Engineering and Commercial Infrastructure - Water Services Monthly Review April 2018
Transcript
Page 1: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Engineering and

Commercial Infrastructure -

Water Services

Monthly Review

April 2018

Page 2: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 2

Engineering & Commercial Infrastructure

Monthly Review > April 2018

OVERVIEW .......................................................................................................................... 3

SAFETY.............................................................................................................................. 4

1.1. Incident Statistics ....................................................................................................... 4 1.2. Lost Time Injuries ...................................................................................................... 4

FINANCE ........................................................................................................................... 5

2.1. Water and Wastewater Financial Fund Report ........................................................... 5 2.2. Operating Result for Water and Sewerage Fund ....................................................... 6 2.3. Accrued Water Revenue Less Expenditure ............................................................... 6 2.4. Accrued Wastewater Revenue Less Expenditure ...................................................... 7

CUSTOMER SERVICES ................................................................................................. 7

3.1. Requests ................................................................................................................... 7 3.2. Request Types .......................................................................................................... 8 3.3. Plumbing Applications ............................................................................................... 8 3.4. Trade Waste Approvals ............................................................................................. 9 3.5. Annual Trade Waste Activity ...................................................................................... 9 3.6. Building Over Adjacent Sewers ............................................................................... 10 3.7. Scientific and Analytical Services............................................................................. 10 3.8. Community Engagement ......................................................................................... 11 3.9. Leak Detection Notifications .................................................................................... 12

ASSET MANAGEMENT ................................................................................................ 13

4.1. Surface Water Raw Water Storage Capacities ........................................................ 13 4.2. Annual Water Consumption vs Allocation by Source ............................................... 14 4.3. Water Consumption by Locality – Residential Customers Only ................................ 14 4.4. Significant Projects .................................................................................................. 15

REGULATORY COMPLIANCE ................................................................................... 18

5.1. Drinking Water Compliance ..................................................................................... 18 5.2. Wastewater Compliance .......................................................................................... 19 5.3. Backflow Testing ..................................................................................................... 19

Page 3: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 3

Engineering & Commercial Infrastructure

Monthly Review > April 2018

OVERVIEW

This report is for Water Services activities for April 2018. Significant items in this period include:

• No Lost Time Injuries occurred in April 2018

• Staff prepared for the potential impacts of Tropical Cyclone Iris. While the cyclone did not make

landfall, it was a good opportunity to test our systems and processes while in the Lean Forward

phase and take any learnings and incorporate these learnings into the processes moving

forward

• Internal repairs to Mount Pleasant No 1 Reservoir were completed in April 2018 and refilling of

the reservoir will commence in the first week of May 2018

• The Showgrounds Trunk Water Main replacement was completed in April 2018

Director Engineering & Commercial Infrastructure

Page 4: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 4

Engineering & Commercial Infrastructure

Monthly Review > April 2018

SAFETY

1.1. Incident Statistics

The incident statistic details a summary of the Water Services safety incident performance. Water

Services aspires to achieve zero harm with a stretch target of zero injuries.

April 2018 Summary:

No of Incidents Mechanism of injury Injury Type

1 Muscular Stress Non-Treatment Injury

1 Single exposure to chemical or

substance First Aid Injury

1 Contact with Electricity Near Miss

1 Falls on the same level Public

1 Hitting Objects with a part of the

body Non-Treatment Injury

1.2. Lost Time Injuries

Water Services aspires to achieve zero Lost Time Injuries by improving safety performance by

developing a proactive safety culture and implementing best practice safety management across all

business areas.

0

1

2

3

4

5

6

7

8

Nu

mb

er

of

Incid

en

ts

Total Incidents Lost Time Injuries Total Recordable Injuries All Injuries

0

1

2

3

4

5

0

10

20

30

40

50

60

70

80

No

of

LT

Is

No

. o

f D

ays

Lo

st

Lost Time Injuries

Water Total Days Lost Water Total LTIs

Page 5: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 5

Engineering & Commercial Infrastructure

Monthly Review > April 2018

April 2018 Summary:

No Lost Time Injuries were sustained during April 2018. The table below shows the Lost Time Injuries

over previous years.

