+ All Categories
Home > Documents > EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th...

EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th...

Date post: 29-Mar-2018
Category:
Upload: hoangnguyet
View: 216 times
Download: 0 times
Share this document with a friend
10
Document Ref: Edition: Effective Date: Page (including appendices): EM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 COMMERCIALLY CONFIDENTIAL - BRIDON International Limited Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com PROCEDURE FOR THE SAFE LOADING AND DESPATCH OF REELS FROM UK MANUFACTURING SITES Contents Section Title Page 1. SCOPE ............................................................................................................. 2 2. REFERENCED DOCUMENTS ......................................................................... 2 3. RESPONSIBILITIES ......................................................................................... 2 4. PROCEDURE ................................................................................................... 2 5. RECORDS ........................................................................................................ 5 6. DOCUMENT HISTORY .................................................................................... 5 APPENDIX A – BRIDON REEL SECUREMENT STANDARD............................................... 6 APPENDIX B – REEL SECUREMENT CHECKLIST ............................................................. 7 APPENDIX C – REEL SECUREMENT DRAWING................................................................ 8 APPENDIX D – REEL SECURING DIAGRAM ...................................................................... 9 APPENDIX E – REEL SECURING FLOW CHART.............................................................. 10 Hard-copy documents & documents not viewed directly from Bridon intranet system are uncontrolled unless stamped otherwise. Author : Document Release: A. Rosbottom D. Thompson - Doncaster J. Inskip - WQ & Neptune I. Sinsbury - Coatbridge Date: Date: Process Owner: M. McGiff Date:
Transcript
Page 1: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 1 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

PROCEDURE FOR THE SAFE LOADING AND

DESPATCH OF REELS FROM UK

MANUFACTURING SITES

Contents

Section Title Page

1. SCOPE ............................................................................................................. 2

2. REFERENCED DOCUMENTS ......................................................................... 2

3. RESPONSIBILITIES ......................................................................................... 2

4. PROCEDURE ................................................................................................... 2

5. RECORDS ........................................................................................................ 5

6. DOCUMENT HISTORY .................................................................................... 5

APPENDIX A – BRIDON REEL SECUREMENT STANDARD ............................................... 6

APPENDIX B – REEL SECUREMENT CHECKLIST ............................................................. 7

APPENDIX C – REEL SECUREMENT DRAWING ................................................................ 8

APPENDIX D – REEL SECURING DIAGRAM ...................................................................... 9

APPENDIX E – REEL SECURING FLOW CHART .............................................................. 10

Hard-copy documents & documents not viewed directly from Bridon intranet system are uncontrolled unless stamped otherwise.

Author : Document Release:

A. Rosbottom D. Thompson - Doncaster J. Inskip - WQ & Neptune I. Sinsbury - Coatbridge

Date: Date: Process Owner:

M. McGiff Date:

Page 2: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 2 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

1. SCOPE

1.1. This procedure covers the loading and despatch of all reels and goods (including coils,

samples, sockets etc.) for all Bridon UK sites.

1.2. It covers both operational and documentation processes.

1.3. It has specific application to the Despatch Team Leadership and Operatives.

2. REFERENCED DOCUMENTS

Bridon Reel Securement Checklist.

Bridon Reel Securement Standard.

3. RESPONSIBILITIES

3.1. The Bridon Group Head of HSE is responsible for maintaining this document.

3.2. The Site Operations Managers are responsible for ensuring adherence to this document.

4. PROCEDURE

4.1. The process is detailed within the attached Process Flow Charts given in the appendix E,

detailing INPUT, PROCESS, OUTPUT & RESPONSIBILITY.

4.2. All incoming vehicles must report to Bridon Security/Despatch Department (whichever is

applicable) together with the correct collection reference and description of goods to be

collected.

4.3. Security/Despatch will check the reference numbers and issue a loading ticket to the driver

after confirming that the vehicle is at the correct Bridon location.

Page 3: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 3 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

4.4. Security or Despatch (as applicable) will then direct the driver to the correct loading point.

Bridon Security/Despatch (as applicable) will contact the Transport Co. office to check that

the consignment is under the Transport Co. control or EXW/FCA.

4.5. All Bridon sites require mandatory use of Personal Protective Equipment (PPE).

4.6. All Personnel visiting Bridon sites must wear as a minimum – Hi Vis, safety boots, gloves

and eye and ear protection.

