Engineering and Commercial Infrastructure -
Water Services
Monthly Review
October 2018
Page 2
Engineering & Commercial Infrastructure Monthly Review > October 2018
OVERVIEW ............................................................................................................................. 3
SAFETY ................................................................................................................................ 5
1.1. Incident Statistics ........................................................................................................ 5 1.2. Lost Time Injuries ........................................................................................................ 5
FINANCE .............................................................................................................................. 7
2.1. Water and Wastewater Financial Fund Report ........................................................... 7 2.2. Operating Result for Water and Sewerage Fund ........................................................ 8
CUSTOMER SERVICES ................................................................................................... 8
3.1. Requests ..................................................................................................................... 8 3.2. Request Types ............................................................................................................ 9 3.3. Plumbing Applications ............................................................................................... 10 3.4. Trade Waste Approvals ............................................................................................. 10 3.5. Annual Trade Waste Activity ..................................................................................... 11 3.6. Building Over Adjacent Sewers ................................................................................. 11 3.7. Scientific and Analytical Services .............................................................................. 12 3.8. Community Engagement ........................................................................................... 13 3.9. Leak Detection Notifications ...................................................................................... 15
ASSET MANAGEMENT.................................................................................................. 16
4.1. Surface Water Raw Water Storage Capacities ......................................................... 16 4.2. Annual Water Consumption vs Allocation by Source ................................................ 17 4.3. Water Consumption by Locality – Residential Customers Only ................................ 17 4.4. Significant Projects .................................................................................................... 18
REGULATORY COMPLIANCE ..................................................................................... 20
5.1. Drinking Water Compliance ....................................................................................... 21 5.2. Wastewater Compliance ........................................................................................... 22 5.3. Backflow Testing ....................................................................................................... 22
Page 3
Engineering & Commercial Infrastructure Monthly Review > October 2018
OVERVIEW
This report is for Water Services activities for October 2018. Significant items in this period include:
No Lost Time Injuries occurred during October 2018.
The Mount Pleasant No.1 Reservoir Refurbishment Project was awarded the winner of the Asset Management Category at the IPWEAQ Excellence Awards held at the Gold Coast on 11 October 2018. An officer attended the AWA QWater’18 Conference on the Gold Coast from 1-2 November 2018 to present the paper.
Officers attended Victor Harbour in South Australia on 3 October 2018 for an operations benchmarking exercise. Our large sewage treatment plants, the Mackay North Water Recycling Facility (MNWRF) and Mackay South Water Recycling Facility (MSWRF), currently operated by Downer, will come back under MRC control on 1 July 2019. As part of the handback conditions, both plants must be in good condition for their age. Victor Harbour was chosen because it's facility is about the same age but also designed, constructed and operated in much the same way (e.g. Design Build Operate) as MNWRF and MSWRF. The visit provided valuable bench marking information.
An officer attended the Customer and Industry Leadership Committee Meeting in Canberra on 9 October 2018 which was hosted by the Water Services Association of Australian.
Representatives from Gympie Regional Council Water Department visited with Water Network, for two days, on 10 & 11 October 2018 to gain an understanding of how Mackay Water is using Assetic. Gympie Regional Council is currently implementing Assetic as an asset management and maintenance system.
Corporate Communications has been working in conjunction with Water Networks to design and install six Water Refill Stations as part of the National Water Week Celebrations. The locations of stations installed in high traffic areas include: Botanic Gardens, John Breen Park, Sarina Field of Dreams, Mirani Railway Playground, Quota Park, Blacks Beach Park. An unveiling of the Water Refill Station at the Botanic Gardens occurred on 22 October 2018.
Whitsunday, Isaac, Mackay (WIM) Water Alliance has been successful in applying for funding through the Queensland Water Regional Alliance Program (QWRAP) for a Learning & Development Project Officer. The officer will be responsible for developing a plan to assist in the implementation of the Water Industry Worker (WIW) framework across Cairns, Burdekin, Whitsunday and Mackay Regional Councils and Townsville City Council.
Officers visited Logan City Council’s Laboratory and Queensland Urban Utilities Laboratory in Brisbane on 26 October 2018. Logan City Council has just recently completed building a new laboratory and provided some useful insights into what went well and what didn’t. Queensland Urban Utilities laboratory is the largest Water Utility laboratory in Queensland and valuable information was gained reviewing the systems and processes used to manage a high workload.
