Rural Development & Panchayat Raj Department Annual Report 2013-14
1
Rural Development & Panchayat Raj Department Annual Report 2013-14
2
ANNUAL REPORT
2013 – 14
Rural Development & Panchayath Raj Department
M.S.Building, III Floor, Dr. Ambedkar Veedhi
Bangalore - 560 001
Additional Chief Secretary to Government Tel.: 080-2235 3929/ 2203 2446 Fax: 080- 2235 3927
e-mail: [email protected]
Secretary to Government Tel.: 080- 2238 4574/ 2203 2941 Fax: 080 2238 9520
e-mail: [email protected]
Rural Development & Panchayat Raj Department Annual Report 2013-14
3
I N D E X
Sl. No.
SUBJECT PAGE
No.
1 VISION, MISSION & OBJECTIVES 1-5
2 Administration 6-10
3 Panchayat Raj Division
3.1 Panchayat Raj Division
3.2 B.R.G.F.
3.3 Abdul Nazir Sab State Institute of Rural Development
3.4 Gram Swaraj Yojane
11-35
4 Mahatma Gandhi National Rural Employment Guarantee Scheme 36-48
5 RURAL INFRASTRUCTURE - 1
5.1 Rural Communication
NABARD, CMGSY etc.,
5.2 Karnataka Rural Road Development Agency
PMGSY, Namma Grama Namma Rasthe
5.3 Karnataka Rural Infrastructure Development Ltd.,
5.4 Western Ghat Development Programme
5.5 Suvarna Gramodaya
49-69
6 RURAL INFRASTRUCTURE - 2
6.1 National Rural Livelihood Mission (NRLM)
6.3 Rehabilitation of Bonded Labour
6.4 Rural Energy Programmes
National Biogas Manure & Management Programme Karnataka State Bio-fuel Policy Soura Belaku
6.5 The Mahatma Gandhi Institute of Rural Energy &
Development
70-92
7 KARNATAKA RURAL WATER SUPPLY AND SANITATION PROJECT
7.1 Rural Water Supply & Sanitation (NRDWP)
7.2 Karnataka Rural Water Supply & Sanitation Project
“Jal Nirmal” Project
7.3 Nirmal Bharat Abhiyan
93-118
8 ANNEXURES 119-143
Rural Development & Panchayat Raj Department Annual Report 2013-14
4
CHAPTER - 1
Vision:
Sustainable and inclusive growth of overall rural development along with
empowerment of Panchayat Raj Institutions.
Mission:
1. Empowering rural population to participate in rural development programmes for
improving their quality of life.
2. Providing rural infrastructure and socio-economic growth opportunities for the poor
people in rural areas.
3. Accountable and Efficient functioning of Panchayat Raj Institutions.
4. Providing opportunity for rural livelihood.
Objectives:
1. To alleviate poverty through Self–Employment Programmes.
2. To strengthen the livelihood of the rural households by providing 100 days of
guaranteed wage employment every year.
3. To create qualitative and durable rural infrastructure within the time schedule paving
way for meeting the requirements of the rural beneficiaries.
4. To provide safe and adequate drinking water to all the rural habitations.
5. To empower the Panchayat Raj Institutions.
6. To improve the capacity of the elected representatives and the executives of the
Panchayat Raj Institutions
7. To improve the quality of service delivery of the Grama Panchayats in the priorities of
the local areas and effective management of public resources.
8. To develop vibrant village communities with an in depth and sustainable knowledge
of integrated rural development.
9. To create awareness about rural energy and to disseminate the innovative technology.
10. To ensure integrated development of western ghat region.
11. To remove barriers in the development of basic amenities.
12. To improve rural sanitation.
13. To ensure transparency in administration.
Rural Development & Panchayat Raj Department Annual Report 2013-14
5
An overview of the activities:
Development of rural areas has a bearing on improved agricultural production and
related economic activities, availability of natural and financial resources and their
development, improvement of service delivery - paving way for improved human
development. The department is striving hard to improve the livelihood of the rural populace
and to inculcate awareness in the economic, social and political spheres through effective
implementation of decentralized administration and implementation of programmes decided
particularly by the rural populace.
1.1 Democratic Decentralisation
One of the major responsibilities to achieve democratic decentralization in the
governance of rural areas is to implement the provisions of the Karnataka Panchayat Raj Act,
1993. The department co-ordinates the process of the constitution of Panchayat Raj
institutions under the above legislation and monitors their functioning in order to ensure that,
they are viable and vibrant institutions of local self-government. The responsibility of plan
formulation and implementation is being bestowed on the people by transferring functions,
functionaries and finances to these decentralised institutions. By this, the rural people can
decide, participate and monitor the development and progress of their villages. To achieve
this, training is being imparted to elected representatives and some members of the public for
capacity building. Recently, one post of Panchayat Development Officer (PDOs) in each of
the 5,627 Grama Panchayats and 2,500 posts of Second Division Accounts Assistants in the
larger Grama Panchayats have been created to strengthen Grama Panchayats. Along with this,
2500 Panchayat development officers have been directly recruited for improving the capacity
of Panchayat administration. Karnataka Public Service Commission has listed 1328 selection
list of PDOs, for which action will be taken for issuing an appointment orders. The following
sections, department, institutions are working under Rural Development and Panchayat Raj
Department.
1. Gram Swaraj Project
Gram Swaraj a Panchayath Strengthening Project is implemented by Government of
Karnataka through Rural Development & Panchayat Raj Department. The project
commissioned from the financial year 2006-07, and implemented in 39 most backward taluks
of the state. The objective of the project is to improve earlier conditions and people‟s
standard of living under the preview of the scheme. This was achieved by providing services
as per decision taken by rural people with their priorities and was more emphasized on
capacity building programmes to create a platform for effective implementation of panchayat
raj institutions.
Rural Development & Panchayat Raj Department Annual Report 2013-14
6
2. Panchayat Raj Division
This division deals with all matters relating to Panchayat Raj institutions viz. Zilla,
Taluk and Grama Panchayats under the Karnataka Panchayat Raj Act 1993. It also monitors
the implementation of the schemes such as Backward Region Grant Fund (BRGF), Grama
Swaraj and Rajeev Gandhi Panchayat Sashaktikaran Yojane. The division is also entrusted
with responsibility of overseeing Rs. 2 crore untied grants for President of Zilla Panchayats
and Rs. 1 crore untied grants for president of Taluk Panchayats.
3. Finance Section
Finance division deals with all financial matters, including preparation of Budget
estimates, release of funds, state, central and central aided scheme grants, audit &
formulation of plan schemes. This unit is also entrusted with the responsibility of preparation
of performance report and monitoring of all the Non-plan schemes being implemented in the
Department. Besides, this unit is also entrusted with the responsibility of overseeing and
submitting the montly reports which includes 13th
finance commission grant and schemewise
Central & State funds released under both plan and non-plan in time, expenditure incurred,
utilization certificate, balance amount details, etc.,
4. Administration Section
This wing looks after administrative matters such as Receipt of letters and distribution
of the same to the concerned Directors, Monitoring of attendance, transfers, promotion
related matters, seniority/gradation list, information related to backlog post, to fill up/
deployment of officers/staff to the sections depending upon the workload, monitoring of
appointments, co-ordination (Legislature & Parliament questions) & training matters.
5. Plan Monitoring and Information Division
This Division deals with monitoring of all Rural Development programmes, Annual
Plan, Annual Report, Monthly Programme Implementation Calender (MPIC), Monitoring of
Result Framework Document, convening Chief Executive Officers & Deputy Secretaries of
Zilla Panchayath‟s meeting and also State Level Vigilance & Monitoring Committee
meetings. This division also looks after the supervision work of District Level Vigilance &
Monitoring Committee meetings. This wing is also undertaking the collection, compilation,
processing and analysis of data and generation of various reports & statements required by
the Goernment.
6. Rural Development Commissionerate
This Commissionerate has the responsibility of implementation and monitoring of
Rural Wage Employment programme i.e., Mahatma Gandhi National Rural Employment
Guarantee scheme (MGNREGA).
Rural Development & Panchayat Raj Department Annual Report 2013-14
7
This scheme is implemented for eradication of rural poverty through wage
employment works. The objective of the scheme is to enhance livelihood security in rural
areas by providing atleast 100 days of guaranteed wage employment in every financial year
to every household, whose adult members volunteer to do unskilled manual work.
Activities such as wage employment to agricultural labourers, food security, creation
of durable infrastructure etc., are taken up under Mahatma Gandhi National Rural
Employment Guarantee scheme (MGNREGA).
7. Panchayat Raj Engineering Division
This division oversees the implementation of rural water supply and sanitation, roads
and bridges, minor irrigation and buildings sector programmes. Improvement of roads and
their maintenance is being taken up under RIDF, NABARD Scheme, Mukhya Manthri
Grameena Rasthe Abhivruddhi Yojane (CMGSY), 13th
Finance Commission Grant, Non-plan
grants etc.
8. Karnataka State Rural Livelihood Promotion Society
The Ministry of Rural Development, Government of India has restructured
Swarnajayanti Gram Swaraj Yojana (SGSY) as Aajeevika - National Rural Livelihoods
Mission (NRLM) is being implemented from 2010-11. The State Government is
implementing this scheme in a phased manner through Karnataka State Rural Livlihood
Promotion Society in the name of „Aajeevika‟.
9. Karnataka Rural Water Supply and Sanitation Agency
Karnataka Rural Water Supply and Sanitation Agency is a registered agency since
2001-02. This agency is responsible for formulation, planning and monitoring of externally
aided rural water supply and sanitation projects.
Water Supply: The department is responsible for co-ordinating and providing
potable water supply to 59,753 rural habitations in conformity with national norms. For this,
the state plan rural water supply schemes, centrally sponsored NRDWP, DDP, Support
Activity and Water Quality Monitoring and Surveillance Programmes along with World
Bank Assisted “Jal Nirmal” project are being implemented.
Nirmal Bharath Abhiyana: Promotion of rural sanitation is being carried out
through the implementation of Nirmal Bharath Abhiyana. Providing toilet facilities to
primary schools and anganwadi with water supply facility is also a component of the
programme.
10. Karnataka Rural Infrastructure Development Limited
KRIDL undertakes the works such as construction of low cost houses, roads,
drainages, Community Halls, Anganwadi Centres, establishment of Potable Drinking Water
Plants. KRIDIL is also undertaking works taken up under Suvarna Gramodaya Scheme.
Rural Development & Panchayat Raj Department Annual Report 2013-14
8
11. Karnataka Rural Road Development Agency
The KRRDA has been commissioned on 10-10-2005 with the aim of constructing all
weather roads for rural area in the State. The total length of rural roads in Karnataka is
1,55,546 km. Out of this, 58,184 km. is asphalted, 21,495 km road length consists of
macadam surface, and 75,867 km consists of mud roads.
