+ All Categories
Home > Documents > Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire...

Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire...

Date post: 27-Apr-2020
Category:
Upload: others
View: 11 times
Download: 0 times
Share this document with a friend
51
DEPÓSITOS ACCESORIOS VÁLVULAS TUBERÍA Engineered Fire Piping HIDRANTES
Transcript
Page 1: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

DEPÓSITOS ACCESORIOS VÁLVULAS

TUBERÍA

Engineered Fire Piping

HIDRANTES

Page 2: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TARIFA2019

www.firepiping.com

F I R E P I P I N G

TUBERÍA

Page 3: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

ENGINEERED FIRE PIPING PROCEDIMIENTO DE FABRICACIÓN

1. CARACTERÍSTICAS DE LOS MATERIALES.

2. PROCESO DE PREFABRICACIÓN

a. Tuberías. Las tuberías estándar utilizadas por EFP están fabricadas de acuerdo con las siguientes normas europeas: • EN 10255, serie M en acero estirado sin soldadura (S), y serie M y tipos L y L2 en acero con soldadura (W), para diámetros hasta DN150. • EN 10216-1 en acero estirado sin soldadura. • EN 10217-1, en acero con soldadura, en varios espeso res de pared.Estas tuberías siempre se suministran acompañadas de Certifica-do de Inspección 2.2 o 3.1, de acuerdo con la norma europea EN 10204. El tubo con soldadura utilizado por EFP siempre es fabri-cado en al CE.

b. Manguitos. EFP utiliza dos tipos de manguitos y/o “Branch outlets” estándar: • MANGUITOS ROSCADOS. Los manguitos roscados utilizados por EFP son aprobados FM. • BRANCH OUTLETS RANURADOS. Los “Branch outlets” ra- nurados son aprobados FM.

EFP utiliza los materiales de la más alta calidad para la realiza-ción de todos sus prefabricados.La procedencia de la tubería puede ser nacional, europea, o de países del este de Europa y Asia.

El proceso de prefabricación de EFP se lleva a cabo en una cé-lula robotizada, totalmente automatizada, pudiendo realizarse prefabricados de hasta 9 metros, en la que se realizan todas las operaciones necesarias:

a. Corte de tubería a la longitud de prefabricación del tubo base y de los tramos de hasta 3,0 m que se soldarán al tubo base en las prefabricaciones en longitudes mayores a 6,0 m.

b. Ranurados de extremos del tubo base y/o del tramo antes indicado, para prefabricaciones en longitudes mayores a 6,0 m.

c. Soldadura para unión del tramo de hasta 3,0 m de longitud al tubo base de 6,0 m, para prefabricaciones en longitudes mayores a 6,0 m.

d. Soldadura de manguitos y operaciones complementarias (Corte del orificio del tubo en la posición de cada manguito, retirada del sobrante de corte y posicionado de la cuna del manguito sobre el tubo).

W W W . F I R E P I P I N G . C O M 902.551.558

Page 4: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

3. PROCESO DE PINTURA 4. CONTROL DE CALIDAD

a. Preparación superficial.

La preparación superficial de los tubos para pintura se realiza mediante una limpieza por granallado, hasta grado SA 2 ½ según la norma ISO 8501-1, consiguiendo una rugosidad de grano nodular grueso según la norma ISO 8503-1, en una línea de granallado en continuo. La preparación superficial se efectúa al inicio del proceso, antes de la entrada de los tubos en la célula robotizada, lo que reduce las posibilidades de rechazo en las soldaduras. Este proceso garantiza una alta rugosidad, lo que asegura una adherencia de la pintura que no se consigue por ningún otro método. La preparación superficial también puede realizarse por Desengrase-Fosfatado. Incluso pueden realizarse ambos procesos, granallado y desengrase-fosfatado, para una mayor calidad de la pintura.

b. Línea de pintura.

La línea de pintura cuenta con una cabina de aplicación electrostática de pintura en polvo y polimerizado en horno a 180º C durante 20 minutos. La pintura estándar es de resina POLIESTER, color rojo RAL3000, fabricada de acuerdo con la norma ISO 2813. El espesor medio de película seca estándar es de 60 μm. También puede aplicarse una capa de imprimación antioxidante, de aplicación líquida, para mayor resistencia en ensayo de cámara de niebla salina.

a. Número de Hoja de Taller número de orden de fabricación del tubo. b. Número de Plano de Montaje al que corresponde el tubo. c. Descripción del área de montaje del tubo. d. Anagrama y datos identificativos del Cliente. e. Número de Pedido del Cliente.

El procedimiento estándar de control de calidad de nuestra producción supone que los tubos prefabricados se someten a las siguientes pruebas:

a. Prueba de presión hidrostática, a 50 bar durante 10 s, del 5% al 10% de los tubos prefabricados de más de 6,0 m de longitud. b. E.N.D. con líquidos penetrantes en el 100% de las soldaduras de manguitos y “branch outlets”. c. Comprobación de la preparación superficial: grado de limpieza, que será como mínimo SA 2 ½, y rugosidad. d. Comprobación de los parámetros dimensionales del tubo y de las ranuras. e. Comprobación del espesor de película seca y la adherencia de la pintura.

El proceso de producción de tubería pintada es similar al de la tubería prefabricada, en los apartados de preparación superficial y pintura. En estos tubos se comprueban dimensionalmente las ranuras, la prepara-ción superficial, el espesor de película seca y la adherencia de la pintura.

El proceso de pintura de EFP define otra de las características es-pecíficas de la tubería:

Nuestros procesos de producción están sometidos a un riguroso control de calidad, conforme a la norma ISO 9001.2000.Toda la tubería prefabricada se suministra etiquetada incluyendo datos

W W W . F I R E P I P I N G . C O M 902.551.558

Page 5: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

DN

TUBOe (mm)

TUBERÍA PINTADA

RANURADO EXTREMOS LISOS

DN15 2,6 -- --

DN202,0 -- --

2,6 -- 2,56

DN25

2,0 3,26 3,07

2,6 3,64 3,45

3,2 -- 4,15

DN32

2,3 -- 3,84

2,6 4,58 4,30

3,2 5,54 5,20

DN40

2,3 4,59 4,32

2,6 5,16 4,85

3,2 6,27 5,90

DN50

2,3 5,65 5,32

2,6 6,36 5,87

3,2 7,75 7,29

3,6 8,65 8,14

DN65

2,6 7,94 7,47

3,2 9,69 9,12

3,6 10,84 10,20

DN

TUBOe (mm)

TUBERÍA PINTADARANURADO EXTREMOS LISOS

DN80

2,9 10,09 9,49

3,2 11,08 10,43

4,0 13,73 12,91

DN100

3,2 14,13 13,28

3,6 15,83 14,88

4,5 19,63 18,45

DN1253,6 19,46 18,30

4,5 24,17 22,73

DN1504,0 26,21 24,52

4,5 29,39 27,50

DN2004,5 37,65 35,23

6,3 52,27 48,91

DN2505,0 49,85 46,66

6,3 62,52 58,49

DN3005,6 62,80 58,76

6,3 70,49 65,96

TARIFA TUBERÍA C/S PINTADA UNE-EN 10255 ó UNE-EN 10217

• PCI.- Granallado sa 2 ½” ó desengrasado y fosfatado. Pintura al horno poliéster Ral-3000. • Clima.- Pintura líquida antioxidante gris Ral-7012. • Portes pagados para camiones completos, otros casos consultar.

Page 6: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TUBOEN

10217-1 MANGUITO DN15 MANGUITO DN20 MANGUITO DN25

e (mm) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

DN252,3 4,73 5,19 5,67 6,20 6,79 7,42 4,77 5,21 5,71 6,24 6,83 7,46

2,9 5,94 6,48 7,04 6,50 8,29 8,98 6,37 6,94 7,54 8,20 8,98 9,30

3,2 5,84 6,33 6,86 7,44 8,06 8,74 5,24 5,69 6,18 6,67 7,31 7,66

DN32

2,3 4,63 5,02 5,46 5,93 6,42 6,93 4,64 5,06 5,50 5,98 6,49 7,02 5,08 5,61 6,17 6,77 7,49 7,75

2,6 5,12 5,54 5,99 6,47 6,99 7,54 5,62 6,06 6,55 7,06 7,61 8,19 5,65 6,20 6,78 7,41 8,16 8,44

2,9 5,60 6,03 6,51 7,01 7,54 8,11 6,07 6,54 7,05 7,58 8,14 8,74 6,21 6,77 7,38 8,03 8,82 9,10

3,2 6,06 6,51 7,01 7,53 8,07 8,66 5,08 5,53 5,98 6,47 6,99 7,54 6,74 7,33 7,96 8,64 9,45 9,76

DN40

2,3 7,01 5,50 5,94 6,42 6,92 7,45 5,10 5,53 5,98 6,47 6,99 7,54 5,35 5,86 6,42 6,99 7,62 8,29

2,6 5,64 6,07 6,54 7,03 7,57 8,13 5,66 6,10 6,58 7,09 7,63 8,20 5,92 6,46 7,03 7,63 8,29 8,97

2,9 6,18 6,62 7,11 7,63 8,18 8,76 6,19 6,64 7,15 7,68 8,24 8,84 6,47 7,03 7,62 8,24 8,91 9,64

3,2 6,70 7,15 7,66 8,20 8,78 9,37 6,71 7,18 7,68 8,26 8,84 9,46 7,02 7,59 8,19 8,85 9,53 10,28

DN50

2,3 6,11 6,57 7,05 7,57 8,11 8,68 6,13 6,59 7,08 7,62 8,18 8,76 6,18 6,72 7,28 7,88 8,52 9,21

2,6 6,80 7,28 7,79 8,31 8,89 9,50 6,81 7,30 7,82 8,37 8,95 9,58 6,87 7,43 8,01 8,64 9,31 10,02

3,2 8,16 8,70 9,26 9,85 10,48 11,17 8,18 8,72 9,30 9,91 10,55 11,25 8,23 8,85 9,49 10,17 10,89 11,68

3,6 9,02 9,58 10,18 10,82 11,48 12,21 9,04 9,61 10,22 10,87 11,55 12,29 9,09 9,73 10,40 11,12 11,89 12,71

Nota. - Si fuese manguito rosca macho tendría un incremento de precio de 5% sobre el precio con manguito rosca hembra.

TARIFA EFP - PREFABRICADO. 2019 · TUBERÍA PREFABRICADA con MANGUITO ROSCA HEMBRA [RAMALES]

Pintura: Poliéster RAL 3000 - Granallado grado SA 2 ½ ó desengrasado y fosfatado - Otros RAL a consultar.

Tubo a 6,0 m. - Portes pagados camiones completos.

W W W . F I R E P I P I N G . C O M 902.551.558

Page 7: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TUBO

EN 10217-1 MANGUITO DN15 MANGUITO DN20 MANGUITO DN25

e (mm) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

DN65

2,6 8,36 8,89 9,45 10,06 10,70 11,39 8,37 8,91 9,49 10,11 10,77 11,47 8,42 9,02 9,68 10,36 11,10 11,89

3,2 10,06 10,66 11,30 11,99 12,70 13,46 10,07 10,69 11,34 12,04 12,76 13,54 10,13 10,81 11,52 12,29 13,09 13,96

3,6 11,14 11,78 12,47 13,18 13,95 14,77 11,15 11,81 12,50 13,24 14,02 14,85 11,21 11,92 12,68 13,49 14,35 15,26

PRECIOS: € / ml.MANGUITOS: Roscados aprobados FM.TUBERÍA: A.C.S. UNE-EN10217 ó UNE-EN 10255(W) LARGO: 2,00 m a 9,00 m. Extremos lisos o ranurados.

Nota. - Si fuese manguito rosca macho tendría un incremento de precio de 5% sobre el precio con manguito rosca hembra.

