ENGINEERING CHANGE PROPOSAL COST ESTIMATE SUPPORT SHEET

Date post: 23-Feb-2022
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
1
DEPARTMENT OF HOMELAND SECURITY U.S. COAST GUARD ENGINEERING CHANGE PROPOSAL COST ESTIMATE SUPPORT SHEET TASK/MATERIAL MATERIAL COST PRODUCTION LABOR HOURS ENGINEERING LABOR HOURS NON- RECUR. RECUR. UNIT NON- RECUR. RECUR. UNIT NON- RECUR. RECUR. UNIT HOURS NON-RECURRING MATERIAL COSTS = RECURRING UNIT MATERIAL COSTS = NON-RECURRING PRODUCTION LABOR COSTS = Hours X = RECURRING UNIT PRODUCTION LABOR COSTS = Hours X = NON-RECURRING ENGINEERING LABOR COSTS = Hours X = RECURRING UNIT ENGINEERING LABOR COSTS = Hours X = CG-5538 (12/19) Page 1 of 1
Transcript
Page 1: ENGINEERING CHANGE PROPOSAL COST ESTIMATE SUPPORT SHEET

DEPARTMENT OF HOMELAND SECURITY U.S. COAST GUARD

ENGINEERING CHANGE PROPOSAL COST ESTIMATE SUPPORT SHEET

TASK/MATERIALMATERIAL COST PRODUCTION

LABOR HOURSENGINEERING LABOR HOURSNON-

RECUR.RECUR.

UNITNON-

RECUR.RECUR.

UNITNON-

RECUR.RECUR.

UNIT

HOURSNON-RECURRING MATERIAL COSTS =

RECURRING UNIT MATERIAL COSTS =

NON-RECURRING PRODUCTION LABOR COSTS = Hours X =

RECURRING UNIT PRODUCTION LABOR COSTS = Hours X =

NON-RECURRING ENGINEERING LABOR COSTS = Hours X =

RECURRING UNIT ENGINEERING LABOR COSTS = Hours X =

CG-5538 (12/19) Page 1 of 1