Development of rural roads and their maintenance has been the responsibility of Zilla
Panchayats since 1987. Technical supervision of the roads at the state level, which was with
the Public Works Department till the end of 1999, has been transferred to the Rural
Development and Panchayat Raj Department from 01.01.2000. Improvement of roads and
their maintenance is being taken up under Pradhan Mantri Grama Sadak Yojane, Mukya
Mantri Grammena Rasthe Abhivriddhi Yojane (CMGSY) and RIDF Schemes.
12. Abdul Nazeer Sab State Institute of Rural Development
Abdul Nazeer Sab State Institute of Rural Development was established in 1989 to
impart training and capacity building aimed at strengthening the Panchayat Raj institutions.
To accomplish this institute aims at empowering elected representatives of the Panchayat Raj
Institutions in administration and implementation of various schemes by enhancing their
capabilities and competence. It also endeavors to impart training to people who are in charge
of Rural Governance by providing those necessary training vis-a-vis various issues involved
in proper implementation of the various schemes.
13. Mahathama Gandhi Regional Rural Energy & Development Institute
(MGIRED), Jakkur
Promotion of sustainable sources of rural renewable energy, ground water
conservation, rain water harvesting, environmental protection and creation of environmental
awareness is the main motto of the Institute along with campaigning of developmental aspect
with respect to the vision of the Institute.
14. Karnataka State Biogas Development Board
Karnataka State Bio Fuel Development Board was started in 2010-11 with the
responsibility of Planning and executing the schemes related to the development of Bio Fuels.
Along with this, to meet the energy demand of rural people. The development of renewable
energy in the state is the responsibility of the board. In this connection, centrally sponsored
Rural Energy Programme is implemented. The demand of domestic fuel is met through
centrally sponsored National Bio Gas Manure and Management Programme.
*****
Rural Development & Panchayat Raj Department Annual Report 2013-14
9
2. ADMINISTRATIVE DIVISION
There are 30 Zilla Panchayats, 176 Taluk Panchayats and 5629 Grama Panchayats in
the State. In order to enable these Panchayat Raj Institutions to function more independently,
necessary Notifications under administrative decentralization of powers, have been issued
and accordingly the Panchayat Raj Institutions are implementing various developmental
programmes. Besides, the following department / institutions are functioning under the Rural
Development and Panchayat Raj Department:-
1) Rural Development Commissionerate.
2) Panchayat Raj Engineering Department,
3) Karnataka State Rural Livelihood Promotion Society (established under National
Rural Livelihood Mission)
4) Karnataka Rural Water Supply and Sanitation Agency,
5) Karnataka Rural Infrastructure Development Limited.
6) Karnataka Rural Roads Development Authority,
7) Abdul Nazir Sab State Institute of Rural Development,
8) Mahatma Gandhi Institute of Rural Energy and Development,
9) Karnataka Bio-fuel Board
Additional Chief Secretary to Government, Rural Development and Panchayat Raj
Department is the Head of the Department and is overall in-charge of implementation of all
the schemes and service matters of officers / staff, formulation of policy matters and also
supervising the entire activities of the Department. Further, the Secretary to Government
(Panchayat Raj) is dealing with implementation of Karnataka Panchayat Raj Act, 1993, and
all matters connected therewith. The works allocated to the Additional Chief Secretary to
Government and the Secretary to Government (Panchayat Raj), Rural Development and
Panchayat Raj Department are as under.
Additional Chief Secretary to Government
1) Cadre Management and Service matters pertaining to all Group-A and B Officers
and Group-C officials belonging to Development Commissioner‟s Establishment.
2) Swarna Jayanti Gram Swarozgar Yojane (SGSY).
3) Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGA)
4) Karnataka Rural Infrastructure Development Ltd., (KRIDL)
5) Karnataka Rural Water Supply & Sanitation Agency.(KRWSSA)
6) Plan, Monitoring & Information
7) Suvarna Gramodaya
8) 13th
Finance Commission Grants, RIDF & Karnataka Vikasa which are looked after
by the Director, Panchayat Raj.
Rural Development & Panchayat Raj Department Annual Report 2013-14
10
9) Abdul Nazir Sab State Institute of Rural Development, Mysore.
10) Karnataka Rural Roads Development Authority (KRRDA)
11) Panchayat Raj Engineering Department. (PRED)
12) National Rural Livelihood Mission (NRLM)
13) Pradhan Mantri Gram Sadak Yojane (PMGSY)
14) Western Ghats Development Programme(WGDP)
15) Nirmal Bharat Abhiyan (NBA)
16) e-Governance
17) Publication of Monthly Magazine Karnataka Vikasa
18) Right to Information Act.
19) Internal Financial Matters.
20) Legislative Assembly / Council
a) Public Accounts Committee
b) Assurance Committee
c) Petition Committee
d) Privilege Committee
e) SC/ST Welfare Committee.
Secretary to Government (Panchayat Raj)
1) Subjects relating to Panchayat Raj State Election Commission, Backward Regions
Grant Fund (BRGF), Rajiv Gandhi Panchayat Empowerment Abhiyan (RGPSA),
Rastriya Grama Swaraj Yojane (RGSY), Panchayat Mahila Evam Yuvashakthi
Abhiyana (PMEYSA),
2) Service matters of Panchayat Development Officer, Grama Panchayat Secretary
Grade-I & II and Second Division Accounts Assistant.
3) Abdul Nazir Sab State Institute of Rural Development, Mysore.
4) Rural Energy Programmes.
5) Bio Energy Development Board.
6) Mahatma Gandhi Institute of Rural Energy and Development.
7) e-Governance
8) Right to Information Act.
9) Implementation of Dr. Nanjundappa Report.
10) Internal Financial matters.
11) Legislative Assembly / Council
a) Committee on Panchayat Raj Institutions and Local bodies.
b) Sub-ordinate Legislation Committee
Rural Development & Panchayat Raj Department Annual Report 2013-14
11
c) Privilege Committee
d) Petition Committee
e) Assurance Committee
f) Backward Classes and Minorities Welfare Committee
g) Women and Child Welfare Committee.
h) Committee on Papers to be laid on the Table of the House.
During the current year, the State Government has established a Commissionerate for
Rural Development for dealing with matters relating to Mahatma Gandhi National Rural
Employment Guarantee (MGNREGA) Scheme. Necessary posts required for the said
Commissionerate have also been created. An officer belonging to All India Service cadre of
the rank of Secretary to Government has been posted as Commissioner, Rural Development.
Certain other posts under this Commissionerate like Additional Commissioner (Forest), Chief
Operating Officer, etc., have also been filled.
Organization Chart depicting the details of Officers working in the Department is
furnished in the next page.
Rural Development & Panchayat Raj Department Annual Report 2013-14
12
Rural Development & Panchayat Raj Department Annual Report 2013-14
13
Further, necessary posts required to implement various activities of the Department,
both at the Secretariat as well as field level, have been created. The details of posts
sanctioned, filled and vacant are furnished in Annexure 2.1 (A & B).
Out of the sanctioned posts, Deputy Secretary, Panchayat Raj, (Selection Grade),
Deputy Secretary, Panchayat Raj (Senior Grade), Executive Officer (Panchayat Raj) /
Assistant Secretary (Panchayat Raj), Assistant Director (Rural Development), Panchayat
Development Officer, Grama Panchayat Secretaries Grade-I and Grade-II and Second
Division Accounts Assistant are Government posts. However, as per the staffing pattern
indicated by the Government certain ministerial staff is appointed by the Zilla Panchayats.
Further, the Grama Panchayats are required to appoint certain staff like Bill Collectors /
Clerks etc., as prescribed by the Government with the prior approval of the Chief Executive
Officers of Zilla Panchayats. The ministerial and other staff appointed by the Zilla
Panchayats as well as Grama Panchayats are Local Body Employees.
Further during the current year, the Karnataka Public Service Commission has
forwarded a select list of 1328 Panchayat Development Officers and the issue of an
appointment order by the appointing authority i.e., Chief Executive Officers of Zilla
Panchayat is under way.
The following Recruitment Rules are in place for administrative management:-
1) Zilla Panchayats Cadre and Recruitment Rules, 1998
2) Karnataka General Service (Development Branch and Local Government Branch)
(Cadre and Recruitment) Rules 2008 and
3) Karnataka Panchayat Raj Engineering Services (Cadre and Recruitment) Rules
2008.
*****
Rural Development & Panchayat Raj Department Annual Report 2013-14
14
3. PANCHAYAT RAJ DIVISION
ORGANIZATIONAL STRUCTURE
Director
↓
↓ ↓
Under Secretary All Rural Local Bodies
↓
--------------------------------------------
↓ ↓
ZP,TP Section GP Section
↓ ↓
SO SO
↓ ↓
Sr. Asst/Asst. Sr. Asst/Asst
↓ ↓
Stenographer Stenographer
↓ ↓
Jr. Asst. Jr. Asst.
↓ ↓
Typist Typist
↓ ↓
Driver Dalayat
↓
Dalayat
Elections to Panchayath Raj Institutions and Members
Karnataka Panchayath Raj Act 1993 came into effect from 10-05-1993, 3 tiers of
Panchayath Raj viz., Zilla Panchayath, Taluk Panchayath and Grama Panchayaths work
accordingly. A total number of 5629 Grama Panchayaths, 176 Taluks and 30 Districts are in
existence. Elections are held once in 5 years to the Panchayath Raj Institutions. The last
elections to the Zilla and Taluk Panchayaths were held during December 2010 and to the
Grama Panchayaths during May 2010.
The total number of elected Members in Grama Panchayaths are 90635 of which
39020 are Women Members, 16863 are SC Members, 9842 ST Members and 30091 belong
to Backward Class and 33869 belong to General Category.
The total number of elected Members in Taluk Panchayaths are 3659 of which 2018
are Women Members, 381 are SC Members, 239 ST Members and 750 belong to Backward
Class and 1888 belong to General Category.
Rural Development & Panchayat Raj Department Annual Report 2013-14
15
The total number of Elected Members in Zilla panchayaths are 1013 of which 539 are
Women Members, 100 are SC Members, 53 ST Members and 225 belong to Backward Class
and 516 belong to General Category.