An officer attended a Sewerage & Water Environmental Advisory Panel (SWEAP) Meeting held by the QLD Water Directorate in Brisbane on 31 October 2018.
Brief overview of recycled water usage and availability via the Mackay Water Recycling Facility (MWRF) Reuse Scheme:
a) 2,270 ML used for the financial year to date
b) Recycled Water Storage 3 (RWS3) is at 40% capacity (880 ML) of which approximately 680 ML is accessible
Page 4
Engineering & Commercial Infrastructure Monthly Review > October 2018
c) Recycled Water Storage 2 (RWS2) is at 50% capacity (265 ML) of which approximately 165 ML is accessible
d) Current total usage is approximately 60 ML per day
e) Inflow from Mackay South Water Recycling Facility (MSWRF) amounts to approximately 12 ML per day
Director Engineering & Commercial Infrastructure
Page 5
Engineering & Commercial Infrastructure Monthly Review > October 2018
SAFETY
1.1. Incident Statistics
The incident statistic details a summary of the Water Services safety incident performance. Water Services aspires to achieve zero harm with a stretch target of zero injuries.
October 2018 Summary:
No of Incidents Mechanism of injury Injury Type
1 Vehicle Near Miss
1 Hitting Objects with a part of the
body Laceration/Cut
1.2. Lost Time Injuries
Water Services aspires to achieve zero Lost Time Injuries by improving safety performance by developing a proactive safety culture and implementing best practice safety management across all business areas.
2 2
3
4
3
4
5
3
4
5
0 0
2
0 0 0 0 0 0 0 0 00
00
1 1 1 1 1
0 0
1
00
1
2 2
3
2
3
0
2
000
1
2
3
4
5
6
Num
ber o
f Inciden
ts
Total Incidents Lost Time Injuries Total Recordable Injuries All Injuries
71
0
13
62
0
3
0
1
3
0 0
1
1
2
2
3
3
4
0
10
20
30
40
50
60
70
80
2014‐15 2015‐16 2016‐17 2017‐18 2018‐19
Num
ber o
f Days Lost
Water Total Days Lost Water Total LTIs
Page 6
Engineering & Commercial Infrastructure Monthly Review > October 2018
October 2018 Summary:
No Lost Time Injuries were sustained during October 2018. The table below shows the Lost Time Injuries over previous years.
LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost
Administration
Business Services
Planning & Sustainability
Water Network 3 71 0 0 1 13 2 35 0 0
Water Treatment
Infrastructure Delivery 1 27
Water Services 3 71 0 0 1 13 3 62 0 0
Department2014‐15 2015‐16 2016‐17 2017‐18 2018‐19
Page 7
Engineering & Commercial Infrastructure Monthly Review > October 2018
FINANCE
2.1. Water and Wastewater Financial Fund Report
Financial Performance Report Period Covered: 1 July 2018 to 31 October 2018
Commercial Infrastructure % YTD Variance of YTD Budget YTD Variance favourable of budget YTD Variance unfavourable, between 0% and 5% of YTD Budget YTD Variance unfavourable, more than 5% of YTD Budget
Revised Budget
YTD Budget
YTD Actual
YTD Variance
Comments
Water Fund 6.01 - Commercial Infrastructure Management
(41,431,410) (20,045,732) (21,075,060) (1,029,328) Operating revenue over budget $992,000. Water Charges - $603,000 residential, $168,000 commercial and $142,000 industrial. $83,000 from bulk water sales.
6.02 - Planning & Sustainability
812,485
267,802
258,458
(9,344) Wages are under budget $9,000.
6.04 - Water Networks
6,337,719
2,155,148
2,021,469
(133,679) Expenses are down $134,000. $38,000 from Wages due to vacancies and $96,000 from Materials & Services due to timing.
6.06 - Business Services
28,698,396
9,197,978
8,982,330
(215,648) Operating revenue is up $68,000. $41,000 is from plumbing inspections and $25,000 from MiWater Marketing and Operations. Expenses are under $147,000. $84,000 from Depreciation, $20,000 from Wages, $58,000 from Materials & Services. Offset by finance funding over budget by $15,000.
