EMERGENCY PREPAREDNESS. B Y : Mr. P. K. Patel. Plant Emergency Manual. * Major hazards of plant in terms of raw materials, processes, equipments, chemical compatibility. * Hazards and actions in case of Power, Water, Air failure. * Actions to overcome process hazards. - PowerPoint PPT Presentation
Transcript:
  • EMERGENCY PREPAREDNESS

    B Y : Mr. P. K. Patel.

  • Plant Emergency Manual

    * Major hazards of plant in terms of raw materials, processes, equipments, chemical compatibility. * Hazards and actions in case of Power, Water, Air failure. * Actions to overcome process hazards. *Containment and disposal of spillage of hazardous chemicals. * Emergency response for environment protection. * Emergency actions in case of fire, leakage, spillages etc* List of critical plant equipments. * List of hazardous chemicals with NFPA hazard classification.

  • Plant Emergency Manual

    * Storage and handling of hazardous solid and liquid chemicals in bulk.

    * Duties and functions of different plant personnel.

    * Special emergency equipments like SCBA, Air Masks, Chlorine / Sulfur Dioxide kits.

    * Revision of Plant Emergency Manual in case of introduction of new chemicals, equipments, processes etc. If there is no change than review it every two years.

  • Emergency Response at East Site : LOCAL EMERGENCY.Any emergency like fire, leakage, spillage within the plant or work area is termed as a LOCAL EMERGENCY. Siren Pattern : * On actuation of fire / emergency alarm by breaking the glass / by pressing the electrical push button the following will be activated :* * Indication on panel board in fire section with sound of hooter.* * Automatic sounding of electrical siren on PH II, till control actions start.* * Indication and alarm at Power House. * * On receiving indication at Power House, six beeps steam siren is blown.

  • Emergency Response at East Site :Actions: - * Plant persons with available equipments shall try to combat the emergency. * Fire fighting staff shall approach incident site with Fire Tender and act as per instructions of Site Incident Controller.* Simultaneously the hydrant network shall also be pressurized. * Site Incident Controller / Plant In Charge, will take overall charge of situation & inform higher authorities if required. * Neighboring plants to remain alert and render help to incident site if required. Security staff shall inform key persons on conference key telephone system and also inform Emergency Duty Rota personnel. * After emergency is over Site Incident Controller shall inform fire officer to blow ALL CLEAR siren.

  • ON SITE EMERGENCY:

    If local emergency affects other work areas / plants within the same site, it is termed as On Site Emergency. Siren Pattern : 4 minutes continuous sounding of electrical / steam siren.Actions: - * Site Incident Controller shall inform Site Main Controller in Main Control Center room, and arrange for plant evacuation. * On receipt of information, Site Main Controller shall approach incident site, assess the gravity of situation & return to Main Control Centre (MCC) Room, & will guide Site Incident Controller for effectively tackling emergency.* Site Main Controller (SMC) shall also get help from neighboring companies, as required

  • OFF SITE EMERGENCY:

    Emergency extending beyond the site is termed as OFF SITE EMERGENCY. Siren Pattern : Sounding of electrical siren on PH II continuously for 10 minutes.Actions: - * Site Main Controller shall declare off site emergency by informing neighboring companies asking them also to blow their sirens continuously for 10 minutes.* Site Main Controller shall also inform & get help from DCG ( District Crisis Group, Collector Office, Valsad. ) ie: Govt. agencies like Factory Inspectorate, Collector, GPCB, Police department, etc, through ALECC ( Atul Local Emergency Control Centre ) , Tele. No: ( 02632 ) 233580, Mobile No : 9824153520, located at Factory Gate, Site East . ALL CLEAR DECLARATION: .Siren Pattern : Sounding of steam siren for 1 minute.

  • Emergency Response at West Site :

    LOCAL EMERGENCYAny emergency like fire, leakage, spillage within the plant or work area is termed as a LOCAL EMERGENCY. Siren Pattern : On actuation of fire / emergency alarm by pressing the electrical push button , the following will be activated : Indication on panel board in Central Fire Station.* Indication on panel board on main gate with sound of hooter. * Automatic sounding / Wailing of three nos. electrical sirens simultaneously till control actions start. * Indication on panel board of Fire Station at site east with sound of hooter.

