LUCKNOW METRO RAIL CORPORATION LIMITED
Emerging Opportunities in
Mass Rapid Transit System (MRTS)in
Uttar PradeshMahendra KumarDirector (RS & S)
04-05-2015
LUCKNOW METRO RAIL CORPORATION LIMITED
Technical Presentation on Rolling Stock, Signalling,Electrical and other system infrastructures for LMRCand other upcoming metros.
� System Parameters� Status of Tenders for LMRC� Emphasis on Green Building for metro stations,
Depot and RSS� Use of Energy Efficient Technolgy � Sustainability is being taken into account
04-05-2015
LUCKNOW METRO RAIL CORPORATION LIMITED04-05-2015
LUCKNOW METRO RAIL CORPORATION LIMITED
SECTION DETAILSß North South Corridor (22.878 KM)
Priority Section: Transport Nagar- Charbagh(Trial Runs to Start by November/December 2016)
Elevated Ramp Underground Total
19.051 Km 0.774 Km 3.053 Km 22.878 Km
04-05-2015
LUCKNOW METRO RAIL CORPORATION LIMITED
System Parameters� Gauge:
Standard Gauge (1435 mm)� Traction:
25 KV overhead.Flexible on the Viaduct and ROCS in the tunnelRetractable in Inspection bay
� Rolling Stock:2.9 m wide coaches, for all the corridors 4 car train formation in the beginning and can be
increased to 6 car in future� Signalling system CBTC (GoA 2)04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
The State of Art Technologies
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�Fu
nctio
na
lR
eq
uire
me
nts.
�T
ime
fram
efo
rco
nstru
ction
.
�M
inim
um
inte
rrup
tion
of
existin
gse
rvice
s(R
ail,
Ro
ad
etc.).
�M
inim
um
inco
nve
nie
nce
toth
ecitize
ns.
�E
nv
iron
me
nta
lfrien
dly.
�O
vera
llcost.
�Syste
mto
be
fully
BarrierFreefo
rP
hysica
llych
alle
ng
ed
Co
nsid
era
tion
s in se
lectio
n o
f
Tech
no
log
ies
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�Rolling Stock is including Signalling
system
State of the Art Light weight m
odern stainless steel coaches
�Heavy duty Escalators
�13 Passenger Heavy Duty Lifts
�Electrical &
Mechanical system
-Air conditioning System
-LED lights-DG sets-Fire detection and protection system
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�Contactless AFC system
using smart cards/Tokens
�Telecom
munication system
using the state of the art PA,PIDS , Announcem
ent system, CCTV system
�LTE (4G) system
being considered for the telecom
munication system
for future corridors
�Energy efficient equipm
ents being considered
�Sustainability being given due im
portance
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Status of the Major System
Tenders�
Rolling
stockincluding
signallingsystem
hasbeen
submitted
on21.4.15
andis
underevaluation.
�Traction
tenderw
ithD
esignand
builtw
hichincludes
RS
Scum
TSS
cumA
MS
,flexibleO
HE
,RO
CS
forthe
undergroundstations,
Cable
layingfrom
thegrid
sub-stations
�is
alreadyfloated
andis
duefor
submission
on26
thMay
Contd.
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�E
&M
forD
epot,a
partof
theC
ivilD
epottender
has
beenaw
arded
�E
&M
forS
tationsa
partof
thefinishing
tenderhas
beenfloated
andis
dueforsubm
issionin
May,2015
�D
ieselGenerating
setsand
UP
Sare
apartofthe
E&
M
tenders.
�E
lectricalUtility
Diversion
isaw
ardedand
isa
partof
theciviltender.
Contd
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�Specifications of the follow
ing Tenders are in finalisation
and shall be floated shortly; v
Telecomm
unication tender includes following
�Fiber O
ptics Transmission S
ystem�
Train Radio TE
TRA S
ystem�
Telephone System
�C
oordinated PA/P
IDS
System
�M
aster Clock S
ystem�
CC
TV S
ystemv
Autom
atic Fare Collection system
vLifts and E
scalatorsv
PV
roof mounted S
olar cells on Depot roof is being
planned under the RE
SC
O m
odel
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Sta
tus o
f the
Un
de
rgro
un
d S
tatio
ns
�There are 3 underground stations
�DDC is under finalisation
�The tenders for the underground E&
M,ECS,TVS,
BMS are likely to floated w
ithin 2015
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
STAG
ES INVO
LVED IN
TEND
ERIN
G1.