6.07 - Water Treatment
5,180,687
1,801,945
1,798,727
(3,218)
Operating revenue is over budget $40,000 in Lab Fees. Expenses are over budget $36,000. Wages are under $57,000 and Materials & Services are over by $94,000; majority of this is from Water Purchases due to spreading
Total Water Fund (402,123) (6,622,860) (8,014,076) (1,391,217) Sewerage Fund 6.01 - Commercial Infrastructure Management
(43,761,698) (22,003,957) (21,987,553) 16,404
Operating revenue is under budget $30,000 majority of which is from Sewerage Charges. Offset by expenses under budget $14,000 majority of which is from Materials & Services.
6.02 - Planning & Sustainability
962,035
317,652
226,269
(91,382)
Expenses are down $94,000 mainly from Consultancy Fees offset by $3,000 overspend in Wages.
6.04 - Water Networks
5,658,158
1,943,864
1,665,394
(278,470)
Operating revenue is up $69,000 from Recoverable Works. Wages are down $12,000 from vacancies and Materials & Services are down $198,000 from SPS Operations and Maintenance.
6.06 - Business Services
32,195,160
10,451,898
10,344,456
(107,443) Operating revenue over budget by $58,000 with majority of this being from Trade Waste Licence Fees and Plumbing Inspections. Wages are under $31,000, Depreciation under $16,000 and Materials & Services under $22,000, offset by $19,000 in Loan Interest and Fees due to spreading.
6.07 - Water Treatment
6,414,112
2,614,330
2,186,504
(427,825)
$55,000 over in operating revenue from Septic Waste Receival. $37,000 under in Wages and $336,000 under in Materials & Services from spreading of the transition project.
Total Sewerage Fund 1,467,765 (6,676,214) (7,564,930) (888,716) Operating (surplus) / deficit 1,065,642 (13,299,074) (15,579,006) (2,279,932)
Page 8
Engineering & Commercial Infrastructure Monthly Review > October 2018
2.2. Operating Result for Water and Sewerage Fund
CUSTOMER SERVICES
3.1. Requests
This chart details the customer requests received and recorded via pathways that relate to the Water Business. The target is to have 90% of all customer requests closed at any one point in time.
October 2018 Summary:
The number of requests received increased slightly from 305 in September 2018 to 333 in October 2018. 93% of Customer Requests were completed within the specified timeframes which is above target.
(35,000,000)
(30,000,000)
(25,000,000)
(20,000,000)
(15,000,000)
(10,000,000)
(5,000,000)
-
5,000,000
July August September October November December January February March April May June
Operating (Surplus) / Deficit
YTD Budget YTD Actual
0%
20%
40%
60%
80%
100%
0
50
100
150
200
250
300
350
400
% C
lie
nt R
eq
ue
sts
Co
mp
lete
d
To
tal
Cli
en
t Re
qu
est
s
Monthly Client Requests Received % of total Client Requests Completed Completion Target %
Page 9
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.2. Request Types
The following chart displays a summary of the customer request types received for the month.
October 2018 Summary:
The number of requests received in October 2018 was 333 and the majority of the requests were for Water Leak Services; i.e. 162 requests.
When a customer lodges a request via the Call Centre, it is sometimes not reflective of the actual problem. Therefore, the following graph is included showing the actual work undertaken. The numbers of Customer Requests will not exactly match the number of actions undertaken mainly due to multiple customers reporting the one issue and the timing of completed work (i.e. a request being received at the end of one month but being actioned at the start of the next month). As the majority of Customer Requests are water related, the following graph is a breakdown of the action type for the current month based on the Customer Requests above, along with the yearly trend for Water.
