    The purpose of this procedure is to outline the primary

    functions, typical duties and responsibilities of the

    Engineering Department personnel within the Mohammad Al-

    Mojil Group (MMG) support group.

    This procedure covers the duties and responsibilities of MMG

    personnel engaged in the various activities carried out by theEngineering Department at Dammam Head Office and all MMG

    project sites.

    The scope covers all Mohammad Al-Mojil Group Engineering

    service operations.

  • 7/30/2019 END 2 001Responsibilites

    3/19

    MMG Engineering main objectives are as follows:

    - Maintain its good relationship with client in

    relation to workmanship, quality and safety

    aspects of the work.

    - Ensure MMG remains competitive in terms ofcost on all the bids participation.

    - To maintain its experienced existing

    workforce.

    - Upgrading of construction technique based on

    the latest technology.

  • 7/30/2019 END 2 001Responsibilites

    4/19

    DEFINITIONS

    Job-Ex - an abbreviation of Job Explanation Meetinga term used to address a mandatory Review

    Meeting initiated by Costumer for the purpose

    of explaining the bid scope of work, and to

    answer questions asked by attending bidders

    representatives for clarifications.

    Weld Map - a detailed shop or pipe isometric drawing,

    where locations of shop and field weld are

    specified.

    CPM - Critical Path Method- a diagram of detailed

    activities showing resources loading and their

    time per activity and critical path of theproject.

    Site Queries - are questions raised at a project site which

    are addressed to the Costumer or Costumer

    representatives for clarifications.

  • 7/30/2019 END 2 001Responsibilites

    5/19

  • 7/30/2019 END 2 001Responsibilites

    6/19

    REFERENCES

    1. BS EN 9001 : 2000 Quality management Systems

    Requirements.

    2. Corporate Quality Manual

  • 7/30/2019 END 2 001Responsibilites

    7/19

    Departmental Responsibilities

    Head Office Estimating

    END is responsible in Companys participation in projects

    development from bidding, pricing, acquiring award and

    extending field support in project implementation during

    construction. END have to make sure that the structure and

    method of pricing projects has been carefully studied to

    ensure that the competitiveness and accuracy of estimates is

    taken into account and applied.

    Project Engineering

    ENDs support to the operation of Project Engineering requires

    closer attendance and coordination from head Office. It isENDs intention by having a dedicated Senior Engineer as

    coordinator between Project(s) and Head office, thus avoiding

    the possibility of late awareness of project deficiencies, which

    may bring financial burden to the project.

  • 7/30/2019 END 2 001Responsibilites

    8/19

    (continuation)

    ENDs Main Task

    Covers the preparation and review of bid pricing, estimation

    and its technical and commercial requirements. This wasdeveloped by checking bid documents, developed job-

    explanation questions, conduct review meetings and review

    contract documents prior to signing of contract.

    Upon award and signing of Contract. END will prepare and

    discuss the project budget with the project manager and

    secure budget approval from executive management. END willalso ensure that all departments/divisions concerned have all

    the necessary engineering information's and assistance.

    In line with the new organization structure, END is also

    extending its services and support to other

    enterprise/divisions.

    Individual Responsibilities

    In order to properly implement these responsibilities, the

    Department has defined individual responsibilities of the

    following:

  • 7/30/2019 END 2 001Responsibilites

    9/19

  • 7/30/2019 END 2 001Responsibilites

    10/19

    SR.PROPOSAL MANAGER

    Is responsible to the Department Manager for:

    Ensuring that all the aspects of the bid requirements

    specified in the scope of the work, technical

    specifications, drawings, and relevant bid documents are

    fully covered and considered in the bid proposal.

    Develop and implement competitive guidelines on

    estimating strategies, new engineering procedures,

    technical & commercial proposal presentations, costing,

    realistic planning and scheduling programs.

    Review and resolve field engineering problems and

    implement solutions and remedial measures.

