ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for Cable Penetration Assemblies for 60+ years Target Qualification Life Mr. Marek Tengler, Mr. Michal Klauber May 20 23, 2019 Equipment Qualification in Nuclear Installations, ÚJV Řež, Řež, Czech Republic (Rizzo Associates Czech, a. s.) (Kabelovna Kabex, a.s.)
Transcript
Page 1: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

ENGINEERING & CONSULTING SERVICES

FOR NUCLEAR FACILITIES

Rizzo Associates Czech, a. s.

Experiences Taken from Preparation of

Qualification Program for Cable

Penetration Assemblies for 60+ years

Target Qualification Life

Mr. Marek Tengler, Mr. Michal Klauber

May 20 – 23, 2019

Equipment Qualification in Nuclear Installations, ÚJV Řež, Řež, Czech Republic

(Rizzo Associates Czech, a. s.) (Kabelovna Kabex, a.s.)

Page 2: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

2

ABSTRACT

• Cable penetration assemblies (CPA) designed for applications

in safety-related systems of nuclear power plants (facilities) shall

follow general and specific design principles described by

the standard IEEE Std 317-2013. CPA perform two important general

safety functions. The first intended safety function is ensuring

the pressure boundary of the containment and, in the case, keeps

the harsh environment generated by accident conditions just inside

hermetized zones. The second intended safety function is providing

a conductive channel through a wall for medium voltage, low voltage,

and coaxial/signal/optic cables in any service and postulated design

conditions.

• Although, the design of CPA is represented as passive component, it

is formed into several functional groups comprise polymeric

compounds, metallic and ceramic components integrated one tubular

piece.

rem-ten013-19.rcz

Page 3: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

3

ABSTRACT

• In general, the mission time of CPA is limited primarily by used

polymeric materials that are mostly sensitive for thermal and radiation

ageing. Equipment qualification process as is recognized in the new

dual-logo standard IEC/IEEE 60780-323:2017 defined principles for

determination of the qualified life. Important part of the process is

performance of equipment type testing program during whose shall

be simulated, in part, accelerated ageing conditions of thermal,

radiation, wearing, vibrational (etc.) effects occurred during mission

time (qualification life), thus, environmental conditions generated by

accident conditions (severe radiation; sharp thermo-hydraulic

elevation). Qualification process of CPA for long-terms mission is

demanding and results are frequently wide scattered and ambiguous.

Therefore Condition Monitoring (CM), as is introduced by IEC/IEEE

60780-323:2017, should always accompany qualification process.

rem-ten013-19.rcz

Page 4: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

4

ABSTRACT

• Company Kabelovna Kabex (a.s.) are developing the new generation

of CPA that are specifically designed for applications in nuclear

facilities towards long-term service. Inseparable part of equipment

qualification program is determination of CM indicators, nomogramig

of predictive indexes, prescriptive guide for follow-up plant in-situ data

gathering and benchamarking surveillance program encompassing

natural aged witnessing samples. The complex qualification program

involving ongoing qualification fully complies with nuclear quality

requirements as are determined by Czech nuclear legislation.

rem-ten013-19.rcz

Page 5: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

5

History of Kabelovna KABEX

CPAs

rem-ten013-19.rcz

• GEN „zero“ Retrofit Pack for Russian Design CPA

Page 6: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

6

History of Kabelovna KABEX

CPAs

rem-ten013-19.rcz

• GEN I.1 – KABEX 2002 LV and MV for Russian Design NPP

Page 7: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

7

History of Kabelovna KABEX

CPAs

rem-ten013-19.rcz

• GEN I.2 – KABEX 2010 Advanced LV and MV CPA For Russian

Design Power Plants

Page 8: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

8

NEW Design of CPA

of Kabelovna KABEX

rem-ten013-19.rcz

• GEN II – „IEEE 317 STRICT“

Cable Penetration Assemblies (CPA) intentionally designed and

qualified in according requirements of IEEE Std 317-2015 for

new generation of nuclear power plants.

Page 9: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

9

NEW Design of CPA

of Kabelovna KABEX

rem-ten013-19.rcz

• Main Design Features

• Hybrid opto-metal cable system – Senzorex utilized for Condition Monitoring

(CM) environmental checks.

• Development of new polymeric insulation systems (compounds and

mixtures) for generic design life sustain not least as 60 years.

• Newly developed ceramic sealing system.

• Fully qualified package of CPA with auxiliary equipment (boxes, trains,

splices.

• Complex CM data management for equipment margin monitoring and

assessment.

• Seismic robust design for sites with strong hazard zones.

• Low susceptible EMC design.

• Rapid Hot Wave design.

• Design Extended Conditions (DEC) Comply

• Total Quality Documents Management System

ISO 9001:2015 + ISO 19443:2018

• CFSI Protection Information System

Page 10: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

10

Equipment Qualification

Concept in Four Steps

A design qualification program shall include:

1) Qualification criteria

2) A program demonstrating qualification using testing, analysis,

operating experience, or a combination of these methods

3) Evidence of successful qualification

4) A documentation file containing (1), (2), and (3)

rem-ten013-19.rcz

1

Page 11: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

11

Equipment Qualification

Concept in Four StepsThe EQ program shall include an assessment of aging effects on

equipment. Significant aging mechanisms shall be identified and

addressed as part of the program. Significant aging mechanisms are

defined as ones satisfying four criteria:

1. An aging mechanism promotes the same failure mode during

normal environmental conditions and from exposure to abnormal

or design basis event service conditions.

2. The aging mechanism adversely affects the ability of the

equipment to perform its safety.

3. The deterioration caused by the aging mechanism is not

amenable to assessment by in-service inspection or surveillance

activities.