0
500
1000
1500
2000
2500
0
50
100
150
200
Sew
erag
e bl
ock
age/
spill
Sew
erag
e od
our
Sew
er M
isce
llane
ous
Sew
er -
Man
hole
s
Sub
sid
ence
in G
roun
d
Dirt
y w
ater
/Clo
udy
wa
ter
Fir
e H
ydra
nt /
Ser
vice
Val
ve
No
Wa
ter
/ Low
Wa
ter
Pub
lic A
men
itie
s /
Re
cF
aci
litie
s
Wat
er L
eak
Ser
vice
Wat
er -
Sto
pco
ckM
alfu
nctio
nin
g
Wat
er L
eak
Mai
n
Wat
er M
ete
rB
roke
n/Le
akin
g
Wat
er O
dou
r/T
ast
e/S
mel
l
Wat
er M
isce
llan
eous
Ye
arl
y T
ren
d T
ota
l R
eq
ue
sts
To
tal
Cli
en
t Re
qu
est
s
Monthly Client Service Requests Yearly Client Service Request Trend
0
500
1000
1500
0
50
100Y
ea
rly
Tre
nd
To
tal
Wa
ter
Re
qu
est
s C
lose
d
To
tal
Wa
ter
Re
qu
est
s C
lose
d
Current Month Yearly Trend
Page 10
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.3. Plumbing Applications
In accordance with the Plumbing and Drainage Act, a plumbing application is required for all new or modifications to plumbing installations. A plumbing application must be lodged to Local Government. Water Services has a regulatory time frame of 20 business days to assess a plumbing application. An internal target of five business days has been set for all residential plumbing applications.
October 2018 Summary:
The number of Plumbing Applications approved decreased from 61 in September 2018 to 46 in October 2018. The Approval Turnaround Time is at two days which is inside the five-day target.
3.4. Trade Waste Approvals
There is an ongoing program for undertaking trade waste assessment and licensing applicable businesses that discharge trade waste. As part of the trade waste assessment process a temporary Trade Waste Approval is established while the formal approval process is undertaken. The table below summarises the number of Trade Waste Approvals for the Mackay region.
October 2018 Summary:
Six new Trade Waste Approvals were provided to businesses during October 2018 after the Trade Waste requirements were completed. These businesses were: three for a change of ownership and three new businesses.
0
2
4
6
0
50
100
Ap
pro
val
Tim
e (D
ays
)
Ap
pli
cati
on
s
Total Approved Plumbing Applications Information Requests Issued
Average Approval Time Target Plumbing Approval Turn Around Time
Total Approved
Businesses
Temporary Approvals in
Place
New Approved Businesses for
the Month
Mackay South 777 33 6
Mackay North 71 1 0
Sarina 53 1 0
Mirani/Marian 30 2 0
Total 931 37 6
Page 11
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.5. Annual Trade Waste Activity
Annual targets are set for the Trade Waste team with respect to licensing trade waste businesses. The target has been set at 250 for new licensed businesses and audits completed by June 2019. The following chart shows the actual approvals, temporary approvals and audits achieved and the number of the target remaining.
October 2018 Summary:
Six Approvals were issued, and eight audits were conducted during October 2018.
3.6. Building Over Adjacent Sewers
Building Over Adjacent Sewer (BOAS) applications are lodged where the construction of a structure is proposed within close proximity of a sewer main. The application is assessed against Queensland Development Code Mandatory Part 1.4 with council reviewing applications that do not comply with acceptable solutions identified in the code. Building over sewer applications are assessed within a target timeframe of 20 business days.
October 2018 Summary:
One BOAS referral was received in October 2018. Plumbing Inspectors continue to handle enquiries and provide information on infrastructure locations and general information regarding the Queensland Development Code.
51
125
29 37
125
0% 20% 40% 60% 80% 100%
Target Trade Waste Approvals & Audits Completed
YTD Audits Remaining Audits YTD Approvals
Temporary Approvals Remaining Approvals
Target Audits =
Target Approvals =
Building Over Adjacent Sewers Applications
Month Number Month Number
September 2017 1 April 2018 0
October 2017 3 May 2018 1
November 2017 0 June 2018 1
December 2017 3 July 2018 0
January 2018 0 August 2018 0
February 2018 0 September 2018 0
March 2018 1 October 2018 1
Page 12
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.7. Scientific and Analytical Services
Scientific and Analytical Services provides laboratory analysis in accordance with National Association of Testing Authorities (NATA) Standards to both Mackay Regional Council and external customers. A summary of the laboratory activities is detailed below.