FINANCE

2.1. Water and Wastewater Financial Fund Report

LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost

Administration

Business Services

Planning & Sustainability

Water Network 4 9 3 71 0 0 1 13 2 35

Water Treatment

Infrastructure Delivery 1 27

Water Services 4 9 3 71 0 0 1 13 3 62

Department2013-14 2014-15 2015-16 2016-17 2017-18

For April 2018

Operating Result AMD Budget YTD Budget YTD Actual YTD Variance %

Water

6.01 - Commercial Infrastructure

Management (41,060,970) (41,016,321) (40,851,104) 165,217 100%

6.02 - Planning & Sustainability 1,006,116 649,775 599,771 (50,003) 92%

6.03 - Infrastructure Delivery 268,338 133,864 106,863 (27,001) 80%

6.04 - Water Networks 6,410,456 5,276,246 4,917,005 (359,241) 93%

6.06 - Business Services 20,410,176 16,964,887 16,850,321 (114,566) 99%

6.07 - Water Treatment 5,252,470 4,338,478 4,617,601 279,123 106%

Total Water (7,713,416) (13,653,072) (13,759,543) (106,471) 101%

Sewerage

6.01 - Commercial Infrastructure

Management (42,667,013) (42,674,726) (42,757,645) (82,918) 100%

6.02 - Planning & Sustainability 806,723 532,254 457,994 (74,260) 86%

6.03 - Infrastructure Delivery 639,652 241,367 165,104 (76,263) 68%

6.04 - Water Networks 5,304,767 4,152,152 3,895,860 (256,292) 94%

6.06 - Business Services 18,924,364 15,577,177 15,706,200 129,023 101%

6.07 - Water Treatment 6,069,185 5,104,519 4,885,552 (218,967) 96%

Total Sewerage (10,922,321) (17,067,257) (17,646,935) (579,678) 103%

TOTAL OPERATIONAL (18,635,737) (30,720,329) (31,406,478) (686,149) 102%

% YTD Variance of YTD Budget

YTD Variance favourable of budget

YTD Variance unfavourable, between 0% and 5% of YTD Budget

YTD Variance unfavourable, more than 5% of YTD Budget

Water & Sewerage Fund Financial Report

Comments

Operational revenue down $194,000 and internal water sales up

$35,000. Offset by timing differences in expenses $16,000 and

increase in wages $22,000

Timing differences in expenses $107,000 and increase in wages

$57,000

Timing differences in expenses $21,000 and $6,000 saving in

wages

Operating revenue up $67,000 (timing differences), $259,000

saving against wages & $33,000 timing difference in expenses

Net MiWater income up $123,000, Pumbing inspections up

$27,000. Offset by increase in wages $70,000 (mainly toolbox

saving against 6.04). Timing difference in expenses $7,000 &

$27,000 decrease in depreciation

$168,000 increase in operating revenue, $28,000 saving against

wages & $30,000 increase in internal transfer income. Offset by

$505,000 increase in expenses

$294,000 increase in operating revenue & $31,000 timing

difference in expenses. Offset by $17,000 increase in wages &

$91,000 decrease in internal transfer revenue (minly leachate

delivery - septic waste receival)

Operational revenue up $85,000. Offset by timing differences in

expenses $19,000 and increase in wages $22,000

Timing differences in expenses $66,000 and $8,000 saving in

wages.

Timing differences in expenses $56,000 and $20,000 saving in

wages

$126,000 saving against wages & $130,000 saving against

expenses

$30,000 increase in Wages (mainly toolbox saving against 6.04),

$30,000 increase in internal expenses (mainly lab testing trade

waste) and $111,000 increase in depreciation. Offset by $42,000

timing difference in expenses

Page 6: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 6

Engineering & Commercial Infrastructure

Monthly Review > April 2018

2.2. Operating Result for Water and Sewerage Fund

April 2018 Summary:

Overall the Water and Waste Water budgets are tracking in line with expected YTD expenditure.