Schemes implemented under Panchayath Raj Division
1) 13th
Finance Commission Grants to Local Bodies
2) Statutory Grants
3) Backward Regions Grant Fund
4) Untied Grants of Rs.200.00 lakhs to Zilla Panchayath
5) Untied Grants of Rs.100.00 laksh to Taluk Panchayath
6) Empowerment of Elected Women Representative (UN Women Project)
13th
FINANCE COMMISSION GRANTS
A five year tenure starting from 2010-11 to 2014-15 had been recommended by 13th
Finance Commission. The said grants are released in 2 installments annually. It is released in
ratio of 10:20:70 (ZP:TP:GP) to all the Panchayat Raj Institutions. Budgetory Allocation is
as follows:
General Basic Grants: (Budgetary Allocation)
2515-00-196-6-10 Rs.66.47 Crores
2515-00-197-6-10 Rs.134.71 Crores
2515-00-198-6-10 Rs.471.48 Crores
General Performance Grants: (Budgetary Allocation)
2515-00-196-6-09. Rs. 67.35 Crores
2515-00-197-6-09 Rs.132.95 Crores
2515-00-198-6-09 Rs.465.34 Crores
Government of India has released Rs.688.96 Crores General Basic Grants and Rs.
660.16 Crores towards General Basic Grants.
Guidelines have been issued on 27th June 2013 and Panchayats have been instructed
to prepare Action Plan accordingly.
The highlights of the guidelines are as follows:
i) To enhance the standard of the rural people by providing safe drinking water,
sanitation health, women and children welfare, nutrition and developmental works.
ii) Funds can be utilized for purchase of furniture, sports equipment, laboratory
equipment of Schools & Anganwadis.
Rural Development & Panchayat Raj Department Annual Report 2013-14
16
iii) Works not exceeding 20% of the funds may be utilized for modernization and
building of roads.
iv) Preference may be given for long term sustainable infrastructure.
v) Under drinking water scheme, modernization and maintenance, protection of sources
of drinking water and prioritise programme of sanitation.
DETAILS OF GRANTS RELEASED
(Rs. in lakhs)
Year Particulars
of FC Grant
Amount
Received by
the State
Government
Amount Transferred to the various tiers
of PRIs (with %)
District
Panchayat
(10%)
Block
Panchayat
(20%)
Village
Panchayat
(70%)
2013-14
General
Performance
Grants
68895.00 6889.50 13779.00 48226.50
2013-14
General
Basic Grants 66016.00 6601.60 13203.20 46211.20
Total 134911.00 13491.10 26982.20 94437.70
The said grants are to be released to the Panchayat Raj Institutions by Electronic
Transfer within 5 days on receipt from the State Huzur Treasury. These grants are released
online to the State PRIs through State Bank of Mysore, G-Seva Branch and Axis Bank,
M.G.Road Branch, Bangalore.
BACKWARD REGIONS GRANT FUND (BRGF)
In order to remove regional imbalances, Government of India has identified areas and
provided financial support through a scheme called Backward Region Grant Fund. Guidelines
have been issued and the main objectives of this scheme are:
Remove barriers to growth and reduce the imbalances
Accelerates the development process through gap filling and improve quality of life
of the people
In Karnataka, it is being implemented in six districts i.e. Gulbarga, Yadgiri, Bidar,
Chitradurga, Raichur and Davanagere. The tenure of the programme is for 5 years and the
total allocation is Rs. 55,000.00 lakhs i.e. annually Rs.11,000.00 lakhs. Presently, it is being
continued in the 12th
Five year plan with an outlay of Rs. 59500.00 lakhs.
Rural Development & Panchayat Raj Department Annual Report 2013-14
17
Backward Region Grants Funds for the year 2013-14
First installment of 2013-14 for Davanagere, Bidar, Chitradurga and Yadgir, districts
has been released.
Follow-up action report and UCs of Raichur and Gulbarga has been dispatched to
Government of India.
Rs.7100.00 lakhs have been released during the year 2013-14.
Capacity Building and Training (ANSSIRD):
For the year 2013-14, Action Plan for Capacity Building and Training along with all
the necessary documents will be submitted to Government of India shortly.
Rajeev Gandhi Panchayat Sashaktikaran Abhiyan (RGPSA)
The Ministry of Panchayath Raj, has launched new Scheme namely Rajeev Gandhi
Panchayat Sashaktikaran Abhiyan (RGPSA) during the year 2012-13 for strengthening of
Panchayats. Some present schemes being implemented by GOI namely e-Panchayat,
Panchayat Empowerment Accountaility Incentive Scheme, Panchayat Mahila Evam Yuva
Shakti Abhiyan, Capacity Building Component (BRGF) will be resumed under RGPSA. The
scheme is being implemented during the 12th
Five Year Plan.
Releases for the year 2013-14
Rs.300.00 lakhs has been released to 600 Gram Panchayats (Rs.50,000/- per GP)
which have less own source revenue.
Present status of the Scheme (2013-14)
Action Plan for the State was approved by the Government of India during the
3rd
CEC meeting. Government of India had released an amount of Rs.25.55 crores as its
share of 1st installment. The State in turn has released its share of Rs.6.38 crores. Totally an
amount of Rs.32.00 crores is released for the following activities listed below.
1. Rs.1.25 crores has been provided for the construction, renovation and repairs of 418
GPs.
2. Rs.3.00 crores were released for Panchayat Processes to 600 Grama Panchayats
(Rs.50,000/- per GP) with inadequate resource base.
3. An amount of Rs.64.27 crores which includes Rs.3.00 lakhs pertaining to the year
2012-13 has been provided for IEC activities to all the GPs of the State.
4. Rs.9.51 crores has been provided for Capacity Building and Training.
5. Rs.30.00 lakhs has been provided for the construction of GP Buildings to the newly
created Gram Panchayats of Jalalpur and Gandhinagar.
Rural Development & Panchayat Raj Department Annual Report 2013-14
18
Untied Grants of Rs.200.00 lakhs to Zilla Panchayath (Development Grants)
Under the Head of Account 2515-00-196-1-22 (Plan) Untied Grants of Rs.6000.00
lakhs have been provided. Accordingly each Zilla Panchayath will be entitled for Rs. 200.00
lakhs, a sum of Rs. 6000.00 lakhs has been fully released to the PRIs during the year
2013-14. These funds are to be utilized for the developmental works in the Zilla Panchayaths.
Untied Grants of Rs.100.00 lakhs to Taluk Panchayath
Under the Head of Account 2515-00-197-1-07 (Plan) Untied Grants of Rs. 17600.00
lakhs had been provided. Accordingly each Taluk Panchayath will be entitled for Rs. 100.00
lakhs, so far a sum of Rs. 17600.00 lakhs has been fully released to the PRIs during the year
2013-14. These funds are to be utilized for the developmental works in the Taluk
Panchayaths.
Honorarium to Zilla, Taluk and Gram Panchayath Members
Honorarium paid to Zilla Panchayath Adhyaksha is Rs.3000/-, Upadhyaksha
Rs. 2250/- and to Members Rs.1500/-, Taluk Panchayath Adhyaksha Rs. 2250/-,
Upadhyaksha Rs.1500/- and Rs.750/- to each Member per month, Gram Panchayath
Adhyaksha is Rs.500/, Upadhyaksha Rs. 300/- and Rs.250/- to each Member per month.
Empowerment of Elected Women Representatives (UN Women Project)
Ministry of Panchayath Raj, Government of India, United Nations Women (UN
Women), New Delhi and Rural Development and Panchayath Raj Department, Government
of Karnataka had signed an MoU on 14th
Sep 2011. The project was launched in Mysore and
Dharwad Districts during April 2012 and in Uttara Kannada in March 2013.
The main aim of the agreement was to empower elected women representatives
socially, financially and also to enhance the leadership qualities. Elected Women
Representatives are encouraged to raise Women related issues in the Ward/ Mahila and
Grama Sabhas to overcome these problems.
Abdul Nazeer Sab State Institute for Rural Development, Mysore is the nodal agency
for the implementation of the Capacity Building Programme as per the Work Plan of the UN
Women Project. A special name “Sampoorana” has been given to the scheme in Karnataka.
Karnataka has also identified issues to be taken up under the programme:-
Sanitation and Health
Legal Advocacy
Environment
Livelihood
Rural Development & Panchayat Raj Department Annual Report 2013-14
19
District Project Officers have been appointed by UN women to facilitate effective
Grama Sabhas.
An amount of Rs. 83,51,800/- has been released to the State by UN Women, New
Delhi as per Work Plan. These funds have been released online in the ratio of 20:20:20 to the
respective Bank Accounts of Abdul Nazir Sab Institute of Rural Development Mysore, and to
Dharwad and Mysore Zilla Panchayats. Funds are yet to be released to Uttara Kannada Zilla
Panchayat by UN Women.
Committees/Commissions set up by the Department during year 2013-14
Sl.
No.
Committees/Co
mmissions set
up by the Dept
during year
2013-14
Objective of the
Committee/ Commission Tenure
Status of the Committee/
Commission
1. 1 High level expert
committee is constituted
for the review and to
suggest amendments to
the existing KPR Act
1993.
4
Months
3 teams have been formed to
visit other States for studying
the PR systems and connected
Rules and to submit the reports .
The said teams have visited
west Bengal and Maharashtra
and submitted the reports.
Committee is examining other
aspects through discussions.
2. 1 In accordance with the
budget speech of 2013-14.
The committee is formed
under the chairmanship of
Sri S.V.Ranganath,
Former Chief secretary of
Government of Karnataka
to give suggestion and
expertisation to the
Government for formation
of Rural Development
University.
4
months
This Committee was constituted
vide GO No. RDP 221 ZPS
2013, Dated: 26.11.2013 and
two meetings have been
convened. Sub-Committees have
been formed to tour other States
to study the working of
Panchayat Raj Institutions. The
Committee has been extended
for a period of 6 months
3. 1 Committee on payment of
electricity bills of Gram
Panchayat under the
chairmanship of Addl.
Chief Secretary to the
Government.
6 months Preliminary meeting has taken
place.
4. 1 Service matter of Gram
Panchayat staff under the
chairmanship of Addl.
Secretary to Rural
Development and
Panchayat Raj
Department.
3 months First meeting has taken place.
Rural Development & Panchayat Raj Department Annual Report 2013-14
20
Achievement in Human Resource maintenance / Administrative Activities
Details of the Officers / Staff Worked during 2013-14
Sl.No. Classification No. of Officers / Staff Male Female SC ST
1. A 2 2 - - -
2. B 2 1 1 - -
3. C 8 7 1 2 -
4. D 2 - 2 1 1
Details of Questions from Vidhana Sabha/ Vidhana Parishad
Vidhana Sabha
Questions
Vidhana Parishad
Questions
Answers to Call
Attention Notes
To be answered
during next session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Vidhana
Sabha
Vidhana
Parishad
98 98 61 61 20 20 - -
Number of cases in Courts or Tribunals
Being agitated by the Dept. Against the Dept.
ZP – 02 (High Court)
GP- 02 (High Court)
GP- 07 (KAT)
Right to Information Act, 2005
Total No. of
Applications
recd.