October 2018 Summary:
The number of sample batches registered, and the number of samples tested remain at around 500 and 1000 respectively. The total number of tests performed was > 26,000 for the month. During this month the laboratory completed all scheduled testing and sampling for the Water and Waste Water monitoring programs for Mackay and Isaac Regional Councils for this quarter. Also completed were the Receiving Environment Monitoring Program (REMP) and Waste Services Quarterly sampling and analysis. In addition, several small projects were undertaken for Sarina Water Recycling Facility and two of Isaac Regional Council’s Wastewater Treatment Plants.
0
5000
10000
15000
20000
25000
30000
35000
0
200
400
600
800
1000
1200
1400
Te
st P
erf
orm
ed
Sa
mp
les
Samples Analysed Tests Performed
Page 13
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.8. Community Engagement
Water Services engagement with the community on the services provided is monitored. The following chart shows the number of media releases, media updates and the number of people that were reached by the Media Releases on Facebook.
October 2018 Summary:
Media Releases Media Updates
Top drop for all Sewer inspections at Sarina
Fire hydrant maintenance program begins at Slade Point
The following chart shows the number of likes and positive comments, the number of neutral comments and the number of negative comments received on Facebook from Media Releases and Media updates for Water Services.
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
0
1
2
3
4
5
6
7
8
9
10
Re
ach
on
Fa
ceb
oo
k (P
eo
ple
)
Re
lea
ses
Media Releases Media Update Facebook People Reached
0
50
100
150
200
250
Fa
ceb
oo
k F
ee
db
ack
Likes Neutral Negative
Page 14
Engineering & Commercial Infrastructure Monthly Review > October 2018
October 2018 Summary:
The following chart shows the cumulative number of myh2o registrations for the reporting period. The target number of registrations for the 2018/19 financial year is 14,300.
October 2018 Summary:
There were 35 new registrations in October 2018 bringing the total number of myh2o registrations to 13,205, including property owners, tenants and agents. Of the 13,205 property owners that have signed up to myh2o, 10,573 are for residential properties and 1,473 are for non-residential customers.
10,000
10,500
11,000
11,500
12,000
12,500
13,000
13,500
14,000
14,500
Nu
mb
er
of
Myh
2o R
eg
istr
ati
on
s
myh2o registrations myh20 Target Registrations 2018/2019
Facebook Likes
164 for the post “Top drop for all” One for the post “Fire hydrant maintenance program begins at Slade Point”
36 for the post “Council’s Water Services team continue their winning streak. Taking out the Asset Management Category at the IPWEAQ Awards for their refurbishment of the Mt Pleasant Reservoir and Sarah Lethbridge wins best paper award”
Nine for the post “Watch the flow of your sprinklers.
Sign up to myh2o to keep tabs on your sprinkler usage”
Seven for the post “Mirani’s new effluent storage dam
is taking shape”
Negative Comment
A negative comment was received that stated “Why should I watch my use when council lets water leaks go for days before repairing them”
Page 15
Engineering & Commercial Infrastructure Monthly Review > October 2018
3.9. Leak Detection Notifications
Leak Detection notifications are sent to customers, when a leak on their property is identified that is greater than 10 litres per hour (L/h). Follow up notices are sent to residents, monthly for a three-month period after the initial notification.
October 2018 Summary:
Residential
The number of new leaks identified during October 2018 for residential customers was 2,302, an increase from last month, and the number of meters with leaks increased to 794. The number of leaks ceased during the period has increased to 2,294 indicating that residents fixed the leak.
Non-Residential
The number of new leaks for non-residential customers was 498 (i.e. a decrease), however, the number of meters with leaks increased by 300 for non-residential customers. The number of leaks ceased for non-residential customers decreased to 468 indicating that the non-residential customers have yet to fix the leaks. Due to the complexity of some non-residential properties (multiple tenants, large properties, etc), leaks are difficult to identify and locate and fixing the leaks for non-residential customers is sometimes not cost effective.
