2 999790002 - 10/2010
User information Floor props Eurex
The Formwork Experts
© by Doka Industrie GmbH, A-3300 Amstetten
User information Floor props Eurex
3999790002 - 10/2010
The Formwork Experts
Contents4 Introduction4 Elementary safety warnings
77 Product description8 Instructions for assembly and use
10 Possible incorrect usages11 Technical condition12 Permitted capacities of Doka floor props14 Transporting, stacking and storing
15 Component overview
4 999790002 - 10/2010
Introduction User information Floor props Eurex
The Formwork Experts
IntroductionElementary safety warnings
User target groups● This User Information booklet (Method Statement) is
aimed at everyone who will be working with the Doka product or system it describes. It contains informa-tion on the standard design for setting up this sys-tem, and on correct, compliant utilisation of the sys-tem.
● All persons working with the product described herein must be familiar with the contents of this man-ual and with all the safety instructions it contains.
● Persons who are incapable of reading and under-standing this booklet, or who can do so only with dif-ficulty, must be instructed and trained by the cus-tomer.
● The customer is to ensure that the information mate-rials provided by Doka (e.g. User Information book-lets, Instructions for Assembly and Use, Operating Instruction manuals, plans etc.) are available to all users, and that they have been made aware of them and have easy access to them at the usage location.
● In the relevant technical documentation and form-work utilisation plans, Doka shows the workplace safety precautions that are necessary in order to use the Doka products safely in the usage situations shown. In all cases, users are obliged to ensure compliance with national OH&S (occupational health and safety) rules throughout the entire project and to take appro-priate additional or alternative workplace safety pre-cautions where necessary.
Hazard assessment● The customer is responsible for drawing up, docu-
menting, implementing and continually updating a hazard assessment at every job-site. This document serves as the basis for the site-spe-cific hazard assessment, and for the instructions given to users on how to prepare and utilise the sys-tem. It does not substitute for these, however.
Remarks on this document● This User Information booklet can also be used as a
generic method statement or incorporated with a site-specific method statement.
● Many of the illustrations in this booklet show the situation during formwork assembly and are therefore not always complete from the safety point of view.Any safety accessories not shown in these illustra-tions must still be used by the customer, in accord-ance with the applicable rules and regulations.
● Further safety instructions, especially warnings, will be found in the individual sections of this document!
Planning● Provide safe workplaces for those using the form-
work (e.g. for when it is being erected/dismantled, modified or repositioned etc). It must be possible to get to and from these workplaces via safe access routes!
● If you are considering any deviation from the details and instructions given in this booklet, or any application which goes beyond those described in the booklet, then revised static cal-culations must be produced for checking, as well as supplementary assembly instructions.
Rules applying during all phases of the assignment:● The customer must ensure that this product is
erected and dismantled, reset and generally used for its intended purpose under the direction and super-vision of suitably skilled persons with the authority to issue instructions. These persons' mental and physical capacity must not in any way be impaired by alcohol, medicines or drugs.
● Doka products are technical working appliances which are intended for industrial/commercial use only, always in accordance with the respective Doka User Information booklets or other technical docu-mentation authored by Doka.
● The stability of all components and units must be ensured during all phases of the construction work!
● The functional/technical instructions, safety warn-ings and loading data must all be strictly observed and complied with. Failure to do so can cause acci-dents and severe (even life-threatening) damage to health, as well as very great material damage.
● Fire-sources are not permitted anywhere near the formwork. Heating appliances are only allowed if properly and expertly used, and set up a safe dis-tance away from the formwork.
● The work must take account of the weather condi-tions (e.g. risk of slippage). In extreme weather, steps must be taken in good time to safeguard the equipment, and the immediate vicinity of the equip-ment, and to protect employees.
● All connections must be checked regularly to ensure that they still fit properly and are functioning cor-rectly. It is very important to check all screw-type connec-tions and wedge-clamped joins whenever the con-struction operations require (particularly after excep-tional events such as storms), and to tighten them if necessary.
