG) 3 SECTION 05120 STRUCTURAL STEEL FRAMING (TDG) 11 SECTION 05121 ARCHITECTURALLY EXPOSED STRUCTURAL 8 STEEL FRAMING (TDG) SECTION 05500 METAL FABRICATIONS (TDG) 4 SECTION 05501 METAL FABRICATION PARK PAVILIONS (TDG) 4

DIVISION 6 SECTION 06100 ROUGH CARPENTRY 13 SECTION 06150 WOOD DECKING 4

DIVISION 7 SECTION 07610 METAL ROOFS (TDG) 11 SECTION 07620 SHEET METAL FLASHINGS AND TRIM (TDG) 25 SECTION 07920 SEALANTS AND CAULKING (TDG) (UN) 5

DIVISION 9 SECTION 09310 CERAMIC TILE (TDG) 10 SECTION 09860 ANTI-GRAFFITI COATING (TDG) 5 SECTION 09911 EXTERIOR PAINTING (TDG) 11 SECTION 09912 PAINTING (PROFESSIONAL LINE PRODUCTS) (TDG) 10 SECTION 09963 ELASTOMERIC COATINGS (TDG) 12 SECTION 09986 EXPOSED AGGREGATE POOL FINISH (TDG) 3

Plumbing, Electrical and Mechanical Specifications:

DIVISION 15 SECTION 15410 BUILDING PLUMBING (HM3) 11 SECTION 15440 PLUMBING FIXTURES (HM3) 24 SECTION 15640 PVC PIPE, FITTINGS AND VALVES (HM3) 13 SECTION 15690 COPPER TUBING AND BRASS PIPE, FITTINGS 6 AND VALVES (HM3)

DIVISION 16 SECTION 16050 BASIC MATERIALS AND METHODS (HM3) 17 SECTION 16110 RACEWAYS (HM3) 6 SECTION 16120 WIRE, CABLES AND RELATED MATERIALS (HM3) 4 SECTION 16140 WIRING DEVICES (HM3) 4

OMITOMIT

TOC-6

Number: PM-C008 Version: 1.3 Date: 11/23/2010

SECTION 16450 GROUNDING (HM3) 3 SECTION 16470 PANELBOARDS (HM3) 5 SECTION 16490 SAFETY AND DISCONNECT SWITCHES (HM3) 3 SECTION 16510 LIGHTING FIXTURES (HM3) 5 SECTION 16721 FIRE ALARM SYSTEM AND COMMUNICATION 12 SYSTEM (HM3)

Building Specifications: DIVISION 3

SECTION 03310 MAINTENANCE OF CONCRETE (WE) 3 SECTION 03351 CONCRETE FLOOR FINISHES (WE) 1

DIVISION 4 SECTION 04200 UNIT MASONARY (WE) 7 SECTION 04720 CAST STONE MASONARY (WE) 5

DIVISION 5 SECTION 05400 COLD-FORMED METAL FRAMING (WE) 4 SECTION 05500 METAL FABRICATIONS (WE) 4 SECTION 05700 DECORATIVE METAL (WE) 3

DIVISION 6 SECTION 06100 ROUGH CARPENTRY (WE) 4 SECTION 06150 WOOD DECKING (WE) 2

DIVISION 7 SECTION 07411 METAL ROOF PANELS (WE) 4 SECTION 07620 SHEET METAL FLASHING AND TRIM (WE) 3 SECTION 07900 JOINT SEALERS (WE) 4

DIVISION 8 SECTION 08111 HOLLOW METAL DOORS (WE) 3 SECTION 08332 OVERHEAD COILING DOORS (WE) 3 SECTION 08710 DOOR HANDLE HARDWARE (WE) 4

DIVISION 9

SECTION 09300 TILING (WE) 4 SECTION 09900 PAINTING AND COATING (WE) 6

DIVISION 10 SECTION 10140 SIGNAGE (WE) 3 SECTION 10211 PLASTIC TOILET COMPARTMENTS (WE) 2 SECTION 10280 TOILET, BATH AND LAUNDRY 2 ACCESSORIES (WE)