0
500
1000
1500
2000
2500
3000
Nu
mb
er
of
Le
aks
Meters with Leaks (End of Period) - Res Meters with Leaks (End of Period) - Non Res
New Leaks in Period - Res New Leaks in Period - Non Res
Leaks Ceased During Period - Res Leaks Ceased During Period - Non Res
Page 16
Engineering & Commercial Infrastructure Monthly Review > October 2018
October 2018 Summary:
The Average Leak Days (Current Leaks) identified during October 2018 for customers has slightly decreased for residential and slightly increased for non-residential. The difference between non-residential and residential for current leak days is 58 days. The Average Leak Days (Ceased Leaks) show that the residential customer has leaks repaired within 9 days on average, whereas the non-residential customer takes 11 days to have leaks repaired on average. Considerable effort is undertaken with non-residential customers to encourage attention to fix the identified leaks, however, some of these leaks are very difficult to track down and are not cost effective to rectify.
ASSET MANAGEMENT 4.1. Surface Water Raw Water Storage Capacities
Water is sourced from a combination of surface and groundwater sources. With the exception of Middle Creek Dam, the storage facilities are owned and operated by SunWater. Middle Creek Dam is under Council’s control. The water stored in each of the storages is detailed below.
October 2018 Summary:
Mirani Weir, Marian Weir and Dumbleton Weir are at full capacity. Teemburra Dam is at 88% capacity. Middle Creek Dam and Peter Faust Dam are at 50% and 62% capacity respectively.
0
20
40
60
80
100
120
140
Nu
mb
er
of
Da
ys
Average Leak Days (Current Leaks) - Res Average Leak Days (Current Leaks) - Non Res
Average Leak Days (Ceased Leaks) - Res Average Leak Days (Ceased Leaks) - Non Res
2,7
30
3,9
85
6,1
08
1,1
20
49
1,4
90
14
7,5
56
0%
20%
40%
60%
80%
100%
Mirani Weir Marian Weir DumbletonWeir
Middle CreekDam
Peter FaustDam
TeemburraDam
% V
olu
me
Sto
red
Volume Stored
ML
ML
ML
ML M
L
ML
Page 17
Engineering & Commercial Infrastructure Monthly Review > October 2018
4.2. Annual Water Consumption vs Allocation by Source
Water Services has an annual water allocation or water license for each water source. The water allocation and year to date water consumption for each of the water source is detailed below.
** Calen Water Usage figures are not based on Water Allocation but show the amount of water usage for the area to date.
4.3. Water Consumption by Locality – Residential Customers Only
Water Services supplies potable water to both residential and commercial customers throughout the Mackay region. The average water consumption in each of the three major community centres is detailed below for residential customers only. The water consumption is presented as litres per equivalent population per day (L/p/d).
October 2018 Summary:
Water consumption for Mackay, Sarina and Marian/Mirani has increased from September 2018 to October 2018 due to the continuing dry conditions.
124,66021102080474150301011188
4815,040
390236300100
9549022
270062
15035
2304660
460272
0% 20% 40% 60% 80% 100%
Calen Water Usage **Dumbleton
Nebo Rd Bores (Zone 12A)Nebo Rd Bores (Zone 15B)
Plane CreekSarina Bores
Mirani BoreMarian Bores
Marwood BoresBloomsbury BoreProserpine River
Eton BoresBally Keel BoreKoumala Bores
Armstrong Beach BoreFinch Hatton Bore
Gargett BoresMarian Weir
Wa
ter
Vo
lum
e (M
L)
YTD Water Consumed (ML) Allocation
0
50
100
150
200
250
300
350
0
50
100
150
200
250
300R
esid
entia
l W
ater
Con
sum
ptio
n (l/
p/d)
Rai
nfal
l (m
m)
Rainfall Mackay Sarina Marian/Mirani Target
Page 18
Engineering & Commercial Infrastructure Monthly Review > October 2018
4.4. Significant Projects
Water Services undertakes a range of projects across the water business. Projects take the form of Capital works projects, planning studies and investigations. Information for the significant projects in Water Services is provided in the table below and was current as at 31 October 2018. Significant Projects are assessed on the following criteria: Dollar Amount, Risk and/or Community Interest.
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
Eton Water Supply
Design and Construction
45%
Schedule
Original scheduled Completion Date: 30/06/2018
Amended Completion Date: 7/12/2018
Original Budget: $650,000
Amended budget: $1,150,000
Design & Construct contract for construction of the new Water Treatment Works progressing with all detailed design complete and procurement of civils progressing. The package treatment plant involves modification and equipment fit out into a 40ft container and physical site works including pipework, concrete structures and civil works. All long lead procurement equipment items on the critical path are being received and fitment into the Process container has commenced. Construction is due for completion in December 2018.
