Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected] Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664 1
Transcript
Page 1: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

1

Page 2: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

2

Date: October 10, 2017 Subject: Adelanto Greenhouse project and Power generation requirements Reference: Two FlexEnergy Turbine® , Model GT333S, rated at 333 KW per unit Dear Mr. Khanbeigi, Attached is our proposal with multiple options for Two FlexEnergy gas turbine systems in weatherproof enclosure and Grid parallel for your Greenhouse Facility in Adelanto. The economics of the project for cost of power generation are very attractive, especially when compared with the cost of electricity from the utilities. Our proposal includes the “dual mode” feature that we discussed which provides uninterrupted power for your facility regardless of grid availability. Because the turbines can also load follow, they can modulate with demand, have redundancies and provide power at all the times. As per your requirements, we have not included any cost for heat recovery inclduing absorption chillers, however they can always be added in the future should project require. Many hours per year, we foresee just one turbine operating and thus the operating cost would drop further. Our cost analysis has been based on conservative estimation, and E&E offers the system on a turnkey installation contract. Please note the pricing as listed and itemized on page 22, and a separate financial projections are in the attachments. In brief analysis, the system in operation will offer significant operating cost reduction of $233,000 per year at 350KW per hour production, and cost of electricity at 7.7/KW. At 600 KW out put, the cost of power will be reduced to 6.2 cents per KW and an annual saving of $608,000 per year. The details are depicted in the one page financial overview for each possibility. I must add that, Flex Energy turbines, are a heavy-duty units built for 24 hours operation and highest uptime in the industry. As many of them been operating in the outdoors of Bokken Oilfields. E&E and FlexEnergy Cop. Will be providing full support services as well as field engineering and installation services on a turnkey basis For your information, E&E carries full professional insurance to include General and Product liability as well as Engineering Errors and Omission up $5 Million Dollars per project. We trust that the proposal meets with your approval and look forward to addressing any questions that you may have as you review our information. Sincerely, Amir A. Sardari Amir A. Sardari President & CEO Energy & Environment

Page 3: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

3

TABLE OF CONTENTS

SCOPE OF SUPPLY............................................................................... 4

TECHNICAL DATA ............................................................................ 10

SERVICE ............................................................................................... 20

PRICING AND TERMS ....................................................................... 21

This proposal in its entirety is copyrighted material and represents the proprietary work product of FlexEnergy Energy Systems, Inc, a subsidiary of Energy & Environment, Inc. The material contained herein was prepared specifically for the recipient named above, and no other use, reproduction, or distribution of this material in whole, in part, or with respect to the concepts and strategies presented, is permitted except with the prior express written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding the foregoing, the recipient is authorized to reproduce this proposal for the sole purpose of evaluating the material for consideration of the purchase of products and services. This proposal does not constitute an offer to sell. An offer to sell will only exist upon order acknowledgement of a customer’s purchase order.

Page 4: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

4

SCOPE OF SUPPLY

Qty Two (2) Flex Turbine® GT333S Model 333SM Gas turbine(s), Rated at 333 KW at ISO conditions, 60 F, Sea Level

Each GT333S gas turbine has the standard FlexEnergy English language control panel interfaces and markings, and will be configured as follows: 480V/60Hz Generator The GT333S gas turbine will be configured with a 480V, 60Hz synchronous generator, control panel for Grid parallel operation. Grid Parallel Operation The GT333S gas turbine will be configured to operate in parallel with the local utility grid and with option to operate in grid-isolated operation based on the control of the facility’s relay protection and electrical control system (provided by customer). The latter is expected to detect the failure of utility power, disconnect the facility power bus used by the gas turbine from the utility grid, and signal the gas turbine to enter grid-isolated operation. When the facility controls detect the return of utility power, they are expected to perform a synchronized reconnection of the utility grid to the facility power bus used by the gas turbine, and direct the gas turbine to return to grid-parallel operation. Please note that all utility interconnection permits and required protection devices are the responsibility of the customer. Medium Caloric Value Fuel The GT333S gas turbine will be configured for a medium caloric value gas fuel with a Lower Heating Value (LHV) Wobbe Index between 800 and 1900 wBtu/ft3. Please see the detailed project-specific details and other fuel requirements in Section 2 Technical Data “Fuel Delivery Conditions” of this proposal. Utility grade pipeline gas will be used for this application Outdoor Enclosure - With Exhaust Stack The GT333S gas turbine will be rated and configured for outdoor installation and use in non-hazardous locations, and includes a standard exhaust stack. The ambient temperature rating is -10°F to 115°F. Factory Acceptance Test (FAT) FlexEnergy will offer extended project services to include a factory acceptance test (FAT) witnessed by the customer or authorized agent and performed according to FlexEnergy Inspection and Test Plan (ITP). Isolation Mounts The GT333S gas turbine will include a set of twelve (12) isolation mounts and associated base frame attachment hardware. The mounts are designed to help mitigate the forces and shocks experienced when transporting the GT333S between customer sites using a typical, sprung