W W W . F I R E P I P I N G . C O M 902.551.558

TARIFA EFP - PREFABRICADO. 2019 · TUBERÍA PREFABRICADA con MANGUITO ROSCA HEMBRA [RAMALES]

Pintura: Poliéster RAL 3000 - Granallado grado SA 2 ½ ó desengrasado y fosfatado - Otros RAL a consultar.

Tubo a 6,0 m. - Portes pagados camiones completos.

Page 8: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TUBOEN

10217-1 MANGUITO DN25 MANGUITO DN32 MANGUITO DN40

e (mm) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

DN 50

2,3 6,58 7,14 7,72 8,37 9,04 9,78 6,99 8,00 9,08 10,25 11,49 12,83

2,6 7,31 7,89 8,50 9,18 9,88 10,63 9,08 8,75 9,86 11,03 12,31 13,66

3,2 8,68 9,32 10,00 10,71 11,48 12,30 9,10 10,17 11,32 12,54 13,87 15,27

3,6 9,58 10,26 10,96 11,71 12,52 13,38 9,99 11,10 12,27 13,54 14,89 16,34

DN 65

2,6 9,02 9,66 10,35 11,08 11,86 12,69 9,42 10,51 11,67 12,91 14,24 15,67 9,69 10,85 12,09 13,43 14,86 16,39

3,2 10,77 11,48 12,23 13,04 13,90 14,81 11,17 12,31 13,53 14,84 16,23 17,73 11,47 12,69 13,99 15,40 16,89 18,48

3,6 11,92 12,67 13,47 14,32 15,22 16,19 12,31 13,49 14,76 16,09 17,54 19,08 12,64 13,90 15,25 16,68 18,22 19,87

DN 80

2,9 11,82 12,99 14,24 15,56 16,99 18,52 11,88 13,09 14,40 15,79 17,29 18,89

3,2 12,83 14,03 15,30 16,68 18,14 19,71 12,87 14,13 15,47 16,90 18,44 20,08

4,0 15,47 16,76 18,14 19,60 21,17 22,85 15,51 16,86 18,29 19,83 21,47 23,22

DN 100

3,2 16,24 17,62 19,10 20,68 22,36 24,15

3,6 17,98 19,42 20,95 22,60 24,35 26,22

4,5 21,57 23,12 24,80 26,58 28,47 30,49

W W W . F I R E P I P I N G . C O M 902.551.558

TARIFA EFP - PREFABRICADO. 2019 · TUBERÍA PREFABRICADA con MANGUITO RANURADO [COLECTORES]

Pintura: Poliéster RAL 3000 - Granallado grado SA 2 ½ ó desengrasado y fosfatado - Otros RAL a consultar.

Tubo a 6,0 m. - Portes pagados camiones completos.

Page 9: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TUBOEN

10217-1 MANGUITO DN50 MANGUITO DN65 MANGUITO DN80

e (mm) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

DN 80

2,9 12,26 13,64 15,10 16,67 18,35 20,15

3,2 13,28 14,69 16,19 17,80 19,52 21,36

4,0 15,98 17,47 19,07 20,78 22,60 24,56

DN 100

3,2 16,35 17,85 19,46 21,17 23,00 24,97 17,01 18,82 20,78 22,86 25,10 27,49

3,6 18,09 19,66 21,32 23,10 24,99 27,03 18,77 20,65 21,85 24,82 27,12 29,59

4,5 21,68 23,36 25,14 27,05 29,10 31,29 22,43 24,43 26,56 28,84 31,29 33,95

DN 1504,0 28,15 30,08 32,15 34,34 36,68 37,60 28,41 30,62 32,96 35,48 38,15 41,00 29,62 32,47 35,53 38,78 42,27 46,00

4,5 31,20 33,27 35,44 37,76 40,23 42,86 31,46 33,78 36,25 38,88 41,69 44,69 32,75 35,71 38,88 42,25 45,86 49,73

DN 2004,5 39,95 42,59 45,40 48,39 51,58 54,98 40,47 43,69 47,12 50,76 54,67 58,85

6,3 54,11 57,30 60,69 64,29 68,11 72,18 54,57 58,37 62,37 66,63 71,14 75,98

PRECIOS: € / ml.MANGUITOS: Ranurados aprobados FM.TUBERÍA: A.C.S. UNE-EN10217 ó UNE-EN 10255(W) LARGO: 2,00 m a 7,50 m. Extremos lisos o ranurados.

W W W . F I R E P I P I N G . C O M 902.551.558

TARIFA EFP - PREFABRICADO. 2019 · TUBERÍA PREFABRICADA con MANGUITO RANURADO [COLECTORES]

Pintura: Poliéster RAL 3000 - Granallado grado SA 2 ½ ó desengrasado y fosfatado - Otros RAL a consultar.

Tubo a 6,0 m. - Portes pagados camiones completos.

Page 10: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

NORMA DN ØEXTREMOS

LISOS(AVANCE)

EXTREMOS RANURADOS (AVANCE)

EXTREMOS EMBRIDADOS C/ CUELLO DIN 2633

PN16 (AVANCE)

NFP

A Y

CEP

REV

EN

DN65 x DN50 2 1/2” x 2”112,06

(155mm.)

195,97

(315mm.)

183,50

(245mm.)

DN80 x DN65 3” x 2 1/2”118,17

(178mm.)

233,45

(338mm.)

221,22

(273mm.)

DN100 x DN80 4” x 3”132,44

(230mm.)

266,77

(390mm.)

245,35

(332mm.)

DN150 x DN80 6” x 3”142,62

(340mm.)

316,92

(500mm.)

290,23

(445mm.)

DN150 x DN100 6” x 4”142,62

(340mm.)

320,02

(500mm.)

306,96

(447mm.)

DN200 x DN100 8” x 4”142,62

(440mm.)

419,83

(600mm.)

386,22

(554mm.)

DN200 x DN125 8” x 5”187,68

(440mm.)

445,85

(600mm.)

408,65

(557mm.)

DN200 x DN150 8” x 6”191,52

(440mm.)

471,88

(600mm.)

431,11

(557mm.)

DN250 x DN100 10” x 4”234,31

(625mm.)

508,18

(785mm.)

469,31

(747mm.)

DN250 x DN125 10” x 5”234,31

(550mm.)

528,47

(710mm.)

487,92

(675mm.)

DN250 x DN150 10” x 6”234,31

(550mm.)

550,52

(710mm.)

506,55

(675mm.)

REDUCCIONES EXCÉNTRICAS <15º

W W W . F I R E P I P I N G . C O M 902.551.558

Page 11: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

NORMA DN ØEXTREMOS

LISOS(AVANCE)

EXTREMOS RANURADOS (AVANCE)

EXTREMOS EMBRIDADOS C/ CUELLO DIN2633

PN16 (AVANCE)

N

FPA

Y CE

PREV

EN

DN250 x DN200 10” x 8”234,31

(550mm.)

595,08

(710mm.)

549,54

(682mm.)

DN300 x DN125 12” x 5”254,68

(700mm.)

588,15

(860mm.)

550,00

(833mm.)

DN300 x DN150 12” x 6”254,68

(650mm.)

610,35

(810mm.)

568,64

(783mm.)

DN300 x DN200 12” x 8”254,68

(650mm.)

654,78

(810mm.)

611,61

(790mm.)

DN300 x DN250 12” x 10”254,68

(650mm.)

693,45

(810mm.)

675,60

(798mm.)

DN350 x DN250 14” x 10”305,61

(715mm.)

776,08

(875mm.)

774,63

(867mm.)

DN350 x DN300 14” x 12”305,61

(715mm.)

826,20

(875mm.)

830,66

(878mm.)

Fabricadas en chapa de acero al carbono calidad ST-37, Espesor 3,0mm., hasta DN150, 4,0mm hasta DN250 y 5,0mm para superiores.

Los precios incluyen acabado pintado rojo RAL3000. Consulte otros diámetros y longitudes.

EFP SE RESERVA EL DERECHO A VARIAR LA TARIFA SIN PREVIO AVISO

W W W . F I R E P I P I N G . C O M 902.551.558

REDUCCIONES EXCÉNTRICAS <15º

Page 12: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRECIOS NETOS VELAS EXTRUSIONADAS, PINTADAS O GALVANIZADASLongitud / ø ø 1" - 3/4" ø 1" - 1/2" ø 1 1/4"-1" ø 1 1/4"-3/4" ø 1 1/4"-1/2" ø 1 1/2"-1 1/4" ø 1 1/2"-1" ø 1 1/2"-3/4" ø 2"-1 1/2" ø 2"-1 1/4" ø 2"-1"

l < 200 mm 8,23 € 8,23 € 9,71 € 11,36 € 12,98 € 11,11 € 12,98 € 14,85 € 12,79 € 14,92 € 17,05 €

200 ≤ l < 300 mm 8,75 € 8,75 € 10,32 € 12,02 € 13,74 € 11,81 € 13,74 € 15,73 € 13,52 € 15,80 € 18,05 €

300 ≤ l < 400 mm 9,23 € 9,23 € 10,89 € 12,68 € 14,52 € 12,45 € 14,52 € 16,58 € 14,30 € 16,68 € 19,04 €

400 ≤ l < 500 mm 9,70 € 9,70 € 11,45 € 13,35 € 15,26 € 13,09 € 15,29 € 17,46 € 15,04 € 17,54 € 20,07 €

500 ≤ l < 600 mm 10,19 € 10,19 € 12,01 € 14,04 € 16,02 € 13,74 € 16,07 € 18,34 € 15,80 € 18,42 € 21,06 €

600 ≤ l < 700 mm 10,66 € 10,66 € 12,58 € 14,70 € 16,80 € 14,39 € 16,80 € 19,23 € 16,54 € 19,30 € 22,05 €

700 ≤ l < 800 mm 11,17 € 11,17 € 13,19 € 15,36 € 17,57 € 15,08 € 17,57 € 20,07 € 17,31 € 20,18 € 23,05 €

800 ≤ l < 900 mm 11,66 € 11,66 € 13,74 € 16,02 € 18,30 € 15,73 € 18,34 € 20,95 € 18,05 € 21,06 € 24,08 €

900 ≤ l < 1000 mm 12,13 € 12,13 € 14,31 € 16,68 € 19,08 € 16,37 € 19,11 € 21,83 € 18,82 € 21,95 € 25,06 €

1000 ≤ l < 2000 mm 12,61 € 12,61 € 14,88 € 17,35 € 19,85 € 17,02 € 19,89 € 22,71 € 19,55 € 22,83 € 26,06 €

2000 ≤ l < 3000 mm 13,60 € 13,60 € 16,04 € 18,71 € 21,39 € 18,35 € 21,39 € 24,44 € 21,06 € 24,55 € 28,08 €

3000 ≤ l < 4000 mm 14,55 € 14,55 € 17,17 € 20,03 € 22,90 € 19,65 € 22,93 € 26,21 € 22,56 € 26,31 € 30,06 €

4000 ≤ l < 5000 mm 15,51 € 15,51 € 18,30 € 21,39 € 24,44 € 20,94 € 24,44 € 27,93 € 24,08 € 28,08 € 32,09 €

5000 ≤ l < 6000 mm 16,51 € 16,51 € 19,47 € 22,71 € 25,95 € 22,28 € 25,99 € 29,69 € 25,58 € 29,84 € 34,10 €

VELAS REDUCIDAS POR EXTRUSIÓN

W W W . F I R E P I P I N G . C O M 902.551.558

Page 13: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PUNTOS DE PRUEBA Y DRENAJE

PUNTO DE PRUEBA PRECIO UD DRENAJE PRECIO

UD

DN15 56,93 € DN25 45,89 €

DN25 63,88 € DN32 50,72 €

DN25 70,82 € DN40 53,13 €

DN40 95,81 € DN50 72,45 €

PUNTOS DE VACÍO Y PRUEBA

PUNTOS DE PRUEBA Y DRENAJE

PRECIO UD

DN15-DN25 95,39 €

DN25-DN32 106,26 €

DN25-DN40 114,71 €

DN40-50 155,77 €

DISCO CALIBRADO PRECIO UD

k-57 0,97 €

k-80 1,21 €

k-115 1,45 €

ESFR-1 0,97 €

ESFR-17 1,21 €

Punto de prueba y limpieza DN40 MOD. EFP

Material Cantidad

Válvula de asiento inclinado en latón 1” H-H 1

Válvula de esfera de 1 ½” latón cromado H-H 1

Junta ranurada rígida 1 ½” 1

Tubería 10255 1 ½” 1

Tubería 10255 1” 1

Manguito reducido M/H 1 ½” X 1” fig. 246 galv 1

Machón rosca doble fig. 280 1 “ galv 1

Tuerca reducción ½” M x 1/4” H fig. 241 galv 1

Racor Barcelona 45 mm aluminio 2

Tapón Barcelona 45 mm aluminio 2

Manguito 1” 1

Te reducida de 1” x 1” x 1/2” fig. 130 1

Mini válvula M/H 1/4” 1

Manómetro 1/4” 0-16 bar 1

W W W . F I R E P I P I N G . C O M 902.551.558

Page 14: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

HIDRANTES PETROQUÍMICAHIDRANTES DE COLUMNA HÚMEDA PRECIO

UD.

