Enclosure 1 to Serial: NPD-NRC-2015-020 Page 1 of 23 Enclosure I APIOOO® IRWST Condensate Return (Non-Proprietary) (23 pages including cover page)
Transcript
Page 1: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Enclosure 1 to Serial: NPD-NRC-2015-020Page 1 of 23

Enclosure IAPIOOO® IRWST Condensate Return (Non-Proprietary)

(23 pages including cover page)

Page 2: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wetigouse No-Prpitr Cls 3 D 201 Wetngos Elcti Co pn 0 Al Riht Reere.

This is the nonproprietary version of these slides.

(• Westinghouse

Page 3: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

WGOTHIC, APIOO0 and the API000 logo are trademarks or registered trademarks of Westinghouse Electric

Westingrhouse Company LLC, its subsidiaries and/or its affiliates in the United States. These marks may also be used and/orregistered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited.

2

Page 4: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

V 0sigoueNnPoreayC ss3( 201 \Nsig s Elcti Coman U Al Right Reere.

" Status of Calculations" Summary of Major Changes" Analysis Results" Licensing Basis Changes" Long Term Analysis Finalization

• Westinghouse

Page 5: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wetnghus No-roretr Cls i D 2015Westinghous EI'l[etic • Compan LLC ll Riht Reserved,•

Initialization Inputs:" Bounding PRHR HX heat transfer" RV downcome_.temperature

IN

APP-PXS-M3C-071 /

9

0

0

0

Confirmationof acceptablelosses

II Cont. pres/temp

CV steam cond. Ratessteam to coit atmsteam to passive heat sinksleakage

IRWST Steaming RatePXS Condensate Flow RatePXS Condensate TemperatureContainment Pressure

APP-SSAR-GSC-536

Calc output-- •Bounding output

APP-SSAR-GSC-009(Due 6/15/15)

FinalResults

1. DBA Extensionm 72 hours with Chapter 15

acceptance criteria2. Time to Safe Shutdown

• Demonstration of 420OF in 36hours or less

3. Safe Shutdown Duration* Demonstration of less than

420°F for greater than 14 days

APP-PXS-M3C-072

(*) Westinghouse4 l caclain suprig ae

4

Page 6: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wsinghoue No -Propr Fietr Class 3•,], @F[I[ [ 2015 •J _ WetnhueEetrcCmayL llRgt eevd

" Analysis approach was developed over time- PRHR Performance (APP-PXS-M3C-020) calculation already

existed- Time to Safe Shutdown (APP-SSAR-GSC-536) built off of existing

PRHR calc- When Condensate Return Issue surfaced, containment effects

(APP-PXS-M3C-071) and condensate losses (APP-PXS-M3C-072)were added at the front end of the process

" Original analysis approach was required to analyze largefluctuations in varying condensate return rates

" Design change to add gutters & downspouts provides moreconsistent losses- Losses are sufficiently reduced / consistent to utilize WGOTHIC

calculation

(• Westinghouse5

Page 7: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

* Calculations available for audit- APP-PXS-M3C-071 (WGOTHIC Containment Analysis)- APP-PXS-M3C-072 (Condensate Losses)- APP-SSAR-GSC-536 (LOFTRAN Safe Shutdown Analysis)

* Licensing documentation submitted- APP-GW-GLR-161 (proprietary)

0 APP-GW-GLR-607 (non-proprietary)

- RAI 6.03-13 Response* Condensate Return Transient Return Rate Differences

OW Westinghouse6

Page 8: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

-,Wti - P re t Ca 3 @ 21 W ge E i C n ..All r- Right Re d.

* Changes since last revision- Utilization of WGOTHIC code version 4.3.1

• Corrects code error associated with incorrect heat transfer on driedout portions of containment vessel exterior

- Incorrect steam table was called out within code to calculate saturationpressure

- Additional sensitivities* Use of ORIGEN-S decay heat to show additional margin• Higher humidity evaluation* Reactor vessel steaming sensitivity* PRHR tube plugging margin

a,c

m

t.• WestinghouseWGOTHIC analysis relativelyunchanged since last revision

7

Page 9: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

WetnhueNo-rpitr Cl.s 3 D 201 Wetnhue0 Elcti Co pn g All Riht Reserve.

