Prosper is a place where everyone maers. September 2019 Town of Prosper Engineering Capital Projects Development Stormwater Physical Address: 250 W First Street 2nd Floor Prosper, Texas 75078 Mailing Address: P.O. Box 307 Prosper, Texas 75078 Phone: 972.569-1198 www.prospertx.gov Statistics at a Glance Engineering Plans Reviewed 15 Water Well Permits Reviewed 0 Plans Approved 1 Engineering Services Monthly Report The new Gee Road connection to Fishtrap Road opened to the public on September 20, 2019. Now that the road is open, a traffic signal warrant study at the intersection is underway.
Transcript
Page 1: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

Prosper is a place where everyone matters.

September 2019

Town of Prosper

Engineering

Capital Projects

Development

Stormwater

Physical Address:

250 W First Street

2nd Floor

Prosper, Texas 75078

Mailing Address:

P.O. Box 307

Prosper, Texas 75078

Phone: 972.569-1198

www.prospertx.gov

Statistics at a Glance Engineering Plans Reviewed

15

Water Well Permits Reviewed

0

Plans Approved 1

Engineering Services

Monthly Report

The new Gee Road connection to Fishtrap Road opened to the public on September 20, 2019. Now that the road is open, a traffic signal warrant study at the intersection is underway.

Page 2: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

2

September 2019 Pre-Construction Meetings

September 2019 Final Acceptance Approved

DEVELOPMENT

Case Number Project Title

1 D19-0075 Prestonwood, Phase 3 & 3A

Case Number Project Title

1 D18-0127 306 E Broadway

2 D16-0096 Falls of Prosper, Phase 2

3 D17-0084 Gates of Prosper Block E

4 D16-0038 Legacy Garden, Phase 1

Page 3: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

3

Case Number Project Title Location

1 D18-0025 Westfork Infrastructure NWC Gee Road and US 380

2 D18-0075 Prosper Commons Infrastructure NWC Coit Road and US 380

3 D18-0048 Chrysler, Dodge, Jeep & Ram 2550 West University Drive

4 D18-0076 La Cima Crossing Infrastructure West of La Cima Boulevard, North of US 380

5 D18-0132 Prosper ISD Middle School #4 3080 Fishtrap Road

6 D18-0100 Prosper Gardens Office SWC of Prosper Trail & Coit Road

7 D18-0114 Brakes Plus 5010 West University Drive

8 D17-0076 Brazos Substation 2600 FM 1385

9 D17-0088 Westfork Crossing, Block A, Lot 2 NWQ Gee Road & US 380

10 INF18-0007 Gates of Prosper, Phase 2 Infrastructure SWQ Lovers Lane & Preston Road

11 D17-0080 Victory at Frontier SWQ Frontier Parkway & Preston Road

12 INF18-0004 SWC DNT and First Grading SEQ First Street & North Dallas Parkway

13 LD18-0026 Prosper North 12 Grading NEC St. Peter and Preston Road

14 D18-0095 Ace Montessori 4770 West University Drive

15 D17-0041 Rock Creek Church 2860 Fishtrap Road

16 D18-0081 Cook Children’s Medical Center 4200 & 4300 West University Drive

Development Continued

Under Construction—Non-Residential Projects

Page 4: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

4

Under Construction—Non-Residential Projects - Continued

Development Continued

Case Number Project Title Location

17 D18-0067 Goddard School 1180 La Cima Boulevard

18 D18-0105 Kindercare 1230 South Coit Road

19 D18-0064 7-Eleven SWQ First Street and Preston Road

20 D17-0053 Pinnacle Montessori SEQ Coit Road and Richland Boulevard

21 D18-0042 World Wide Rock SEQ Cook Lane and Prosper Trail

22 D18-0098 Whispering Gables NWC Coit Road and Richland Boulevard

23 D19-0029 Prosper Commons-Panda Express North side of US 380 W of Coit Road

24 D19-0032 Westfork –Valvoline North side of US 380 W of Gee Road

25 D19-0048 Gates of Prosper, Phase 2 SWC Lovers Lane and Preston Road

26 D19-0075 Prestonwood, Phase 3 1001 West Prosper Trail

Page 5: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

5

Development Continued

3. Chrysler, Dodge, Jeep & Ram

2550 West University Drive

Pre-Construction Held:

March 29, 2019

2. Prosper Commons

Infrastructure

NWQ US 380 & Coit Road

Pre-Construction Held:

October 4, 2018

1. Westfork Infrastructure

NWQ US 380 & Gee Road

Pre-Construction Held:

October 10, 2018

Page 6: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

6

Development Continued

5. Prosper ISD Middle School #4

3080 Fishtrap Road

Pre-Construction Held:

February 21, 2019

4. La Cima Crossing

Infrastructure

NWQ US 380 & Richland Boulevard

Pre-Construction Held:

December 12, 2018

6. Prosper Gardens Office

SWC Prosper Trail & Coit Road

Pre-Construction Held:

February 18, 2019

Page 7: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

7

Development Continued

8. Brazos Substation

2600 FM 1385

Pre-Construction Held:

September 13, 2018

7. Brakes Plus

5010 West University Drive

Pre-Construction Held:

March 15, 2019

9. Westfork Crossing,

Block A, Lot 2

NWQ Gee Road & US 380

Pre-Construction Held:

January 16, 2019

Page 8: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

8

Development Continued

11. Victory at Frontier

SWQ Frontier Parkway & Preston Road

Pre-Construction Held:

January 11, 2019

10. Gates of Prosper, Phase 2

Infrastructure

SWQ Preston Road & Lovers Lane

Pre-Construction Held:

November 26, 2018 - Utilities

March 25, 2019 - Roads

12. SWC DNT & First Street

Grading

SWC DNT & First Street

Pre-Construction Held:

November 27, 2018

Page 9: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

9

Development Continued

14. Ace Montessori

4770 West University Drive

Pre-Construction Held:

December 19, 2018

13. Prosper North 12

Grading

NEC of Street Peter & Preston Road

Pre-Construction Held:

September 26, 2018

15. Rock Creek Church

2860 Fishtrap Road

Pre-Construction Held:

July 9, 2018

Page 10: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

10

Development Continued

16. Cook Children’s Medical Center

4200 & 4300 West University Drive

Pre-Construction Held:

February 7, 2019

17. Goddard School

1180 La Cima Boulevard

Pre-Construction Held:

December 4, 2018

18. Kindercare

1230 South Coit Road

Pre-Construction Held:

December 3, 2018

Page 11: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

11

Development Continued

21. World Wide Rock

1020 and 1030 Cook Lane

Pre-Construction Held:

April 10, 2019

19. 7-Eleven

390 North Preston Road

Pre-Construction Held:

February 25, 2019

20. Pinnacle Montessori

2770 Richland Boulevard

Pre-Construction Held:

May 1, 2019

Page 12: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

12

Development Continued

22. Whispering Gables

SWC Coit Road and Richland Boulevard

Pre-Construction Held:

May 15, 2018

24. Westfork-Valvoline

2251 East University Drive

Pre-Construction Held:

July 11, 2019

23. Prosper Commons-Panda

Express

2251 East University Drive

Pre-Construction Held:

July 25, 2019

Page 13: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

13

Development Continued

25. Gates of Prosper, Phase 2

SWC Lovers Lane and Preston Road

Pre-Construction Held:

June 6, 2019

26. Prestonwood, Phase 3

1001 West Prosper Trail

Pre-Construction Held:

September 13, 2019

Page 14: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

14

Case Number Project Title Location

1 D18-0073 Legacy Garden, Phase 1C NWQ Prosper Trail & Shawnee Trail

2 D18-0036 Star Trail, Phase 5 SWQ Prosper Trail & Shawnee Trail

3 D17-0083 Lakewood, Phase 1A NWQ Coit Road & Meadowbrook Boulevard

4 D18-0130 Lakewood, Phase 2 NWQ Lakewood Drive & Meadow Dell

5 D19-0022 Lakewood, Phase 3

Grading only NWQ Lakewood Drive & Meadow Dell

6 D18-0107 Windsong Ranch, Phase 5A NWQ Fishtrap Road & Teel Parkway

7 D18-0125 Windsong Ranch, Phase 5B NWQ Fishtrap Road & Teel Parkway

8 D18-0137 Tanners Mill, Phase 1D South and East of Coleman Road

9 D18-0077 Parks at Legacy, Phase 3

*Grading only NWQ Prairie Drive/Legacy Drive

10 D18-0078 Parks at Legacy, Phase 4

*Grading only NWQ Prairie Drive/Legacy Drive

Under Construction—Residential Projects

Development—Continued

Page 15: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

15

CAPITAL PROJECTS

Current Construction Activity—Total of $49,627,033

Project Project Title Start Date Finish Date Project Cost Est. Project Agency

S01 1507-ST - West Prosper Road Improvements,

Phase 2 (Segment D) Summer 2018 Fall 2019

$4,500,000

(Town Participation $1.85 Million) Town of Prosper

S04 1511-ST - Prosper Trail (Kroger - Coit Road) Winter 2017-

2018

Winter 2019-2020

(estimated) $4,742,760 Town of Prosper

S05 1513-ST - Old Town Streets 2015 Summer 2018 Summer 2019 $1,800,000 Town of Prosper

S06 1412-ST - Broadway (McKinley - Coleman) Summer 2018 Summer 2019 $2,500,000 Town of Prosper