Page 5: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

5

suspension, flatbed trailer. Each isolation mount design includes holes for fasteners to connect the mount to an underlying structure. Integrated Waste Heat Recovery (Cogen) The GT333S gas turbine will be configured with an integral hot water heat exchanger (copper tubing with aluminum fins) suitable for cogeneration applications. CARB Certification The GT333S gas turbine will include a California Air Resources Board emissions certification as part of the Distributed Generation Program. To meet these emission levels, the customer must use pipeline natural gas while utilizing the internal waste heat recovery (co-gen) option. Additionally, the customer must operate in grid-parallel mode or have sufficient electrical load requirements to allow the GT333S gas turbine to maintain 100% power output based on the ambient conditions. Any deviation from these required operating conditions will cause the turbine to violate the CARB emissions requirements.

Ancillary Equipment

Fuel Shutoff Solenoid Valve Each gas turbine will include a ship loose fuel shutoff solenoid valve. Fuel Gas Strainer Each gas turbine will include a ship loose fuel gas strainer.

Fuel Gas Filter Each gas turbine will include a ship loose grade 7 filters. Fuel Gas Liquids Safety Sensor Each gas turbine includes a safety sensor that is designed to detect the presence of liquids (hydrocarbon or water) passing through the fuel gas train. This sensor is intended to be placed near the delivery point to the turbine and is directly integrated into the gas turbine controls.

Generator Braking Resistor (GBR) Each gas turbine will include a separate GBR module designed to facilitate starting and stopping of the GT333S gas turbine by absorbing excess energy through a resistive load bank. IP LAN Customer/Service Remote Communication Kit Each gas turbine includes an IP LAN remote communication kit that will support LAN remote communication. Provides Internet Protocol (IP) communications access to the gas turbine controls through a pre-configured (DNS globally accessible) fixed IP address. Accepts RJ45 connector from either a 10Mbps or 100Mbps Ethernet LAN. Fuel Gas Regulation

Page 6: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

6

Gas pressure regulation upstream of the GT333S gas turbine will be the responsibility of the customer.

Equipment Options Supervisory Control Master (SCM) - Introduction: Supervisory Control Master Supervisory Control Master (SCM) An SCM will be included to provide group management, and import control of the GT333S gas turbines. The SCM provides single point communication and control with customer-provided utility protection relay and electrical control system to facilitate dual mode operation. Please refer to the following page for detailed information.

Tier 2 control for a group of FlexEnergy turbines will be performed by a single Supervisory Control Master (SCM) per site. The Supervisory Control Master (SCM) is used to monitor the state of the gas turbine generation buss and control the gas turbines’ electrical performance as a group. The SCM incorporates the following functions:

• Monitors the power produced by the gas turbines as a set • Import control • Turbine scheduling • Data collection • Communication to operations and service to personnel • Runs service utilities for diagnostics, log retrieval and uploads • Allows the operator to direct whether individual gas turbines operate automatically under the

control of the SCM or manually • When grid-isolated, automatically starts and stops individual gas turbines as directed by control

parameters • Sequences the gas turbine black starting process (if the turbines are equipped with black start

features) • VPN firewall provides a common point for system communications • Interfaces site specific equipment (SCADA/DCS, power meters, gas analyzers, fuel conditioning

equipment, etc.)