Mod. PETRONOR STD. Muskiz

c/ válvulas Serie 1525.071,50 €

Mod. CLH STD. IA-DI-14

c/ válvulas latón V-701.710,32 €

Mod. ENAGAS STD. Barcelona

c/ válvulas L-86982.277,35 €

Mod. CEPSA STD-L-251

c/ válvulas Fig. 2003.660,32 €

HIDRANTES DE COLUMNA HÚMEDA PRECIO UD.

Mod. REPSOL STD.

PE-S-0200.01

Tarragona c/ válvulas L-8366

1.987,45 €

Mod. REPSOL STD.

PE-S-0200.01

La Coruña c/ válvulas L-8366

1.987,45 €

Mod. REPSOL STD.

PE-S-0200.01

Puertollano c/ válvulas L-8366

2.114,20 €

Mod. REPSOL STD.

PE-S-0200.01

Cartagena c/ válvulas L-8698

4.705,90 €

W W W . F I R E P I P I N G . C O M 902.551.558

Page 15: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

FILTROS T PETROQUÍMICA

FILTROS T PARA PETROQUÍMICA PRECIO

Mod. eFP de 2” 235,07 €

Mod. eFP de 3” 316,29 €

Mod. eFP de 4” 479,26 €

Mod. eFP de 6” 735,09 €

Mod. eFP de 8” 938,32 €

Mod. eFP de 10” 1.412,70 €

Mod. eFP de 12” 2.207,32 €

Mod. eFP de 14” 2.994,42 €

PLACA DE RETENCIÓN DE CALOR PRECIO UD

Placa Retención de calor Mod. eFP 93,27 €

PLACAS DE RETENCIÓN DE CALOR

W W W . F I R E P I P I N G . C O M 902.551.558

Page 16: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO DESCRIPCIÓN PINTADO GALVANIZADO

COLECTORES PUESTOS DE CONTROL CONSULTAR CONSULTAR

RAMALES CURVADOS REDUCIDOS POR EXTRUSIÓN CONSULTAR CONSULTAR

CODOS ESPECIALES DE DISTINTOS ÁNGULOS CONSULTAR CONSULTAR

CARRETES EMBRIDADOS, RANURADOS...

ASPIRACIONESCONSULTAR CONSULTAR

FABRICACIONES EN INOXIDABLES CONSULTAR CONSULTAR

OTROS PRODUCTOS

W W W . F I R E P I P I N G . C O M 902.551.558

Page 17: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

Certificación FM APPROVED

EFP SE RESERVA EL DERECHO A VARIAR LA TARIFA SIN PREVIO AVISO

W W W . F I R E P I P I N G . C O M 902.551.558

Page 18: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

Certificación ISO 9001

W W W . F I R E P I P I N G . C O M 902.551.558

Page 19: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TABLA DE ESPESORES SEGÚN NORMAS DE TUBERÍA

(1) El espesor máximo depende de cada fabricante. No en todos los casos se alcanza el espesor máximo recogido en la norma EN 10220

DN

NORMA DE DISEÑO (e=mm)

EN 10216-1

(1)

EN10217-1

(1)

EN10255 ANSI/ASME B36.10M

Serie M Tipo L1 Tipo L Tipo L2 Sch 5 Sch 10 Sch 20 Sch 30 Sch 40

25 2,3 a 8,8 1,4 a 8,8 3,2 2,9 2,9 2,6 1,7 2,77

N/A N/A

3,3

32 2,6 a 10,0 1,4 a 8,8 3,2 2,9 2,9 2,6 1,7 2,77 3,56

40 2,6 a 12,5 1,4 a 8,8 3,2 2,9 2,9 2,9 1,7 2,77 3,81

50 2,9 a 16,0 1,4 a 10,0 3,6 3,2 3,2 2,9 1,7 2,77 3,81

65 2,9 a 20,0 1,6 a 10,0 3,6 3,2 3,2 3,2 2,1 3,05 5,08

80 3,2 a 25,0 1,6 a 10,0 4,0 3,6 3,2 3,2 2,1 3,05 5,59

100 3,6 a 32,0 2,0 a 11,0 4,5 4,0 3,6 3,6 2,1 3,05 6,1

125 4,0 a 40,0 2,0 a 11,0 5,0

N/A

4,5

N/A

2,8 3,4 6,6

150 4,5 a 50,0 2,9 a 11,0 5,0 4,5 2,8 3,4 7,1

200 6,3 a 70,0 3,2 a 12,5N/A N/A

2,8 3,76 6,4 7 8,18

250 6,3 a 80,0 3,2 a 12,5 3,4 4,19 6,4 7,8 9,27

W W W . F I R E P I P I N G . C O M 902.551.558

Page 20: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TABLA DE ESPESORES DE TUBERÍA SEGÚN NORMA DE DISEÑO

(1) Ranurado: Se refiere a preparación de extremos para unión SIN retirada de material (P.ej.: soldadura o ranurado “Roll Groove”). Roscado: Se refiere a preparación de extremos para unión CON retirada de material (P.ej.: roscado o ranurado “Cut Groove”).(2) Espesores mínimos para tubos NO listados. Se admiten espesores menores para tubos Listados para su uso en sistemas de rociadores (NFPA 13-2013, punto 6.3.4).(3) FM admite espesores menores de pared si los tubos empleados están Aprobados para su uso en sistemas de rociadores automáticos (LPD 2-0, punto 2.5.2.1)

TUBO NORMA DE DISEÑOe-FP:

Espesores mínimos

Aprobados FM (mm)DN Ø

Espesor mínimo de pared (mm) (1)

EN 12845 CEA 4001 NFPA 13 (2) FM LPD 2-0 (3)

Ranurado Roscado Ranurado Roscado Ranurado Roscado Ranurado Roscado

25 1” 2,0 3,2 2,9 3,2 2,8 3,4 2,6

Esp

esor

mín

imo

de

pa

red

3,4

mm

2,0

32 1 1/4” 2,3 3,2 2,9 3,2 2,8 3,6 2,6 2,3

40 1 1/2” 2,3 3,2 2,9 3,2 2,8 3,7 2,6 2,3

50 2” 2,3 3,6 3,2 3,6 2,8 3,9 2,6 2,3

65 2 1/2” OD 2,6 3,6 3,2 3,6 3,0 5,2 2,9 2,6

80 3” 2,9 4,0 3,2 4,0 3,0 5,5 2,9 2,9

100 4” 3,2 4,5 3,6 4,5 3,0 6,0 2,9 3,2

125 5” 3,6 5,0 4,0 5,0 3,4 6,6 3,3 3,6

150 6” 4,0 5,0 4,5 5,0 3,4 7,1 3,3 4,0

200 8” 4,5 N/A 6,3 6,3 4,8(1) 7,0(2) 4,5 4,5

250 10” 5,0 N/A 6,3 6,3 4,8(1) 7,8(2) 4,5 ---

W W W . F I R E P I P I N G . C O M 902.551.558

Page 21: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

· Pesos de tubería CON AGUA

· Pesos de tubería SIN AGUA

DIAMETRO EXTERIOR D EN mm SERIE 1

ESPESOR T EN mm2,0 2,3 2,6 2,9 3,2 3,6 4,0 4,5 5,0 5,4 5,6 6,3

PESO TUBO LLENO AGUA POR UNIDAD DE LONGITUD = (D-T)·T·0,0246615 + π·(D-2T)2/4000 (kg/m)

33,7 1” 2,26 2,45 2,63 2,81 2,99 3,22 3,45 3,72 3,98 4,18 4,28 4,61

42,4 1 1/4” 3,15 3,40 3,64 3,88 4,11 4,42 4,72 5,08 5,44 5,71 5,85 6,31

48,3 1 1/2” 3,82 4,11 4,39 4,67 4,94 5,30 5,65 6,07 6,49 6,82 6,98 7,53

60,3 2” 5,36 5,73 6,08 6,44 6,79 7,25 7,70 8,26 8,81 9,24 9,45 10,18

76,1 2 1/2” OD 7,74 8,20 8,66 9,12 9,57 10,17 10,75 11,48 12,20 12,76 13,04 14,01

88,9 3” 9,95 10,49 11,04 11,57 12,11 12,82 13,52 14,38 15,23 15,91 16,25 17,41

114,3 4” 15,09 15,80 16,51 17,21 17,91 18,84 19,76 20,89 22,02 22,92 23,36 24,90

139,7 5” 21,25 22,13 23,00 23,87 24,73 25,87 27,01 28,42 29,82 30,93 31,49 33,41

168,3 6” 29,40 30,46 31,52 32,57 33,62 35,01 36,39 38,11 39,82 41,18 41,85 44,21

219,1 8” 47,05 48,43 49,82 51,20 52,57 54,40 56,22 58,48 60,74 62,54 63,43 66,55

273,0 10” 70,20 71,93 73,66 75,39 77,11 79,41 81,69 84,54 87,37 89,63 90,76 94,69

DIAMETRO EXTERIOR D EN mm SERIE 1

ESPESOR T EN mm

2,0 2,3 2,6 2,9 3,2 3,6 4,0 4,5 5,0 6,3

PESO TUBO POR UNIDAD DE LONGITUD = (D-T)·T·0,0246615 (kg/m)

33,7 1” 1,564 1,781 1,994 2,203 2,407 2,672 2,930 3,241 3,539 4,257

42,4 1 1/4” 1,993 2,275 2,552 2,825 3,094 3,445 3,788 4,206 4,612 5,609

48,3 1 1/2” 2,284 2,609 2,930 3,247 3,559 3,969 4,370 4,861 5,339 6,525

60,3 2” 2,876 3,290 3,700 4,105 4,506 5,034 5,554 6,193 6,819 8,390

76,1 2 1/2” OD 3,655 4,186 4,713 5,235 5,753 6,437 7,112 7,946 8,767 10,845

88,9 3” 4,286 4,912 5,534 6,151 6,763 7,573 8,375 9,366 10,345 12833

114,3 4” 5,539 6,353 7,162 7,967 8,768 9,828 10,881 12,185 13,478 16,780

139,7 5” 6,792 7,794 8,791 9,784 10,772 12,083 13,386 15,004 16,610 20,726

168,3 6” 8,202 9,416 10,625 11,829 13,029 14,622 16,208 18,178 20,136 25,170

219,1 8” 10,708 12,297 13,882 15,462 17,038 19,132 21,219 23,816 26,400 33,062

273,0 10” 13,367 15,354 17,338 19,317 21,292 23,918 26,536 29,797 33,046 41,436

W W W . F I R E P I P I N G . C O M 902.551.558

Page 22: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TARIFA2019

www.firepiping.com

F I R E P I P I N G

DEPÓSITOS

Page 23: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

C= CAPACIDAD m3 DIÁMETROS Y PRECIOS - DEPÓSITO DE MASTIC

ALTURA 6,24 7,02 7,80 8,58 9,36 10,14 10,92 11,70 12,45 13,26

4,8517.763 € 19.328 € 19.416 € 20.469 € 21.805 € 22.661 € 24.945 € 26.793 € 29.774 € 31.184 €