Budgets are continuing to be reviewed closely along with remaining forecast revenue predications.

2.3. Accrued Water Revenue Less Expenditure

The following shows the estimation of the accrued revenue less expenditure.

April 2018 Summary:

The annual surplus (before tax and dividends) is projected to be $151,793 more than budget. Revenue

is projected to be $3,267,530 more than budget (mainly capital income). Wages are projected to be

$153,351 less than budget. Goods and Services are projected to be $99,033 less than budget. A Loss

on Disposal of Assets is $3,154,374 more than budget. Finance costs are $19,875 less than budget.

(45,000,000)

(40,000,000)

(35,000,000)

(30,000,000)

(25,000,000)

(20,000,000)

(15,000,000)

(10,000,000)

(5,000,000)

-

July August September October November December January February March April May June

Operating Result

YTD Budget YTD Actual

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

Re

ve

nu

e le

ss e

xp

en

dit

ure

(m

arg

in)

Operational Hours

Budget - Water Accrual Actual - Water Accrual Proj. Accrual Actuals - Water

Page 7: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 7

Engineering & Commercial Infrastructure

Monthly Review > April 2018

2.4. Accrued Wastewater Revenue Less Expenditure

The following shows the estimation of the accrued revenue less expenditure.

April 2018 Summary:

The annual surplus (before tax and dividends) is projected to be $354,106 more than budget. Revenue

is projected to be $539,031 more than budget. Wages are projected to be $51,318 less than budget.

Goods and Services are projected to be $118,209 more than budget. Finance costs are projected to

be $27,235 less than budget. A Loss on Disposal of Asset is $187,562 more than budget.

CUSTOMER SERVICES

3.1. Requests

This chart details the customer requests received and recorded via pathways that relate to the Water

Business. The target is to have 90% of all customer requests closed at any one point in time.

April 2018 Summary:

The number of requests received increased from 313 in March 2018 to 344 in April 2018. 97% of

Customer Requests were completed within the specified timeframes which is above target.

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

Re

ve

nu

e le

ss e

xp

en

dit

ure

(m

arg

in)

Operational Hours

Budget - Sewerage Accrual Actual - Sewerage Accrual Proj. Accrual Actuals - Sewarage

0%

20%

40%

60%

80%

100%

0

50

100

150

200

250

300

350

400

450

% C

lie

nt R

eq

ue

sts

Co

mp

lete

d

To

tal

Cli

en

t R

eq

ue

sts

Monthly Client Requests Received % of total Client Requests Completed Completion Target %

Page 8: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 8

Engineering & Commercial Infrastructure

Monthly Review > April 2018

3.2. Request Types

The following chart displays a summary of the customer request types received for the month.

April 2018 Summary:

The number of requests received in April 2018 was 344 with the majority of the requests being for Water

Leak Services; i.e. 179 requests.

3.3. Plumbing Applications

In accordance with the Plumbing and Drainage Act, a plumbing application is required for all new or

modifications to plumbing installations. A plumbing application must be lodged to Local Government.

Water Services has a regulatory time frame of 20 business days to assess a plumbing application. An

internal target of five business days has been set for all residential plumbing applications.

April 2018 Summary:

The number of Plumbing Applications approved decreased from 38 in March 2018 to 29 in April 2018.

The Approval Turnaround Time is at three days which is within the five-day target.