S10 1836-ST - DNT Southbound Service Road

(US 380 - FM 428) Summer 2018

Winter 2019-2020

(estimated) $ 17,000.000 (County Funded) Collin County

T18 1909-TR - Traffic Signal (First and Coit) Fall 2019 Summer 2020

(estimated) $288,444 Town of Prosper

S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper

S24 1820-ST - First Street and DNT Intersection Spring 2019 Winter 2019-2020

(estimated) $1,387,000 Town of Prosper

S30 1819-ST Coleman Street (at Prosper High School)

Summer 2019 Spring 2020

(estimated) $650,000 Town of Prosper

W02 1715-WA - Fishtrap Elevated Storage Tank Winter 2018-

2019

Summer 2020

(estimated) $5,979,677 Town of Prosper

W04 1716-WA - LPP Water Line, Phase 1B

(FEST to BNSF and Lovers to Coit) Summer 2019

Summer 2020

(estimated) $9,275,061 Town of Prosper

Page 16: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

16

Capital Projects -Continued

S04. Prosper Trail

(Kroger to Coit Road)

Start Date : Winter 2017-2018

Finish Date: Winter 2019-2020 (estimate)

Project Cost: $4,742,760

S01. West Prosper Road

Improvements, Phase 2 (Segment D)

Start Date : Summer 2018

Finish Date: Fall 2019

Project Cost: $4, 500,000

S05. Old Town Streets 2015

Start Date : Summer 2018

Finish Date: Summer 2019

Project Cost: $1,800,000

*Contractor in Final Cleanup of Site

Page 17: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

17

Capital Projects -Continued

S06. Broadway Street

(McKinley Street to Coleman Street)

Start Date : Summer 2018

Finish Date: Summer 2019

Project Cost: $2,500,000

*Broadway complete, North Main began in

July 2019.

S10. DNT Southbound Service Road

(US 380 to FM 428)

Start Date : Summer 2018

Finish Date: Winter 2019-2020 (estimate)

Project Cost: $17,000,000

Collin County Funded

T18. Traffic Signal (First and Coit)

Start Date : Fall 2019

Finish Date: Summer 2020 (estimate)

Project Cost: $288,444

Page 18: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

18

Capital Projects -Continued

S24. First Street & DNT Intersection

Start Date : Spring 2019

Finish Date: Winter 2019-2020 (estimate)

Project Cost: $1,387,000

S20. E-W Collector

(Cook Lane –DNT)

Start Date : Spring 2019

Finish Date: Fall 2019 (estimate)

Project Cost: $1,504,091

S30. Coleman Street at Prosper High

School

Start Date : Summer 2019

Finish Date: Spring 2020 (estimated)

Project Cost: $650,000

Page 19: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

19

Capital Projects -Continued

W02. Fishtrap Elevated Storage Tank

Start Date : Winter 2018-2019

Finish Date: Summer 2020 (estimate)

Project Cost: $5,979,677

*Foundation crews have completed the

installation if foundation piers.

W04. LPP Water Line, Phase 1B.

Start Date : Summer 2019

Finish Date: Summer 2020 (estimate)

Project Cost: $9,275,061

Page 20: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

20

Have been submitted to the Town

Notice of Intent (NOI) — 1

Notice of Termination (NOT) — 2

Notice of Change (NOC) — 1

Stormwater Inspections — 58

STORMWATER

The Stormwater program conducts many types of compliance inspections. In any given

month, Stormwater staff will see compliant sites, non-compliant sites and sites that are

just plain awful. September was a pretty good month as far as the number of compliant

job sites. This is primarily due to the lack of precipitation which makes it easier for job

sites to keep sediment on site and out of our local water ways. Below you will find

comparison graphs that show the number of inspections performed or documents

received and the total amount that have been performed or received so far, this year. The

goal is to paint you a picture of a few of our many accomplishments this month.

58

461

SEPTEMBER YTD

Active Site Inspections

Page 21: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

21

1

8

SEPTEMBER YTD

Notice of intent (NOI)All construction sites that disturb >5 acres of land, require a NOI

issued by the Texas Commission on Environmental Quality (TCEQ).

Stormwater—Continued

Page 22: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

22

Stormwater—Continued

Page 23: Engineering Services Monthly Report - Prosper, Texas · S20 1708-ST - E-W Collector (Cook Lane - DNT) Spring 2019 Fall 2019 $1,504,091 Town of Prosper S24 1820-ST - First Street and

23

At the Community Picnic, Stormwater staff hosted the Prosper Stormwater management

program booth, which helps to satisfy state required education and outreach

requirements for the MS4 permit. The education and outreach booth is starting to come

together; staff was able to reach out to approximately 100 residents, demonstrating the

watershed model, and handing out Stormwater management program SWAG. Staff is

looking forward to the Christmas Festival, where we will be able to reach out to more

residents.

Education is a key component to achieving water quality and construction site

compliance. The Stormwater management program is dedicated to educating Town

residents and site workers to ensure that everybody is doing their best to protect water

quality and stay in compliance with Town Stormwater ordinance, TCEQ permit

requirements, and Federal regulations.

Community Picnic!!