The SCM consists of a rack with servers, a VPN firewall, a switch and a UPS as follows: 1. The servers will perform the following functions:

a. Power management – shutting down or starting turbines to optimize the number operating for the load

b. Import control – managing the output power of the turbines to ensure import minimum required by local utility is satisfied

c. Turbine scheduling – starting or stopping turbines based on an operating schedule d. Data collection for billing purposes (if the SCM is attached to such customer-

supplied meters)

Page 7: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

7

e. Data storage f. Sending alarm and trip emails to service or operations personnel g. Turbine controller Service Tool h. Generator Protection Unit (GPU) access i. Event log access j. Analysis log access

2. The firewall will provide internet VPN to customer and FlexEnergy headquarters: a. Customer site control b. FlexEnergy service access c. Site status monitoring d. Billing data collector (if the SCM is attached to such customer-supplied meters)

The SCM will communicate with the turbines via Ethernet busing. Scope of Supply FlexEnergy provides the SCM as an external unit in its own enclosure. Control and power connections between the gas turbine and the SCM are provided by the facility. FlexEnergy will provide up to twenty (20) hours of support and engineering services as related specifically to the SCM. If additional time is required, it will be charge at a fixed hourly rate. Assembly Layout The SCM is contained in a server rack. It is a stand-alone package suitable for floor mounting and includes casters. Construction is solid steel. Front door is steel frame with a window and back door is steel mesh. Both are lockable. Dimensions are 23.6” wide x 26.1” tall x 35.4” deep. Maximum weight of the system is 1768 lbs. The rack complies with the following industry standards:

• DIN 41491 Part I • EIA RS310-D • IEC 297-2

The SCM interface is via software accessed through a suitable PC with monitor. Input power requirements are 120VAC / 60Hz. The enclosure is designed for IP20 ingress protection. Interface Connections The SCM communicates with each gas turbine through IP LAN and/or RS485 hardwired connections installed by the customer or others from the SCM to each gas turbine. The SCM is also designed to include a connection for a customer IP LAN. This LAN connection should have a minimum of a T1 level ISP access. A typical T1 access would consist of transfer rates of approximately 1.5 Mbps both up and down regardless of the time of day. Typical Supervisory Control Master

Page 8: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

8

Standard Project Support Services FlexEnergy has a comprehensive knowledge base and the experience in gas turbine applications to support you through the design, installation, and commissioning activities for your project. FlexEnergy will provide up to twenty (20) hours of standard project support services via email and telephone to answer questions related to the installation of equipment and interconnection of components to ensure proper gas turbine operation and serviceability. These support services include the following electronically provided project documents and discussions related to the interpretation of these documents:

GT333S Planning Guide & Installation Guide GT333S Operating Manual GT333S Spare Parts List GT333S Remote Communication Manual GT333S General Arrangement Drawing GT333S Pre-commissioning Installation Checklist GT333S Customer Electrical Connection Interface Drawing

Additionally, if requested, FlexEnergy will provide one review and comment of customer’s installation drawings as part of these project support services. Standard project support services are provided solely in FlexEnergy’s capacity as an equipment manufacturer, intended to provide information that would lead to the best performance and serviceability of the gas turbines. Since these documents are based upon FlexEnergy experiences with projects that may not be exactly like your project, FlexEnergy strongly encourages every customer to work with their engineers responsible for the project, along with their contractor, to execute the design and installation of the gas turbines and ancillary equipment appropriate for the site. Any associated construction and construction management, including electrical distribution panels, fuel gas piping, vent lines, waste heat recovery piping (if applicable), conduit, and conductors will be the customer’s responsibility. If any additional documentation or special testing is required, it will be charged and billed separately. Examples of services not included in this proposal are, but are not limited to, performing special tests at the FlexEnergy factory or customer site required to meet local, state or national codes, standards or

Page 9: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc. Adelanto Greenhouse Proposal-Confidential information