User information Floor props Eurex Introduction
5999790002 - 10/2010
The Formwork Experts
Assembly● The equipment/system must be inspected by the
customer before use, to ensure that it is in suitable condition. Steps must be taken to rule out the use of any components that are damaged, deformed, or weakened due to wear, corrosion or rot.
● Combining our formwork systems with those of other manufacturers could be dangerous, risking damage to both health and property. If you intend to combine different systems, please contact Doka for advice first.
● The assembly work must be carried out by suitably qualified employees of the client's.
● It is not permitted to modify Doka products; any such modifications constitute a safety risk.
Erecting the formwork● Doka products and systems must be set up in such
a way that all loads acting upon them are safely transferred!
Pouring● Do not exceed the permitted fresh-concrete pres-
sures. Excessively high pouring rates lead to form-work overload, cause greater deflection and risk causing breakage.
Striking the formwork● Do not strike the formwork until the concrete has
reached sufficient strength and the person in charge has given the order for the formwork to be struck!
● When striking the formwork, never use the crane to break concrete cohesion. Use suitable tools such as timber wedges, special pry-bars or system features such as Framax stripping corners.
● When striking the formwork, do not endanger the stability of any part of the structure, or of any scaf-folding, platforms or formwork that is still in place!
Transporting, stacking and storing● Observe all regulations applying to the handling of
formwork and scaffolding. In addition, the Doka slinging means must be used - this is a mandatory requirement.
● Remove any loose parts or fix them in place so that they cannot be dislodged or fall free!
● All components must be stored safely, following all the special Doka instructions given in the relevant sections of this User Information booklet!
Regulations; industrial safety● Always observe all industrial safety regulations and
other safety rules applying to the application and uti-lisation of our products in the country and/or region in which you are operating.
Instruction as required by EN 13374:● If a person or object falls against, or into, the edge
protection system and/or any of its accessories, the edge protection component affected may only con-tinue in use after it has been inspected and passed by an expert.
Maintenance● Only original Doka components may be used as
spare parts. Repairs may only be carried out by the manufacturer or authorised facilities.
Symbols usedThe following symbols are used in this booklet:
MiscellaneousWe reserve the right to make alterations in the interests of technical progress.
Important noteFailure to observe this may lead to malfunc-tion or damage.
CAUTION / WARNING / DANGERFailure to observe this may lead to material damage, and to injury to health which may range up to the severe or even life-threaten-ing.
InstructionThis symbol indicates that actions need to be taken by the user.
Sight-checkIndicates that you need to do a sight-check to make sure that necessary actions have been carried out.
TipPoints out useful practical tips.
ReferenceRefers to other documents and materials.
☞
User information Floor props Eurex
7999790002 - 10/2010
The Formwork Experts
Product description
Doka floor propsDoka floor props Eurex are adjustable telescopic steel props that conform to EN 1065. They are intended to be used as vertical props for temporary works equipment.
The main features:● EN 1065-compliant prop● high load-bearing capacity
- see the section headed "Permitted capacities of Doka floor props"
● numbered pegging holes, for easier height adjust-ment
● Quick connection: Head adapters of various types can be attached in a crane-handling-safe manner with the spring-locked connecting pin
● Drop-out latch: For safety reasons, Doka props have latches to pre-vent the inner tube sliding out of the outer tube.
● special thread geometry, which makes the prop eas-ier to release even when it is under high load
● When the prop is pushed in all the way, it still leaves a clear 10 cm gap so that the operator's hands are not trapped.
● elbowed fastening clamps, reducing the risk of injury and making the props easier to operate
● Galvanised, long-life constructional designA Head-plateB Inner tubeC Fastening clampD Adjusting nutE Toggle leverF Rating labelG Outer tubeH Baseplate
A
B
CD
E
F
G
H98
017-
200-
01
8 999790002 - 10/2010
User information Floor props Eurex
The Formwork Experts
Instructions for assembly and use
Example of use with Dokaflex 1-2-4
You will also find information on correct usage in the in user information for the individual products, for exam-ple:● Dokaflex● Doka Xtra● Dokamatic table● Dokaflex table
Example of use - Doka floor props Eurex for temporary shoringWhen the Doka Eurex floor props are used as tempo-rary reshores, the permitted carrying capacities increase as shown in the table in "Permitted capacities of Doka floor props".