C=133 C=168 C=208 C=251 C=299 C=351 C=407 C=468 C=530 C=608

5,1018.225 € 19.842 € 20.471 € 21.578 € 22.474 € 23.382 € 26.264 € 27.619 € 30.662 € 32.163 €

C=141 C=178 C=220 C=266 C=316 C=371 C=431 C=495 C=560 C=642

5,4018.562 € 19.999 € 20.904 € 21.785 € 23.660 € 23.681 € 26.990 € 28.870 € 30.949 € 33.436 €

C=150 C=190 C=234 C=283 C=337 C=396 C=459 C=527 C=597 C=684

5,7018.900 € 20.156 € 21.078 € 21.974 € 23.918 € 25.344 € 27.716 € 29.122 € 32.268 € 33.731 €

C=159 C=201 C=248 C=301 C=358 C=420 C=487 C=559 C=633 C=725

6,0519.083 € 20.402 € 21.303 € 23.249 € 24.186 € 25.636 € 28.025 € 29.519 € 32.617 € 34.117 €

C=170 C=215 C=265 C=321 C=382 C=448 C=520 C=597 C=676 C=773

6,3019.534 € 21.904 € 22.838 € 23.857 € 24.844 € 26.543 € 29.096 € 30.334 € 34.050 € 36.675 €

C=177 C=224 C=277 C=335 C=399 C=468 C=543 C=624 C=706 C=808

6,6020.197 € 22.095 € 23.091 € 24.080 € 26.525 € 27.836 € 29.610 € 31.600 € 35.330 € 37.003 €

C=187 C=236 C=291 C=353 C=420 C=493 C=571 C=656 C=743 C=849

6,9021.352 € 22.481 € 23.297 € 24.301 € 26.817 € 28.090 € 30.610 € 32.163 € 35.703 € 38.310 €

C=196 C=248 C=306 C=370 C=440 C=517 C=599 C=688 C=779 C=891

7,2521.569 € 22.761 € 23.556 € 24.631 € 27.137 € 28.410 € 31.446 € 32.592 € 37.068 € 38.731 €

C=206 C=261 C=323 C=390 C=464 C=545 C=632 C=726 C=822 C=939

7,5022.065 € 23.328 € 24.174 € 26.283 € 27.850 € 30.156 € 32.837 € 34.971 € 38.009 € 40.723 €

C=214 C=271 C=334 C=405 C=482 C=565 C=656 C=753 C=852 C=974

7,8022.296 € 23.519 € 24.427 € 26.976 € 28.578 € 31.143 € 33.105 € 35.516 € 38.684 € 41.071 €

C=223 C=283 C=349 C=422 C=502 C=589 C=684 C=785 C=889 C=1015

8,1022.471 € 23.710 € 24.633 € 27.587 € 29.380 € 31.638 € 33.866 € 35.927 € 40.038 € 41.889 €

C=232 C=294 C=363 C=439 C=523 C=614 C=712 C=817 C=925 C=1056

8,4522.688 € 23.988 € 26.411 € 27.916 € 30.105 € 32.449 € 35.094 € 36.888 € 40.987 € 42.909 €

C=243 C=308 C=380 C=460 C=547 C=642 C=745 C=855 C=968 C=1105

IMAGEN ARTÍCULO

TARIFA 2019 DEPÓSITOS DE MASTIC

1. Cubierta 6. Aspiración.2. Trampilla 7. Rebosadero3. Llenado 8. Envolvente acero galvanizado.4. Escalera 9. Boca de hombre.5. Plataforma. 10. Vaciado.

Page 24: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

C= CAPACIDAD m3 DIÁMETROS Y PRECIOS - DEPÓSITO DE MASTIC ALTURA 6,24 7,02 7,80 8,58 9,36 10,14 10,92 11,70 12,45 13,26

8,7023.156 € 24.826 € 26.778 € 28.540 € 30.780 € 33.635 € 36.055 € 37.720 € 42.360 € 44.373 €

C=251 C=317 C=392 C=474 C=564 C=662 C=768 C=882 C=998 C=1139

9,0023.479 € 25.017 € 27.521 € 28.762 € 31.744 € 34.438 € 37.304 € 39.475 € 43.285 € 44.701 €

C=260 C=329 C=406 C=491 C=585 C=686 C=796 C=914 C=1035 C=1181

9,3023.654 € 26.385 € 27.728 € 29.965 € 33.016 € 35.292 € 37.574 € 39.886 € 44.148 € 46.010 €

C=269 C=341 C=420 C=509 C=606 C=711 C=824 C=946 C=1071 C=1222

9,6524.153 € 26.663 € 27.986 € 30.627 € 33.740 € 35.612 € 38.406 € 40.316 € 44.660 € 46.430 €

C=280 C=354 C=437 C=529 C=630 C=739 C=857 C=984 C=1114 C=1270

9.9027.429 € 29.500 € 31.896 € 34.911 € 37.576 € 40.112 € 41.405 € 46.365 € 48.260 €

C=364 C=449 C=543 C=647 C=759 C=880 C=1011 C=1144 C=1305

10,2027.937 € 30.732 € 32.136 € 35.251 € 38.869 € 41.366 € 42.670 € 46.818 € 48.588 €

C=375 C=463 C=561 C=667 C=783 C=908 C=1043 C=1181 C=1346

10,5029.109 € 30.938 € 32.360 € 35.543 € 39.251 € 41.812 € 44.711 € 47.682 € 50.058 €

C=387 C=478 C=578 C=688 C=808 C=937 C=1075 C=1217 C=1388

10,8529.408 € 31.198 € 32.690 € 36.824 € 40.032 € 41.998 € 45.141 € 48.066 € 50.478 €

C=401 C=495 C=598 C=712 C=836 C=969 C=1113 C=1260 C=1436

IMAGEN ARTÍCULO

Tanques de reserva de agua que se montan mediante chapas de acero galvanizado en caliente.Sellados con masilla de poliuretano que se aplica entre chapas y tornillería, y que polimeriza por acción de la humedad.Transporte a obra y montaje completo incluído.Conexiones: conexión aspiración con placa anti-vórtice, conexión de retorno, conexión de llenado con válvula de compuerta de husillo ascendente, conexión de rebosadero.Cubierta de techo en chapa trapezoidal de 0,6 mm, con lacado exterior. Embellecedor perimetral del techo en chapa galvanizada de 1 mm.Escalera de acceso, trampilla de registro, boca hombre con tapa y junta de neopreno, hidrómetro para lectura del nivel de agua interior.

Homologaciones Incluído en el precio: depósitos < 200 m3 aspiración DN150UNE 23500 1x DN80 vaciado con válvula retorno DN150Acero del depósito según UNE 36086 1x boca de hombre depósitos < 400m3 aspiración DN200RT2-ABA CATEGORÍA 1 TIPO A (CEPREVEN) 1x escalera retorno DN150Galvanizado continuo en caliente superior a 275 gr. de Zinc/m2. 1x trampilla de inspección depósitos < 600m3 aspiración DN250 2x interruptores de nivel (sin certificados) retorno DN200 1x nivel manométrico depósitos > 601 m3 aspiración DN300 1x aspiración antivórtice retorno DN200 1x retorno de pruebasPintura Incremento del precio del 15%. Ral a elegir. · Desengrase y limpieza química a base de bifluoruro amónico. · Secado en horno a 120ºC. · Aplicación de una capa base de WASH PRIMER epoxídico, aplicación líquida pulverizada, con espesor mínimo de película seca de 20 µm. · Aplicación de una capa de acabado de resina POLIESTER en polvo, aplicación electrostática, color rojo RAL3000, espesor mínimo de película seca 100 µm.· Polimerizado en horno a 190ºC durante 20 min.

TARIFA 2019 DEPÓSITOS DE MASTIC

Page 25: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

C= CAPACIDAD m3 DIÁMETROS Y PRECIOS - DEPÓSITO DE MEMBRANAALTURA 6,24 7,02 7,80 8,58 9,36 10,14 10,92 11,70 12,45 13,26

4,8518.651 € 20.295 € 20.386 € 21.492 € 22.896 € 23.794 € 26.192 € 28.132 € 31.262 € 32.743 €

C=139 C=176 C=217 C=263 C=313 C=367 C=426 C=489 C=554 C=628

5,1019.136 € 20.834 € 21.494 € 22.656 € 23.598 € 24.552 € 27.577 € 29.000 € 32.195 € 33.771 €

C=147 C=186 C=229 C=278 C=330 C=388 C=450 C=516 C=584 C=663

5,4019.490 € 20.999 € 21.950 € 22.875 € 24.843 € 24.865 € 28.340 € 30.313 € 32.496 € 35.108 €

C=156 C=197 C=244 C=295 C=351 C=412 C=478 C=548 C=621 C=704

5,7019.845 € 21.164 € 22.132 € 23.073 € 25.114 € 26.611 € 29.102 € 30.578 € 33.881 € 35.418 €

C=165 C=209 C=258 C=312 C=372 C=436 C=506 C=581 C=657 C=746

6,0520.037 € 21.422 € 22.369 € 24.412 € 25.395 € 26.918 € 29.426 € 30.995 € 34.248 € 35.822 €

C=176 C=223 C=275 C=332 C=396 C=464 C=539 C=618 C=700 C=794

6,3019.534 € 21.904 € 22.838 € 23.857 € 24.844 € 26.543 € 29.096 € 30.334 € 34.050 € 36.675 €

C=183 C=232 C=287 C=347 C=413 C=485 C=562 C=645 C=730 C=829

6,6021.207 € 23.200 € 24.245 € 25.284 € 27.851 € 29.227 € 31.091 € 33.180 € 37.097 € 38.853 €

C=193 C=244 C=301 C=364 C=434 C=509 C=590 C=677 C=767 C=870

6,9022.419 € 23.605 € 24.462 € 25.516 € 28.158 € 29.494 € 32.140 € 33.771 € 37.488 € 40.226 €

C=202 C=255 C=315 C=382 C=454 C=533 C=618 C=710 C=803 C=911

7,2522.648 € 23.899 € 24.733 € 25.862 € 28.494 € 29.830 € 33.019 € 34.222 € 38.922 € 40.668 €

C=213 C=269 C=332 C=402 C=478 C=561 C=651 C=747 C=846 C=960

7,5023.168 € 24.494 € 25.383 € 27.597 € 29.243 € 31.664 € 34.478 € 36.720 € 39.909 € 42.759 €

C=220 C=279 C=344 C=416 C=495 C=581 C=674 C=774 C=877 C=994

7,8023.410 € 24.695 € 25.649 € 28.324 € 30.007 € 32.700 € 34.761 € 37.292 € 40.618 € 43.124 €

C=229 C=290 C=358 C=434 C=516 C=606 C=702 C=806 C=913 C=1036

8,1023.595 € 24.896 € 25.896 € 28.966 € 30.849 € 33.219 € 35.559 € 37.723 € 42.039 € 43.983 €

C=239 C=302 C=373 C=451 C=537 C=630 C=731 C=839 C=950 C=1077

8,4523.823 € 25.188 € 27.731 € 29.312 € 31.610 € 34.072 € 36.849 € 38.732 € 43.036 € 45.055 €

