SCALE: 1" = 1,000'
1
2
3
4
5
6
MERRIMACK RIVER
WATER STREET
S
H
A
P
L
E
I
G
H
A
V
E
N
U
E
RIVERSIDE AVENUE
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
Haverhill, Massachusetts
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
DRAWING LIST SHEET NO.
TITLE SHEET 1
PLANTING PLANS 2-7
PLANT LIST 8
PLANTING DETAILS 9
LOCUS PLAN
Mayor
James J. Fiorentini
City Councilors
Council President John A. Michitson
Council Vice President Melinda Barrett
Councillor Andres X. Vargas
Councillor Michael S. McGonagle
Councillor Colin F. LePage
Councillor Mary Ellen Daly O'Brien
Councillor William J. Macek
Councillor Thomas J. Sullivan
DPW Director
Michael Stankovich
DPW Deputy Director
Waste/Wastewater Division
Robert E.Ward
Collection System Supervisor
Paul J. Jessel
PREPARED FOR
THE CITY OF HAVERHILL
DEPARTMENT OF PUBLIC WORKS
GPI PROJECT NO: 2017071
MAY 2017
PRIME CONSULTANT:
SUB CONSULTANT:
Nover - Armstrong Associates, Inc.
124 Main Street, Unit 2GG
Carver, MA 02330
Environmental Permitting
CLIENT:
INDEX:
JOB NO.:
N
S
H
A
P
L
E
I
G
H
S
T
R
E
E
T
W
A
T
E
R
S
T
R
E
E
T
1
QR
1
QR
1
QR
1
AS
1
AS
1
QR
1
QR
1
QR
MA
TC
H
MERRIMACK RIVER
EBB
FLOW
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
1 OF 6
2
NOTES:
1. TREE LOCATIONS HAVE BEEN
ESTABLISHED TO RESPECT VIEWS OF
RIVER FROM ABUTTERS. DO NOT ADJUST
LOCATIONS BETWEEN TREES WITHOUT
PRIOR APPROVAL OF THE LANDSCAPE
ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY
TOWARDS THE RIVER TO AVOID
OBSTRUCTIONS INCLUDING EXISTING
TREE STUMPS AND/OR EXISTING BRICK
TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET
MINIMUM FROM THE BACK OF GUARDRAIL
TO MINIMIZE CONFLICT WITH OVERHEAD
WIRES.
N
CONTINUED
ON SHEET 3
P
E
A
R
S
O
N
S
T
R
E
E
T
B
O
A
R
D
M
A
N
S
T
R
E
E
T
WATER S
TREET
3
AS
1
AS
2
AS
3
PS
3
QR
MA
TC
H
MA
TC
H
MERRIMACK RIVER
EBB
FLOW
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
2 OF 6
3
NOTES:
1. TREE LOCATIONS HAVE BEEN ESTABLISHED TO RESPECT
VIEWS OF RIVER FROM ABUTTERS. DO NOT ADJUST
LOCATIONS BETWEEN TREES WITHOUT PRIOR APPROVAL
OF THE LANDSCAPE ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY TOWARDS THE
RIVER TO AVOID OBSTRUCTIONS INCLUDING EXISTING
TREE STUMPS AND/OR EXISTING BRICK TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET MINIMUM FROM THE
BACK OF GUARDRAIL TO MINIMIZE CONFLICT WITH
OVERHEAD WIRES.
N
CONTINUED
ON SHEET 2
CONTINUED
ON SHEET 4
M
E
C
H
A
N
I
C
S
T
R
E
E
T
WATER STREET
G
R
E
E
N
V
I
L
L
E
S
T
R
E
E
T
3
QR
3
PS
2
AS
3
QR
1
AS
MA
TC
H
MA
TC
H
MERRIMACK RIVER
EBB
FLOW
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
3 OF 6
4
N
NOTES:
1. TREE LOCATIONS HAVE BEEN ESTABLISHED TO
RESPECT VIEWS OF RIVER FROM ABUTTERS. DO
NOT ADJUST LOCATIONS BETWEEN TREES
WITHOUT PRIOR APPROVAL OF THE LANDSCAPE
ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY TOWARDS
THE RIVER TO AVOID OBSTRUCTIONS INCLUDING
EXISTING TREE STUMPS AND/OR EXISTING BRICK
TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET MINIMUM
FROM THE BACK OF GUARDRAIL TO MINIMIZE
CONFLICT WITH OVERHEAD WIRES.
CONTINUED
ON SHEET 3
CONTINUED
ON SHEET 5
H
A
V
E
R
H
I
L
L
S
T
R
E
E
T
W
AT
ER
ST
RE
ET
3
AS
1
AS
1
QR 3
PS
3
QR
MA
TC
H
MA
TC
H
MERRIMACK RIVER
EBB
FLOW
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
4 OF 6
5
N
NOTES:
1. TREE LOCATIONS HAVE BEEN ESTABLISHED
TO RESPECT VIEWS OF RIVER FROM
ABUTTERS. DO NOT ADJUST LOCATIONS
BETWEEN TREES WITHOUT PRIOR APPROVAL
OF THE LANDSCAPE ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY
TOWARDS THE RIVER TO AVOID
OBSTRUCTIONS INCLUDING EXISTING TREE
STUMPS AND/OR EXISTING BRICK TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET MINIMUM
FROM THE BACK OF GUARDRAIL TO MINIMIZE
CONFLICT WITH OVERHEAD WIRES.