9720-337-01
☞ This increase in capacity only applies if the head- and baseplates are placed directly against the floor-slabs (a formwork-sheeting packing strip (A) is permissible).
Tr570-200-01
A
User information Floor props Eurex
9999790002 - 10/2010
The Formwork Experts
Setup and removal
Setting up with tripodApplies only for use as free-standing props. Comply with the instructions in the applicable user information document when using the props in combination with a formwork system.➤ Roughly adjust the height of the floor prop, using the
fastening clamp.
The pegging holes are all numbered, which makes it easier to adjust the props to the same height.
➤ Put up each removable folding tripod.➤ Put the floor prop into the tripod and fix it in place with
the clamping lever. Before stepping onto the formwork, check again to make sure that the props have been correctly fixed in the tripods.
➤ With the prop upright, use the adjusting nut for preci-sion adjustment.
Setting up without tripod➤ To prevent toppling, use the Supporting head H20
DF to secure intermediate props on the floor form-work (see Dokaflex 1-2-4 or Doka Xtra User Informa-tion booklets, as applicable).
➤ When using props as temporary reshoring, press them sufficiently tightly to the underside of the floor slab so that they cannot topple.
Backing off floor props under load1) Use a hammer to back off the adjusting nut.2) Hold the inner tube with one hand.3) Open the fastening clamp to unfix the inner tube.
Guide this by hand while lowering it into the outer tube.
9720-006
9720-000
9720-006
9720-006
1
2
3
10 999790002 - 10/2010
User information Floor props Eurex
The Formwork Experts
Possible incorrect usages
WARNING➤ The uses illustrated below are prohibited, as
are other, similar uses!
Use only perfectly upright and plumb.
Baseplate must make full-sur-face contact with the ground.
Place only on ground of adequate load-bearing strength.
Do not attempt to use floor props one on top of another.
Do not use anchor rods or lengths of rebar as substitutes for the fastening clamps.
Do not use to support formwork panels.
Do not use as trenching braces.
9790-205-01 9790-207-01
9790
-202
-01
9790
-201
-01
9790-206-01 9790
-200
-01
9790
-203
-01
9790
-204
-01
Do not use as barrier to close off openings.
9790-209-01
9790-212-01
User information Floor props Eurex
11999790002 - 10/2010
The Formwork Experts
Technical conditionThe following quality criteria define the extent of dam-age permissible in terms of load-bearing strength. Use is prohibited if damage is beyond these limits.
Outer tube - inner tube
Head plate or baseplate bent out of shape● a max. 1 mm outward and● b max. 3 mm inward is permissible
Cracks in welds● Not permissible.
Threads● must be greased over entire length and action must
be smooth.
Inner tube● When the inner tube is rotated inside the outer tube
so that the U-bolt fixing-holes of both tubes are lined up, it must be possible to fully extend and retract the inner tube.
Widening● of the pegging holes in the inner tube is permissible
up to 2 mm.