Answered
within
timeline
Amount
Charged for
application +
Amount
Charged for
Copies
provided
Solved Applications after
Appeal
Penalty
Charged
(Amount in
Rs.)
No. of
Applications
solved by
Appealing
Authority
No. of
Applications
solved by
Right to
information
Commission
256 256 2560 - - -
* * * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
21
3.3 ABDUL NAZEER SAB STATE INSTITUTE OF RURAL DEVELOPMENT
Objectives of the Institute, Vision and set Goals
Abdul Nazeer Sab State Institute of Rural Development was established in 1989 to
impart training and capacity building aimed at strengthening the Panchayat Raj institutions.
To accomplish this, the institute aims at empowering elected representatives of the Panchayat
Raj institutions in administration and implementation of various schemes by enhancing their
capabilities and competence. It also endeavours to impart training to people who are in
charge of Rural Governance by providing them necessary training vis-a-vis various issues
involved in proper implementation of the various schemes. The main objectives of the
institute includes
Conduct of training for elected representatives of the Panchayat Raj Institutions,
officers at various levels and staff working in the PRIs.
Conduct of workshops, seminars and symposia pertaining to rural development and
Panchayat Raj.
Conduct research and provide inputs to Government on various aspects of Rural
Development including policy initiatives.
Engage in field level studies in coordination with reputed organisations viz., World
Bank and other such organisations.
Organise meetings and give suggestions in formulating various people friendly
programmes and their implementation.
Initiate necessary steps to provide opportunities for proper utilisation of the
infrastructural facilities available at the institute to Government
departments/organisations and voluntary organisations to conduct their programmes.
Administrative Set up of the Institute
The Institute is administered by a Management Committee which has been constituted
under the chairmanship of the Additional Chief Secretary to Government. This committee is
empowered to take decisions about administration and training issues and to give guidance.
The constitution of the Committee is as follows :
Additional Chief Secretary - Chairperson
Members
Additional Chief Secretary to Government – Rural Development and Panchayat Raj
Department
Principal Secretary to Government - Revenue Department
Principal Secretary to Government - Finance Department
Principal Secretary to Government - Urban Development Department
Principal Secretary to Government - Education Department
Rural Development & Panchayat Raj Department Annual Report 2013-14
22
Principal Secretary to Government - Department of Personnel and Administrative
Reforms Department
Joint Secretary (Training), Government of India
Director General, NIRD, Hyderabad
Director, Institute of Social and Economic change, Bangalore
Deputy Secretary to Government, Department of Personnel and Administrative
Reforms
Director General, Administrative Institute-Member Secretary
Director, ANSSIRD - Invitee
Director General, Administrative Training Institute is also the Director General of this
Institute under whose guidance, the Director, faculty, consultants and staff of the institute
carry on the administration, training activities. The administrative set up of the institute is as
follows:
Administrative Chart
DEPUTY DIRECTOR ACADEMIC STAFF:
o Faculty (Agriculture) -1
o Faculty (Finance) -1
o Faculty (Decentralization
& Planning) -1
o Faculty (DWCRA) -1
o Faculty (SATCOM) -1
o Faculty (Rural Social
o Service) -1
o Faculty (SHG & SGSY) -1
o Faculty (Engineering) -1
o Faculty (Panchayat Raj &
o Decentralisation) -1
DIRECTOR GENERAL
ATI (ANS SIRD)
OFFICE STAFF:
Audit Officer -1
Superintendents - 3
Cine Operator - 1
Librarian - 1
First Division Assistants - 3
Second Division Assistants - 4
Assistant Librarian - 1
Stenographers - 4
Typists - 3
Drivers - 3
„D‟ Group -20
Cooks - 2
Assistant Cooks - 2
TECHNICAL STAFF:
Senior Prgrammer - 1
Producer A - 2
Assistant Producer - 2
Social Researcher – A - 1
Social Researcher – B - 1
Research Assistant - 1
Scientific Assistant – A
Library - 1
Assistant Engineer - 1
Junior Engineer - 4
Programme Assistant - 1
Production Assistant A - 1
Cameraman – A - 2
Trade man – D (Elcl) - 1
Tape Librarian - 1
Helper – A - 1
Light man - 2
Telephone Operator - 1
DIRECTOR
Rural Development & Panchayat Raj Department Annual Report 2013-14
23
Infrastructure Facilities Available
The institute has one administrative block and one hostel building. The administrative
block is well equipped with seminar hall, computer centre, Studio to conduct Satcom training.
SATCOM Studio
The Institute is well equipped with an audio-visual SATCOM studio which was
constructed with the technical assistance of the Department of Space, Government of
India and ISRO at a cost of around Rs. 427.00 lakhs. It has an Earth Station as well as
an extended INSAT 3-B C Band Modulator with one–way video and two-way audio
facilities. Of the 176 taluks in the state, except Bangalore East taluk, receiving centres
have been established in all the Taluk Panchayats. The Institute is carrying on its
programmes successfully making use of this facility and also extending this facility to
several departments of the Government and institutions to conduct their training
programmes at a prescribed fee.
GRANTS RECEIVED FROM CENTRAL AND STATE GOVERNMENTS,
DETAILS OF FINANCIAL AND PHYSICAL PROGRESS
1. Name of the Project Strengthening District Plans
2. Head of Account Grants : 2515-00-102-0-08 (Plan)
3. If under Plan, share of the Centre
and the State
50 : 50
4. Objective For Administrative and training purpose of the
Institute.
5. Fund (Rs. in Lakhs) 2011-12 - 209.30
2012-13 - 230.22
2013-14 - 267.64
6. Expenditure (Rs in Lakhs) 2011-12 - 209.30
2012-13 - 230.22
2013-14 - 267.64
Rural Development & Panchayat Raj Department Annual Report 2013-14
24
Details of Grant under Backward Region Grant
1. Name of the Project B R G F
2. Head of Account 2575-02-800-0-01-059 (Plan)
3. If under Plan, share of the Centre and
the State
75 : 25
4. Objective To conduct capacity building training for
elected representatives and officers regarding
the various schemes implemented in backward
districts.
5. Fund (Rs. in Lakhs) 2011-12 – 372.00
2012-13 - -
2013-14 - -
6. Expenditure (Rs. in Lakhs) 2011-12 - 125.140
2012-13 - 28.577
2013-14 - 419.32
(Funds during 2013-14 was not released
however balance of 2012-13 is being utilised)
Progress Report of the B.R.G.F. Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n O
ffic
ers
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-face
Training 66 1155 581 - 1736 413 111 506 706 392
Satellite-
based
Training
09 1827 - 22265 24092 5920 3756 8356 6060 9410
12-13
Face-to-face
Training 13 130 240 0 370 70 44 70 186 240
Satellite-
based
Training
2 1792 0 365 2157 396 227 652 882 364
13-14
Face-to-face
Training 492 1791 1453 10332 13576 34198 1953 4439 3765 5307
Satellite-
based
Training
01 1133 0 0 1133 186 88 350 509 133
Rural Development & Panchayat Raj Department Annual Report 2013-14
25
Details of Grant under Gram Swaraj
1. Name of the Project Gram Swaraj
2. Head of Account 2515-00-101-0-80 (Plan)
3. If under Plan, share of the Centre and
the State
World Bank Sponsored Project
4. Objective Imparting Training with regard to programmes
formulated for the development of most
backward districts identified in the state.
5. Fund (Rs. in Lakhs) 2011-12 - 400.00
2012-13 - -
2013-14 - 100.00
6. Expenditure (Rs. in Lakhs) 2011-12 - 149.39
2012-13 - 68.398
2013-14 - 382.98
(Funds during 2012-13 was not released
however balance of 2011-12 is being utilised)
Progress Report of the Gram Swaraj Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n O
ffic
ers
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
40 1877 117 59 2053 293 93 609 1058 233
Satellite-
based
Training
02 12212 - 3975 16187 2743 1015 5439 6990 3647
12-13
Face-to-
face
Training
215 5722 74 22 5818 1168 562 2120 1968 325
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-
face
Training
31 442 43 379 864 178 73 244 369 456
Satellite-
based
Training
- - - - - - - - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
26
Details of Grant under Mahatma Gandhi National Rural Employment
Guarantee Scheme
1. Name of the Project MGNREGS
2. Head of Account Through On line
3. If under Plan, share of the Centre
and the State
90 : 10
4. Objective To train Elected Representatives and officers
regarding providing job to each family of
unskilled labourers in rural areas for at least 100
days per annum.
5. Fund (Rs. in Lakhs) 2011-12 - 459.00
2012-13 - -
2013-14 - 194.00
6. Expenditure (Rs. in Lakhs) 2011-12 - 138.652
2012-13 - 203.711
2013-14 - 195.63
Progress Report of the MGNREGA Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n
Off
icer
s
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
39 751 421 168 1340 257 96 458 529 308
Satellite-
based
Training
01 - 195 - 195 34 16 81 64 43
12-13
Face-to-
face
Training
40 852 290 0 1142 179 80 293 590 107
Satellite-
based
Training
27 4881 0 54815 59696 12468 7282 19645 20301 24030
13-14
Face-to-
face
Training
73 2122 80 0 2202 391 110 772 928 362
Satellite-
based
Training
03 20355 0 64535 84890 17244 9309 23568 34769 31132
Rural Development & Panchayat Raj Department Annual Report 2013-14
27
Details of Grant under Swarna Jayanthi Gram Swarojgar
Yojana / NRLM Scheme
1. Name of the Project Swarna Jayanthi Gram Swarojgar Yojana / NRLM
2. If under Plan, share of the Centre
and the State
100% central share
3. Objective The Basic Objective of the SGSY/NRLM is to
bring the assisted Poor Families above Poverty
line by Providing them income Generating assets
through a mix of Bank Credit and Governmental
Subsidy.
4. Fund (Rs. in lakhs) 2011-12 - 43.00
2012-13 -
2013-14 -
5. Expenditure (Rs.in lakhs) 2011-12 - 21.327
2012-13 - 8.205
2013-14 - 11.78
(Funds Released during 2011-12 is being utilised
in 2012-13, 2013-14)
Progress Report of the S.G.S.Y/N.R.L.M Training Programmes
Year Details
No.
of
Pro
gra
mm
es
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
han
Off
icer
s
Ele
cted
Rep
rese
nta
tives
Tota
l
Sch
edu
led
Cast
es
Sch
edu
led
Tri
bes
Oth
er B
ack
ward
Cla
sses
Gen
eral
Wom
en
11-12
Face-to-face
Training 10 121 277 - 398 89 25 112 172 240
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-face
Training 16 11 537 0 548 111 67 188 182 526
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-face
Training 16 119 412 0 525 116 30 212 167 167
Satellite-
based
Training
- - - - - - - - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
28
Details of Grant under UN Women Project
1. Name of the Project UN Women Project
2. If under Plan, share of the Centre
and the State
100% central share
3. Objective The programme aims to Empower Elected Women
Representatives (EWRs) in local Governments to
make public policy and resource allocations
responsive to women‟s human rights in the selected
districts.