C=249 C=315 C=389 C=471 C=561 C=658 C=763 C=876 C=992 C=1125

TARIFA 2019 DEPÓSITOS DE MEMBRANA

Page 26: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

C= CAPACIDAD m3 DIÁMETROS Y PRECIOS - DEPÓSITO DE MEMBRANAALTURA 6,24 7,02 7,80 8,58 9,36 10,14 10,92 11,70 12,45 13,26

8,7024.313 € 26.068 € 28.117 € 29.967 € 32.319 € 35.316 € 37.858 € 39.606 € 44.478 € 46.592 €

C=257 C=325 C=401 C=486 C=578 C=678 C=787 C=903 C=1023 C=1160

9,0024.653 € 26.268 € 28.897 € 30.200 € 33.331 € 36.160 € 39.170 € 41.448 € 45.449 € 46.936 €

C=266 C=337 C=416 C=503 C=599 C=703 C=815 C=935 C=1059 C=1201

9,3024.837 € 27.705 € 29.115 € 31.463 € 34.667 € 37.056 € 39.453 € 41.881 € 46.356 € 48.310 €

C=275 C=348 C=430 C=520 C=619 C=727 C=843 C=968 C=1096 C=1243

9,6525.361 € 27.996 € 29.385 € 32.159 € 35.427 € 37.392 € 40.326 € 42.332 € 46.893 € 48.751 €

C=286 C=362 C=447 C=541 C=643 C=755 C=876 C=1005 C=1138 C=1291

9,9028.801 € 30.975 € 33.491 € 36.657 € 39.455 € 42.118 € 43.475 € 48.683 € 50.673 €

C=372 C=459 C=555 C=661 C=775 C=899 C=1032 C=1169 C=1326

10,2029.334 € 32.269 € 33.743 € 37.013 € 40.812 € 43.434 € 44.803 € 49.159 € 51.017 €

C=383 C=473 C=572 C=681 C=799 C=927 C=1064 C=1205 C=1367

10,5030.565 € 32.485 € 33.978 € 37.320 € 41.214 € 43.903 € 46.947 € 50.066 € 59.911 €

C=395 C=487 C=590 C=702 C=824 C=955 C=1097 C=1242 C=1409

10,8530.879 € 32.757 € 34.324 € 38.665 € 42.034 € 44.098 € 47.398 € 50.469 € 53.002 €

C=408 C=504 C=610 C=726 C=852 C=988 C=1134 C=1284 C=1457

Tanques de reserva de agua que se montan mediante chapas de acero galvanizado en caliente.Estanqueidad mediante membrana de PVC protegida con manta geotextil y plástico de politeno.Transporte a obra y montaje completo incluído.Conexiones: conexión aspiración con placa anti-vórtice, conexión de retorno, conexión de llenado con válvula de compuerta de husillo ascendente, conexión de rebosadero.Cubierta de techo en chapa trapezoidal de 0,6 mm, con lacado exterior. Embellecedor perimetral del techo en chapa galvanizada de 1 mm.Escalera de acceso, trampilla de registro, boca hombre con tapa y junta de neopreno, hidrómetro para lectura del nivel de agua interior.

Homologaciones Incluído en el precio: depósitos < 200 m3 aspiración DN150UNE 23500 1x DN80 vaciado con válvula retorno DN150Acero del depósito según UNE 36086 1x boca de hombre depósitos < 400m3 aspiración DN200RT2-ABA CATEGORÍA 1 TIPO A (CEPREVEN) 1x escalera retorno DN150Galvanizado continuo en caliente superior a 275 gr. de Zinc/m2. 1x trampilla de inspección depósitos < 600m3 aspiración DN250 2x interruptores de nivel (sin certificados) retorno DN200 1x nivel manométrico depósitos > 601 m3 aspiración DN300 1x aspiración antivórtice retorno DN200 1x retorno de pruebasPintura Incremento del precio del 15%. Ral a elegir. · Desengrase y limpieza química a base de bifluoruro amónico. · Secado en horno a 120ºC. · Aplicación de una capa base de WASH PRIMER epoxídico, aplicación líquida pulverizada, con espesor mínimo de película seca de 20 µm. · Aplicación de una capa de acabado de resina POLIESTER en polvo, aplicación electrostática, color rojo RAL3000, espesor mínimo de película seca 100 µm.· Polimerizado en horno a 190ºC durante 20 min.

TARIFA 2019 DEPÓSITOS DE MEMBRANA

Page 27: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TARIFA2019

www.firepiping.com

F I R E P I P I N G

ACCESORIOS

Page 28: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

SET FLEXIBLE SPRINKLER HOSE 1000 mm1 piece of flexible unbraided sprinkler hose 1000 mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

SET FLEXIBLE SPRINKLER HOSE 1200 mm1 piece of flexible unbraided sprinkler hose 1200mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

SET FLEXIBLE SPRINKLER HOSE 1500 mm1 piece of flexible unbraided sprinkler hose 1500 mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

To be specified with each purchase order:* length of the hose* standard reducer NPT 1/2” or 3/4”

In case you should need additional technical information,please consult our catalogue and website

Model PF-UH-1000 Price

1/2 11,76 €

3/4 11,85 €

only available per 20 sets

Model PF-UH-1200 Price

1/2 12,39 €

3/4 12,48 €

only available per 20 sets

Model PF-UH-1500 Price

1/2 13,57 €

3/4 13,70 €

only available per 20 sets

FLEXIBLE HOSES: PROFLEX UNBRAIDED - UL CERTIFIED

Page 29: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

To be specified with each purchase order:* length of the hose* standard reducer NPT 1/2” or 3/4”

In case you should need additional technical information,please consult our catalogue and website

FLEXIBLE HOSES: PROFLEX BRAIDED - FM CERTIFIED

SET FLEXIBLE SPRINKLER HOSE 1000 mm1 piece of flexible braided sprinkler hose 1000 mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

SET FLEXIBLE SPRINKLER HOSE 1200 mm1 piece of flexible braided sprinkler hose 1200mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

SET FLEXIBLE SPRINKLER HOSE 1500 mm1 piece of flexible braided sprinkler hose 1500 mm

1 standard bar 700mm

1 bracket

1 nipple

1 piece of standard reducer NPT 1/2” or 3/4”