0

500

1000

1500

2000

2500

0

50

100

150

200

Sew

era

ge b

lock

ag

e/s

pill

Sew

era

ge o

dour

Sew

er

Mis

cella

neo

us

Sew

er

- M

an

hole

s

Sub

sid

en

ce in

Gro

un

d

Dirty

wate

r/C

lou

dy w

ate

r

Fir

e H

ydra

nt /S

erv

ice

Valv

e

No W

ate

r / L

ow

Wa

ter

Pub

lic A

men

itie

s / R

ec

Fa

cilit

ies

Wate

r L

ea

k S

erv

ice

Wate

r -

Sto

pcock

Ma

lfunctio

nin

g

Wate

r L

ea

k M

ain

Wate

r M

ete

r

Bro

ken/L

eakin

g

Wate

r O

dou

r/T

ast

e/S

mell

Wate

r M

iscella

neo

us

Ye

arl

y T

ren

d T

ota

l R

eq

ue

sts

To

tal

Cli

en

t R

eq

ue

sts

Monthly Client Service Requests Yearly Client Service Request Trend

0

2

4

6

0

50

100

Ap

pro

va

l T

ime

(D

ays)

Ap

pli

ca

tio

ns

Total Approved Plumbing Applications Information Requests Sent

Average Approval Time Target Plumbing Approval Turn around Time

Page 9: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 9

Engineering & Commercial Infrastructure

Monthly Review > April 2018

3.4. Trade Waste Approvals

There is an ongoing program for undertaking trade waste assessment and licensing applicable

businesses that discharge trade waste. As part of the trade waste assessment process a temporary

Trade Waste Approval is established while the formal approval process is undertaken. The table below

summarises the number of Trade Waste Approvals for the Mackay region.

April 2018 Summary:

Seven new Trade Waste Approvals were provided to businesses during April 2018 after they completed

the Trade Waste requirements. These businesses were in the following categories: one new business

was a previous Trade Waste approved business where previously located, two changes of ownership

and one existing business.

3.5. Annual Trade Waste Activity

Annual targets are set for the Trade Waste team with respect to licensing trade waste businesses. The

target has been set at 250 for new licensed businesses and audits completed by June 2018. The

following chart shows the actual approvals, temporary approvals and audits achieved and the number

of the target remaining.

April 2018 Summary:

Seven approvals were issued and 15 audits were completed during April 2018.

108

125

74 32

125

0% 20% 40% 60% 80% 100%

Target Trade Waste Approvals & Audits Completed

YTD Audits Remaining Audits YTD Approvals

Temporary Approvals Remaining Approvals

Target Audits =

Target Approvals =

Total Approved

Businesses

Temporary

Approvals in

Place

New Approved

Businesses for

the Month

Mackay South 777 30 6

Mackay North 73 0 1

Sarina 54 1 0

Mirani/Marian 28 1 0

Total 932 32 7

Page 10: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 10

Engineering & Commercial Infrastructure

Monthly Review > April 2018

3.6. Building Over Adjacent Sewers

Building over adjacent sewer (BOAS) applications are lodged where the construction of a structure is

proposed within close proximity of a sewer main. The application is assessed against Queensland

Development Code Mandatory Part 1.4 with council reviewing applications that do not comply with

acceptable solutions identified in the code. Building over sewer applications are assessed within a

target timeframe of 20 business days.

April 2018 Summary:

No BOAS referrals were received in April 2018. Plumbing Inspectors continue to handle enquiries and

provide information on infrastructure locations and general information regarding the Queensland

Development Code.

3.7. Scientific and Analytical Services

Scientific and Analytical Services provides laboratory analysis in accordance with National Association

of Testing Authorities (NATA) Standards to both Mackay Regional Council and external customers. A

summary of the laboratory activities is detailed below.

April 2018 Summary:

The number of sample batches registered and the number of samples tested dropped slightly in April

2018 and the total number of tests performed also decreased. During April 2018, the Laboratory

completed the Mirani Sewerage Characterisation and continued with the routine monitoring for Mackay

and Isaac Regional Councils.