4. Fund (Rs. in Lakhs) 2011-12 – 30.613
2012-13 - 28.690
2013-14 - -
5. Expenditure (Rs. in Lakhs) 2011-12 – 0.730
2012-13 - 15.506
2013-14 - 6.41
Progress Report of the UN-Women Project Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n
Off
icer
s
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
03 25 34 46 105 20 04 33 48 80
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-
face
Training
42 88 127 950 1165 239 217 406 303 1080
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-
face
Training
08 56 22 183 261 57 22 103 79 216
Satellite-
based
Training
- - - - - - - - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
29
Details of Grant under Rajiv Gandhi Panchayat Shashaktikarana Abhiyan
1. Name of the Project Rajiv Gandhi Panchayat Shashaktikarana Abhiyan
2. If under Plan, share of the Centre
and the State
100% central share
3. Objective Gram Panchayt members Training
4. Fund (Rs. in lakhs) 2011-12 - -
2012-13 - -
2013-14 - 952.377
5. Expenditure (Rs.in lakhs) 2011-12 - -
2012-13 - -
2013-14 - 363.04
Progress Report of the RGPSA Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n O
ffic
ers
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-
face
Training
125 5124 285 95 5504 1011 240 2776 1477 1607
Satellite-
based
Training
15 9223 0 32263 41486 8285 4167 15102 13932 16548
Rural Development & Panchayat Raj Department Annual Report 2013-14
30
2013-14 Training Programme Details
Conducting Trainings/ Workshops / Research Activities of schemes implementing by
the state and central Government is the administrative activity of this institution. The
workshops conducted in this regard in the year 2013-14 are listed below.
Progress Report of the under Drinking Water (ZP Fund) Training Programmes
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n
Off
icer
s
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-face
Training - - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-face
Training 7 105 27 2 134 24 2 27 81 7
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-face
Training 28 397 39 0 436 82 27 95 232 33
Satellite-
based
Training
- - - - - - - - - -
Progress Report of the Training Programmes under Recurrent Grant
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n
Off
icer
s
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-face
Training 15 429 16 0 445 79 15 94 257 69
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-face
Training 15 296 13 19 328 42 5 80 201 31
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-face
Training 4 9 0 73 82 20 10 20 32 75
Satellite-
based
Training
- - - - - - - - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
31
Progress Report of the Training Programmes under Prime Minister‟s Gram Sadak Yojana
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n O
ffic
ers
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
01 23 - - 23 05 - 03 15 -
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
Progress Report of the Training Programmes under Rajiv Gandhi Chaitanya Yojana
Year Details
No
. o
f P
rog
ram
mes
con
du
cted
Trainees Participated
Off
icer
s
Oth
er t
ha
n O
ffic
ers
Ele
cted
Rep
rese
nta
tiv
es
To
tal
Sch
edu
led
Ca
stes
Sch
edu
led
Tri
bes
Oth
er B
ack
wa
rd
Cla
sses
Gen
era
l
Wo
men
11-12
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
12-13
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
- - - - - - - - - -
13-14
Face-to-
face
Training
- - - - - - - - - -
Satellite-
based
Training
30 - 140528 - 140528 19806 6466 21884 92372 45068
Rural Development & Panchayat Raj Department Annual Report 2013-14
32
The Institute has initiated steps to obtain feedback report in order to understand
whether the objectives of the training have been fulfilled effectively from to those who have
undergone training and processes of implementation.
ACTION TAKEN FOR EFFECTIVE IMPLEMENTATION OF THE SCHEME
DETAILS ABOUT THE EVALUATION STUDY, REPORT AND ACTION TAKEN
Change Management Courses have been taken up during 2013-14 in order to ensure
effective implementation of programmes and encourage officials. The focus is on Stress
Management, Attitudinal Change and improving Service Delivery to ensure increased
efficiency of officers. Further, Foundation Course has also been organised for the newly
recruited Government staff and officials.
The Evaluation of number of programmes have been done by reputed institutions viz.
KSCST, MIDS, Chennai, CBPS, Bangalore and also other NGOs like Bhagirath, Mysore.
The Evaluation reports help in improving the quality of the training programme and make
suitable changes in the programmes. The Government programmes are reaching out to the
community through effective training provided by the Institute. Institute is acting as a link
between the Government and the Community and by adopting innovative methods and
practices is assisting in rural development in the State.
MANAGEMENT OF HUMAN RESOURCES AND ACHIEVEMENT IN
ADMINISTRATIVE ACTIVITIES
The posts in the cadre of Faculty, clerical and Superintendents as sanctioned by
Government for the administrative and training purpose are filled up on deputation from
different departments of Government. The assistants to Faculty are working on outsource
basis.
The details of teaching, clerical and superintendent cadre employees serving on
deputation are as follows :
Achievement in Human Resource maintenance / Administrative Activities
Details of Officers/Staffs worked during the year 2013-14
Sl.No Category No. of
Officers/Staffs Men Women S.C. S.T.
1 A 08 06 02 - -
2 B 03 03 - - -
3 C 14 08 07 02 01
4 D 14 12 02 04 -
Total 39 29 10 6 1
Rural Development & Panchayat Raj Department Annual Report 2013-14
33
Details of vacant posts and retired/to be retired employees during 2013-14
Sl.No Category Vacant posts Retired To be Retired
1 A 05
2 B 03
3 C 20 03
4 D 15
Total 43 03
Details of Outsourcing – Employees working on contract basis under various schemes
during the year 2013-14
Sl.No Post Number
1 Core Faculty 05
2 Consultants/ Co-ordinators 01
3 Senior Programmer 01
4 MGNREGS Training Co-ordinators 02
5 Project Managers 02
6 Research Assistants 05
7 Course Assistants 01
8 Office Assistants 05
9 Computer Assistant 01
10 Data Entry Operators 03
11 D Group 11
12 D Group (Cook) 1
13 Driver 01
14 Security Staff 09
15 Garden Section out sourced Employees 15
Total 63
Details of Officers/Staff trained during 2013-14
Sl.No. Category State Training
Programmes
Out of the State
Training Programmes
Foreign Training
Programmes
1 A 30 20 02
2 B - - -
3 C - 05 -
4 D - - -
5
Project Managers /
Training coordinators/
Senior Programmer
04 03 -
Rural Development & Panchayat Raj Department Annual Report 2013-14
34
Details of Awards received during the year 2013-14
The institute has secured First price in Dussera Flower show 2013-14 in the following
categories
1. Decorative Garden
2. Lawn ornamental Flub
3. Rock Garden
4. Flower Check
Details of Administrative Supervision taken up during 2013-14
Since the satellite-based training programmes are telecast through taluk and district
centres, the faculty and officers have done periodical supervision in those taluk and district
centres to supervise attendance of the participants and redressal of local problems.
Right to Information Act 2005
Tota
l N
o. of
Ap
pli
cati
on
s re
ceiv
ed
Ap
pli
cati
on
s d
isp
ose
d
wit
hin
th
e p
resc
rib
ed
tim
e
Application Fee
Received + Amount
received to get the
copies of documents
Applications disposed after the
appeal
Fine
( in
Rs.)
Applications
disposed by
the Appellant
Authority
No. of cases
decided by
RI
Commission
12 12 120/- + 278/- (for
additional
information)
- - -
Departmental Enquiries and Disciplinary Actions taken :
No disciplinary action has been taken against any of the faculty/officer/staff working
in this Institute.
Audit Report :
The Accountant General Audit and Accounts was taken up to 2011-12 during
2012-13.
* * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
35
3.4 Gram Swaraj Yojane
Gram Swaraj - is a Panchayath Strengthening Project being implemented by
Government of Karnataka through Rural Development & Panchayat Raj Department. The
project commissioned from the Financial year 2006-07, implemented in 39 most backward
taluks of the state. The project period is five years with its size of 600 crores.
The objective of the project is to improve earlier conditions and standard of living of
people in Gram Panchayats of the Taluks under the perview of the scheme
The Objectives of the Gram Swaraj Project are as follows:
Management of public resources and providing services as per priorities. To achieve the
objectives, the following programmes were taken up.
1. Capacity building of Gram Panchayats, Taluk Panchayats and Zilla Panchayats.
2. Guiding on mobilization of own source and improvement in execution.
3. Provide formula-based Block grants to 1341 GPs in the 39 „Most Backward
Talukas‟.
4. Revamp financial management and procurement system.
5. Improve the effectiveness of service delivery across a range of services that
have devolved on them under the Karnataka Panchayath Raj Act, 1993
Organization of the Scheme:
Project Office has been established at Bangalore to implement the Gram Swaraj
Project systematically. Project office is headed by the Chief. Additional Chief – Operation,
Additional Chief – Finance, Project Officer (Env.) Panchayath Facilitation Experts,
Procurement Officer, Executive Assistants and computer programme officers are assisting the
chief while implementing the project.
The project sub unit was established at Gulbarga to monitor the scheme in the project
taluks of Northern Karnataka. This Office is headed by Panchayat Facilitation Expert.
Implementation :
Gram Swaraj-Karnataka Panchayat Strengthening Project working under Rural
Development and Panchjayat Raj Department and the project is strictly adheres and follows
Karnataka Panchayath Raj Act 1993 at every stage. Under this project, the training
programmes are imparted to elected representatives of Panchayat Raj Institutions.
Rural Development & Panchayat Raj Department Annual Report 2013-14
36
Financial and Physical Progress Report of the Scheme
( Rs. in Crores )
Financial
Year
Financial Progress Physical Progress
Target Achievement Target Achievement
2013-14 45.19 18.14 3133 2670
District wise details are enclosed in the Annexure 3.4 (A) & 3.4 (B)
Observations from inspections / audit done analysis of performance:
Statutory audit is being done by the Local Audit Circles at the gram panchayath level
related to Gram Swaraj Accounts and also Chartered Accountant services have been obtained
by this office to Internal and External audit of the project.
Evaluation during the year and the study reports received in the last three years:
The baseline Study on Gram Swaraj – Panchayath Strengthening Project, was carried
out by SRI-IMRB, New Delhi and submitted the final Report and accepted.
A Review of the Gram Swaraj Project in Koppal District Karnataka: some policy
perspectives by J.N.Chaube has been completed. As per the agreement total Rs.5.50 lakhs
has been paid.
Research study of the project has been done by the Abdul Nazirsab State Institute for
Rural Development, Mysore.