4. In the normal service environment, the aging mechanism causes

degradation during the design life of the equipment that is

appreciable compared to degradation caused by

the design basis events. rem-ten013-19.rcz

2

Page 12: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

12

Equipment Qualification

Concept in Four Steps

Qualified life shall be established for equipment with significant aging

mechanisms.

Qualified life is equal to design life for equipment with no significant

aging mechanisms.

rem-ten013-19.rcz

3

Page 13: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

13

Equipment Qualification

Concept in Four StepsA qualification program specificiation shall contain and discussed

in appropriate level of details the following elements of information

about equipment:

• Safety functions and performance

• Description and boundaries

• Interfaces, loads, power sources, signals, and so on

• Design codes and standards

• Qualification codes and standards

• Environmental conditions

• Operating conditions

• Margin

• Significant aging mechanisms

• Acceptance criteria

• Documentationrem-ten013-19.rcz

4

Page 14: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

14

Safety Functions and

Performance CPA is an assembly of

insulated electric conductors,

conductor seals, module seals

(if any), and aperture seals that

provides two general safety

function during NOC, AOC,

DBE, DEC.

(a) the passage of the electric

conductors through a

single aperture in the

nuclear containment

structure

(b) a pressure barrier between

the inside and the outside

of the containment

structure.rem-ten013-19.rcz

[A]

{REFERENCE} - Excerption from: IEEE Std 317-2013, „IEEE

Standard for Electric Penetration Assemblies in Containment

Structures for Nuclear Power Generating Stations“

Page 15: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

15

Description

and boundaries

rem-ten013-19.rcz

[B]

Page 16: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

16

Design

Codes and Standards

rem-ten013-19.rcz

[C]

Page 17: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

17

Qualification Codes and

Standards

rem-ten013-19.rcz

[D]

Page 18: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

18

Environmental

conditions• Seismic Design Capacity

0.5g PGA + 65% margin

• Fire Protection Withstand

90 min, and Rapid Hot

Wave 1600°C

• EMC: low level

susceptibility

• Extra pressure

• Extra Life +60 year

• DEC Survaiability

Assessment Concept

rem-ten013-19.rcz

[E]

Page 19: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

19

Environmental

conditions

rem-ten013-19.rcz

[E]

{REFERENCE} - Excerption from: IAEA TECDOC Series No. 1818,

„Assessment of Equipment Capability to Perform Reliably under

Severe Accident Conditions“

Page 20: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

20

Description

of Equipment

rem-ten013-19.rcz

[F]

Page 21: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

21

General Schema

of EQ Process for NPP

and Documentation Flow Planing

Equipment

performance

requirements

Service conditionsQualification

requirements

Design

requirements

Qualification

specification

Design

specification

Technical

specification for

supply

StorageProcurement Instalation

Existing data and

experience

Analysis

Qualification plan

Test procedure Test execution

Qualification status

Basic Design

Verification of

qualification

adequacy

[G]

Page 22: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

22

Condition Monitoring (CM)

Background

rem-ten013-19.rcz

Page 23: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

23

Condition Monitoring (CM)

Background

rem-ten013-19.rcz

Page 24: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

24

Condition Monitoring (CM)

CPA Immplementation Cases

rem-ten013-19.rcz

• Optional solution for ongoing environmental CM.

• Metal cables with optical leads implmented into cable jacket.

Page 25: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

25

Condition Monitoring (CM)

CPA Immplementation Cases

rem-ten013-19.rcz

• Application of nanoindentation techniques for tinny sample

evaluation and mechanical trending checks (indenter modulus, EtB

and Hook Modulus).

Page 26: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

26

CPA Protection Aganist CFSI

Counterfeit

– Intentionally manufactured or altered to imitate a legitimate product

without the legal right to do so.

– A counterfeit item is one that has been fabricated in imitation of

something else with purpose to defraud by passing the false copy for

genuine or original or is an items copied without the legal right or

authority to do so.

Fraudulent

– Items that are intentionally misrepresented with intent to deceive.

Fraudulent items include item provided with incorrect identification or

falsified or inadequate certification.

Substandard

– deviating from of a quality lower or scope of qualification than that

prescribed by required standard

Page 27: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

27

CPA Protection Aganist CFSI

Suspect items

are items that are suspected of being counterfeit, fraudulent or

substandard

– It may not always be cost effective to verify if a suspect item is indeed

counterfeit, fraudulent or substandard

NOTE: Legally, it may not be appropriate to call an item counterfeit or

fraudulent unless it is verified as such.

– In case of authentication testing, simply obtaining an authentic item or

one that complies with the specification may be the prudent course of

action.

– Conclusive investigation (electrical testing and used advanced

invasive methods) is always time consuming and expensive.

Page 28: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

28

CPA Protection Aganist CFSI

Implementation of „CFSI Protection Information System“ – website

platform for data exchange between manufacturer (Kabelovana Kabex),

vendors and equipment end user.

CFSI-PIS ensure exclusion of suspicious item and verification of

genuineness in order to elimination of:

• an unauthorized copy;

• conformance to original OCM design, model, and/or performance

standards;

• production by unauthorized contractors;

• off-specification, defective, or used OCM product sold as "new" or

working; or

• incorrect or falsing markings and/or documentation.

NOTE: OCM – Original Component Manufacture

Page 29: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

29

IEEE Initiative – ICAP (IEEE Conformity Assessment Program)

• Conformity Assessment

Activities will Include:

• Conformance to IEEE

Standards,

• Lab audits to maintain

accreditation

• IEEE Certified components

following IEEE ICAP

process.

Page 30: ENGINEERING & CONSULTING SERVICES FOR NUCLEAR FACILITIES Rizzo Associates Czech… · Rizzo Associates Czech, a. s. Experiences Taken from Preparation of Qualification Program for

Click to edit Master title style

30

THE END...

QUESTIONS ???


Recommended