0

5000

10000

15000

20000

25000

30000

35000

40000

0

200

400

600

800

1000

1200

1400

Te

st P

erf

orm

ed

Sa

mp

les

Samples Analysed Test Performed

Building Over Adjacent Sewers Applications

Month Number Month Number

May 2017 1 November 2017 0

June 2017 1 December 2017 3

July 2017 1 January 2018 0

August 2017 1 February 2018 0

September 2017 1 March 2018 1

October 2017 3 April 2018 0

Page 11: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 11

Engineering & Commercial Infrastructure

Monthly Review > April 2018

3.8. Community Engagement

Water Services engagement with the community on the services provided is monitored. The following

chart shows the number of media releases, media updates and the number of people that were reached

by the Media Releases on Facebook.

April 2018 Summary:

Media Releases Media Updates

Minor interruptions as Showgrounds water main

set for commissioning

The following chart shows the number of likes and positive comments, the number of neutral comments and the number of negative comments received on Facebook from Media Releases and Media updates for Water Services.

April 2018 Summary:

Facebook Likes

1 for the post on “Minor interruptions as Showgrounds

water main set for commissioning”

1 for the post on “Maintenance on Sydney Street

Sewerage Pump Station”

0 for the post on “Water interruption Holland Street”

0

20,000

40,000

60,000

80,000

100,000

120,000

0

1

2

3

4

5

6

7

8

9

10

Re

ach

on

Fa

ce

bo

ok (

Pe

op

le)

Re

lea

ses

Media Releases Media Update Facebook People Reached

0

50

100

150

200

250

300

Fa

ce

bo

ok F

ee

db

ack

Likes Neutral Negative

Page 12: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 12

Engineering & Commercial Infrastructure

Monthly Review > April 2018

The following chart shows the cumulative number of myh2o registrations for the reporting period. The target number of registrations for the 2017/18 financial year is 13,000.

April 2018 Summary:

There were 54 new registrations in April 2018 bringing the total number of myh2o registrations to

12,369.

3.9. Leak Detection Notifications

Leak Detection notifications are sent to customers, when a leak on their property is identified that is

greater than 10 litres per hour (L/h). Follow up notices are sent to residents, monthly for a three-month

period after the initial notification.

April 2018 Summary:

The number of new leaks identified during April 2018 for residential customers was 2,072 and for non-

residential customers was 275. This was an increase for both residential customers and non-residential

customers from the previous month. The number of meters with leaks at the end of the reporting period

has decreased to 941 for residential customers and increased to 362 for non-residential customers.

The number of leaks ceased during the period for residential customers has increased to 2,082 and

non-residential customers has increased to 256.

0

2,000

4,000

6,000

8,000

10,000

12,000

Nu

mb

er

of

Myh

2o

Re

gis

tra

tio

ns

myh2o registrations myh20 Target Registrations 2017/2018

0

500

1000

1500

2000

2500

Nu

mb

er

of

Le

aks

Meters with Leaks (End of Period) - Res Meters with Leaks (End of Period) - Non Res

New Leaks in Period - Res New Leaks in Period - Non Res

Leaks Ceased During Period - Res Leaks Ceased During Period - Non Res

Page 13: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 13

Engineering & Commercial Infrastructure

Monthly Review > April 2018

The average leak days shows the average number of days a leak exists before any action is taken by

the customer to rectify. The average leak days for ceased leaks shows the average number of days

that the leak exists before being repaired.

April 2018 Summary:

The Average Leak Days (current leaks) for residential customers has decreased but has increased for

non-residential customers during April 2018. The difference between non-residential and residential for

current leak days is 141 days. The Average Leak Days (Ceased Leaks) show that the residential

customer has the leaks repaired within 16 days on average, whereas, the non-residential customer

takes 25 days to have leaks repaired on average. Considerable effort is undertaken with non-residential

customers to encourage attention to fix the identified leaks, however, some of these leaks are very

difficult to track down due to the size and complexity of their property.

ASSET MANAGEMENT

4.1. Surface Water Raw Water Storage Capacities

Water is sourced from a combination of surface and groundwater sources. With the exception of Middle

Creek Dam, the storage facilities are owned and operated by SunWater. Middle Creek Dam is under

Council’s control. The water stored in each of the storages is detailed below.