Empirical Impact Evaluation Study on the Gram Swaraj – Strengthening Project has
been entrusted to CMSR organisation, Hyderabad, and submitted the final study report.
Achievement in Human Resource maintenance / Administrative Activities
Details of Officers / Staff worked during 2013-14
Sl.No Group No. of Officers / Staff Male Female SC ST
1 A 05 05 - - -
2 B - - - - -
3 C 02 01 01 - -
4 D - - - - -
Total 07 06 01 - -
Details of Vacant Posts and retired / to be retired during the year 2013-14
Sl. No Category Vacant of Posts Retired To be retired
1 A 10 02 -
2 B - - -
3 C 19 01 -
4 D 03 0 -
Total 32 03 -
Rural Development & Panchayat Raj Department Annual Report 2013-14
37
Details of the outsourced Persons
Sl.No. Post Number
1 Project Accounts Officer 01
2 Account‟s Officer 0
3 Programme Officer 02
4 Executive Assistants 06
5 Planning Officer (Information) 03
6 Panchayat Facilitation Expert 02
7 Research Assistants 02
8 Computer Programmer 01
9 Accountants 0
10 Data Entry Operators 0
11 Group „D‟ 05
Total 22
Details of Officer / Staff taken up Training during the year 2013-14
Sl.
No Category
State Training
Programme
Out of State
Training
Programmes
Foreign Training
Programmes
1 A 01 03 -
2 B - - -
3 C - - -
4 D - - -
Total 01 03 -
Administrative inspections taken up during the year – 2013-14
Officers from the project are visiting the taluks and reviewing the progress Gram
Panchayat wise.
Details Legislative Assembly (L.A.) / Legislative Council (L.C.) Questions attended
L A Questions L. C. Questions Answer to Call
attention
Questions to be
answered in the next
session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Legislative
Assembly
Legislative
Council
06 06 07 07 - - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
38
Administrative inspections by District and State level official during last year and
reporting year, nature of observation done. No. of officials / staff against whom
punitiative action taken:
Routine inspections were taken up and suggested for corrections.
Right to Information - 2005:
Applications
received
Answered in
time
Fee received
for Forms +
Amount
received to
give copies
of records
Applications decided after
Higher Requisition
Penalty (In
Rupees)
No. of Cases
decided
from the
Higher
Requisition
authority
No. of Cases
decided
from the RI
Commission
09 08 90 - - -
* Pending application was disposed in April 2014.
* * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
39
4. MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE SCHEME – KARNATAKA
Objectives of the Scheme:
The primary objective of the scheme is to provide livelihood security to the
households of the rural area by providing not less than 100 days of guaranteed wage
employment in every financial year to every house hold whose adult members volunteer to do
unskilled and manual work. In this backdrop, Central Government in association with State
Governments MGNREGA is being implemented in all the districts of the state since 2006-07
in phased manner.
In order to streamline and implement the scheme successfully certain points are to be
kept in view especially for smooth functioning with pro-active by PRI functionaries. Wages
are to be paid within a week or not beyond 15 days as per the wage rate notified under the
scheme. Equal wages for both men and women are to be paid. No gender discrimination in
the disbursal of wages.
It is mandatory to maintain the wage material ratio of 60:40 under the scheme. Wage
portion is fully borne by Government of India. With regard to material portion, Central and
State Government are to be shared in the order of 75 % and 25 % respectively & overall
funding to be shared between GoI and GoK is nearly in the ratio of 90 :10
100 days of wage employment to be provided to every rural house hold in a financial
year. Employment to be provided within 15 days from the date of demand through
application by the wage seekers / labourers or otherwise they are eligible for unemployment
allowance. The scheme enacted under the ACT is quite contrast to the erstwhile wage
employment programmes. In case wages are not paid in time to the labourers and delayed,
compensatory allowance has to be paid for the delayed period.
During the current year, implementation of the scheme has been extended to involve
line departments to implement their departmental schemes with MGNREGS through
convergence for which provision has been made under guidelines by GOI. As per this
provision, in addition to the PRIs, nine line department viz Forest, Horticulture, Agriculture,
Watershed, Sericulture, Animal husbandry, Fisheries, Minor irrigation and Panchayat Raj
Engineering Departments have been declared as implementing agencies on 23.10.2013 vide
Govt order no. RDP.186.EGS 2012. All the declared line departments are actively
participating in MGNREGS programme. There is a scope for increasing the physical &
financial progress by way of participation by line departments.
During the presentation of the budget for the year 2013-14, fifteen programmes
have been announced for implementation under MGNREGS. Accordingly Government
orders have been issued, as for as MGNREGS is concerned. Action is taken to commence the
implementation. The progress of the respective programmes is under various stages.
Besides payment of wages through e-FMS, action is being taken to pay the material bill
amount directly to the accounts of the vendor‟s / suppliers from 2013-14 onwards. Paying
wage and material cost through e FMS would indeed increase in transparency and
Rural Development & Panchayat Raj Department Annual Report 2013-14
40
maintaining the accountability. Besides this, it is also contemplated to make payment of
administrative expenses through e-FMS this year (2013-14).
Following are the works to be taken up:-
During 2013-14, all the prioritized works are extended to 16 categories as per the
revised guidelines issued by GOI in the 4th
edition and GOI subsequently during the current
year have effected certain changes in the schedule-I & schedule –II of the Act through
amendment. According to this, all the 16 categories of works are classified & amalgamated
into 4 categories along with inclusion of new works proposed for implementation and
notified during the current year. Details are enumerated below.
I. Category: A: PUBLIC WORKS RELATING TO NATURAL RESOURCES
MANAGEMENT
1. Water conservation and water harvesting structures to augment and improve
groundwater like underground dykes, earthen dams, stop dams, check dams with
special focus on recharging ground water including drinking water sources;
2. Watershed management works such as contour trenches, terracing, contour bunds,
boulder checks, gabion structures and spring shed development resulting in a
comprehensive treatment of a watershed;
3. Micro and minor irrigation works and creation, renovation and maintenance of
irrigation canals and drains;
4. Renovation of traditional water bodies including desilting of irrigation tanks and other
water bodies;
5. Afforestation, tree plantation and horticulture in common and forest lands, road
margins, canal bunds, tank foreshores and coastal belts duly providing right to
usufruct to the households covered in Paragraph 5; and
6. Land development works in common land.
II. Category B: INDIVIDUAL ASSETS FOR VULNERABLE SECTIONS (ONLY FOR
HOUSEHOLDS IN PARAGRAPH 5)
1. Improving productivity of lands of households specified in Paragraph 5 through land
development and by providing suitable infrastructure for irrigation including dug
wells, farm ponds and other water harvesting structures;
2. Improving livelihoods through horticulture, sericulture, plantation, and farm forestry;
3. Development of fallow or waste lands of households defined in Paragraph 5 to bring it
under cultivation;
4. Unskilled wage component in construction of houses sanctioned under the Indira
Awaas Yojana or such other State or Central Government Scheme;
5. Creating infrastructure for promotion of livestock such as, poultry shelter, goat
shelter, piggery shelter, cattle shelter and fodder troughs for cattle; and
Rural Development & Panchayat Raj Department Annual Report 2013-14
41
6. Creating infrastructure for promotion of fisheries such as, fish drying yards, storage
facilities, and promotion of fisheries in seasonal water bodies on public land;
III. Category C: COMMON INFRASTRUCTURE FOR NRLM COMPLIANT SELF
HELP GROUPS
1. Works for promoting agricultural productivity by creating durable infrastructure
required for bio-fertilizers and post-harvest facilities including pucca storage facilities
for agricultural produce; and
2. Common work-sheds for livelihood activities of self-help groups.
IV. Category D: RURAL INFRASTRUCTURE:
1. Rural sanitation related works, such as, individual household latrines, school toilet
units, Anganwadi toilets either independently or in convergence with schemes of
other Government Departments to achieve „open defecation free status. And solid and
liquid waste management as per prescribed norms
2. Providing all-weather rural road connectivity to unconnected villages and to connect
identified rural production centres to the existing pucca road network; and
construction of pucca internal roads or streets including side drains and culverts
within a village;
3. Construction of play fields;
4. Works for improving disaster preparedness or restoration of roads and other essential
public infrastructure including flood control and protection works, providing drainage
in water logged areas, deepening and repairing of flood channels, chaur renovation,
construction of storm water drains for coastal protection;
5. Construction of buildings for Gram Panchayats, women self-help groups‟ federations,
cyclone shelters, Anganwadi centres, village haats and crematoria at the village or
block level.
6. Construction of Food Grain Storage Structures for implementing the provisions of
The National Food Security Act 2013 (20 of 2013);
7. Production of building material required for construction works under the Act as a
part of the estimate of such construction works.
8. Maintenance of rural public assets created under the Act; and
9. Any other work which may be notified by the Central Government in consultation
with the State Government in this regard.(2) The order of priority of works shall be
determined by each Gram Panchayat in the meetings of the Gram Sabha keeping in
view potential of the local area, its needs, local resources and in accordance with the
provisions of Paragraph 9.
Works which are non-tangible, not measurable, repetitive such as, removing grass,
pebbles, agricultural operations, shall not be taken up.
Rural Development & Panchayat Raj Department Annual Report 2013-14
42
Works creating individual assets shall be 42 prioritized on land or homestead owned
by households belonging to the:
(a) Scheduled Castes
(b) Scheduled Tribes
(c) Nomadic tribes
(d) denotified tribes
(e) other families below the poverty line
(f) women-headed households
(g) physically handicapped headed households
(h) beneficiaries of land reforms
(i) the beneficiaries under the Indira Awaas Yojana
(j) beneficiaries under the Scheduled Tribes and Other Traditional Forest
(k) Dwellers (Recognition of Forest Rights) Act, 2006 (2 of 2007), and
and after exhausting the eligible beneficiaries under the above categories, on lands of the
small or marginal farmers as defined in the Agriculture Debt Waiver and Debt Relief
Scheme, 2008 subject to the condition that such households shall have a job card with at
least one member willing to work on the project undertaken on their land or homestead.