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

9

agency regulations; providing FlexEnergy factory or FlexEnergy sub-supplier component inspection reports; and providing third party agency certifications. FlexEnergy can provide a proposal for special tests, data or a Vendor Data Requirement List (VDRL) defined by the customer. Every FlexEnergy turbine will be fully tested in accordance with FlexEnergy’s ISO 9001:2008 registered quality system and issued an individual Performance Acceptance Certificate. Gas turbine Commissioning Services Initial startup and commissioning of the FlexEnergy gas turbine generators will be performed by a certified FlexEnergy service technician. This will occur after the installation has been completed by the customer and the customer has completed the FlexEnergy customer installation checklist. The FlexEnergy service technician will complete a commissioning checklist, and perform several other checks and tests to ensure the gas turbines are ready for initial startup and to verify proper performance. These checks and tests may include, but are not limited to:

• Checking the gas turbines for damage • Verifying proper installation per the Planning & Installation Guide • Verifying adequate ventilation • Verifying anchor bolt torque • Confirming the fuel system has been properly connected and leak tested • Confirming the water system has been properly connected and leak tested • Inspecting the engine air inlet and exhaust • Inspecting the coalescer, fuel and fuel regulator vents • Removing the internal shipping brackets • Removing any shipping debris and cleaning interior spaces • Setting the fuel pressure regulator • Purging the fuel line and venting to atmosphere • Checking the turbine coolant level • Checking the fuel gas booster coolant level • Verifying a minimum water flow (if applicable) • Checking and testing power wiring • Checking and testing external control circuits • Checking and testing remote control and monitoring systems • Starting the gas turbines and verifying key operating parameters

The technician will register the gas turbine generators with FlexEnergy upon completion of the commissioning process to ensure proper FlexEnergy warranty coverage. Commissioning services are charged and billed separately. Please refer to the “Commissioning” section for more information.

Page 10: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

TECHNICAL DATA

General The following table describes the general characteristics of the FlexEnergy GT333S gas turbine.

Prime mover type Gas turbine

Rated power 323 kW / 333 kW at ISO conditions (59°F, sea level, 60%RH)

Maximum power 345 kW / 359 kW at 0°F Electrical output 480 Vac, 60 Hz, 3 phase

Fuel type Propane or LPG

Fuel LHV Wobbe Index range 1200 - 1440 wBtu/ft3 1380 - 1900 wBtu/ft3

Fuel pressure range Low pressure Codes and Standards and Facility Certifications The gas turbine is designed to meet the applicable sections of the codes and standards specified below.

ISO 9001:2008 Registered NFPA 70 (2014) – National Electrical Code NFPA 37 (2015) – Stationary Combustion Engines NFPA 54 (2015) – National Fuel Gas Code ANSI Z223.1 ISO 3744 (1994) – Acoustics – Determination of Sound Power Levels of Noise Sources using Sound Pressure NEMA 250 (1997) – Enclosures for Electrical Equipment (1000 Volts Maximum) ANSI C84.1 (1995) – Electric Power Systems & Equipment Voltage Ratings (60Hz)

C37.102-2006; IEEE Guide for AC Generator Protection

C37.2-2008; IEEE Standard – Electrical Power System Device Function Numbers and Contact Designations IEEE Std. 67-2005 Guide for Operation and Maintenance of Turbine Generators

EGSA 101P (1995a) – Performance Standard for Engine Driven Generator Sets

NFPA 70E (2015) – Standard for Electrical Safety in the Workplace

Page 11: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Physical The following table describes the physical characteristics of the GT333S package.

Package configuration Outdoor Overall dimensions (not including louvers or anchor attachments) 77.2 W x 167.6 D x 158.1 H in

Ambient temperature range -10°F to 115°F Sound emissions at 1 meter 82 dBA / 77 dBA Weight 14,400 lbm

Note: all dimensions are typical; refer to submittal package for project-specific dimensions

Space and Clearance Requirements The GT333S installed space and clearance requirements for proper operation and maintenance are summarized below. Details will be provided in the FlexEnergy GT333S Planning Guide and GT333S Installation Manual.

Minimum ceiling height, outdoor units No overhead obstructions allowed Minimum ceiling height, indoor units 1 192 in. Minimum horizontal clearances, front, rear and left sides 2 48 in.

Minimum horizontal clearance, right side 2 72 in. Minimum unobstructed floor area 2 196.7 x 250 in.

1 The minimum ceiling height necessary to provide a vertical clearance of 102 in. above indoor units for ventilation

and maintenance access. National or local code may require more clearance. 2 National or local code may require additional clearance in front of the control panel, with a corresponding increase

in minimum unobstructed floor area.