April 2018 Summary:

Mirani Weir, Marian Weir and Dumbleton Weir are at full capacity. Peter Faust Dam is at 72% capacity. Middle Creek Dam is at 98% capacity. The data for Teemburra Dam reflects March 2018 figures as no data is available as at end of April 2018.

0

50

100

150

200

250N

um

be

r o

f D

ays

Average Leak Days (Current Leaks) - Res Average Leak Days (Current Leaks) - Non Res

Average Leak Days (Ceased Leaks) - Res Average Leak Days (Ceased Leaks) - Non Res

2,7

30

3,9

85

6,1

08

1,1

20

49

1,4

90

14

7,5

56

0%

20%

40%

60%

80%

100%

Mirani Weir Marian Weir Dumbleton

Weir

Middle Creek

Dam

Peter Faust

Dam

Teemburra

Dam

% V

olu

me

Sto

red

Volume Stored

ML

ML

ML

ML M

L

ML

Page 14: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 14

Engineering & Commercial Infrastructure

Monthly Review > April 2018

4.2. Annual Water Consumption vs Allocation by Source

Water Services has an annual water allocation or water license for each water source. The water

allocation and year to date water consumption for each of the water source is detailed below.

** Calen Water Usage figures are not based on Water Allocation but show the amount of water usage

for the area to date.

4.3. Water Consumption by Locality – Residential Customers Only

Water Services supplies potable water to both residential and commercial customers throughout the

Mackay region. The average water consumption in each of the three major community centres is

detailed below for residential customers only. The water consumption is presented as litres per

equivalent population per day (L/p/d).

April 2018 Summary:

Water consumption for all three major community centres has decreased from March 2018 to April 2018 due to the rainfall received across the region.

30

9,307

895

0

31

1

13

0

7

125

35

0

6

0

25

18

401

48

15,040

1180

236

300

100

95

490

22

2700

62

150

35

230

46

60

460

0% 20% 40% 60% 80% 100%

Calen Water Usage **

Dumbleton

Nebo Rd Bores

Plane Creek

Sarina Bores

Mirani Bore

Marian Bores

Marwood Bores

Bloomsbury Bore

Proserpine River

Eton Bores

Bally Keel Bore

Koumala Bores

Armstrong Beach Bore

Finch Hatton Bore

Gargett Bores

Marian Weir

Wa

ter

Vo

lum

e (M

L)

YTD Water Consumed (ML) Allocation

0

50

100

150

200

250

300

350

400

0

50

100

150

200

250

300R

esid

ential

Wate

r C

onsum

ption (

l/p/d

)

Rain

fall

(mm

)

Rainfall Mackay Sarina Marian/Mirani Target

Page 15: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 15

Engineering & Commercial Infrastructure

Monthly Review > April 2018

4.4. Significant Projects

Water Services undertakes a range of projects across the water business. Projects take the form of

Capital works projects, planning studies and investigations. Information for the significant projects in

Water Services is provided in the table below and was current as at 30 April 2018. Significant Projects

are assessed on the following criteria: Dollar Amount, Risk and/or Community Interest

Council Project Management Phases 1. Planning (Plan) 2. Design (Des) 3. Procurement (Proc) 4. Construction (Con)

Indicators On Track

Potential Issue

Definite Issue

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL

BUDGET

DETAILS

COMMENTS

Sewerage

Network

Refurbishments

(Relining)

Proc 80% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$2,525,260

Amended Budget:

$1,384,823

The project scope included 17km of sewer

inspection and condition assessment using

CCTV and the internal relining repair of 8.4km of

sewer in the size range 150 to 900mm diameter.

There has been a decision reached to reassess

this project's Business Case for compliance to

revised operational requirements and thus not

proceed further with the current Tender

Assessment.