PI,C

Ow Westinghouse8

Page 10: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

* Changes since last revision- Incorporation of outstanding design changes associated with

finalized attachment plates inside containment- Reference to RAI 6.03-5 response regarding containment

temperature extrapolation- Analysis being used to confirm 18% condensate loss

• Maximum 18% loss conservatively assumed for duration oftransient in WGOTHIC (APP-PXS-M3C-071) calculation

- Additional sensitivities* Use of ORIGEN-S decay heat to show additional margin* Holdup volume calculation added in response to RAI 6.03-3

(• Westinghouse

Page 11: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

S I - Suo

* Changes since last revision- DBA Extension case provided in RAI 7440 (15.02.06-2) is

now incorporated into Appendix D- Use of LOFTRAN version 15.2.0, which incorporates single

application features introduced in prior revisions of analysis

- Additional sensitivities* Use of ORIGEN-S decay heat to show additional margin* Evaluation of additional margin within calculation* PRHR tube plugging margin* Evaluation of updated LOFTRAN base decks

- DOD R. 19 versus expected future changes

(• Westinghouse10

Page 12: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wetngos Non- Prpitr 6ls 3~ (D 201 Wetngos Elc0i Co pn - g . All Riht Reere.

p,c

Ow Westinghouse11

Page 13: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

W stigos No-rpitr Cls 3 9 201 WetnhueEetrcCm ayL Al Rihs Resrve.

ThotTco I dCore Avg.420 F

T

urnT mI

LA_

LUJ

.- .,.. .... ...... .... . ........ .....

40 -- *. •f '.",,,

3W11 1 111; 1 1,[ I I I II II i lt I IIIIII* I till,

LUJ

250CLULJ.0

-200

1

I10

210

310

410

510

610

TIME (S)

tWestinghouseTim to rec 42 s 3.

12

Page 14: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

WetnhueNnP .pitr ls @6 201 Wetnhuem Elcti Copn S . Al*l Riht R esevd

-- aC

(t. Westinghouse

Page 15: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wetngos S o n- Prpitr Sls *S3- @ 201 Wetngos Elcti Co pn LL* Al Riht Resrve.

(t Westinghouse

Page 16: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

NoSn-lo 0 e p rt r *SS Time -* - ga A *--

-ac

(% Westinghouse

Page 17: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Westinghouse Non-Proprietary Class 3 (D 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Design Basis Extension AnalysisPressurizer Volume

--I a, c

Ow Westinghouse16

Page 18: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

" Revised licensing basis markups were incorporated into thefollowing sections:- Section 7.4- Section 19E.4.10.2- Figures 19E.4.10-1, 10-2, 10-3, 10-4- Table 19E.4.10-1

" Updated descriptions of supporting calculations" Addition of discussion about DBA extension evaluation* Calculation inter-relationships diagram update" Safe Shutdown temperature evaluation (420TF in 36 hours)

is described as a licensing performance criterion rather thana safety evaluation

* Westinghouse

Non of th chne mad to the

sumta ar imace by th -open

calulaios.

Page 19: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

(twesfinOD""

is

Page 20: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Soting-uso Non-Proprietary Clas 3S B 0 15; W g s d

ILlong i! iiTermi Ana'f~lysi Planl

3/2-3/20I Weels I

3/23 -4/103 Weeks 4/13

Decmsic Point4114-6/15

8 WeeksI

I(Is it rsn

AP6RveS-iilRu ýai

(ýJh ulatiow,

availdble fcxNRC Review

a,c

Westinghouse

Page 21: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Wetngos a Nan- Prpitr Cls 3S~ @ 201 Ws tigos Elcti *0mpany g Al Riht Resrve.

(t Westinghouse20

Page 22: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

W estSngh Sue N o Sr y Class 3 @ 21 W ighoue -Elge i C. Al R t R.

-a,C

(t- Westinghouse

Page 23: Enclosure I APIOOO® IRWST Condensate Return (Non ... · " Addition of discussion about DBA extension evaluation * Calculation inter-relationships diagram update" Safe Shutdown temperature

Westinghouse Non-Proprietary Class 3 @ 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Conclusions

" Calculations available for audit- Safe Shutdown acceptance criteria are met- Chapter 15 acceptance criteria are met for 72 hours- Revised analysis had minimal impact on previously submitted

license change package

" Long term calculations in process- Preliminary results showing >14 days below 420IF- No additional licensing markups expected as a result of long

term calculation completion

" No additional physical changes were required

Westinghouse22