Energy Resource Recovery Account (ERRA)Review Of Operations, 2018 Chapters I-VII
i.e.
e.g.
inter
alia
See
Table I-1 2018 Forecast & Recorded Fuel and Purchased Power Revenue Requirement
($000)
i.e.
e.g.
demonstrate
ooo
ooooo e.g.
ex post
ex ante
e.g.
e.g.
discretionary
e.g. e.g.
e.g.
e.g.
See
e.g.
Table II-2 Summary of 2018 Thermal Resource Incremental Bid Cost Exceptions
Table II-3 2017-2018 MSG Transition Cost Impacts
Table II-4 Background Summary of 2018 Resource Capacity and Awards
i.e
Table II-5 Summary of 2018 Day-Ahead Spot Electric Transactions
(Physical and Financial)
e.g.
Table II-6 Summary of 2018 Hour-Ahead Spot Electric Transactions
(Physical and Financial)
i.e.
e.g
Table II-7 Summary of 2018 Spot Gas Transactions
Figure III-1 Typical Hydroelectric Generating Station
e.g.,
i.e.,
Table III-8 SCE Large Hydro Powerhouses
available at
i.e.
i.e.
e.g.,
i.e.
i.e.
Table III-9 SCE Hydro – 2018 Recorded Hydro Production
i.e.,
i.e.,
i.e.
Table III-10 SCE Large Hydro – Equivalent Availability Factor (EAF)
i.e.,
i.e.
i.e.
Table III-11 SCE Large Hydro – Forced Outage Factor (FOF)
i.e.,
available at
e.g.,
i.e.
i.e
e.g.,
Table III-12 SCE Large Hydro – 2018 Scheduled Outages
i.e.
Table III-13 SCE Large Hydro – 2018 Unscheduled Outages
(Lasting Longer than 24 Hours on Units Greater Than 25MW)
e.g.
i.e.,
e.g.
e.g.
i.e.
Table IV-14 SCE Peakers - 2018 Generation and Starts
i.e.
Table IV-15 SCE Peakers - 2018 Fuel Usage & Cost
i.e.
i.e.
i.e.,
i.e.
Table IV-16 SCE Peakers - 2018 Reliability
e.g.,
available at
Table IV-17 SCE Peakers - 2018 Scheduled Outage Results
i.e.,
i.e.,
Table IV-18 SCE Peakers - 2018 Unscheduled Outages Exceeding 24hrs
i.e.,
i.e.
i.e.
Table IV-19 SCE Mountainview - 2018 Generation
Table IV-20 SCE Mountainview – 2018 Fuel Usage & Cost
i.e.
i.e.,
i.e.
i.e.
i.e.
i.e.
i.e.,
Table IV-21 SCE Mountainview - Availability Targets
i.e.
i.e.
i.e.
i.e.
i.e.
i.e.,
i.e.,
Table IV-22 SCE Mountainview - 2018 Availability
Table IV-23 SCE Mountainview – 2018 Reliability
i.e.,
i.e.
e.g.,
i.e
i.e
i.e.
Table IV-24 Mountainview – 2018 Scheduled Outage Extensions and Unscheduled Outages
(Lasting Longer than 24 Hours)
i.e
i.e.
i.e.,
i.e.
i.e
i.e.,
i.e.,
i.e
e.g
i.e
i.e
i.e.,i.e.,
i.e.,
i.e.,
i.e.,i.e.,
i.e.,
i.e.,i.e.,
i.e
i.e
i.e
e.g.,
i.e.,
i.e., i.e
i.e.,
i.e.,
i.e.,
i.e.,
i.e.
i.e.,
i.e
i.e
(i.e.,
Table V-25 Catalina Operations Diesel Fuel
2018 Recorded Delivered Diesel Costs
Table V-26 Catalina Operations Diesel Fuel
2018 Recorded Delivered Diesel Costs
Table V-27 Catalina Operation Propane Fuel
2018 Recorded Delivered Propane Costs
Table V-28 SCE-Owned Solar PV Plants
Id.
See generally
i.e.
i.e.,
i.e.
i.e.
i.e.
i.e.
i.e
See
i.e.
See
Table V-29 SCE Fuel Cells – 2018 Performance
Note 1: The UCSB fuel cell is an electric only fuel cell and does not provide any thermal output.