Pre qualification / Technical Evaluation
2.Financial Evaluation.
3.Approval of Com
petent Authority at different stages as required
4.Issue of Letter of Acceptance also im
plies NTP.
5.Signing of Contract.(A fully Transparent system
)
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Tender Conditions –
Some A
spectsN
ocontractororsupplierallow
edto
engageagentsas
middlem
an.Help
takenfrom
FIDIC/
InternationalFunding
Agencies/DMRC
conditionsto
suitablyupdate
theInternationalCom
petitiveBidding
Completion
time
issacrosanct.Im
portantitem
sof
interfacew
ithother
Contractorsclearly
identified&
givenin
tabularform
contractw
ise.For
Interfacem
anagement
Accessdates
&Key
datesare
listed.04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Ten
de
r Co
nd
ition
s S
om
e A
spe
cts.Technical
specificationsclearly
andelaborately
speltoutspeciallyby
:�
Givinglist
ofrelevant
codenum
bersof
specifications,Standardsetc.�
Modifying
theinternational
codalprovisions
tosuitIndian
conditions�
Prescribingthe
precedenceof
codein
caseof
contradiction.�
Aboveall
GeneralPhilosophy
successof
theContract/Projectdependsupon
thesuccessofthe
contractors
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
RO
LLING
STO
CK
AN
D S
IGN
ALLIN
G
SYST
EM
�W
e need 80 coaches including the signalling
system
�Presently a 4 car rake is planned extendable to
6 car rake in future 40 additional coaches
shall be required.
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Crite
ria fo
r sele
ction
of ro
lling
stock
:
�Proven equipm
ent with high reliability
�Passenger safety feature
�Energy efficiency
�Light w
eight equipment and coach body
�O
ptimized scheduled speed
�Aesthetically pleasing Interior and Exterior
�Low
Life cycle cost�
Flexibility to meet increase in traffic dem
and�
Anti-telescopic
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�U
ttarPradesh
govt.hasplans
tostartE-W
corridorofLkoM
etrovery
early,w
hichw
illneed
�additional
coaches.In
additionthere
areproposals
toconstruct
Metros
inVaranasi,
Kanpur,
Agra
andM
eerut.Thesecities
alsow
illhaveM
etrocoaches
ofsim
ilarspecifications.
Inview
ofthis
andto
haveTransfer
ofTechnology
/Indigenisation,
theR
ollingS
tockSupplier
ifthey
donot
havethe
facilityof
manufacturing
inIndia,
theyshould
setup
afactory
form
anufactureof
carsin
theS
tateof
Uttar
Pradesh.
UP
Governm
entshall
facilitateacquisition
ofthe
requiredland
forsetting
upthe
factory.The
tenderersshould
keepthis
inm
indand
indicatein
thetender
thespecific
proposalsand
comm
itment.
�The
employer
reservesthe
rightto
enterinto
asupplem
entarycontractforE-W
corridorforsupply
ofelevenno
trains(44
Nos
ofcars)
atthe
same
ratesof
theoriginal
contract.
Such
supplementary
ordershallbeplaced
beforethe
RO
Dofthe
N-S
corridor.
