EMCal DCS Status. By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project. Contents. Problems to be solved Completed tasks Plans. Problems to be Solved. Introduction of Recipes Been having difficulties making a working implementation. - PowerPoint PPT Presentation
22
EMCal DCS Status By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project
Transcript
Page 1: EMCal DCS Status

EMCal DCS Status

By

B. S. Nilsen, M. Cherney, J. Fujita

Creighton UniversityFor the

EMCal project

Page 2: EMCal DCS Status

Contents

• Problems to be solved

• Completed tasks

• Plans

Page 3: EMCal DCS Status

Problems to be Solved• Introduction of Recipes

– Been having difficulties making a working implementation.

– Recent workshop been very helpful.– Want to have a backup dcs system before we try

implementing this again.– Needed to allow for multiple configurations like LED

running.

• Busy occurring during Physics run attempts– Not seen during stand alone runs– Effects ERP Drill and LHC Dry runs

• ERP Drill and LHC Dry run– Most recent attempt when well (ERP), but effected by

busy

Page 4: EMCal DCS Status

Completed Tasks

• 4/12 Super-modules installed and working.

• Emergency Button implemented.

• L0 timing issue understood and patched.

Page 5: EMCal DCS Status

Plans

• Continue to tack down Busy problems.

• Obtain and install Parallel PVSS system on new DCS machine.– Implement recipes.– Improve and streamline Control system.– Set up Cooling control and monitoring.– Implement LED calibration.

• Reestablish remote development and test bed.

Page 6: EMCal DCS Status

The EndThat’s All Folks

QuickTime™ and a decompressor

are needed to see this picture.

Page 7: EMCal DCS Status

Outline• Installation• Fee Cards• DCS machines• Recipes• Cooling• Emergency

Button• PVSS panels• Going Busy• Physics Drill

• High voltage– ISEG

OPC/CANHVcontrol

• Low voltage• Led calibration

system• L0 timing• Planning• LHC Dry Run

Page 8: EMCal DCS Status

Installation

• 4 out of 12 Super modules installed and working.

Page 9: EMCal DCS Status

L0 Latency

• L0 presently arriving 960ns after interaction (352 BC)

• Expect to improve by 6 or 7 BC (150-175 ns)

Page 10: EMCal DCS Status

Emergency Button

• Installed in August

• Hardware version yet to come.

Page 11: EMCal DCS Status

Fee cards

• Suspected noise fee card has been swapped (twice now) but noise still there.

• Problem must be else where.– LTU system.– ELMB system.– ?

Page 12: EMCal DCS Status

Going Busy

• PVSS has Intermittently been going Busy, when trying to go global, OK when in standalone run.

• Is SOD checks in the physics runs?

• Still under investigation.

Page 13: EMCal DCS Status

Recipes

• Been having difficulties making a working implementation.

• Recent workshop been very helpful.

• Want to have a backup dcs system before we try implementing this again.

• Needed to allow for multiple configurations like LED running

Page 14: EMCal DCS Status

Cooling

• Still some hardware problems and developments under way.

• PVSS monitoring still under development.

Page 15: EMCal DCS Status

DCS Machine

• Present machine limits being reached.

• Acquisition of additional machine just starting.

• CERN has new contract with HP and dcs machine parameters still under negotiations.

Page 16: EMCal DCS Status

High voltage

• Intermittent Problems with Iseg HV system have been seen.

• Simultaneous running of Iseg OPC and IsegCANHVcontrol may be source of problem.

• Fix planned ASAP.

Page 17: EMCal DCS Status

LHC Dry Run

• First Try: Failed due to problems with LHC clock switching

• 10/16/09 Was busy and not in today.

• 10/19/09

Central DCS has all Detectors In READY state All 4 LHCExperiments will perform 2*(READY-BEAMTUNING-READY)

Page 18: EMCal DCS Status

Physics (ERP) Drill

• First attempt took 3 tries

• 10/15/09 Attempt EMCal failed.

• Most resent drill Performed OK

Cycle throughREADY BEAM-Tuning READY

Page 19: EMCal DCS Status

LED System

• LED are now working

• Will require changes in PVSS for proper operations (recipes).

Page 20: EMCal DCS Status

Low Voltage System

• Operational

Page 21: EMCal DCS Status

PVSS Panels

• System to date is adequate

• Will need to be redesigned to better support of full EMCal.

• Will attempt to make operational efficiencies.

Page 22: EMCal DCS Status

Planning• Iseg OPC CANHVcontrol conflict to be removed (go to all

OPC control).• Continue to tack down Busy problems.

• Obtain and install Parallel PVSS system on new DCS machine.– Implement recipes.– Improve and streamline Control system.– Set up Cooling control and monitoring.– Implement LED calibration.

• Reestablish remote development and test bed.


Recommended