TOC-7

Number: PM-C008 Version: 1.3 Date: 11/23/2010

DIVISION 12 SECTION 12360 COUNTERTOPS (WE) 12

Appendix A: Geotechnical Report (IT) Appendix B: Stormwater Management Report (AR) Appendix C: Stormwater Pollution Prevention Plan (SWPPP) (AR)

TOC-8

Number: PM-C008 Version: 1.3 Date: 11/23/2010

44   Wall, Concrete Combination, Over 4' Tall C.Y.  45   Wall, Seat CMU Tile Benches L.F.  46   Wayfinding EA.  

Notes:   A   All unit prices are complete in place cost to include all materials and

procedures required for complete and operational install.  

B   Bid item unit prices are to match the construction items specified in the bid plans and specifications.

 

ADDITIVE ALTERNATE BID ITEMS The San Antonio River Authority and The City of San Antonio reserves the right to determined the Low Bid based on the low base bid combined with selected additive alternate bid items. ALT-1. ISLAND IMPROVEMENTS, as indicated in the plans, to include but not limited to, site demolition as required, excavation, backfill, compacting, concrete trail, walk and pad, benches, picnic tables, trash and recycle receptacles, bar-b-q grills, bollards, interpretive signs, walls, wall columns, metal railings, electrical panel, lighting, fishing piers, floating dock, existing bridge renovation, limestone rip-rap, equipment ferry and all other miscellaneous materials and labor as required to install the island improvements as per the plans, details and specifications. No additional Calendar Days allowed. Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________ ALT-2. SWIMMING POOL, as indicated in the plans, to include but not limited to, site demolition as required, excavation, haul off, swimming pool shotcrete structure, reinforcing steel, pool plaster, pool tile, pool color beach entry, concrete walks and plaza with 8” depth beams at all edges and at expansion joints, excavation, fill placement, fill compaction, grading, sleeves, forming, steel, reinforcement placement, concrete placement, concrete with integral color, concrete finishing, backfill compaction, shade canopies, pool plumbing, pool pumps, filters, spray nozzles, pool pump room, pool fencing and gates, swimming pool canopy lighting, swimming pool receptacles, site furniture, pool signage, swimming pool permits and permitting fees and all other miscellaneous materials and labor as required to install the swimming pool as per the plans, details and specifications. No additional Calendar Days allowed. Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________

P-12

Number: PM-C008 Version: 1.3 Date: 11/23/2010

ALT-3. PLAYGROUND, as indicated in the plans, to include but not limited to, site demolition as required, excavation, haul off, playground equipment, playground rubber surfacing, shade canopies, concrete walks and plaza with 8” depth beams at all edges and at expansion joints, excavation, fill placement, fill compaction, grading, sleeves, forming, steel, reinforcement placement, concrete placement, concrete with integral color, concrete finishing, backfill compaction, signage, drinking fountain and sump, playground restroom building, shade canopies, pavilion and all other miscellaneous materials and labor as required to install the playground area s per the plans, details and specifications. No additional Calendar Days allowed. Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________ ALT-4. INTERACTIVE FOUNTAIN, as indicated in the plans, to include but not limited to, excavation, haul off, fill, footing, backfill placement, backfill compaction, concrete plaza pavement with 8” depth beams at all edges and at expansion joints, colored concrete fountain pad, forming, steel, reinforcement placement, concrete placement, concrete with integral color, concrete finishing, fountain jets, lights, controller pumping system, filtration system, underground storage tank, shade canopy, benches, interactive fountain signage, cabana renovation and all other miscellaneous materials and labor as required to install the interactive fountain as per the plans, details and specifications. No additional Calendar Days allowed. Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________ ALT-5. WETLAND, as indicated in the plans, to include but not limited to, excavation, haul off, fill, footing, backfill placement, backfill compaction, wetland, concrete with 8” depth beams at all edges and at expansion joints, forming, steel, reinforcement placement, concrete placement, concrete finishing, landscaping, irrigation, controller pumping system, piping, benches, and all other miscellaneous materials and labor as required to install the interactive fountain as per the plans, details and specifications. No additional Calendar Days allowed. Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________