SL No Year Wage rate fixed (in Rs)
1 2006-07 69.00
2 2007-08 74.00
3 2008-09 82.00
4 2009-10 82.00
5 2010-11 100.00
6 2011-12 125.00
7 2012-13 155.00
8 2013-14 174.00
9 2014-15 (w.e.f 01.04.2014) 191.00
For the financial year 2013-14 Government of India has approved labour budget of
Rs. 213303.00 lakhs and at different stages Government of India and State Government have
released the funds has follows :
(Rs. in lakhs)
1 Central Government 159606.81
2 State Government 26503.00
3 Opening Balance 32042.77
4 Others 1136.51
Total 219289.09
Rural Development & Panchayat Raj Department Annual Report 2013-14
43
Administrative Structure for implementation and Monitoring of the MGNREGS Karnataka at State Level
(Organogram)
Chief Operating Officer, Rural
Development Commissionerate Director (Quality Monitoring,
Complaints, IEC, &
Vigilance)
Commissioner, Rural Development
Rural Development Commissionerate,
RD&PR Department
State Employment Governing Council (Chairman: Hon. Minister for Rural Development & Panchayath Raj, GOK)
(Vice Chairman- Development Commissioner & Additional Chief Secretary, GOK)
Karnataka Rural Employment Guarantee Fund
Executive Committee & Governing Council
Chairman: Addl. Chief Secretary, Rural Development & Panchayath Raj Department, GOK
Chief Financial Adviser Joint Director (Administration)
Joint Director (Technical) Joint Director (Horticulture)
Director (Social Audit) Directorate of Social Audit
State Level Line Departments
5
1) Forest 5) Sericulture
2) Agriculture 6) Water Shed (Jalanayana)
3) Horticulture 7) Minor Irrigation
4) Fisheries 8) Animal Husbandary
9) PRED
Rural Development Commissionerate
Accounts Officers Audit Officers Assistant Directors Account Superintendent Office Superintendent First Division Assistant Stenographer Drivers
Special Commissioner
(Forest)
Rural Development & Panchayat Raj Department Annual Report 2013-14
44
MGNREGA Financial Progress as on 31-03-2014 (Rs. in lakhs)
Sl.
No Financial Year
Opening
balance Total Releases
Total Available
Funds Expenditure
1 2006-07 (5 districts) 7849.00 26284.00 34133.00 25190.00
2 2007-08 (11 districts) 12463.00 29406.00 41925.00 23669.00
3 2008-09 23565.00 42337.00 66777.00 35787.00
4 2009-10 35342.00 266079.71 303889.00 221693.00
5 2010-11 82187.00 208507.75 295641.00 186047.28
6 2011-12 109593.00 82162.49 195568.00 164099.00
7 2012-13 31468.39 143792.63 179691.31 147648.54
8 2013-14 ( as on
31.3.2014) 32042.77 186109.81 *219289.09 209522.00
* Miscellaneous receipt of Rs 1136.51.00 lakhs is included in total available fund at the state level.
District wise Financial Progress as on 31-03-2014 (Rs. in lakhs)
Sl
No Districts
Opening
Balance
Misc.
Receipts
Total
Releases
Total
Available
funds
Expenditure
1 BAGALKOTE 217.45 8424.65 0.00 8642.10 8256.76
2 BANGALORE 415.57 289.70 3.41 708.68 319.34
3 BANGALORE RURAL 67.74 3823.90 0.45 3892.09 3860.05
4 BELGAUM 1092.05 8779.90 33.32 9905.27 8955.09
5 BELLARY 260.94 4196.35 1.34 4458.63 4142.56
6 BIDAR 636.19 5998.25 6.38 6640.82 6142.11
7 BIJAPUR 630.60 9887.05 0.00 10517.65 10105.35
8 CHAMARAJA NAGARA 130.66 4439.80 6.49 4576.95 4478.97
9 CHIKKABALLAPURA 475.02 2368.65 5.03 2848.70 2428.99
10 CHIKMAGALUR 340.51 2779.30 14.25 3134.06 3013.11
11 CHITRADURGA 894.49 17860.55 13.56 18768.60 18565.81
12 DAKSHINA KANNADA 72.78 1899.05 6.60 1978.43 1854.85
13 DAVANAGERE 1450.66 18320.10 6.87 19777.63 19757.90
14 DHARWAR 148.93 7468.05 3.25 7620.23 7294.87
15 GADAG 96.16 3906.10 65.11 4067.37 4023.31
16 GULBARGA 2165.08 13371.60 0.79 15537.47 14451.99
17 HASSAN 203.47 6594.10 85.96 6883.53 6526.58
18 HAVERI 659.88 6699.40 11.96 7371.24 7180.97
Rural Development & Panchayat Raj Department Annual Report 2013-14
45
Sl
No Districts
Opening
Balance
Misc.
Receipts
Total
Releases
Total
Available
funds
Expenditure
19 KODAGU 108.92 1453.30 9.13 1571.35 1475.46
20 KOLAR 802.02 8712.80 45.25 9560.07 9326.12
21 KOPPAL 1158.37 6160.30 5.68 7324.35 6642.91
22 MANDYA 126.64 4616.80 3.67 4747.11 4697.02
23 MYSORE 408.59 4012.45 32.07 4453.11 4211.13
24 RAICHUR 633.94 8957.60 2.70 9594.24 9237.53
25 RAMANAGARA 348.51 6067.70 0.00 6416.21 6125.00
26 SHIMOGA 160.24 6233.40 73.90 6467.54 6198.75
27 TUMKUR 486.14 16635.20 15.96 17137.30 17141.21
28 UDUPI 400.26 281.10 16.45 697.81 438.02
29 UTTARA KANNADA 3.78 2640.60 9.74 2654.12 2627.97
30 YADAGIR 1506.24 8931.95 3.74 10441.93 9394.70
Total 16101.83 201809.7 483.06 218394.59 208874.87
(Tech cell, ANSIRD, Social Audit) ----- 16342.83* 653.45 894.45** 647.34
State fund 15940.94$ ---
--- ---
Grand Total 32042.77 218152.53 1136.51 219289.04 209522.21
* Amount released to Tech. cell, ANSSIRD and Social Audit
** Rs.894.45 Lakhs including Rs.653.45 lakhs Misc receipts and Rs.241 lakhs balance with State fund.
*** As Per MIS
$ Opening Balance of Rs.15940.94 Lakhs under state fund is included in the released amount
MGNREGA Physical Progress as on 31-03-2014
(Rs. in lakhs)
Sl.
No
Financial
Year
Cumulative No.
of Households
issued job cards
Cumulative
No. of
Households
Demanded
Employment
Cumulative
No. of
Households
Provided
Employment
Cumulative No.
of Person days
generated in
lakhs
Cumulative No.
of Households
completed 100
days of
employment
1 2010-11 5301760 2416064 2366290 1099.82 132179
2 2011-12 5571697 1664074 1652095 699.20 45111
3 2012-13 5392825 1470744 1467510 627.41 108473
4 2013-14 5726876 1909049 1449649 718.41 117657
Rural Development & Panchayat Raj Department Annual Report 2013-14
46
District wise Physical Progress as on 31-03-2014
Sl No Districts
Cumulative
No. of
Households
issued job
cards
Cumulative
No. of
Household
Demanded
employment
Cumulative
No. of
Household
provided
employment
Cumulative
No. of
persondays
generated
Cumulative
No. of
Household
completed
100 days of
employment
1 BAGALKOTE 213031 65025 58108 3196485 7560
2 BANGALORE 53484 6511 6060 144202 31
3 BANGALORE (R) 84089 25569 22970 1382748 2790
4 BELGAUM 543992 97547 79128 3497676 3210
5 BELLARY 211822 41343 32369 1582328 1771
6 BIDAR 198601 48787 37713 1888237 2616
7 BIJAPUR 264634 87700 55984 2774035 3281
8
CHAMARAJA
NAGARA 130339 40603 35357 1704249 2800
9 CHIKKABALLAPURA 148391 50351 29742 1151546 1115
10 CHIKMAGALUR 131762 40559 36913 1319358 699
11 CHITRADURGA 261549 131390 74323 4578537 7783
12
DAKSHINA
KANNADA 73520 21218 19919 794134 828
13 DAVANAGERE 257013 120084 96122 5680951 13287
14 DHARWAR 128534 54328 38503 1852186 3647
15 GADAG 111809 54790 36856 1758579 2628
16 GULBARGA 313212 104665 70684 4456736 6386
17 HASSAN 222416 69790 54658 2405274 2372
18 HAVERI 180067 54417 38103 1807155 2382
19 KODAGU 64960 13727 11587 539028 519
20 KOLAR 199190 67404 58947 3128070 6970
21 KOPPAL 220252 72723 50433 2597792 4887
22 MANDYA 189402 63801 55705 2124784 3081
23 MYSORE 199758 52218 43170 1765069 2527
24 RAICHUR 267265 80817 57451 3281969 4507
25 RAMANAGARA 158812 61504 44410 2318561 4020
26 SHIMOGA 180487 104217 89476 2627425 1829
27 TUMKUR 315856 141372 112592 6846744 18833
28 UDUPI 41868 8742 8304 220095 119
29 UTTARA KANNADA 144497 47334 42904 1318233 899
30 YADAGIR 216264 80513 51158 3099462 4280
Total 5726876 1909049 1449649 71841648 117657
Rural Development & Panchayat Raj Department Annual Report 2013-14
47
A photo of construction of cattle pond under this project.
The following steps have been taken to intensify the implementation of the scheme.
Administrative sanction: Estimated cost within 10.00 lakhs GP‟s can accord approval,
the cost of the estimate exceeding 10.00 lakhs and within 30.00 lakhs Executive
Officer TP can accord approval & the cost exceeding Rs. 30.00 lakhs CEO ZP can
accord approval.
Technical sanction: GP and Hobli level officers are permitted to accord technical
approval up to Rs. 1.00 lakh and Taluk level officers are permitted to accord
technical approval for the amount exceeding 1.00 lakh and upto 10.00 lakhs, district
level officers for the amount exceeding 10.00 lakhs can accord technical approval.
For proper and speedy implementation of the scheme by the line departments,
simplified directions have been issued.
Provision has been made to appoint mates to get the attendance at every work place.
Provision has been made to get 25% discount in the work out put to the physically
challenged persons and elder labourers who attained the age of 60 years and above.
Provision has been made to get extra 10% of wage towards travelling charges to the
physically challenged persons.
Use of eNMRs have been made mandatory in the work execution.
Trainings have been conducted to the Executive Officers and District Programme
Officers at Divisional level and trainings conducted to the district / taluka Presidents
at Abdul Nazir Sab State Institute of Rural Development, Mysore.
Rural Development & Panchayat Raj Department Annual Report 2013-14
48
Instructions have been issued to all the DPCs to take up more no of labourintensive
works in the drought affected areas / block declared by the State Govt. to implement
them to provide employment to the rural households by generating persondays.
NREG (Grievance Redressal) Act, 2009 has been published.
Ombudsman are working in 25 districts and for the rest of districts the process of
appointment to the post of ombudsman is under process. However in charge
arrangements are made in these districts.
Appellate authority to appeal on the orders of ombudsman has been established.
To carry out social audit of MGNREGS works, separate directorate has been created.
Through eFMS payment of wages to the labourers & material payment to the venders
/ suppliers are being done to their respective accounts by transfer of funds from the
state fund. With this, middlemen role, parking of funds & delayed payment can be
prevented and thus transparency can be maintained.