  • 7/30/2019 END 2 001Responsibilites

    11/19

    ESTIMATING MANAGER

    (Bid Development/Estimating)

    Responsible to the SR Proposal Manager for;

    Ensuring the Estimating Supervising Engineers

    implementation of updated estimating system

    parameters, standards and procedures in the bid

    estimates to achieve a highly competitive bid proposal.

    The preparation of bid cost estimates and obtain theapproval of the Sr. Proposal Manager, Engineering

    Manager and the Executive Management.

    TECHNICAL PROPOSAL SECTION HEAD

    Responsible to the Sr. Proposal Manager for the

    preparation of the bid, technical & commercial proposal

    requirements, and documentation works, ensure clients

    requirements has been prepared and submitted in

    accordance with the instructions.

  • 7/30/2019 END 2 001Responsibilites

    12/19

    ESTIMATING SUPERVISING ENGINEER

    (Civil, Mechanical, Electrical & Instrumentation)

    Responsible to the Estimating Manager (Bid Development

    /Estimation Section) for the supervision of the Engineering

    Department Estimating Section, respective estimatingworkloads. Review and collate all estimates from Estimating

    Engineers and discuss assumptions and considerations made

    prior to presentation to his immediate superior for final pricing.

    TECHNICAL PROPOSAL SUPERVISING ENGINEER

    (Technical Bid Proposal & Central Documentation Control)

    Responsible to the Technical Proposal Section Head for;

    The supervision and implementation of the Technical Proposal

    Section & Central Documentation Control Section, operations

    and procedures.

    Formulate and perform write-ups for bid execution and

    prepare other bid technical proposal required for the submittal

    and to review all those proposals prepared by Bid

    Proposal/Planning Engineers prior to finalization and

    incorporation on the technical proposal. Check final bid

    technical proposals prior to submission.

  • 7/30/2019 END 2 001Responsibilites

    13/19

    COMMERCIAL PROPOSAL SUPERVISING ENGINEER

    (Commercial Bid Proposal & END Documentation)

    Responsible to the Technical Proposal Section Head for;

    The preparation of bid commercial proposals, ensure clients

    commercial requirements are submitted in conformity with

    their instructions, supervision of the END documentation and

    maintain all classified documents strictly confidential for

    accessed by the authorized personnel only.

    PROPOSAL SUPERVISING ENGINEER

    (Engineering Drafting at END, Head Office, Dammam)

    Responsible to the Technical Proposal Section Head for;

    Preparation of facility layout plans and detail drawings, lifting

    and rigging procedures, project organization charts and performall other drafting works as required for bid submittals.

  • 7/30/2019 END 2 001Responsibilites

    14/19

    ESTIMATING ENGINEER

    (Civil, Mechanical, Electrical & Instrumentation)

    Responsible to the respective Discipline Estimating Supervising

    Engineer for;

    Quantifying the volume of work on each assigned specific disciplinecontained in the bid documents as per available bid drawings,

    specifications, applicable reference documents, and the bid scope of

    work.

    Identify MMG major supplied permanent plant materials and

    subcontract items. Prepare Material Cost Request and request for

    Subcontract Quotations.Attend and prepare report of Job-Ex Meeting and Site Visits.

    PROPOSAL ENGINEER

    (Planning / Scheduling)

    (Technical Bid Proposal & END Documentation)

    Responsible to the Technical Bid Proposal Supervising Engineer for;

    Development of bid construction schedules in bar chart or CPM

    (Critical Path Method), preparation of Manpower and Equipment Loading

    Charts and coordinate with other department of availability of

    resources to forecast a realistic time frame for incorporation in the bid

    construction plan schedule.

  • 7/30/2019 END 2 001Responsibilites

    15/19

    DOCUMENT CONTROLLER (Head OfficeDammam)

    (Commercial Bid Proposal & END Documentation)

    Responsible to the Commercial Proposal Supervising Engineer

    (Commercial Bid Proposal & END Documentation) / Technical

    Proposal Section Head for;

    Receiving, recording, distribution of files and maintain all

    incoming and outgoing documents in an orderly and controlled

    manner. This includes bid documents from the Central

    Documentation Control Section, other departments and from other

    external source. Assist in the preparation and assembly of bid

    packages.