DEDUCTIVE ALTERNATE BID ITEMS

DED-1. TURN AROUND AND POOL DEMO, to include but not limited to, site demolition as required, excavation, haul off, concrete walk, benches, map pedestal, trash and recycle receptacles, asphalt drive including base, asphalt parking including base, pavement markings, concrete curb and any other miscellaneous materials and labor as required to install the asphalt turn around as per the plans, details and specifications. To include but not limited to the demolition of the existing pool as shown in the plans. If deductive alternate is to be accepted, contractor is responsible to install (2) ADA parking spaces in the parking lot.

P-13

Number: PM-C008 Version: 1.3 Date: 11/23/2010

Lump Sum $ ___________________ Bid Amount Written in Words ____________________________________________________

P-14

1

2 3

4 5 6

9 8 7

14 15 13

12 11 10

16 17

INDIVIDUAL CROSS SECTION PROFILE

DEPARTMENT OF WATERSHED MANAGEMENT GIS DIVISION AUTHOR: JOHN REFOLO PUBLISHED: FEBRUARY 2010

The GIS material included with this transmittal is made available as a public service. The maps and/or data are to be used for reference purposes only. The data herein shall be used and relied upon only at the user's sole risk, and the user agrees to indemnify and hold harmless the San Antonio River Authority, its officials and employees from any liability

arising out of the use of the data or information provided. If there are any questions about the appropriateness of this data, please email [email protected].

Est. Water Surface (658 ft)

Historic Conditions

Current Conditions

Future Conditions

Cross Sections

Comparison Boundary

River

grhee
Polygonal Line
grhee
Polygonal Line

AN

D IM

AG

ES

FLOO

R P

LAN

DE

MO

LITION

Sheet:

Date:

Project no:

DATEREVISION

81

6 ca

ma

ro

n, su

ite

1

03

21

0.2

20

.1

40

4

21

0.2

20

.1

40

0

sa

n a

nto

nio

, te

xa

s 7

82

12

Sheet:

Date:

Project no:

DATEREVISION

81

6 ca

ma

ro

n, su

ite

1

03

wh

ea

rd

@te

rra

de

sig

nsa

.co

m

21

0.2

20

.1

40

4

21

0.2

20

.1

40

0

sa

n a

nto

nio

, te

xa

s 7

82

12

200 E. Grayson Street, S

UITE 207

SA

N AN

TON

IO, Texas 78215210.530.0755

WW

W.W

ESTEASTD

ESIGN

.CO

M

W E S T E

A S T

A R C

H I T E C

T S

D E S I G

N G

R O U

P, L L C

3700 WE

ST C

OM

ME

RC

ES

AN

AN

TON

IO, TE

XA

S 78207

13320A

UG

8, 2014

OF 13

8/8/14

1

ELE

VATIO

NS

EXTE

RIO

RD

EM

OLITIO

N2

Sheet:

Date:

Project no:

DATEREVISION

81

6 ca

ma

ro

n, su

ite

1

03

21

0.2

20

.1

40

4

21

0.2

20

.1

40

0

sa

n a

nto

nio

, te

xa

s 7

82

12

Sheet:

Date:

Project no:

DATEREVISION

81

6 ca

ma

ro

n, su

ite

1

03

wh

ea

rd

@te

rra

de

sig

nsa

.co

m

21

0.2

20

.1

40

4

21

0.2

20

.1

40

0

sa

n a

nto

nio

, te

xa

s 7

82

12

200 E. Grayson Street, S

UITE 207

SA

N AN

TON

IO, Texas 78215210.530.0755

WW

W.W

ESTEASTD

ESIGN

.CO

M

W E S T E

A S T

A R C

H I T E C

T S

D E S I G

N G

R O U

P, L L C

3700 WE

ST C

OM

ME

RC

ES

AN

AN

TON

IO, TE

XA

S 78207

13320A

UG

8, 2014

OF 13

8/8/14


Recommended