Table V-30 SCE Fuel Cell – 2018 Fuel Cell Usage and Cost
i.e.
Table VI-31 2018 Record Period Generation
Table VI-32 2012-2017 EAF and FOF Palo Verde Generation
Table VI-33 2018 Palo Verde Generation (Net MWh, 100% Share)
Table VI-34 2018 Palo Verde Unit 1 Scheduled/Unscheduled Shutdowns
See
available at
See
available at
Table VI-35 2018 Palo Verde Unit 2 Scheduled/Unscheduled Shutdowns
Table VI-36 2018 Palo Verde Unit 3 Scheduled/Unscheduled Shutdowns
Table VI-37 Nuclear Fuel Energy Production and Expense
Table VI-38 Typical Reload Nuclear Fuel Procurement Schedule – Months
e.g.
i.e.
available at
available at
See
See
available at
available at https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill id=201720180SB100.
inter alia
i.e.
See
Table VII-39 Conventional Projects Costs Recovered Through CAM and ERRA
January 2, 2018 Through December 31, 2018
See
force majeure
inter alia
Table VII-41 SCE BTM Contract Consents and Consents to Assignments
January 1, 2018 through December 31, 2018
Table VII-42 Contract Capacity Demonstrations
January 1, 2018 through December 31, 2018
Table VII-43 BTM Contracts that Terminated
January 1, 2018 Through December 31, 2018
Table VII-44 BTM Contracts that Achieved Commercial Operation
January 1, 2018 Through December 31, 2018
i.e.
Table VII-46 Conventional Projects that Began Operations January 1, 2018 Through December 31, 2018
Table VII-47 New Conventional and Natural Gas ContractsJanuary 1, 2018 Through December 31, 2018
Table VII-49 Conventional Contract Terminations
January 1, 2018 Through December 31, 2018
Table VII-50 Non-Coincident Contract Capacity Quantities and
Expiration Dates for SCE’s Major Inter-utility for 2018 Contract
See, e.g.
available at
Id.
Table VII-51 PURPA and CHP Contract Costs Recovered Through CAM and ERRA
Table VII-52 PURPA and CHP Contracts that Achieved Commercial Operation
January 1, 2018 Through December 31, 2018
Table VII-53 PURPA and CHP New Contracts Executed
January 1, 2018 Through December 31, 2018
Table VII-54 PURPA and CHP Contract Amendments and Letter Agreements
January 1, 2018 Through December 31, 2018
Table VII-55 CHP and PURPA Contract Consents and Consents to Assignments
January 1, 2018 Through December 31, 2018
force majeure
Table VII-56 PURPA and CHP Uncontrollable Force Claims Tendered and/or Pending
January 1, 2018 Through December 31, 2018
orce majeure
Table VII-57 PURPA and CHP Contract Terminations
January 1, 2018 Through December 31, 2018
Table VII-58 RPS Contracts that Achieved Commercial Operation
January 1, 2018 Through December 31, 2018
Table VII-59 New RPS Contracts Executed
January 1, 2018 Through December 31, 2018
Table VII-61 RPS Contract Consents and Consents to Assignments
January 1, 2018 Through December 31, 2018
Force Majeure
Table VII-62 RPS Uncontrollable Force Claims Tendered and/or Pending
January 1, 2018 Through December 31, 2018
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force Majeure
Force
Majeure
Force Majeure
Force Majeure
Force Majeure
Table VII-63 RPS Contract Terminations
January 1, 2018 Through December 31, 2018
Table VII-64 PURPA and RPS ACH Letter Agreements & Amendments
January 1, 2018 Through December 31, 2018
See
Table VII-65 CapPerformance Failures
January 1, 2018 Through December 31, 2018
Table VII-66 Projects That Failed to Submit Operation
and Efficiency Data for Calendar Year 2017
See
Table VII-67 Renewable Capacity Verifications
January 1, 2018 Through December 31, 2018
see
Table VII-68 RPS Active Monitoring
January 1, 2018 Through December 31, 2018
i.e.
e.g.
oo
Table VII-69 QF Legacy Amendment Energy Pricing Options
QF Legacy Amendment Energy Pricing Options
e.g.
e.g.