    Maintain in controlled manner all existing engineering files, keep

    all engineering references, books, brochures and other relatedengineering magazines in an orderly manner at the office library.

    Controlling the allocation of the Conference Room.

  • 7/30/2019 END 2 001Responsibilites

    16/19

    DRAFSTMAN (Head OfficeDammam)

    (Technical/Commercial Proposal & Doc. Section)

    Draftsman assigned in the Engineering Head Office in Dammam is

    directly supervised by the Drafting Proposal Supervising Engineer, his

    main responsibilities includes:

    Drafting of layout plans for temporary building facilities for personnel

    camp, project site offices, warehouses, fabrication shops, storage

    buildings, lay down yards, maintenance sheds, painting and

    sandblasting sheds, etc for bid technical submittal requirements and

    for awarded projects.PRINTER

    (CDC SectionSecond Floor Printing & Archive Room)

    The CDC Document Controller/Printer is responsible to the Technical

    Bid Proposal Supervising Engineer, his main responsibilities includes:

    Execute and control the Central Documentation Control Section

    documentation (2nd floorprinter & archive room) activities. Receive

    record, file and maintain archive all incoming documents and

    reproduce distribution copies where necessary.

  • 7/30/2019 END 2 001Responsibilites

    17/19

    PROJECT TASK FORCE / STEEL FACTORY ENGINEERING / FIELD

    ENGINEERING SUPPORT GROUP SUPT. / SUPERVISING ENGINEER

    Is responsible to the Sr. Proposal manager for organizing and

    managing the nominated Task Force for newly awarded projects

    and management of the Site Engineering Support Group for:

    Supervise the Project Task Force comprising of appointed

    members from the Engineering Department assigned for civil,

    mechanical, electrical & instrumentation discipline engineering

    works, engineering documentation, drafting and as-built works.

    Preparation and submission of engineering contract deliverables,preparation of quantity material take offs for MMG and costumer

    supplied permanent plant materials.

    Provide technical and engineering requirements specified in the

    contract scope of work and required by the Project Manager.

    FIELD ENGINEERS

  • 7/30/2019 END 2 001Responsibilites

    18/19

    FIELD ENGINEERS

    (Project Task Force / Field Engineering Support Group)

    The Engineers assigned in the Project Task Force for newly awarded project or

    Field Engineering Support Group is directly under the supervision of the Project

    Task Force Head. His main responsibilities includes:

    Responsible for the activities of their respective engineering works discipline,including preparation of material quantity take off, sub-contract works, estimate

    quantity & cost for change orders, resolve engineering field problems and other

    engineering works directed by the Site Engineering Supt. and/or Supervising

    Engineer.

    DOCUMENT CONTROLLER

    (Project task Force / Field Engineering Support Group)

    The Document assigned at the project Task Force or Field Engineering Support

    Group is directly under the supervision of the Task Force / Field Engineering

    Support Group Engineering. His main responsibilities includes:

    Collect Issued for construction Drawings (IFC), specifications, standard

    references and other documents necessary to start the project from the

    costumer and implement control of incoming documents as per procedure.

    Collect all bid drawings, project bid documents and data turnover by the

    Engineering Department (END) Document Controller to the project Task Force

    Supervising Engineer during the Hand-over of the project through the assigned

    Project manager and implement documentation control procedure.

  • 7/30/2019 END 2 001Responsibilites

    19/19

    DRAFSTMAN

    (Assigned at Project Site Engineering Support Group)

    Draftsman in the Project Task Force or Project Site Engineering

    Support Group is directly supervised by the Project Task Force /

    Field Engineering Support Group Site Engineering Head, his

    responsibilities includes:

    Perform drafting works for fabrication shop detail drawing

    including isometric drawings, perform, As-built drawings and

    maintain control of drawings, developed and draft lifting & rigging

    plans.

    PROCEDURES

    The details of all actions and responsibilities contained in this

    documents are to be found in the department level 3 procedures

    and form the basic requirement for the operations and control of

    the sections mentioned.