  • Emergency Response at West SiteActions: - * Plant persons with available equipments shall try to combat the emergency. * Fire fighting staff shall approach incident site with Fire Tender and act as per instructions of Site Incident Controller. * Simultaneously the hydrant network shall also be pressurized. * Site Incident Controller. / Plant In Charge, will take overall charge of situation & inform higher authorities if required. * Neighboring plants to remain alert and render help to incident site if required. Security staff shall inform key persons on conference key telephone system and also inform Emergency Duty Rota personnel. * After emergency is over Site Incident Controller shall inform fire officer to blow ALL CLEAR siren.

  • ON SITE EMERGENCY:

    If local emergency affects other work areas / plants within the same site, it is termed as On Site Emergency. Siren Pattern : 4 minutes intermittent wailing sound of electrical sirens.Actions: - * Site Incident Controller shall inform Site Main Controller in Main Control Center room, and arrange for plant evacuation.* On receipt of information, Site Main Controller shall approach incident site, assess the gravity of situation & return to Main Control Centre (MCC) Room, & will guide Site Incident Controller for effectively tackling emergency.* Site Main Controller (SMC) shall also get help from neighboring companies, as required

  • OFF SITE EMERGENCY:

    Emergency extending beyond the site is termed as OFF SITE EMERGENCY. Siren Pattern : Sounding / Wailing of three nos. electrical sirens continuously for 10 minutes. Actions: - * Site Main Controller shall declare off site emergency by informing neighboring companies asking them also to blow their sirens continuously for 10 minutes.Site Main Controller shall also inform & get help from DCG ( District Crisis Group, Collector Office, Valsad. ) ie: Govt. agencies like Factory Inspectorate, Collector, GPCB, Police department, etc, through ALECC ( Atul Local Emergency Control Centre ) , Tele. No: ( 02632 ) 233580, Mobile No : 9824153520, located at Factory Gate, Site East ALL CLEAR DECLARATION: Siren Pattern : Intermittent wailing sound of electrical sirens for 3 times.

  • Emergency Response at P. P. Site :

    LOCAL EMERGENCY.Any emergency like fire, leakage, spillage within the plant or work area is termed as a LOCAL EMERGENCY. Siren Pattern : On actuation of fire / emergency alarm by breaking the glass, the following will be activated : * Indication on panel board on main gate with sound of hooter. * Automatic sounding of electrical siren till control actions start. * Indication on panel board of Fire Station at site east with sound of hooter.

  • Emergency Response at P. P. Site :

    Actions: - * Plant persons with available equipments shall try to combat the emergency.* Fire fighting staff shall approach incident site with Fire Tender and act as per instructions of Site Incident Controller. * Simultaneously the hydrant network shall also be pressurized.* Site Incident Controller / Plant In Charge, will take overall charge of situation & inform higher authorities if required.* Neighboring plants to remain alert and render help to incident site if required. Security staff shall inform key persons on telephone and also inform Emergency Duty Rota personnel.* After emergency is over Site Incident Controller shall inform fire officer to blow ALL CLEAR siren.

  • ON SITE EMERGENCY:

    If local emergency affects other work areas / plants within the same site, it is termed as On Site Emergency. Siren Pattern : 4 minutes continuous sounding of electrical siren. Actions: - * Site Incident Controller shall inform Site Main Controller in Main Control Center room. and arrange for plant evacuation.* On receipt of information, Site Main Controller shall approach incident site, assess the gravity of situation & return to Main Control Centre (MCC) Room, & will guide Site Incident Controller for effectively tackling emergency. * Site Main Controller (SMC) shall also get help from neighboring companies, as required

  • OFF SITE EMERGENCY:

    Emergency extending beyond the site is termed as OFF SITE EMERGENCY. Siren Pattern : Sounding of electrical siren continuously for 10 minutes.Actions: - * Site Main Controller shall declare off site emergency by informing neighboring companies asking them also to blow their sirens continuously for 10 minutes.Site Main Controller shall also inform & get help from DCG ( District Crisis Group, Collector Office, Valsad. ) ie: Govt. agencies like Factory Inspectorate, Collector, GPCB, Police department, etc, through ALECC ( Atul Local Emergency Control Centre ) , Tele. No: ( 02632 ) 233580, Mobile No : 9824153520, located at Factory Gate, Site East . ALL CLEAR DECLARATION: Siren Pattern : Continuous sounding of electrical siren for 1 minute.

  • ROLE OF PLANT IN CHARGE / SITE INCIDENT CONTROLLER.

    DURING LOCAL EMERGENCY:* Raise emergency alarm. * Determine the nature, extent, cause of the occurrence. * Asses severity of situation, formulate a tactful plan and steps to control it.* Assign duties