9790-208-07
b
a
9790-208-04 9790-208-01
9790
-208
-02
12 999790002 - 10/2010
User information Floor props Eurex
The Formwork Experts
Permitted capacities of Doka floor props
Used as free-standing construction propsPermitted capacities [kN] as a function of the extension length and the position of the outer tube
Eurex 20 Eurex 30250 300 350 400 550 250 300 350 400 450
Pro
p le
ngth
[m]
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Bot
tom
Top
Pos
ition
of
oute
r tub
e*)
A25 A25 A30 A30 A35 A35 A40 A40 A55 A55 A25 A25 A30 A30 A35 A35 A40 A40 A45 A45
Prop
cat
egor
y to
EN
106
5
B25 B25 B30 B30 B35 B35 B40 B40 B55 B55 B25 B25 B30 B30 B35 B35 B40 B40 B45 B45C25 C25 C30 C30 C35 C35 C40 C40 C55 C55 C25 C25 C30 C30 C35 C35 C40 C40 C45 C45D25 D25 D30 D30 D35 D35 D40 D40 D55 D55 D25 D25 D30 D30 D35 D35 D40 D40 D45 D45
E25 E25 E25 E30 E30 E35 E35 E40 E40 E45 E455.5 20.0 22.15.4 20.9 23.25.3 21.9 24.45.2 22.9 25.75.1 23.9 27.15.0 25.0 28.54.9 26.4 30.14.8 27.8 31.64.7 29.2 33.24.6 30.6 34.94.5 32.2
35.6
31.8 33.54.4 33.9 33.8 35.84.3
35.6
35.8 38.04.2 38.0
40.0
4.1
40.0
4.0 20.9 24.1 30.6 33.23.9 22.3 26.0 32.8 35.73.8 23.7 27.9 35.1 38.23.7 25.2 29.9 37.5
40.0
3.6 26.9 32.2
40.0
3.5 20.2 23.8 28.5 34.4 30.0 33.23.4 21.7 25.9 30.1
35.6
32.4 35.73.3 23.1 28.1 31.4 34.7 38.23.2 24.6 30.4 32.5 37.1
40.0
3.1 26.3 33.0 33.5
40.0
3.0 20.1 24.1 27.9
35.6
34.4 30.0 33.82.9 21.7 26.6 28.8 35.4 32.6 36.22.8 23.3 29.1 29.6
35.6
35.2 38.52.7 24.6 31.6 30.6 37.5
40.0
2.6 25.4 34.3 31.8 38.82.5 26.2 31.2 26.2
35.6
32.9 30.0 35.9
40.0
2.4 27.1 33.4 27.0 34.0 31.3 37.42.3 27.9
35.6
27.8 35.1 32.6 38.92.2 28.9 28.9
35.633.8
40.0
2.1 29.6 30.2 34.92.0 30.3 31.5 35.91.9 31.7 33.0 37.51.8 33.1 34.5 39.21.7 34.6
40.01.635.6
1.51.41.31.21.11.0
User information Floor props Eurex
13999790002 - 10/2010
The Formwork Experts
*) Position of outer tube When used in Dokamatic and Dokaflex tables, or as temporary repropping (with props restrained)Permitted load-bearing capacity [kN]
Bottom Top
For details of the permitted capacities of the Doka floor props when used with the Dokaflex and Doka-Xtra systems, please refer to the rel-evant User Information booklets.
Pro
p le
ngth
[m] Eurex 20 Eurex 30
250 300 350 400 550 250 300 350 400 450
5.5 305.4 325.3 345.2 365.1 385.0
40
4.94.84.74.64.5
40
4.44.34.24.14.0 30
40
3.9 323.8 343.7 363.6 383.5 30
40
40
3.4 323.3 343.2
35
3.13.0 30
40
2.9 322.8 342.7
35
2.62.5 30
40
2.4 322.3 342.2
35
2.12.01.91.81.71.61.51.41.31.21.11.0
14 999790002 - 10/2010
User information Floor props Eurex
The Formwork Experts
Transporting, stacking and storing
Doka stacking pallet 1.55x0.85m● Ideal for all sizes of floor props, timber formwork
beams, Dokadur panels and formwork sheets.● Galvanised - stackable - safe to lift by crane.
Loading capacity of the stacking pallet:
Bolt-on castor set BThe Bolt-on caster set B turns the stacking pallet into a fast and manoeuvrable transport trolley.Suitable for drive-through access openings > 90 cm.