Budget
Other Issues/
Risk
Sewerage Network Refurbishments (Relining)
Construction 0% Schedule Scheduled Completion Date: 28/02/2019 for Sarina works and 30/06/19 for Mackay works
Original Budget: $2,635,000
The 18/19 project scope includes 21km of sewer inspection and condition assessment using CCTV and the internal relining repair of 12km of sewer in the size range 150 to 900mm diameter. This scope includes 3.4km of relining in Sarina which originates from a W4Q2 project.
Interflow will commence sewer relining work in Sarina in the first week of November 2018 after completion of Pre-lining CCTV and cleaning.
Budget
Other Issues/
Risk
Sewerage Network Refurbishments (Maintenance Holes (MH's)
Construction 50%
Schedule
Scheduled Completion Date: 30/06/2019
Original Budget: $855,000
External Contract for Condition Assessment Inspections of 884 MHs completed.
CCTV survey of identified buried MHs in progress with 80 of 110 completed with an estimated completion by end December 2018.
Repairs for 135 MHs by Sewer Network crew commenced with 20 completed.
Tender for the first package of MH rehabilitation works awarded and contractor to commence first week of November 2018. Second package tender under evaluation and expect to be awarded by end of November 2018
Budget
Other Issues/
Risk
Council Project Management Phases 1. Planning (Plan) 2. Design (Des) 3. Procurement (Proc) 4. Construction (Con)
Indicators On Track Potential Issue Definite Issue
Page 19
Engineering & Commercial Infrastructure Monthly Review > October 2018
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
Water Main Replacements - Roads Driven
Design and Construction
45% design phase, 20% Construction
Schedule Scheduled Completion Date:
30/6/19 Original Budget:
$2,509,214
Vines Creek WMR - The temporary main remains in operation. Works on the permanent water main that is now to be built on the new outbound bridge commenced mid-August 2018, final commissioning has been delayed due to construction issues - timing still to be confirmed by DTMR
The following roads driven water mains are in various stages of design. Once design is completed, they are scheduled for construction:Basset & Martin Streets and The Crescent - Survey and potholing completed with design commenced. Preliminary investigations commenced for The Goosewalk, Bothwick Street, Nicholson Street, William Street, Atherton Street, Innes Street & Lillendal Avenue.
Construction in progress on Victoria and Louise Streets, Mirani. Goldsmith Street / Bridge Road intersection (emergent project triggered by blackspot funding approval for traffic signal upgrades) scheduled to commence mid-November 2018, following Cape Hillsborough WM works.
Budget
Other Issues/
Risk
Water Main Renewals
Design and Construction
55% design phase, 15% construction
Schedule Scheduled Completion Date:
30/06/2019
Original Budget:
$2,344,934
Cape Hillsborough Road Watermain is still progressing with completion estimated mid-November 2018.
18/19 Projects:
Bovey Street - Design complete, Materials ordered with construction to commence mid-November 2018.
Pratt Street - Design is underway with potholing being completed early November 2018.
The following water mains are in various stages of investigation (survey and service locations) and design with construction being scheduled as necessary to deliver the program.
Blacks Beach Road - Design of Ian Reddacliff Drive has been completed and Droughtmaster Drive expected by early November 2018. Preparation of Tender documentation for external construction is now underway.
Budget
Other Issues/
Risk
Nebo Road WTP Clear Water Tank Valves and Filter Valves Replacements
Design and Construction
30% Schedule Scheduled Completion Date: 30/06/2019
Budget FY18/19: $644,055
Clear Water Tank Valves: further investigations regarding the effective isolation of the interconnecting valve between tanks 1 and 3 to be undertaken
Filter Valves Replacements: Detailed scoping of works and draft tender documentation has been completed
Budget
Other Issues/
Risk
Page 20
Engineering & Commercial Infrastructure Monthly Review > October 2018
PROJECT PHASE PHASE %
COMPLETE INDICATORS
ORIGINAL BUDGET DETAILS
COMMENTS
and is currently being reviewed by asset owner. Tender scheduled for issuing by end of November 2018.