The scope for this financial year and any

additional scope will be incorporated into a

revised Package of Works to be retendered in the

2018/2019 Financial Year.

Budget

Other

Issues/

Risk

Sewerage

Network

Refurbishments

(Maintenance

Holes (MH))

Con 75% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$857,778

All scheduled condition assessment inspections

of manholes complete. CCTV survey of all

scheduled buried manholes complete. Water

Networks Sewer Crew has 2 remaining manhole

repairs to complete.

Two packages of manhole rehabilitation works

have been commenced by contractors. These

works are expected to be complete by end of May

2018.

Budget

Other

Issues/

Risk

Water Main

Replacements

(WMR) - Roads

Driven

Des and

Con

100% Des

98% Con

Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$1,640,770

Amended Budget:

$1,697,166

Vines Creek WMR - The temporary main is

operational, Transport and Main Roads

contractor has commenced piling work for the

outbound bridge. The permanent water main is

now to be built on the new outbound bridge.

Extent of water main requiring replacement in

Maud Street, Mirani found to be greater than

originally anticipated. These works are part of the

overall Roads Driven Water Main (WM)

Replacement Package that has had some

projects delayed or deferred due to changes in

the Roads Program or removed where detailed

design established roads would not impact the

mains.

Budget

Other

Issues/

Risk

Page 16: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 16

Engineering & Commercial Infrastructure

Monthly Review > April 2018

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL

BUDGET

DETAILS

COMMENTS

Reallocation of surplus funds to address Mirani

works has been included in the March 2018

Budget review.

Water Main

(WM) Renewals

Des and

Con

97% Des

70% Con

Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$1,296,359

Amended

Budget:

$1,333,053

Construction is progressing on Ready Street

water main and is expected to be completed by

end of May 2018.

Design for Lambrook Street water main was

completed and construction commenced early

April 2018.

Design of Alfred Street (between Brisbane and

Carlyle Streets) is being revised with further

service location information identified during the

design process. Design expected to be

completed in April 2018 with construction to

commence mid-May 2018.

Budget

Other

Issues/

Risk

Eton Water

Supply

Proc 50% Schedule Scheduled Completion Date:

30/06/2018

Original Budget:

$650,000

Drilling of production bore located in the shallower

aquifer commenced, however, unforeseen sub-

surface conditions were encountered and this

requires that the bore site be relocated and the

works resumed.

Sustained wet weather has impacted site

constructability conditions and a return to site

date depends on the onset timing of drier

conditions.

Tender Assessment is underway for the offers

received to construct the new Water Treatment

Works.

Budget

Other

Issues/

Risk

Shakespeare

Street Sewer

Realignment

Con 98% Schedule Scheduled Completion Date:

30/12/2017

Original Budget:

$450,250

The sewer construction was completed in

January 2018 slightly behind schedule.

Replacement of vegetation in garden beds

disturbed by construction completed. The

carport/shed structure now substantially

complete with gable ends matching original shed

still to be fitted.

Budget

Other

Issues/

Risk

Mt Pleasant

Reservoir No. 1

Refurbishments

Con 90% Schedule Scheduled Completion Date:

30/12/2017

Original Budget:

$1,661,016

Amended

Budget:

$2,334,058

Internal repairs completed. Contractor

demobilised from site at the end of April 2018.

Refilling and commissioning of reservoir to be

undertaken by Networks Crew which is

scheduled to commence in the first week in May

2018.

Measures to prevent unauthorised persons

climbing up the post-tensioning brackets fixed to

the external wall of the reservoir are being

arranged.

Budget

Other

Issues/

Risk

Page 17: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 17

Engineering & Commercial Infrastructure

Monthly Review > April 2018

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL

BUDGET

DETAILS

COMMENTS

Mirani Storage Proc 40% Schedule Scheduled Completion Date:

31/01/2019

17/18 Original Budget:

$683,000

Tender period closed late April and evaluations

have commenced.

Construction still expected to commence late

June 2018.