04-05-2015
Sp
ecia
l Pro
visio
ns :
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
E-W CO
RRIDOR
�E-W
corridor is 12 kms long from
Vasant Kunj to Charbagh railw
ay Station�
25 kV ac traction system�
Signalling System w
e may consider GoA 3 or
GoA 4�
Other system
s likely to remain sam
e
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�Requirem
ent of Rolling Stocks for the four upcom
ing Metros is as below
:v
Considering an average of 25 kms for four
metros viz. Varanasi, M
eerut, Agra and Kanpur w
ith 6 car rake and 4-5 minutes headw
ay requirem
ent is likely to be 450.v
Specifications are likely to be the same as that
of LMRC except for the Grade of Autom
ation for Signalling system
vIn case of GoA 3/GoA 4 PSDs shall be provided
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Traction System�
Design and Built Tender�
220/132 kV GIS has been envisaged for the RSS�
25 kV GIS has been planned�
Power evacuation has been planned through cables
from the Grid Substations of U
PPCL�
33 kV ring main w
ith duplicate feeders for auxiliary supply
�33 kV GIS for U
G portion for the breakers and for elevated it could be either GIS/AIS
�Sub-station autom
ation has been planned with the
latest IEC 61850 protocol
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�O
perationalControl
centrebeing
plannednearSahkarita
Bhawan
�Back
upcontrolcentre
beingplanned
atDCC
inthe
depot.TheBCC
shallbew
ithoutm
imic
panelsand
ithas
beenplanned
tom
akeit
operationalalongwith
thePriority
section.
�Integrated
SCADAisbeing
beenconsidered.
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Telecomm
unications
�State
oftheartbackbone
transmission
system�
IPbased
telephonesalong
with
traditionaltelephonesforequipm
entsroom�
CoordinatedPA/PIDS
aspertrainschedule
�Centrally
synchronizedClock
systemfor
passengersandstaff
�Trunk
Radiosystem
sforGroupcalls
�IP
basedCCTV
systems
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Electrical & M
echanical System
�LED
lightshave
beenplanned
atallthe
stationsand
Depot�
Fordetection
andprevention
offire,
detectorsand
automatic
pumpsw
ithstandby
arrangements
andJockey
pumpsshallbe
provided.�
Forreliability
ofpow
ersupply
DGsets
haveprovided
atallthestationsand
theDepot.
�Air
conditioningshall
beprovided
forsom
eof
thetechnicalroom
sandthe
SMsroom
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
GREEN IN
ITIATIVES�
Allthe
stationsare
inthe
processfor
gettingthe
certifications(G
old/Platinum
)asperIG
BC
Green
Mass
Rapid
TransitS
ystem(M
RTS
)R
ating
�A
ttempt
isthere
forthe
Depot
andthe
RS
Salso
toobtain
thecertifications.
�P
lannedto
goin
forSolarin
abig
way
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
Operation and M
aintenance
�The
philosophyforthe
O&
Mis
beingdraw
nout
�Attem
ptisto
havea
mix
ofbothoutsource
andin
houseso
thatthe
costand
requiredm
anpowerare
within
thelim
its.
�The
major
contractshave
a24
months
Defect
liabilityperiod
andin
additionsom
econtracts
will
haveA
MC
also.
�E
RP
systemis
alsobeing
planned04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�The
traindepotshallbe
equippedw
ithallthe
M&
Prequired
likePit
wheellathe,M
obileand
stationaryjacks,re-railing
equipmentsetc.
�Auto
Wash
Planthas
beenplanned
atthe
entryline
ofthe
Depotw
hereall
thetrains
shallbe
washed
beforeentering
thedepot.
�W
orkshophas
beenplanned
forthe
maintenance
schedulesofthetrains.
�O
neofthe
Inspectionlines
shallbew
ithretractable
catenarysystem
.�
CMV/Tow
erw
agonhas
beenplanned
forthe
maintenance
ofthecatenary
system
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
�A
world
classTraining
schoolhasbeen
plannedw
ithallthe
latesttrainingm
odulesincluding
theS
imulatorforthe
train.
�Training
classesshallhave
them
odernfacilities
forim
partingtraining
toLM
RC
employees
asw
ellasto
theengineers
andstaffofotherm
etrosalso
�A
libraryw
hichshallhouse
allthem
aintenancem
anualsapart
fromthe
otherbooks
hasbeen
planned.
04-05-2015
LUC
KN
OW
ME
TR
O R
AIL C
OR
PO
RA
TIO
N LIM
ITE
D
THANK YO
U
04-05-2015