Mirani Recycled Water Storage
Construction 85% Schedule
Scheduled Completion Date: 20/12/2018
18/19 Original Budget:$3,393,320
300ML Dam is nearing completion.
The transfer pipeline is 95% complete.
Construction of the pump station at the 60ML dam is continuing along with outlet structures at the 300ML dam.
Budget
Other Issues/
Risk
Mirani WRF Upgrade
Procurement 85% Schedule Scheduled Commissioning Completion Date: 30/07/2020
Original Budget: $15,834,449
Tender assessment is continuing with commercial negotiations and technical clarifications ongoing. Contract award was scheduled for end of October 2018 although this may push into November 2018 due to the ongoing negotiations.
Budget
Other Issues/
Risk
Water Laboratory Relocation
Procurement 35% Schedule
Scheduled Completion Date:
30/06/2018
Revised completion date:
30/07/2019
Original Project Budget: $1,750,000
Amended Project Budget: $2,212,500
Tenders have been received, however, prices are higher than budgeted. Some delays to project anticipated with Budget to be reviewed and expenditure cashflow reforecast. A re-tendering process also needs to occur.
Budget
Other Issues/ Risk
REGULA TORY COMPLIANCE
Page 21
Engineering & Commercial Infrastructure Monthly Review > October 2018
REGULATORY COMPLIANCE
5.1. Drinking Water Compliance
Potable water is provided in accordance with the requirements of the Water Supply Safety and Reliability Act, measured against the Australian Drinking Water Quality Guidelines. Drinking Water samples are taken at the outlet of Water Treatment Plants and at various locations within the reticulation network. Please note: These results are reported one month in arrears. A summary of the performance is detailed below.
September 2018 Summary:
All wastewater tests were compliant against the health-based targets within the ADWG during October 2018 with the exception of a non-compliance faecal coliform result for Mirani STP. The new Eton Bore (#3) has been the sole water source since 17 September 2018 and the reticulation samples for Selenium in Eton continue to be in the range of 9 - 11 µg/L.
60
65
70
75
80
85
90
95
100
0
20
40
60
80
100
120
140
160
180
Co
mp
lia
nce
(%)
Te
sts
Co
nd
uct
ed
Health Parameter Test Results
Drinking Water Test Completed Non Compliant Health Parameter Tests % Compliance Target
0
20
40
60
80
100
120
140
160
180
Te
sts
Co
nd
uct
ed
Aesthetic Parameter Test Results
Drinking Water Test Completed Non-Compliant Aesthetic Parameter Tests
Page 22
Engineering & Commercial Infrastructure Monthly Review > October 2018
September 2018 Summary:
Eton and Koumala exceeded the recommended aesthetic guideline for hardness of 200 mg/L CaCO3 (Values ranged from 380 - 430 for Eton and 375 - 430 for Koumala). In addition, the pH at Gargett (Reservoir) for one sample during the month was low (6.3 pH units). This is an exceedance for the aesthetic limit of 6.50 pH units.
5.2. Wastewater Compliance
The discharges from wastewater treatment facilities are regulated by Development Approvals issued by the Department of Environment and Science (DES). The licence requirements differ based on the year the Development Approval was issued and the receiving environment associated with discharges.
October 2018 Summary:
All wastewater tests were compliant during October 2018 with the exception of a non-compliance faecal coliform result for Mirani STP.
0
10
20
30
Te
sts
Co
nd
uct
ed
Samples Tested Non Compliant tests
Wastewater Test Results
Page 23
Engineering & Commercial Infrastructure Monthly Review > October 2018
5.3. Backflow Testing
Backflow devices are installed on water services where there is a risk that water could return from a private property back into the Water Reticulation network. The requirement for backflow devices is regulated in accordance with the Standard Plumbing and Drainage Regulation.
October 2018 Summary:
21 new devices were registered while four devices were cancelled during October 2018. Council performed 45 tests on backflow devices during October 2018.
0
10
20
30
40
50
60
70
80
0
10
20
30
Te
ste
d b
y C
ou
nci
l
No
of
De
vice
s R
eg
iste
red
/Ca
nce
lle
d
Monthly Devices Registered Devices Cancelled Tested By Council