The Bolt-on caster set B can be mounted to the follow-ing multi-trip packaging items:● Doka stacking pallets● Doka accessory box
Max. load: 1100 kg
Doka floor propsEurex 20 250, 300 and 350 40 unitsEurex 20 400 and 550 30 unitsEurex 30 250 and 300 40 unitsEurex 30 350, 400 and 450 30 units
Follow the directions in the Operating Instruc-tions!
9720-332-01
Article n°[kg] Article n°[kg]
15999790002 - 10/2010
User information Floor props Eurex Component overview
The Formwork Experts
Component overviewDoka System ComponentsFloor prop Eurex
Doka floor prop Eurex 20 250 12.9 586086000Length: 152 - 250 cmDoka floor prop Eurex 20 300 15.3 586087000Length: 172 - 300 cmDoka floor prop Eurex 20 350 17.8 586088000Length: 197 - 350 cmDoka floor prop Eurex 20 400 22.2 586089000Length: 227 - 400 cmDoka floor prop Eurex 20 550 34.6 586090000Length: 297 - 550 cmDoka-Deckenstütze Eurex 20
Doka floor prop Eurex 30 250 14.8 586092000Length: 152 - 250 cmDoka floor prop Eurex 30 300 16.7 586093000Length: 172 - 300 cmDoka floor prop Eurex 30 350 20.5 586094000Length: 197 - 350 cmDoka floor prop Eurex 30 400 24.9 586095000Length: 227 - 400 cmDoka floor prop Eurex 30 450 29.2 586119000Length: 248 - 450 cmDoka-Deckenstütze Eurex 30
Removable folding tripod 15.6 586155000Stützbein
Doka stacking pallet 1.55x0.85m 42.0 586151000Doka-Stapelpalette 1,55x0,85m
Bolt-on castor set B 33.6 586168000Anklemm-Radsatz B
Galvanised
Galvanised
GalvanisedHeight: 100 cmDelivery condition: folded closed
GalvanisedHeight: 77 cmFollow the directions in the "Operat-ing Instructions"!
Painted blue
999790002 - 10/2010The Formwork Experts
Doka floor props:Dependable in every usage situation
Doka floor props are the right choice for every usage situation.They have high load-bearing strength, plus many practical details that help to make handling easier.
You can rent, lease or buy Doka floor props.At any of the Doka branches in your region.
Why not give us a call?
The Doka Group's central plant at Amstetten, Austria
KazakhstanLatviaLithuaniaLuxembourgMaroccoMexicoNetherlandsNew ZealandOmanPanamaPolandPortugalRomaniaRussiaSenegalSerbiaSlovakiaSloveniaSpainSwitzerlandTaiwanThailandUkraineVietnam
Doka internationalDoka GmbH
Josef Umdasch Platz 1, A 3300 Amstetten, AustriaTel.: +43 (0)7472 605-0, Fax: +43 (0)7472 64430
E-Mail: [email protected]: www.doka.com
AlgeriaSARL Doka Algérie24 A Route de la RassautaBordj-El-Kifane, BP 170, 16120 AlgerTelephone: +213 (0)21 21 27 26Telefax: +213 (0)21 21 28 98E-Mail: [email protected]
CanadaDoka Canada Ltd./Ltée5404 - 36th Street S.E.Calgary AB T2C 1P1Telephone: +1 403 243-6629Telefax: +1 403 243-6787E-Mail: [email protected]
ChinaDoka Formwork (Shanghai) Co. Ltd.Bldg. 2, No.3883 Yuanjiang RoadMinhang DistrictShanghai 201109Telephone: +86 21 6090 0899Telefax: +86 21 6090 1099E-Mail: [email protected]