Page 12: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Figure 1: GT333S Required Installation Clearances

Page 13: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

41ft. 0in.

Comm

, Controls, Electrical

GT333S

Gas | Water

6ft. 0in.4ft. 0in.

Comm

, Controls, Electrical

GT333S

Gas | Water

6ft. 0in.

4ft. 0in. 4ft. 0in.

12ft. 10in.

6ft. 4in.

20ft. 10in.

Comm

, Controls, Electrical

GT333S

Gas | Water

6ft. 0in.

Figure 2: Example of Multiple GT333S Layout and Spacing Requirements

Note: all dimensions are typical; refer to submittal package for project-specific dimensions

Page 14: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Shipment and Storage

The GT333S gas turbine will be packaged for shipping to accommodate storage for up to six months, indoors or outdoors, whether shipped domestically or internationally. The ancillary equipment and additional “ship-loose” items such as the GBR(s) and exhaust stack(s) (if part of the gas turbine configuration) will also be palletized and shipped with the gas turbine itself. Fuel Delivery Conditions The GT333S gas turbine will be designed to operate within the following fuel conditions:

Gas Turbine Model Fuel type

Fuel system

Min press.a, b

Max press.a, b

Max flow a, c Min temp.a

Max temp.a, f

333SM

Medium caloric value gas 800-1200 wBtu/ft3

Low pressure

4” WC 1 psig 107 scfmd See notee 115°F

333SM

Medium caloric value gas 800-1200 wBtu/ft3

High pressure

75 psig 140 psig 107 scfmd See notee 175°F

a Measured at inlet of automatic shutoff value. Does not include pressure drop through pressure regulator or fuel

filter/strainer. b Pressure requirements for standard gas turbines. Pressures outside these limits may require additional options. c Maximum flow for 0°F engine inlet air and cold startup conditions. Higher engine inlet air temperatures or warm

startup conditions require less flow. d Maximum flow for medium caloric value gas with Wobbe Index of 800 wBtu/ft3. Medium caloric value gas with

different heat content may have different requirements. e 18°F above fuel hydrocarbon and water dewpoints or 35°F, whichever is greater. f May be limited by other fuel system components such as the regulator.

Page 15: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Fuel Constituent Limits (By Volume) The fuel supplied to the GT333S gas turbine must meet the following constituent limits:

Oxygen 10% maximum 1 Hydrogen 5% maximum 2 Fuel-bound nitrogen 40 ppm threshold 1,3 C3+ (propane, butane, etc.) Limits based on hydrocarbon

dewpoint 18°F dewpoint suppression

1 Applies to all fuels. Please note that N2 in the fuel is not considered fuel-bound nitrogen. Every 41 ppmv of fuel-

bound nitrogen is estimated to increase NOx emissions by 1 ppmv @ 15% O2. 2 Applies only to natural gas and low caloric value gas. Other gaseous fuels may require analysis to assess compatibility. 3 NOx in exhaust increases by 1 ppmv.

Fuel Impurity Limits The fuel supplied to the GT333S gas turbine must meet the following impurity limits:

Hydrogen sulfide 6500 ppm by volume maximum 25 ppm by volume maximum

Halogenated organic compounds 200 ppm by volume maximum Particulates 10 micron average size Alkali metal sulfides (Na, K, Li) 0.6 ppm by mass maximum Siloxanes 60 ppb by volume maximum Calcium 0.5 ppm by mass maximum

Page 16: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Note: a ±15kW, steady state output, at ISO conditions (59°F @ sea level, 60% RH) unless otherwise noted, pipeline natural gas, altitude

derate of approximately 3.5% per 1000 ft b at engine air inlet on gas turbine enclosure

Note: a ±2 percentage points, steady sate output, without gas booster, at ISO conditions (59°F @ sea level, 60% RH) unless otherwise

noted, pipeline natural gas b at engine air inlet on gas turbine enclosure

Page 17: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Heat Recovery Specifications

Maximum inlet pressure 125 psig Minimum inlet temperature 35°F Maximum outlet temperature 205°F Maximum flow 225 gpm Minimum flow (below which heat recover disabled)