2 pieces of short clamps

Model PF-BH-1000 Price

1/2 18,35 €

3/4 18,45 €

only available per 20 sets

Model PF-BH-1200 Price

1/2 20,35 €

3/4 20,45 €

only available per 20 sets

Model PF-BH-1500 Price

1/2 23,94 €

3/4 24,03 €

only available per 20 sets

Page 30: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT

33,7 25 0,42

42,4 32 0,51

48,3 32 0,53

60,3 40 0,68

76,1 50 0,80

88,9 65 0,96

114,3 80 1,32

139,7 100 1,74

168,3 125 2,06

219,1 200 3,89

273,0 250 6,39

RED PAINTEDREFERENCE PRICE/PCE

GKSR1 1,88 €

GKSR1¼ 1,93 €

GKSR1½ 2,02 €

GKSR2 2,24 €

GKSR2½ 2,64 €

GKSR3 3,16 €

GKSR4 4,61 €

GKSR5 7,02 €

GKSR6 7,27 €

GKSR8 12,80 €

GKSR10 23,26 €

GALVANIZEDREFERENCE PRICE/PCE

GKSG1 2,71 €

GKSG1¼ 2,81 €

GKSG1½ 2,97 €

GKSG2 3,39 €

GKSG2½ 4,05 €

GKSG3 4,86 €

GKSG4 7,08 €

GKSG5 8,85 €

GKSG6 9,96 €

GKSG8 19,53 €

GKSG10 34,18 €

GENERALMM DN WEIGHT

33,7 25 0,42

42,4 32 0,48

48,3 40 0,53

60,3 50 0,68

76,1 65 0,80

88,9 80 0,95

114,3 100 1,44

139,7 125 1,91

168,3 150 2,10

219,1 200 3,77

273,0 250 6,54

RED PAINTEDREFERENCE PRICE/PCE

GKFR1 2,31 €

GKFR1¼ 2,18 €

GKFR1½ 2,40 €

GKFR2 3,21 €

GKFR2½ 3,63 €

GKFR3 4,39 €

GKFR4 6,53 €

GKFR5 8,58 €

GKFR6 9,75 €

GKFR8 17,10 €

GKFR10 28,98 €

GALVANIZEDREFERENCE PRICE/PCE

GKFG1 2,71 €

GKFG1¼ 2,64 €

GKFG1½ 2,91 €

GKFG2 3,91 €

GKFG2½ 4,39 €

GKFG3 5,33 €

GKFG4 7,92 €

GKFG5 10,38 €

GKFG6 11,81 €

GKFG8 20,73 €

GKFG10 35,12 €

RIGID COUPLING

FLEXIBLE COUPLING

Page 31: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT

60,3 * 42,4 50-32 0,73

60,3 * 48,3 50-40 0,82

76,1 * 42,4 65-32 0,97

76,1 * 48,3 65-40 1,03

88,9 * 42,4 80-32 0,99

88,9 * 48,3 80-40 1,03

88,9 * 60,3 80-50 1,23

114,3 * 42,4 100-32 1,26

114,3 * 76,1 100-40 1,40

114,3 * 60,3 100-50 1,61

114,3 * 76,1 100-65 1,85

114,3 * 88,9 100-80 2,01

139,7 * 60,3 125-50 2,04

139,7 * 76,1 125-65 2,26

168,3 * 42,4 150-32 2,58

168,3 * 48,3 150-40 2,58

168,3 * 60,3 150-50 2,19

168,3 * 76,1 150-65 2,58

168,3 * 88,9 150-80 2,73

168,3 * 114,3 150-100 3,52

219,1 * 76,1 200-65 3,46

219,1 * 88,9 200-80 3,89

RED PAINTEDREFERENCE PRICE/PCE

GMGR2 - 1¼ 3,70 €

GMGR2 - 1½ 4,15 €

GMGR2½ - 1¼ 4,70 €

GMGR2½ - 1½ 5,06 €

GMGR3 - 1¼ 5,01 €

GMGR3 - 1½ 4,91 €

GMGR3 - 2 6,98 €

GMGR4 - 1¼ 6,38 €

GMGR4 - 1½ 6,93 €

GMGR4 - 2 8,25 €

GMGR4 - 2½ 9,47 €

GMGR4 - 3 10,17 €

GMGR5 - 2 10,32 €

GMGR5 - 2½ 11,43 €

GMGR6 - 1¼ 13,05 €

GMGR6 - 1½ 12,60 €

GMGR6 - 2 12,10 €

GMGR6 - 2½ 13,05 €

GMGR6 - 3 13,81 €

GMGR6 - 4 17,80 €

GMGR8 - 2½ 17,51 €

GMGR8 - 3 19,58 €

GALVANIZEDREFERENCE PRICE/PCE

GMGG2 - 1¼ 4,39 €

GMGG2 - 1½ 4,95 €

GMGG2 ½ - 1¼ 5,61 €

GMGG2 ½ - 1½ 5,54 €

GMGG3 - 1¼ 5,96 €

GMGG3 - 1½ 5,83 €

GMGG3 - 2 8,31 €

GMGG4 - 1¼ 7,58 €

GMGG4 - 1½ 8,24 €

GMGG4 - 2 9,81 €

GMGG4 - 2½ 11,26 €

GMGG4 - 3 12,10 €

GMGG5 - 2 12,27 €

GMGG5 - 2½ 13,60 €

GMGG6 - 1¼ 15,52 €

GMGG6 - 1½ 14,99 €

GMGG6 - 2 14,40 €

GMGG6 - 2½ 15,52 €

GMGG6 - 3 16,43 €

GMGG6 - 4 21,19 €

GMGG8 - 2½ 20,82 €

GMGG8 - 3 23,29 €

MECHANICAL TEE GROOVED

Page 32: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT

33,7 25 0,30

42,4 32 0,41

48,3 40 0,47

60,3 50 0,61

76,1 65 0,87

88,9 80 1,12

114,3 100 1,80

139,7 125 3,05

168,3 150 4,94

219,1 200 8,31

273,0 250 14,14

RED PAINTEDREFERENCE PRICE/PCE

GB90 R1 1,40 €

GB90 R1¼ 1,50 €

GB90 R1½ 1,71 €

GB90 R2 2,01 €

GB90 R2½ 2,86 €

GB90 R3 3,87 €

GB90 R4 6,22 €

GB90 R5 10,70 €

GB90 R6 16,25 €

GB90 R8 27,97 €

GB90 R10 51,46 €

GALVANIZEDREFERENCE PRICE/PCE

GB90 G1 1,94 €

GB90 G1¼ 2,31 €

GB90 G1½ 2,52 €

GB90 G2 3,03 €

GB90 G2½ 4,35 €

GB90 G3 5,72 €

GB90 G4 9,75 €

GB90 G5 15,38 €

GB90 G6 21,42 €

GB90 G8 42,09 €

GB90 G10 78,63 €

GENERALMM DN WEIGHT

33,7 25 0,22

42,4 32 0,30

48,3 40 0,36

60,3 50 0,53

76,1 65 0,93

88,9 80 1,08

114,3 100 1,81

139,7 125 2,77

168,3 150 3,63

219,1 200 8,77

273,0 250 11,50

RED PAINTEDREFERENCE PRICE/PCE

GB45 R1 1,62 €

GB45 R1¼ 1,62 €

GB45 R1½ 1,68 €

GB45R2 2,23 €

GB45 R2½ 3,49 €

GB45 R3 4,54 €

GB45 R4 7,72 €

GB45 R5 11,63 €

GB45 R6 16,80 €

GB45 R8 36,83 €

GB45 R10 48,30 €

GALVANIZEDREFERENCE PRICE/PCE

GB45 G1 1,74 €

GB45 G1¼ 1,81 €

GB45 G1½ 2,16 €

GB45 G2 2,97 €

GB45 G2½ 5,10 €

GB45 G3 6,75 €

GB45 G4 9,95 €

GB45 G5 15,21 €

GB45 G6 20,77 €

GB45 G8 51,27 €

GB45 G10 63,19 €

ELBOW 90º

ELBOW 45º

Page 33: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT

48,3 * 42,4 40-32 0,3260,3 * 48,3 50-40 0,4176,1 * 48,3 65-40 0,4976,1 * 60,3 65-50 0,5188,9 * 60,3 80-50 0,5988,9 * 76,1 80-65 0,62114,3 * 60,3 100-50 0,88114,3 * 76,1 100-65 0,95114,3 * 88,9 100-80 1,02139,7 * 60,3 125-50 1,60139,7 * 76,1 125-65 1,65139,7 * 88,9 125-80 1,65139,7 * 114,3 125-100 1,80168,3 * 88,9 150-80 2,04168,3 * 114,3 150-100 2,23168,3 * 139,7 150-125 2,29219,1 * 168,3 200-150 3,34

RED PAINTEDREFERENCE PRICE/PCE

GRCR 1½ - 1¼ 2,58 €GRCR 2 - 1½ 2,47 €

GRCR 2½ - 1½ 2,96 €GRCR 2½ - 2 3,13 €GRCR 3 - 2 3,55 €

GRCR 3 - 2½ 3,84 €GRCR 4 - 2 6,07 €

GRCR 4 - 2½ 5,61 €GRCR 4 - 3 6,38 €GRCR 5 - 2 8,61 €

GRCR 5 - 2½ 8,67 €GRCR 5 - 3 9,33 €GRCR 5 - 4 10,05 €GRCR 6 - 3 12,27 €GRCR 6 - 4 11,74 €GRCR 6 - 5 13,78 €GRCR 8 - 6 19,50 €

GALVANIZEDREFERENCE PRICE/PCE

GRCG 1½ - 1¼ 3,23 €GRCG 2 - 1½ 3,07 €

GRCG 2½ - 1½ 3,69 €GRCG 2½ - 2 3,90 €GRCG 3 - 2 4,43 €

GRCG 3 - 2½ 4,80 €GRCG 4 - 2 7,58 €

GRCG 4 - 2½ 6,98 €GRCG 4 - 3 7,95 €GRCG 5 - 2 10,73 €

GRCG 5 - 2½ 10,80 €GRCG 5 - 3 11,63 €GRCG 5 - 4 12,54 €GRCG 6 - 3 15,30 €GRCG 6 - 4 14,64 €GRCG 6 - 5 17,17 €GRCG 8 - 6 24,31 €

GENERALMM DN WEIGHT33,7 25 0,5042,4 32 0,6448,3 40 0,7360,3 50 0,8976,1 65 1,4388,9 80 1,68114,3 100 2,29139,7 125 4,67168,3 150 6,50219,1 200 12,50273,0 250 18,30

RED PAINTEDREFERENCE PRICE/PCE

GTR 1 2,58 €GTR 1¼ 3,00 €GTR 1½ 3,42 €GTR 2 3,73 €

GTR 2½ 6,01 €GTR 3 7,43 €GTR 4 9,61 €GTR 5 19,61 €GTR 6 27,30 €GTR 8 52,50 €GTR 10 76,86 €

GALVANIZEDREFERENCE PRICE/PCE

GTG 1 3,23 €GTG 1¼ 3,91 €GTG 1½ 4,39 €GTG 2 4,89 €

GTG 2½ 7,75 €GTG 3 9,68 €GTG 4 14,57 €GTG 5 31,94 €GTG 6 37,32 €GTG 8 68,25 €GTG 10 100,57 €

CONCENTRIC REDUCTION

EQUAL TEE

Page 34: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT33,7 25 0,0742,4 32 0,0948,3 40 0,1260,3 50 0,1876,1 65 0,3088,9 80 0,38114,3 100 0,70139,7 125 1,15168,3 150 1,50219,1 200 3,13273,0 250 5,23

GENERALMM DN WEIGHT

60,3 * 33,7 50-25 0,2660,3 * 48,3 50-40 0,2576,1 * 33,7 65-25 0,3876,1 * 42,4 65-32 0,3076,1 * 48,3 65-40 0,3876,1 * 60,3 65-50 0,3588,9 * 33,7 80-25 0,6488,9 * 42,4 80-32 0,6488,9 * 48,3 80-40 0,6488,9 * 60,3 80-50 0,54114,3 * 60,3 100-50 0,86139,7 * 60,3 125-50 1,25168,3 * 60,3 150-50 1,78219,1 * 60,3 200-50 2,97

GENERALMM DN WEIGHT60,3 50 1,5076,1 65 1,7588,9 80 2,05114,3 100 2,45139,7 125 3,40168,3 150 4,50219,1 200 5,95

RED PAINTEDREFERENCE PRICE/PCE

GER 1 1,62 €GER 1¼ 1,62 €GER 1½ 1,62 €GER 2 1,62 €

GER 2½ 1,70 €GER 3 2,15 €GER 4 3,96 €GER 5 6,51 €GER 6 8,48 €GER 8 17,70 €GER 10 29,58 €

RED PAINTEDREFERENCE PRICE/PCE

GER 2 - 1 2,54 €GER 2 - 1½ 2,54 €GER 2½ - 1 3,33 €

GER 2½ - 1¼ 3,13 €GER 2½ - 1½ 3,33 €GER 2½ - 2 3,06 €

GER 3 - 1 5,58 €GER 3 - 1¼ 5,58 €GER 3 - 1½ 5,58 €GER 3 - 2 4,28 €GER 4 - 2 7,50 €GER 5 - 2 10,92 €GER 6 - 2 15,52 €GER 8 - 2 25,92 €

RED PAINTEDREFERENCE PRICE/PCE

GAF16 R2 9,03 €GAF16 R2½ 10,53 €GAF16 R3 12,34 €GAF16 R4 14,75 €GAF16 R5 20,46 €GAF16 R6 27,09 €GAF16 R8 36,13 €

GALVANIZEDREFERENCE PRICE/PCE

GEG 1 1,74 €GEG 1¼ 1,74 €GEG 1½ 1,74 €GEG 2 1,87 €

GEG 2½ 2,64 €GEG 3 3,23 €GEG 4 5,02 €GEG 5 8,63 €GEG 6 11,26 €GEG 8 24,54 €GEG 10 39,24 €

GALVANIZEDREFERENCE PRICE/PCE

GEG 2 - 1 2,82 €GEG 2 - 1½ 2,71 €GEG 2½ - 1 4,14 €

GEG 2½ - 1¼ 3,91 €GEG 2½ - 1½ 4,14 €GEG 2½ - 2 3,81 €

GEG 3 - 1 6,96 €GEG 3 - 1¼ 6,96 €GEG 3 - 1½ 6,96 €GEG 3 - 2 5,33 €GEG 4 - 2 9,36 €GEG 5 - 2 13,60 €GEG 6 - 2 19,37 €GEG 8 - 2 32,31 €

GALVANIZEDREFERENCE PRICE/PCE

GAF16 G2 11,26 €GAF16 G2½ 13,14 €GAF16 G3 15,38 €GAF16 G4 18,39 €GAF16 G5 25,50 €GAF16 G6 33,76 €GAF16 G8 44,64 €

ENDCAP

ENDCAP WITH EXCENTRIC HOLE

ADAPTOR FLANGE

Page 35: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

GENERALMM DN WEIGHT

33,7 * 21,3 25-15 0,33

42,4 * 21,3 32-15 0,42

42,4 * 26,9 32-20 0,46

42,4 * 33,7 32-25 0,49

48,3 * 21,3 40-15 0,38

48,3 * 26,9 40-20 0,38

48,3 * 33,7 40-25 0,41

60,3 * 21,3 50-15 0,45

60,3 * 26,9 50-20 0,45

60,3 * 33,7 50-25 0,47

RED PAINTEDREFERENCE PRICE/PCE

GSTR 1 - ½ 2,54 €

GSTR 1¼ - ½ 3,44 €

GSTR 1¼ - ¾ 3,38 €

GSTR 1¼ - 1 3,52 €

GSTR 1½ - ½ 2,86 €

GSTR 1½ - ¾ 2,79 €

GSTR 1½ - 1 3,00 €

GSTR 2 - ½ 3,30 €

GSTR 2 - ¾ 3,30 €

GSTR 2 - 1 3,44 €

GALVANIZEDREFERENCE PRICE/PCE

GSTG 1 - ½ 2,54 €

GSTG 1¼ - ½ 3,75 €

GSTG 1¼ - ¾ 3,65 €

GSTG 1¼ - 1 3,81 €

GSTG 1½ - ½ 3,12 €

GSTG 1½ - ¾ 3,02 €

GSTG 1½ - 1 3,27 €

GSTG 2 - ½ 3,59 €

GSTG 2 - ¾ 3,59 €

GSTG 2 - 1 3,75 €

GENERALMM DN WEIGHT

76,1 * 21,3 65-15 0,74

76,1 * 26,9 65-20 0,75

76,1 * 33,7 65-25 0,87

GENERALLubricant for gaskets - 900 gr 16,15 €

only obtainable / box (12 pcs)

RED PAINTEDREFERENCE PRICE/PCE

GSTFCR 2½ - ½ 5,79 €

GSTFCR 2½ - ¾ 5,72 €

GSTFCR 2½ - 1 6,46 €

GALVANIZEDREFERENCE PRICE/PCE

GSTFCG 2½ - ½ 6,30 €

GSTFCG 2½ - ¾ 6,21 €

GSTFCG 2½ - 1 7,01 €

REFERENCELUBRICANT

U BOLT SPRINKLER TEE

FULL CASTING SPRINKLER

FULL CASTING SPRINKLER TEE

Page 36: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

ELEMENTOS DE SOPORTECUELGUE PERA CASQUILLO fig FPE - 330

<FM> (UL)1 1/4" M10 0,26 €

1 1/2" M10 0,27 €

2" M10 0,29 €

2 1/2" M10 0,58 €

3" M10 0,66 €

4" M10 0,75 €

CUELGUE PERA DOBLE TUERCA fig FDT - 320 <FM> Vds

1 1/4" M10 0,39 € 1 1/2" M10 0,41 €

2" M10 0,43 € 2 1/2" M10 0,65 €

3" M10 0,70 € 4" M10 0,86 €

6” M12 1,20 €

MORDAZA VIGA fig BMP - 680 <FM> (UL) Vds

M10 0,85 €

M10 1,60 €

ABRAZADERA REF fig RCL - 300

1" M10 31 - 35 mm Vds 1,35 € 1 1/4" M10 40 - 45 mm Vds 1,44 € 1 1/2" M10 48 - 53 mm Vds 1,52 €