CONTINUED
ON SHEET 4
CONTINUED
ON SHEET 6
W
AT
ER
S
TR
EE
T
3
QR
3
PS
3
PS
3
QR
1
QR
MA
TC
H
MA
TC
H
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
MERRIMACK RIVER
EBB
FLOW
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
5 OF 6
6
N
NOTES:
1. TREE LOCATIONS HAVE BEEN ESTABLISHED TO
RESPECT VIEWS OF RIVER FROM ABUTTERS. DO NOT
ADJUST LOCATIONS BETWEEN TREES WITHOUT PRIOR
APPROVAL OF THE LANDSCAPE ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY TOWARDS THE
RIVER TO AVOID OBSTRUCTIONS INCLUDING EXISTING
TREE STUMPS AND/OR EXISTING BRICK TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET MINIMUM FROM
THE BACK OF GUARDRAIL TO MINIMIZE CONFLICT WITH
OVERHEAD WIRES.
CONTINUED
ON SHEET 5
CONTINUED
ON SHEET 7
KE
ELE
Y
S
TR
EE
T
L
I
N
C
O
L
N
A
V
E
N
U
E
RIV
ER
SID
E A
VE
N
U
E
W
A
T
E
R
S
T
R
E
E
T
5
PS
MA
TC
H
MERRIMACK RIVER
EBB
FLOW
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
0
SCALE: 1" = 40'
40 100
PLANTING PLAN
6 OF 6
7
N
NOTES:
1. TREE LOCATIONS HAVE BEEN ESTABLISHED TO RESPECT VIEWS OF
RIVER FROM ABUTTERS. DO NOT ADJUST LOCATIONS BETWEEN
TREES WITHOUT PRIOR APPROVAL OF THE LANDSCAPE ARCHITECT.
2. TREES MAY BE ADJUSTED LATERALLY TOWARDS THE RIVER TO
AVOID OBSTRUCTIONS INCLUDING EXISTING TREE STUMPS AND/OR
EXISTING BRICK TREE PITS.
3. TREES SHALL BE PLANTED 10 FEET MINIMUM FROM THE BACK OF
GUARDRAIL TO MINIMIZE CONFLICT WITH OVERHEAD WIRES.
CONTINUED
ON SHEET 6
PLANT LIST
SYMBOLQTY.
BOTANICAL NAME COMMON NAME SIZE COMMENT
SH
1
SH
2
SH
3
SH
4
SH
5
SH
6
TREES
AS 15 ACER SACCHARINUM SILVER MAPLE
1"-1.5"
CALIPER
B&B 2 6 3 4 0 0
PS 20 PINUS STROBUS WHITE PINE 5'-6' HT. B&B 0 3 3 3 6 5
QR 26 QUERCUS RUBRA RED OAK
1"-1.5"
CALIPER
B&B 6 3 6 4 7 0
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
PLANT LIST
8
1
1
V
:
1
H
S
L
O
P
E
M
A
X
.
DECIDUOUS TREE PLANTING (SLOPE)
WATERING SAUCER SHALL BE FLOODED TWICE
DURING THE FIRST 24 HOURS AFTER PLANTING
BACKFILL MIX PER SPECIAL PROVISIONS
BELOW
ROOTBALL
NOT TO SCALE
TREE SHALL BE SET PLUMB
S
L
O
P
E
V
A
R
I
E
S
6 INCHES
TREE WRAP SHALL NOT BE USED
DO NOT CUT LEADER
COMPLETELY REMOVE SYNTHETIC BURLAP & LACING
3 INCH HIGH EARTH WATERING SAUCER AROUND TREE PIT
2-3 INCHES AGED PINE BARK MULCH (PULL MULCH AWAY
CUT & ROLL BACK 1/3 OF BURLAP BEFORE BACKFILLING.
FROM TRUNK OF TREE)
MIN. 2 X ROOTBALL DIAMETER
ROOTBALL
DEPTH OF ROOT BALL
S
L
O
P
E
V
A
R
I
E
S
EXCAVATE PLANTING PIT TO
TREE SHALL BE PLANTED SO THAT CROWN IS 2-3 INCHES
ABOVE FINISHED GRADE AFTER SETTLEMENT
MAY 2017
1"=40'
2017071
RIVERINE BUFFER RESTORATION
WATER STREET BETWEEN SHAPLEIGH AVENUE AND RIVERSIDE AVENUE
HAVERHILL, MASSACHUSETTS
181 BALLARDVALE STREET, SUITE 202
Tel: 978.570.2999 Fax: 978.658.3044
http://www.gpinet.com
Engineering Design Planning Construction Management
WILMINGTON, MA 01887
PLANTING DETAILS
9