80 gpm

Heat rejection to heat recovery system water See figure

Heat Recovery Water Quality Requirements

Corrosivity (hardness, pH, total dissolved solids, temperature at inlet, alkalinity) Langelier Index: 0 to 1

Iron < 2 ppm Sulfate < 50 ppm Chloride < 50 ppm Nitrate < 2 ppm Silica < 100 ppm Oil and grease < 5 ppm Ammonia < 1 ppm

Typical Heat Transfer Performance (±15%)*

*Note: There is a 3kW electric derate when using co-gen. Inlet Air Specifications

Page 18: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

The GT333S gas turbine inlet air specifications are:

Maximum flow 4600 scfm Maximum allowable inlet duct pressure loss 0.25 in. WC at 4600 scfm

Maximum positive inlet pressure 0.5 in. WC Maximum temperature 115°F Minimum temperature -10°F

Exhaust Gas Specifications The GT333S gas turbine exhaust gas specifications are:

Maximum flow 4600 scfm Maximum exhaust duct pressure loss without heat recovery option 5.5 in. WC at 4600 scfm

Maximum exhaust duct pressure loss with heat recovery option 0.75 in. WC at 4600 scfm

Maximum exhaust gas temperature 545°F Package Ventilation Specifications The GT333S gas turbine ventilation requirements are:

Minimum ambient air flow 4135 scfm

Gas turbine heat load to ambient air 272,970 Btu/hr for low pressure system 255,911 Btu/hr for high pressure system

Generator The GT333S gas turbine generator specifications are:

Interconnection type Grid-parallel operation Generator connection 4-wire Wye

Rated generator output 380 kW, 380 kVA, 480Y/277, 3 phase, 60 Hz, 1.0 PF

Generator full load amps 457 A Synchronous speed 1800 rpm Exciter type Brushless, rotating rectifier with PMG AmbºC/Insul 40/H1

Page 19: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Interconnection type Grid-isolated operation Generator connection 4-wire Wye

Rated generator output 380 kW, 475 kVA, 480Y/277, 3 phase, 60 Hz, 0.80 PF lagging

Generator full load amps 571 A Synchronous speed 1800 rpm Exciter type Brushless, rotating rectifier with PMG AmbºC/Insul 40/H1

Internal Protection Functions The GT333S gas turbine is designed to provide the following internal protection functions:

Synch check relay Generator/intertie bus RMS under voltage Generator directional power VAR import and export Generator phase current unbalance Generator phase voltage unbalance Generator/intertie bus RMS overvoltage Generator/intertie bus over- and under-frequency

Communication Inputs / Outputs The GT333S gas turbine is designed to provide the following communication inputs and outputs:

Floating-point read-only output: Electric power output Number of starts Generator output line-to-line voltage Gas turbine serial number Generator speed Compressor inlet temperature Generator power factor Fuel temperature Generator power factor Heat recovery water inlet temp Output power setpoint Heat recovery water outlet temp Powered hours Running hours Floating-point read/write values: Power output setpoint Heat recovery water temperature setpoint Digital read-only values: Engine running Engine not ready to start

Page 20: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

Engine ready to start Any alarm active Any trip active Digital read-only string values: First Out Alarm First Out Trip Digital write-only command values: Remote start Remote stop

Controls The GT333S gas turbine is designed to provide the following control inputs and outputs:

Inputs / outputs Remote emergency stop Remote start/stop Fault Input from Supervisory Device Heat Exchanger On/Off Alarm Indicator Fuel Inlet Solenoid Valve Power Output Control Device

Ancillary Equipment Supplied as Separate Ship Loose Parts Generator Braking Resister (GBR)

Enclosure NEMA 3R Overall dimensions without exhaust duct option 43 W x 63 D x 30 H in

Ambient temperature range -10°F to 115°F Weight without exhaust duct option 594 lbm

Note: all dimensions are typical; refer to submittal package for project-specific dimensions