Budget

Other

Issues/

Risk

Mirani Water

Recycling

Facility Upgrade

Proc 30% Schedule Scheduled Completion Date:

31/01/2021

17/18 Original Budget:

$815,888

Request for Tender was sent to the shortlist on

28 March 2018 with a closing date of 19 June

2018. There has been no change to this date thus

far.

Tenderers have organised site inspections and a

number of Requests for Information have been

sent in.

Budget

Other

Issues/

Risk

Water

Laboratory

Relocation

Plan /

Des

10% Schedule Scheduled Completion Date:

31/06/2018

17/18 Original Budget:

$1,750,000

Laboratory and furniture layout concepts have

been refined considering existing building

structure constraints, building services design in

progress but is behind program and now

expected to be completed by end of May 2018.

Detailed scope of works being developed through

design process with revised estimates which are

higher than original budget. Budget amendments

have been identified in the March Budget review

Budget

Other

Issues/

Risk

Page 18: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 18

Engineering & Commercial Infrastructure

Monthly Review > April 2018

REGULATORY COMPLIANCE

5.1. Drinking Water Compliance

Potable water is provided in accordance with the requirements of the Water Supply Safety and

Reliability Act, measured against the Australian Drinking Water Quality Guidelines. Drinking Water

samples are taken at the outlet of Water Treatment Plants and at various locations within the reticulation

network. Please note: These results are reported one month in arrears. A summary of the performance

is detailed below.

March 2018 Summary:

Eton reticulation samples for Selenium continue to be in the range of 10-13 ug/L.

March 2018 Summary:

Eton and Koumala continue to have high values for the aesthetic parameter of hardness (>200 mg/l)

with values ranging from 369 mg/l to 402 mg/l for Eton and around 380 mg/l for Koumala. These

hardness levels will be addressed in the future with the planned provision of water softening plants as

part of each Scheme.

60

65

70

75

80

85

90

95

100

0

20

40

60

80

100

120

140

160

180

Co

mp

lia

nce

(%

)

Te

sts

Co

nd

ucte

d

Health Parameter Test Results

Drinking Water Test Completed Non Compliant Health Parameter Tests % Compliance Target

0

20

40

60

80

100

120

140

160

180

Te

sts

Co

nd

ucte

d

Aesthetic Parameter Test Results

Drinking Water Test Completed Non-Compliant Aesthetic Parameter Tests

Page 19: Engineering and Commercial Infrastructure - Water Services · Engineering & Commercial Infrastructure April 2018 3.4. Trade Waste Approvals There is an ongoing program for undertaking

Page 19

Engineering & Commercial Infrastructure

Monthly Review > April 2018

5.2. Wastewater Compliance

The discharges from wastewater treatment facilities are regulated by Development Approvals issued

by the Department of Environment and Heritage Protection. The licence requirements differ based on

the year the Development Approval was issued and the receiving environment associated with

discharges.

April 2018 Summary:

A wastewater test for Mirani Sewerage Treatment Plant was noncompliant with release limits to the

receiving environment for pH and faecal coliforms. This relates to algae pushing the pH up in the re-

use dam and birdlife utilising the dam contributing to the high faecal coliform result.

5.3. Backflow Testing

Backflow devices are installed on water services where there is a risk that water could return from a

private property back into the Water Reticulation network. The requirement for backflow devices is

regulated in accordance with the Standard Plumbing and Drainage Regulation.

April 2018 Summary:

18 new devices were registered while six devices were cancelled during April 2018. Council performed

seven tests on backflow devices in April 2018.

0

10

20

30

Te

sts

Co

nd

ucte

d

Samples Tested Non Compliant tests

Wastewater Test Results

0

10

20

30

40

50

60

70

80

0

10

20

30

40

50

Te

ste

d b

y C

ou

ncil

No

of

De

vic

es

Re

gis

tere

d/C

an

ce

lle

d

Monthly Devices Registered Devices Cancelled Tested By Council


Recommended