4.7. Upon arrival at the loading point the vehicle driver will report to the Despatch Shift

Supervisor/Loader.

4.8. Bridon staff will supervise any vehicle reversing manoeuvre into the Despatch Bays.

4.9. The Despatch Supervisor/Loader must check the driver’s reference numbers against the

Goods Ready for Despatch List/Factory Instructions. All vehicles that arrive on site must

have the required Export Reference Number, e.g. DR/****/10 or Bridon Works Order

Number, e.g. X833**** or Bridon Rope Number, e.g. S766**. A list of Bridon Order

References by location is included in the table below. It is the driver’s responsibility to

present the correct reference number. If the driver does not have the reference number or

has an incorrect reference number, it is the driver’s responsibility to obtain the correct

reference via his Company Transport Office. Failure to present a reference number could

result in a refusal to load.

Bridon Location Bridon Order Reference Transport Company Prefix

Coatbridge E10***** CB/****/13

Doncaster (Ropery) X83***** DR/****/13

Doncaster (Site Services) X59***** SS/****/13

Doncaster (Strand) E32***** DS/****/13

Doncaster (Wire Mill) F05***** DW/****/13

Doncaster (Misc., Engineering and

Lab)

No Order Ref. allocated DM/****/13

Neptune Quay X06***** NQ/****/13

Willington Quay X04***** or F05***** WQ/****/13

Page 4: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 4 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

4.10. Despatch Supervisor/Loader will discuss and complete the Bridon Reel Securement

Checklist in conjunction with the driver and refer to the Bridon Load Securement

Standard. Any vehicle arriving for a collection without the required load securing

devices and/or consignment reference numbers will not be permitted to load.

4.11. Both the driver and the Despatch Supervisor will agree how the reels are to be

loaded and where the reels will be positioned on the vehicle. The minimum number

of securing devices is detailed in the Bridon Load Securement Standard.

4.12. The driver must prepare vehicle for loading, e.g. nail down the required timber

supports and placement of edge protection. Additionally, if a reel is secured to a

cradle, ensure that anti – slip matting is placed between the trailer deck and the

cradle base. Bridon will provide reel bore protection material and anti – slip mats.

4.13. On completion of loading, the driver must secure the load in accordance with the

Bridon Reel Securement Standard.

4.14. The Despatch Supervisor/Loader is responsible for taking photographs of the

finished load and the vehicle number plate. The photograph of the finished load will

be imported to the Bridon Reel Securement Checklist or stored on the Despatch

Department desktop computer.

4.15. The driver must check that the loaded goods match the goods on the driver’s

collection instruction and will sign for receipt of goods, noting any damage.

4.16. The Despatch Supervisor/Loader will oversee the vehicle leaving the loading bay in a

safe manner.

4.17. Unless by prior agreement, collecting vehicles must arrive on site between the hours

of 06:00 - 18:00 Monday to Thursday and 06:00 – 15:00 Friday.

Page 5: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 5 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

5. RECORDS

5.1. Records results of evaluations and actions arising from evaluations shall be maintained.

6. DOCUMENT HISTORY

Edition 1 27th June 2013

Created by A. Rosbottom

• First edition of the document.

Page 6: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 6 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

APPENDIX A – BRIDON REEL SECUREMENT STANDARD

Page 7: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 7 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

APPENDIX B – REEL SECUREMENT CHECKLIST

Page 8: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 8 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

APPENDIX C – REEL SECUREMENT DRAWING

Page 9: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 9 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

APPENDIX D – REEL SECURING DIAGRAM

Page 10: EM-IHS-PR-000402 - Procedure for the Safe Loading and ... · PDF fileEM-IHS-PR-000402 1 27 th June 2013 Page 1 of 10 ... PROCEDURE FOR THE SAFE LOADING AND ... Document Release: A.

Document Ref: Edition: Effective Date: Page (including appendices):

EM-IHS-PR-000402 1 27th June 2013 Page 10 of 10

COMMERCIALLY CONFIDENTIAL - BRIDON International Limited

Icon Building – First Point, Balby Carr Bank, Doncaster Tel +44 (0) 1302 565100 Fax +44 (0) 1302 565190 www.bridon.com

APPENDIX E – REEL SECURING FLOW CHART


Recommended