SERVICE

Summary FlexEnergy has a skilled service network dedicated to customer support. This network of highly trained and certified technicians ensures that customers experience superior response and support. FlexEnergy technicians are respected experts in their field with extensive product and application knowledge. Customer Training FlexEnergy will provide training to the customer’s designated operator to safely operate all equipment provided by FlexEnergy. Basic onsite operational training and equipment startup and shutdown will be included as part of regular commissioning activities. Operation of the GT333S gas turbine will also be outlined in detail in the

Page 21: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

FlexEnergy GT333S Operating Manual. Further training by FlexEnergy can also be made available under a separate proposal. Connectivity Every gas turbine has the capability to be remotely monitored and diagnosed through Internet connectivity. This provides our service team with the tools and data required to identify and resolve problems quickly, even for unattended operations. Parts Availability FlexEnergy maintains an inventory so customers will have the right parts when and where they are needed. PRICING AND TERMS

Pricing Option (I) 2 X Flex Turbine system, with weatherproof Enclosure as per specification $ 872,100.00 Total Rated output 660 KW, weatherproof enclosure 8% sales Tax $ 69,768.00 Total Equipment Cost $ 941,868.00 Estimated Installation cost and site engineering, permitting(within 10% range) $ 492,647.00 Total estimated system cost installed $1,364,747.00 Phase (I) Engineering and design to confirm all of the parameters $25,000.00 ( 50% of This phase will be credited toward total system cost. During this phase often in the confirmation, much cost saving can be achieved and the installation cost to be fully confirmed) Total estimated Project Cost General

1. The pricing above is for equipment and project support services only. 2. All pricing is in US dollars. 3. FlexEnergy attached Terms and Conditions apply. 4. FlexEnergy attached Equipment Warranty applies to the GT333S gas turbine(s). 5. This proposal is valid until November 10, 2017. 6. FlexEnergy reserves the right to amend proposals at any time. 7. Final pricing is dependent on site fuel gas analysis showing levels of all impurities. 8. Unless otherwise stated, customer shall pay all VAT, sales, and other taxes, duties, tariffs, and levies of

whatever nature chargeable on the purchase price of this proposal. 9. All terms of payment are subject to approval by FlexEnergy’s Credit Department. 10. FlexEnergy will provide general comments to the customer solely in its capacity as an equipment

manufacturer. Since these comments are limited to our experience with projects that may or may not

Page 22: Energy & Environment, Inc. - LoopNetimages1.loopnet.com/d2/k_xv2s3ScYFAredSxxXS1... · written consent of Energy & Environment Inc and FlexEnergy Energy Systems, Inc. Notwithstanding

Energy & Environment, Inc.

Corporate Office: 1901 E. Carnegie, Suite 1B, Santa Ana, California 92705 Tel: (714) 545-7805 Fax: (714) 556-6007 E-mail: [email protected]

Central California Office: 33362 Lerdo Highway, Bakersfield, CA 93308 Tell: (661)776-5664

have similarity with the customer’s project and since our background information was gathered under circumstances that may differ from the configuration of the customer’s site, we strongly encourage the customer to contact and work with their engineers responsible for the project. Those engineers, along with their contractor(s), must determine if additional technical or commercial comments are necessary and whether the comments of FlexEnergy are appropriate for their project. FlexEnergy’s comments, suggestions, opinions and statements (whether communicated in writing or orally) are made solely for the customer’s convenience and, such, FlexEnergy makes no warranty as to the appropriateness or suitability of those communications and any reliance by the customer on such is made at the customer’s own risk.

All shipments are from FCA factory, Portsmouth, NH. Commissioning Commissioning is defined as initial start-up and testing of the gas turbine(s) after customer installation has been completed by the customer and the customer has completed the FlexEnergy installation checklist. Natural Gas/Alternate fuel installations are estimated to take 3 days per GT333S gas turbine to commission, based on one technician. If additional technicians are requested, the daily rate will be charged for each technician. Any delays due to customer will be charged at the daily rate per technician. Commissioning will be billed upon incurrence and will not be included in the equipment progress invoices. Service A separate Service agreements will be executed, that will cover full parts and labor warranties for five years and 10 years operation, and its cost is estimated in the financial projections separately and invoiced separately. Payment Terms Payments will be due as follows:

• 30% upon receipt of Order Acknowledgement • 30% 45 days following Order Acknowledgement • Balance upon release to Factory Test


Recommended