Kinley Construction Group's energy brochure
Popular Tags:
8
CONSTRUCTION ENERGY
Transcript
Page 1: Energy Brochure 2013

CONSTRUCTION

ENERGY

Page 2: Energy Brochure 2013
Page 3: Energy Brochure 2013

AIRPORTS GOVERNMENT ENERGY

RAILROAD ENVIRONMENTAL FUEL FLUSHING

WWW.KINLEYCONSTRUCTION.COM

INDUSTRIAL GENERAL CONTRACTORBUSINESS DIVISION FOR:

ENERGY

3

Page 4: Energy Brochure 2013

Design / Build project to construct a new fuel storage facility. Work included clearing a 5 acre wooded site, clearing & grubbing, site grading, chemical soil injection, new underground storm sewer, sanitary sewer, water lines, industrial waste, oil / water separator, retention pond, waste water tanks with carbon filtering system, 4 acres of concrete apron paving with various structural foundations,concrete tank containment area, 2,400 SF custom built office building, 17,000 SF custom built warehouse with filling area and floor scales, bulk tank farm consisting of 40 storage tanks for various fuel, lubricants and solvents, 2 blending tanks with nitrogen bubbling system, pumps, motor operated valves, 16,000 LF of 3” piping, overhead piping rack with manifolds, truck scale with canopy and kiosk, site electrical work, new overhead lighting, fully automated tank inventory / dispensing system with controls, PLC, painting, fencing, fire protection system, phone system, landscaping, sprinkler system, flushing, testing, startup and commissioning.

New Storage Facility – Mineral Wells, TX

Natural Gas Compressor Station – Benbrook, TX

Project included the pouring of all equipment pads, setting equipment, installation of pipe, valves and fittings for compressors, coalescing filter, dehy after scrubber, glycol tower, salt separator, slug catcher, meter skid, regen skids and slop tanks.

4

Page 5: Energy Brochure 2013

Crude Oil Off-Loading Facility– St. James, LA

Ethanol Off-Loading Facility– Arlington, TX

Complete construction of entire facility. Phase one included installation of main line rail switches, 16,300’ of 115# rail, siding extension, 800’ double sided 26 spot rail car unloaded rack. Crude oil is transported from the rack to the storage facility via the (2) 250 HP vertical turbine pumps. Facility also includes a complete industrial waste water system including an oil water separator. Construction also includes the installation of terminal buildings for facility management and crew.

Work consisted of the construction of two 25,000 bbl diesel fuel tanks, concrete containment around new tanks and one existing tank, liner, fuel distribution piping, double wall underground pipe, paint tanks and new & existing pipe, cathodic protection, electrical distribution and controls. Site work included clean & grub, excavation for new tank ring wall, excavation for containment walls, excavation for under ground pipe, new asphalt paving, and fencing. Work also included drain pipe, connection to existing oil water separator, and new eight spot rail car unloading rack.

4 5

Page 6: Energy Brochure 2013

Work consisted of the installation of 26,000 feet of ½ thru 12” carbon steel pipe to receive and dispense various fuels for a new terminal. To support the pipe we installed 97 tons of structural steel pipe supports and grouting the bases. We installed 12 each transfer pumps to transfer fuels to the fueling rack from eight new tanks installed by others. We also installed additive tubing, injectors and set owner supplied additive tanks. At the fueling rank we furnished and installed the fueling skids. Piping included underground drain lines to a new EOP tank. The new E-85 pipe was heat treated and received 100% x-ray testing. All above ground pipe was painted.

New Fuels Terminal – Mustang Ridge, TX Crude Oil Loading & Off-Loading Facility–Van Hook, ND

Fuel Storage Tanks – Elko, NV

Construction of two (2) new 25,000 bbl above ground steel diesel fuel storage tanks, tank farm piping (diesel, fire foam, and water draw-off), tank car unload rack piping, pump skids, new 6” take car unloading arms, electrical, site lighting, cathodic and containment basin, sludge drying bed, 530LF retaining wall, site utilities (including sewer, storm, fire, water, and industrial waste), new asphalt roadway and tanker truck turnaround.

6

Page 7: Energy Brochure 2013

Crude Oil Loading & Off-Loading Facility–Van Hook, ND

Crude Transload – Carr, CO

Installation of new crude oil loading and off-loading facility. Scope included erection of 90,000 bbl crude oil stor-age tanks, two 800 gpm pumps, 8 truck off-loading rack and a 9 spot rail loading platform 700’ long,metering at all positions, office complex, and 75’ x 11’dia. VCU Flare system. Project also had over 120,000 cy of site civil work balancing and track work included 20,000 feet of rail, sub-ballast and ballast work and 9 switches.

Our scope of this facility was to design, fabricate and erect 4 transload carts to move crude oil from trucks to rail. We alsoinstalled an office facility with associated utilities, designed and installed an enclosed air compressor station along with 2,500 feet air compressed air line to 50 rail car spots and provided site civil and grading work.