2" M10 60 - 65 mm <FM> Vds 1,62 € 2 1/2" M10 76 - 81 mm <FM> Vds 2,36 €

3" M10 88 - 93 mm <FM> Vds 2,50 €

4" M12 110 - 116 mm <FM> Vds 2,82 €

6" M16 167 - 173 mm <FM> Vds 6,29 € 8" M16 219 - 225 mm <FM> Vds 7,20 €

SOPORTE TIPO CARACOL

Código Descripción Ud. Ud/caja Precio/UdZ10 Soporte tipo caracoll M-10 zincado 1 100 0,78 €

Page 37: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

ELEMENTOS DE SOPORTETACOS DE EXPANSIÓN RETACAR Y VARILLA ROSCADA

Código Descripción Ud. Ud/caja Precio/Ud

EAM8 "Taco de acero para retacar M-8 longitud 25mm., neceesita broca de 10, Homologado VSD" 1 100 0,20 €

EAM10 "Taco de acero para retacar M-10 longitud 40mm., neceesita broca de 12, Homologado VSD" 1 50 0,28 €

EAM12 "Taco de acero para retacar M-12 longitud 50mm., neceesita broca de 15, Homologado VSD" 1 25 0,56 €

EAM16 "Taco de acero para retacar M-16 longitud 65mm., neceesita broca de 20, Homologado VSD" 1 20 1,35 €

975PM8X1M Varilla roscada DIN975 M-8, longitud 1 m., zincada 1 0,76 €

975PM10X1M Varilla roscada DIN975 M-10, longitud 1 m., zincada 1 0,97 €

975PM10X2M Varilla roscada DIN975 M-10, longitud 2 m., zincada 1 2,29 €

975PM12X1M Varilla roscada DIN975 M-12, longitud 1 m., zincada 1 1,62 €

975PM12X2M Varilla roscada DIN975 M-12, longitud 2 m., zincada 1 4,47 €

SOPORTE MURAL UNIKON

Código Descripción Ud. Ud/caja Precio/Ud

UNIKON180 Soporte UNIKON L=180, taladros pared para tornillo M-10 zincado 1 2,44 €

UNIKON240 Soporte UNIKON L=240, taladros pared para tornillo M-10 zincado 1 2,81 €

UNIKON300 Soporte UNIKON L=300, taladros pared para tornillo M-10 zincado 1 3,09 €

UNIKON360 Soporte UNIKON L=360, taladros pared para tornillo M-10 zincado 1 CONSULTAR

UNIKON420 Soporte UNIKON L=420, taladros pared para tornillo M-10 zincado 1 4,13 €

UNIKON540 Soporte UNIKON L=540, taladros pared para tornillo M-10 zincado 1 CONSULTAR

UNIKON660 Soporte UNIKON L=660, taladros pared para tornillo M-10 zincado 1 CONSULTAR

UNIKON780 Soporte UNIKON L=780, taladros pared para tornillo M-10 zincado 1 CONSULTAR

Page 38: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

SOPORTE MURAL

Código Descripción Ud. Precio/Ud

KON300/200 Soporte mural L=315 x 220 zincado 1 11,72 €

KON550/300 Soporte mural L=550 x 300 zincado 1 20,63 €

KON700/400 Soporte mural L=700 x 400 zincado 1 48,51 €

KON850/550 Soporte mural L=850 x 550 zincado 1 70,29 €

KON BM Apoyo lateral para soporte mural 300/200 & 550/350 zincado 1 4,75 €

KON BH Apoyo lateral para soporte mural 700/400 & 850/550 zincado 1 7,62 €

CARRIL TALADRADOCódigo Descripción Ud. Precio/Ud

P1011222 Carril taladrado 41 x 41 x 2,5 en longitud de 2.000 mm. Zincado 1 13,35 €

P1011223 Carril taladrado 41 x 41 x 2,5 en longitud de 3.000 mm. Zincado 1 22,92 €

P1011226 Carril taladrado 41 x 41 x 2,5 en longitud de 6.000 mm. Zincado 1 46,10 €

P3311322 Carril taladrado 21 x 41 x 2,5 en longitud de 2.000 mm. Zincado 1 10,56 €

P3311323 Carril taladrado 21 x 41 x 2,5 en longitud de 3.000 mm. Zincado 1 15,91 €

P3311326 Carril taladrado 21 x 41 x 2,5 en longitud de 6.000 mm. Zincado 1 31,81 €

ELEMENTOS DE SOPORTE

Page 39: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

ABARCÓN LARGO NORMAL (TUERCAS INCLUIDAS)Código Descripción Ud. Ud/caja Precio/Ud

170002102 Abarcón largo normal DN15 M-6 zincado, incluso tuercas 1 100 0,25 €

170002702 Abarcón largo normal DN20 M-6 zincado, incluso tuercas 1 100 0,25 €

170003402 Abarcón largo normal DN25 M-6 zincado, incluso tuercas 1 100 0,23 €

170004222 Abarcón largo normal DN32 M-10 zincado, incluso tuercas 1 100 0,51 €

170004822 Abarcón largo normal DN40 M-10 zincado, incluso tuercas 1 100 0,53 €

170006022 Abarcón largo normal DN50 M-10 zincado, incluso tuercas 1 100 0,53 €

170007622 Abarcón largo normal DN65 M-10 zincado, incluso tuercas 1 100 0,58 €

170008922 Abarcón largo normal DN80 M-10 zincado, incluso tuercas 1 50 0,73 €

170011422 Abarcón largo normal DN100 M-10 zincado, incluso tuercas 1 50 0,78 €

170013932 Abarcón largo normal DN150 M-12 zincado, incluso tuercas 1 25 1,44 €

170021942 Abarcón largo normal DN200 M-16 zincado, incluso tuercas 1 25 8,25 €

170027342 Abarcón largo normal DN250 M-16 zincado, incluso tuercas 1 1 10,07 €

170032442 Abarcón largo normal DN300 M-16 zincado, incluso tuercas 1 1 10,07 €

ABARCÓN EXTRA LARGO NORMAL (TUERCAS INCLUIDAS)Código Descripción Ud. Ud/caja Precio/Ud

171002102 Abarcón extra largo normal DN15 M-6 zincado, incluso tuercas 1 100 0,66 €

171002702 Abarcón extra largo normal DN20 M-6 zincado, incluso tuercas 1 100 0,66 €

171003402 Abarcón extra largo normal DN25 M-6 zincado, incluso tuercas 1 100 0,73 €

171004222 Abarcón extra largo normal DN32 M-10 zincado, incluso tuercas 1 100 0,76 €

171004822 Abarcón extra largo normal DN40 M-10 zincado, incluso tuercas 1 100 0,78 €

171006022 Abarcón extra largo normal DN50 M-10 zincado, incluso tuercas 1 100 0,81 €

171007622 Abarcón extra largo normal DN65 M-10 zincado, incluso tuercas 1 100 0,84 €

171008922 Abarcón extra largo normal DN80 M-10 zincado, incluso tuercas 1 50 0,86 €

171011422 Abarcón extra largo normal DN100 M-10 zincado, incluso tuercas 1 50 2,64 €

171013932 Abarcón extra largo normal DN150 M-12 zincado, incluso tuercas 1 25 2,92 €

171021942 Abarcón extra largo normal DN200 M-16 zincado, incluso tuercas 1 25 9,57 €

171027342 Abarcón extra largo normal DN250 M-16 zincado, incluso tuercas 1 1 10,07 €

171032442 Abarcón extra largo normal DN300 M-16 zincado, incluso tuercas 1 1 10,91 €

ELEMENTOS DE SOPORTE

Page 40: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TARIFA2019

www.firepiping.com

F I R E P I P I N GVÁLVULAS

Page 41: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

Flanged Resilient OS&Y Gate Valve, F4 INCH MM KGS € /Ud. MATERIAL SPECIFICATION

2 1/2" 65 12,72 104,74 € 1. Valve Body: EN-GJS-450-102. Resilient Wedge Disc: EN-GJS-450-10+EPDM3. O-Ring: NBR4. Stem: SS420 5. Bonnet: EN-GJS-450-106. Gland: EN-GJS-450-107. Yoke: EN-GJS-450-108. Handwheel: EN-GJS-450-109. Bonnet Gasket: EPDM

3" 80 17,68 113,56 €4" 100 22,74 142,22 €6" 150 44,06 276,73 €8" 200 60,52 361,62 €10" 250 118,29 712,22 €12" 300 160,89 1.036,35 €

Grooved Resilient OS&Y Gate Valve INCH MM KGS € /Ud. MATERIAL SPECIFICATION

2 1/2" 76 7,57 58,43 € 1. Valve Body: EN-GJS-450-10

2. Resilient Wedge Disc: EN-GJS-450-10+EPDM

3. O-Ring: NBR

4. Stem: SS420

5. Bonnet: EN-GJS-450-10

6. Gland: EN-GJS-450-10

7. Yoke: EN-GJS-450-10

8. Handwheel: EN-GJS-450-10

9. Bonnet Gasket: EPDM

3" 89 11,70 91,51 €4" 114 15,99 119,07 €6” 168,3 35,19 232,63 €8" 219 52,00 329,65 €10" 273 112.23 750,80 €12" 324 154.05 996,66 €

GATE VALVE

Grooved Resilient Butterfly ValveGear Operated, with Tamper Switch INCH MM KGS € /Ud. MATERIAL SPECIFICATION

2" 60 6,96 82,51 €

1.Valve Body:Ductile Iron EN-GJS-450-10

2.Disc: Ductile iron + EPDM Coating

3.Stem: SS431, Two-Piece Stem Design

4.Bushing: NYLON 1010

5.Gear box: Ductile Iron EN-GJS-450-10

2 1/2” 76,1 7,71 89,02

3" 89 8,20 91,92 €

4" 114 9,65 103,95 €

6” 168,3 15,62 143,01 €

8" 219 25,76 241,77 €

Page 42: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

Swing Check ValveRubber sealGrooved end

INCH MM KGS € /Ud. MATERIAL SPECIFICATION

2" 60,3 3,26 48,51 €

1.Valve Body:Ductile Iron EN-GJS-450-10

2.Disc: DN50-100 SS304

DN150-300 Ductile iron EN-GJS-450-10

3.Disc Sealing Ring: EPDM

4.Spring: SS304

5.O-Ring: EPDM

6.Seat Ring: ASTM B62 C83600(Pressed Fit)

2 1/2" 76 3,55 49,61 €

3" 88,9 4,63 57,33 €

4" 114,3 7,44 69,46 €

6" 168,3 16,14 134,51 €

8" 219,1 26,92 197,35 €

CHECK VALVE

Page 43: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

TARIFA2019

www.firepiping.com

F I R E P I P I N GHIDRANTES

Page 44: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PRODUCTO PVP

MOD. FP_HYD_E_4

Hidrante bajo rasante de 4” (DN100) con 1 salida de 100 mm (racor + Tapón bombero). Fabricado conforme a la norma UNE-EN 14339.