IndiaDoka India Pvt. Ltd.Hiranandani Business ParkSentinel Bldg 2nd FloorCommercial Premises No 201&202Powai, Mumbai - 400 076Telephone: +91 22 402 64435Telefax: +91 22 402 64436E-Mail: [email protected]
IrelandDoka Ireland Formwork Techn. Ltd.Monasterboice, DroghedaCounty LouthTelephone: +353 (0)41 686 1620Telefax: +353 (0)41 686 1525E-Mail: [email protected]
JapanDoka Japan K.K.Miwanoyama 744-6 Nagareyama-shi270-175 Chiba-KenTelephone: +81 (0)471 78 8808Telefax: +81 (0)471 78 8812E-Mail: [email protected]
KoreaDoka Korea Ltd.Rm.N.220, Doosan Venture Digm Bldg., 126-1 Pyeongchon-Dong, Dongan-Gu, 431-755 Anyang City, Gyeonggi-DoTelephone: +82 31 478 3700Telefax: +82 31 478 3701E-Mail: [email protected]
KuwaitDoka KuwaitDiv. of Riham Gen. Trad.& Cont. Co.P.O. Box 2217 Salmiyah22023 KuwaitTelephone: + 965 2 4822 462Telefax: +965 2 4822 472E-Mail: [email protected]
LebanonDoka Branch LebanonSodeco Square, Block C / 9th floorBeirutTelephone: +961 (0)1 612569Telefax: +961 (0)1 612570E-Mail: [email protected]
NorwayDoka Norge ASHeggstadmoen 4N 7080 HeimdalTelephone: +47 72 89 38 10Telefax:n +47 72 89 38 11E-Mail: [email protected]
Other subsidiaries andrepresentatives:
AngolaAzerbaijanBahrainBelgiumBelarusBosnia andHerzegovinaBrazilBulgariaChileCroatiaCzech RepublicDenmark EgyptEstoniaFinlandFranceGermanyGreece HungaryIceland IranItalyJordan
QatarDoka Qatar WLLP.O.Box 23439Doha, QatarTelephone: +974 44500628Telefax: +974 44500608E-Mail: [email protected]
Saudi ArabiaDoka Formwork TechnologyMahmoud Othman & Sons LLCP.O. Box 7620Jeddah 21472Telephone: +966 0)2 669 10 08Telefax: +966 (0)2 664 86 25E-Mail: [email protected]
SingaporeDoka Formwork Pte. Ltd.9 Gul CircleSingapore 629565Telephone: +65 6897 7737Telefax: +65 6897 8606E-Mail: [email protected]
South AfricaDoka South Africa (Pty) Ltd.Johannesburg BranchCA Brand Bldg, 2 Sebasa RoadChloorkop Ext.10Kempton Park 1619Telephone: +27 (0)11 310 9709Telefax: +27 (0)11 310 9711E-Mail: [email protected]
SwedenDoka Sverige ABKurödsvägen 20S 451 55 UddevallaTelephone: +46 (0)10 45 16 300Telefax: +46 (0)10 45 16 309E-Mail: [email protected]
TunisiaDoka Tunisia Ltd.Bureau de LiaisonZone Industrielle, Rue d l‘usineLe Kram 2015 TunisTelephone: +216 (0)71 977 350Telefax: +216 (0)71 977 856E-Mail: [email protected]
TurkeyDoka Kalip-IskeleSanayi ve Ticaret A.S.Güzeller Org. San. BölgesiInönü Mah. Nazarbayev Sok. No:1941400 Gebze, KocaeliTelephone: +90 262 751 50 66Telefax: +90 262 751 50 05E-Mail: [email protected]
United Arab EmiratesDoka Gulf FZEP.O. Box 61407Jebel Ali Free Zone, DubaiTelephone: +971 (0)4 881 8096Telefax: +971 (0)4 881 8097E-Mail: [email protected]
United KingdomDoka UK Formwork Technologies LtdMonchelsea Farm, Heath RoadBoughton MonchelseaMaidstone, Kent, ME17 4JDTelephone: +44 (0)1622 74 90 50Telefax: +44 (0)1622 74 90 33E-Mail [email protected]
USADoka USA, Ltd.214 Gates RoadLittle Ferry, NJ 07643Telephone: +1 201 329-7839Telefax: +1 201 641-6254E-Mail: [email protected]: www.dokausa.com
ISO 9001Certified to