Hidrante de incendios instalado bajo tierra, con 1 salida de 100 mm con rosca y tapón tipo Bombero según

UNE 23400. Entrada recta a tubería embridada DIN PN-16 de 4”. Pintado en rojo. Producto marcado CE

conforme Directiva Productos de la Construcción 89/106 CE y fabricado conforme a Norma UNE-EN 14339.

CARACTERÍSTICAS: • Válvula: Tipo Globo / Asiento. • Accionamiento: Llave de cuadradillo 25 x 25. • Nº

de vueltas hasta apertura total (totales): 11 ¾ vueltas.• MOT (par máximo de maniobra): 130 Nm. • MST

(par mínimo de resistencia): 260 Nm. • Cuerpo: Fabricado en fundición gris GJL-200 EN 1561. • Meca-

nismo de accionamiento: Fabricado en latón CuZn39Pb1Al-B

191,98 €

MOD. FP_HYD_E_2.5

Hidrante bajo rasante de 4” (DN100) con 2 salidas de 70mm

(racores + tapones Barcelona).

Hidrante de incendios instalado bajo tierra, fabricado en hierro fundido, con 2 salidas de 70 mm con racores

BCN según UNE 23400. Entrada recta a tubería embridada DIN PN-16 DE 4”. Pintado en rojo. Producto marcado

CE conforme Directiva Productos de la Construcción 89/106CE y fabricado conforme a Norma UNE-EN 14339.

CARACTERÍSTICAS: • Válvula: Tipo Globo / Asiento. • Accionamiento: Llave de cuadradillo 25 x 25. • Nº de vueltas hasta apertura total (totales): 11 ½ vueltas.• MOT (par máximo de maniobra): 130 Nm. • MST (par mínimo de resistencia): 260 Nm. • Cuerpo: Fabricado en fundición gris GJL-200 EN 1561. • Meca-nismo de accionamiento: Fabricado en latón CuZn39Pb1Al-B

229,48 €

HIDRANTES

W W W . F I R E P I P I N G . C O M 902.551.558

Page 45: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PRODUCTO PVP

MOD. FP_HYD_C_4

Hidrante de columna seca de 4” (DN100) con 1 salida de 100 mm + 2 salidas de 70 mm. Toma recta a tubería. Incluye carrete de 300mm

Hidrante de columna, con vaciado automático para protegerlo contra heladas. Conexión de mangueras y

equipos de lucha contra incendios. Uso exclusivo bomberos.

Entrada Salidas Factor Kv P. Servicio P. Prueba

RECTABrida DIN 4” PN16

1 de 4’’ BSP 187

16 bar 25 barBrida DIN 4” PN16 130

1 de 2½’’ BSP 130

CARACTERÍSTICAS: • Válvula: Tipo Globo / Asiento. • Accionamiento: Llave de cuadradillo 30 x 30 • Nº de vueltas hasta apertura total (totales): 10 1/4 vueltas.• Nº de vueltas hasta inicio de flujo (muertas): 1 1/4 vueltas. .• Sistemas anti rotura. • Sistema de drenaje. • Sistema de accionamien-to con baño de aceite

MATERIALES: • Cuerpo: Fabricado en fundición gris GJL 200 EN 15261. • Mecanismo de acciona-

miento: • Fabricado en latón CuZn39Pb1Al-B y acero inoxidable AISI-304.

453,75 €

W W W . F I R E P I P I N G . C O M 902.551.558

HIDRANTES

Page 46: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PRODUCTO PVP

Hidrante de columna seca de 4” (DN100) con 1 salida de 100mm + 2 salidas de 70 mm. Toma curva a tubería.

Hidrante de columna seca de toma a tubería curva en 4” (DN100) embridada DIN PN-16. Producto marcado

CE conforme Directiva Productos de la construcción 89/106CE y fabricado según UNE 14.383. Incluye 2

salidas laterales de 70 mm con racores y tapones en aluminio uso ligero tipo BCN según UNE 23.400 1

salida centran de 100 mm con rosca y tapón tipo bombero según UNE 23.400. Tornillos de titanio para

evitar pérdidas en golpes. Cierre por obturador reemplazable in situ. Sistema de drenaje y sistema de rotura. 487,50 €

W W W . F I R E P I P I N G . C O M 902.551.558

HIDRANTES

Page 47: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PRODUCTO PVP

Caseta de intemperie con peana con dotación estándar.

Conjunto fabricado en poliéster reforzado con fibra de vidrio que le garantiza una muy alta resistencia a la intemperie. Herrajes (bisagras y cierre) en material inoxidable.

Conjunto compuesto por dos piezas:

Armario con tejadillo incorporado en resina de poliéster de color rojo RAL 3000 reforzado con fibra vidrio. Puerta de poliéster reforzado de color blanco y puerta en color blanco. Dispone de compartimento interno para pequeño material.

Peana de tronco piramidal para anclarse al suelo, fabricada en resina de poliéster de color rojo y altamente reforzada con tejido de fibra de vidrio.

La dotación que incluye es (según CEPREVEN para uso estándar):

DOTACION para uso LIGERO UNIDADES

Tramo de manguera textil de 45 mm racorada con acoples de Al forjado 2x15 mts

Tramo de manguera textil de 70 mm racorada con acoples de Al forjado 1x15 mts

Lanza de agua de 45 mm inyectada en ABS con acople de Al forjado 2

Lanza de agua de 70 mm inyectada en ABS con acople de Al forjado 1

Bifurcación de entrada 70 mm x 2 salidas de 45 mm con acoples de Al forjado 1

Acople reducción de 70x45 mm en Al forjado 1

Dotación de acuerdo a la Regla técnica Cepreven R.T.2 CHE.

562,50 €

W W W . F I R E P I P I N G . C O M 902.551.558

HIDRANTES

Page 48: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PRODUCTO PVP

Caseta de intemperie con peana con dotación profesional

Conjunto fabricado en poliéster reforzado con fibra de vidrio que le garantiza una muy alta resistencia a la

intemperie. Herrajes (bisagras y cierre) en material inoxidable.

Conjunto compuesto por dos piezas:

Armario con tejadillo incorporado en resina de poliéster de color rojo RAL 3000 reforzado con fibra vidrio.

Puerta de poliéster reforzado de color blanco y puerta en color blanco. Dispone de compartimento interno

para pequeño material.

Peana de tronco piramidal para anclarse al suelo, fabricada en resina de poliéster de color rojo y altamente

reforzada con tejido de fibra de vidrio.

La dotación que incluye es (según CEPREVEN para uso profesional):

DOTACION para uso PROFESIONAL UNIDADES

Tramo de manguera recubierta de caucho de 45 mm racorada con acoples de Al forjado

2x15 mts

Tramo de manguera recubierta de caucho de 70 mm racorada con acoples de Al forjado

1x15 mts

Lanza de agua de 45 mm metálica con acople de Al forjado 2

Lanza de agua de 70 mm metálica en ABS con acople de Al forjado 1

Bifurcación de entrada 70 mm x 2 salidas de 45 mm con acoples de Al forjado 1

Acople reducción de 70x45 mm en Al forjado 1

Dotación de acuerdo a la Regla técnica Cepreven R.T.2 CHE.

742,50 €

W W W . F I R E P I P I N G . C O M 902.551.558

HIDRANTES

Page 49: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO DESCRIPCIÓN PVP

Fanal de protecciónFanal de protección contra intemperie o las manipulaciones indebidas, compuesto

de una parte inferior de hierro fundido y una cubierta superior de poliéster-fibra de

vidrio, con cierre de cuadradillo para su apertura.

147,00 €

Llave para hidrante de columna seca Llave de cuadradillo de 20X30 mm para la apertura de hidrantes de columna seca. 13,50 €

Llave para hidrante bajo rasanteLlave de cuadradillo con estructura de “T” de 28x28 mm, para la apertura de hi-

drantes bajo rasante.13,50 €

Racor 100mm latón tipo bomberoRacor fabricado en latón de 100 mm de salida, con rosca macho de 3-1/2”. Se instala

en hidrantes de 4” y en hidrantes bajo rasante. Salida tipo bomberoestándar. Fabri-

cado según UNE 23.400

37,54 €

Tapón 100 mm aluminio tipo bomberoTapón de aluminio de 100 mm para roscar en racor de latón de 100mm. Se instala

en hidrantes de 4” y en hidrantes bajo rasante. Para ser roscado en racor de 100

mm tipo bombero estándar. Fabricado según UNE 23.400

37,54 €

ACCESORIOS

W W W . F I R E P I P I N G . C O M 902.551.558

Page 50: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

HIDRANTES Y ACCESORIOS

PRODUCTO PVP

Racor inyectado BCN de 45 mm Rosca Macho UNE 23.400

Racor tipo BCN de 45 mm inyectado de alta calidad (1-1/2”) de rosca macho para diámetro de 45 mm, de alta resis-

tencia. Incluye junta estanca. Fabricado según UNE 23.400. De obligada instalación en hidrantes de todo tipo.16,54 €

Racor inyectado BCN de 70 mm Rosca macho UNE 23.400

Racor tipo BCN de 70 mm inyectado de alta calidad (2-1/2”) de rosca macho para diámetro de 70 mm, de alta re-

sistencia. Incluye junta estanca. Frabricado según UNE 23.400. De obligada instalación en hidrantes de todo tipo.25,46 €

Tapón inyectado BCN de 45 mm UNE 23.400

Tapón tipo BCN de 45 mm inyectado de alta calidad (1/1/2”) para diámetro de 45 mm, de alta resistencia. Incluye

junta estanca y orificio de salida de agua por exceso de presión y cadena exterior para su acople. Fabricado según

UNE 23.400. De obligada instalación en hidrantes de todo tipo.

21,00 €

Tapón inyectado BCN de 70 mm UNE 23.400

Tapón tipo BCN de 70 mm inyectado de alta calidad (21/2”) para diámetro de 70 mm, de alta resistencia. Incluye

junta estanca orificio de salida de agua por exceso de presión y cadena exterior de su acople. Fabricado según

UNE 23.400. De obligada instalación en hidrantes de todo tipo.

25,46 €

W W W . F I R E P I P I N G . C O M 902.551.558

Page 51: Engineered Fire Piping · 2019-04-24 · depÓsitos accesorios vÁlvulas tuberÍa engineered fire piping hidrantes. tarifa 2019 fire piping tuberÍa. engineered fire piping procedimiento

PRODUCTO PVP

Caseta poliéster sin dotación

Caseta en fibra de vidrio-poliester, para intemperie sin dotación. Color rojo - puerta en blanco, con maneta de apertu-

ra. Fabricada en fibra de vidrio. Ideal para intemperie. Ligera y duradera.

330,00 €

Pie curvo para hidrantes de 4” (DN100)

Pie curvo pintado en negro embridado DIN PN-16 para anexionar a hidrantes de 4” de toma recta. Toma brida-brida.

Fabricado en hierro fundido.

60,00 €

Toma especial para monitores de 4” para hidrantes de coluna seca

Toma especial de monitor para conectar a salida central de hidrantes de columna seca de 4”. Pieza fabricada en

acero, curva de 90º, pintada en rojo RAL-3000, ROSCA MACHO DE 3-1/2” Y SALIDA EMBRIDADA DIN PN16 Bar de 4”

(DN100) para conectar monitor.

148,49 €

Codo giratorio especial para salida de agua en hidrantes bajo rasante

Codo giratorio especial para salida de agua en hidrantes bajo rasante. Posibilidades de distintos diámetros en las to-

mas y en el numero de salidas.

Consultar

Puesto de control reducido para Hidrantes de 4”

Equipo reducido de control de hidrantes de 4”. Válvula de mariposa ranurada de PN-16 con interruptor de final de ca-

rrera supervisada homologada UL-FM + Detector de flujo de 4” incluido homologado UL-FM. Equipo completo para

su montaje final en obra.

Consultar

HIDRANTES Y ACCESORIOS

W W W . F I R E P I P I N G . C O M 902.551.558


Recommended