During 2013-14 as many as 106191 works have been completed and 790935 works
are in different stages of progress. Most of these works have been inspected by State
/District /Taluk Level Officers. Action has been taken against those officers/elected
representatives for violating the guidelines. The action taken details are as follows-
Departmental Enquiry 33
Departmental Enquiry and Criminal case register 32
Under suspension 170
Departmental enquiry when one is under suspension 3
Suspension and criminal case registered 71
Suspension, Criminal case registered and departmental enquiry ordered 0
Suspension revoked 50
Suspension revoked and Departmental enquiry conducted 137
Suspension revoked and criminal case launched 16
Suspension revoked, criminal case launched and DE ordered 7
Criminal case launched 93
Dismissed from service 3
Departmental Enquiry completed by ordering fine 56
Departmental enquiry completed as the charges are not proved 13
Different stages of enquiry 23
Rural Development & Panchayat Raj Department Annual Report 2013-14
49
Details of Studies conducted under MGNREGS
Sl.
No. Name of the Institution Name of the Study
Cost
(Rs. in
lakhs)
Stage
1
Pragna Research And
Consultancy Services,
Hyderabad
Status of Women in
Karnataka 5.00
Final report
submitted to RDPR
and report accepted.
2
Hyderabad Karnataka
Centre for Advance
Learning Gulbarga
Hyderabad Karnataka
Regional imbalance – Study
and role of NREGA in
improving Rural
Infrastructure with
particular emphasis on
water and soil conservation.
5.00
-- do --
3
Center for Budget and
Policy Studies
Bangalore -04
Short study of land
development 2012 under
MGNREGA
4.90
-- do --
4 Center for Budget and
Policy Studies
Bangalore -04
Short study of financial
inclusion under
MGNREGA
4.90 -- do --
Human Resources and Achievement in Administrative Activities
Details of Officers/Staff worked during the year 2013-14
Sl.
No. Category No. of Officers/Staff Male Female SC ST
1 A 6 4 2 - -
2 B 5 3 2 1 -
3 C 6 4 2 - -
4 D - - - - -
Total 17 11 6 1 -
Details of Vacant post and retired/To be Retired Staff during the year 2013-14
Sl.No. Category Vacant Retired To be Retired
1 A 4 - 1
2 B 1 - -
3 C 9 1 -
4 D 0 - -
Total 14 1 1
Rural Development & Panchayat Raj Department Annual Report 2013-14
50
Details of employees working on outsource
Sl.No. Post Nos.
1 Data entry operators 12
2 Group-D 9
3 Driver 3
4 Programe Managers/Consultants/Executive Asst./ programme
executives 2+1+6+1
Total 34
Training Details
Trained
Govt. Officers/Officials
Elected
Representatives Representatives of
Non-Governmental
Organization
Total
Dist Taluk GP Zp TP GP
526 6648 7245 1136 2136 57980 93141 168812
Details of Legislative Assembly/ Legislative Council / Call Attentions answered
Legislative Assembly
Questions
Legislative Council
Questions
Answer to Call
Attentions
Questions to be answered
in the next Session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Legislative
Assembly
Legislative
Council
51 51 28 28 18 18 0 0
Right to Information Act -2005
Applications
received
Answered in
time
Fee received
for Forms +
Amount
received to
give copies
of records
Applications decided after
Higher Requisition
Penalty
(in Rupees)
No. of Cases
decided
from the
Higher
Requisition
authority
No. of Cases
decided
from the RI
Commission
163 163 1275.00 - - -
Rural Development & Panchayat Raj Department Annual Report 2013-14
51
Formation of committees and Decision taken:-
a) Karnataka State Employment Guarantee Council has 34 members and implements,
monitors, supervises, and evaluate the works taken up under MGNREGS. (During the
reporting period meeting was held on 12.02.2013 and on 03-10-2013).
b) Karnataka State Employment Guarantee (Grievance Redressal) has 7 members and
they take care of disposal of complaints and its supervision.
c) There are five members in Executive Committee and they look after the funds
Management.
d) There are 16 members in Rural Employment Guarantee Fund Governing Council. It
controls and supervises Funds Management. The last meeting was held on 01-07-
2013.
* * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
52
5. Rural Infrastructure Facilities – I
5.1 Rural Communication
The development of Rural roads and its Monitoring activities in the State has been
under the jurisdiction of Public Works Department till the end of 1999. From 1-1-2000
onwards, the development of these roads, technical supervision, and monitoring functional
responsibilities were transferred to Rural Development and Panchayat Raj Department.
Rural road connectivity leads to socio-economic development of rural people.
Improvement of rural roads will have direct bearing in improving the conditions of rural
people. It has not been possible to improve rural roads since many years. The rural roads are
being improved / maintained under various schemes, viz, Pradhana Mantri Gram Sadak
Yojane, NABARD, Rural Communication, 13th Finance Commission Grant, and Mukhya
Mantri Grameena Raste Abhivruddi Yojane etc.,
The details of Rural roads in Karnataka are as follows:
Sl.No. Description Road Length
(in KMs)
(As on 31-3-2012)
Road Length
(in KMs)
(As on 31-3-2013)
1 Asphalted Roads 47854.00 58184.00
2 WBM Road 25716.00 21495.00
3 Mud Roads 73642.00 75867.00
Total 147212.00 155546.00
NABARD :
RIDF Nabard-15
Under RIDF-15 series, out of 277 approved Roads & Bridge works 273 works were
completed and four works detained for the period ending March,2014.
RIDF Nabard-16
Government has administratively approved 404 Road & Bridge works under RIDF-16
series. Out of 404 Roads & Bridge works, 355 works are completed for the period
ending March, 2014. Remaining 39 works are under progress. 10 works were
dropped.
RIDF Nabard-17
Government has administratively approved 599 Road & Bridge works for Rs.204.645
crores under RIDF-17 series. Out of 599 works, 314 works were completed for the
period ending March,2014. Remaining 274 works are under progress and 11 works
dropped.
Rural Development & Panchayat Raj Department Annual Report 2013-14
53
RIDF Nabard-18
Government has administratively approved 199 Roads with and estimated cost of
Rs.73.30 Crs & 2 Bridges works for Rs.0.65 Crs. under RIDF-18 series. In this Road
works, improvement of 325.27 kms road length and 2 Bridge works with an
estimated cost of Rs.65.00 lakhs were taken up. Works are under progress.
RIDF Nabard-19
Government has administratively approved 355 Roads & Bridges works for
Rs.114.75 crores under RIDF-19 series. In addtion to this, proposal under RIDF-19
submitted to Finance Dept.,for 61 works for an amount of Rs.44.00 crores. Out of
this administrative approval is given for 36 works at an amount of Rs.26.20 crores.
3054-CMGSY:
Under Mukhya Mantri Gramina Raste Abhivruddi Yojane (Head of Account-3054) a
sum of Rs.149.70 crores have been provided in the annual budget for 2013-14. Out of this,
146.37 crores have been released and 7318 Kms of roads are maintained with an
expenditure of Rs.146.37 crores by the end of March, 2014.
Districtwise details are enclosed in Annexure 5.1 (A)
13th
Finance Commission Grant :
Rural Roads are maintained under 13th
Finance Commission Grants. During 2013-14
maintenance grants of Rs.125.40 crores has been provided and released based on Road
length. 6270 Kms are maintained with an expenditure of Rs.125.40 crores by the end of
March, 2014.
Districtwise details are enclosed in Annexure 5.1 (B)
* * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
54
5.2 KARNATAKA RURAL ROAD DEVELOPMENTAGENCY
MAIN OBJECTIVES :-
To provide all weather connectivity to the rural habitations as per the design standards
and to maintain the same to the required standards for their overall social and economic
development.
ACTIVITIES:-
1. Construction of all weather quality Roads adopting appropriate technology and
locally available materials with the technical support of reputed technical
institutions.
2. Improvement of roads by utilising the available funds and the road will be
completed within the stipulated period.
3. Imparting technical training to the departmental engineers and contractors for
updating the latest developments in Construction methods of rural roads.
4. Maintaining the developed roads in good condition.
5. To maintain high quality in construction and give proper response to complaints
received by the public.
6. Maintaining transparency in administration and execution.
Pradhana Manthri Gram Sadak Yojana-I
Empowered committee held on 05-12-2013 at MORD has accorded approval for the
following
1. To provide connectivity to 12 Left Out Habitation in general areas for a length of
43.86 km with an estimated cost of Rs. 18.58 crore
2. To provide connectivity under DDP areas for left out 16 habitations covering a length
48.38 km at a cost of Rs 21.71 crores
3. 38 Missing bridges at the cost of Rs. 34.49 crores
Pradhana Manthri Gram Sadak Yojana-II
1. Up gradation of 315 number of roads covering a length of 2246.23km at an estimated
cost of Rs. 1031.16 crores
2. 12 Long span Bridges at a cost of Rs.13.43 crores
Tender activity are under progress for the said works.
Rural Development & Panchayat Raj Department Annual Report 2013-14
55
Progress achieved under Pradhana Manthri Gram Sadak Yojana
(Rs. in Crores)
Opening
Balance
Central
Grant
State
Grant
Total Financial
Progress
Physical Progress
in Kms
150.997 - 42.41 193.407 55.98 211.43
District wise details are enclosed in Annexure 5.2(A)
Namma Grama Namma Rastha Yojana
Improvement of rural road of 10,000km under NGNR 50km per Constituency is being
taken up in two phases as per PMGSY guide lines.
Phase-I
Improvements of rural roads is taken up for a length of 3714.65km at an estimated
cost of Rs. 1066.75 crores in 189 Rural constituencies at 20 km per constituency. 3455.25 km
length of road is completed incurring an expenditure of Rs. 1055.07 crores upto end of March
2014. The balance length of 114.59 km will be completed by the end of June 2014.
Phase-II
Improvement of rural roads is taken up during 2013-14 for a length of 5728 km at an
estimated cost of Rs. 2413.86 crores in 189 Rural constituencies at 30km per constituency.
2269.84 km length of road is completed incurring an expenditure of Rs. 956.03 crores upto
end of March 2014. Works are under different stage of progress and the works will be
completed by the end of December- 2014.
Name of Work : “£ÀªÀÄä UÁæªÀÄ £ÀªÀÄä gÀ ÉÛ AiÉÆÃd£É ºÀAvÀ-II” Package No: KS 26-06, W26-182-09
Anjaru to T-06 Road in Udupi Taluk & Dist. & Package No: KS 26-06, W26-182-11
Harikhandige to Udupara Kambala Road in Udupi Taluk & Dist.
Rural Development & Panchayat Raj Department Annual Report 2013-14
56
Progress Achieved under Namma Grama Namma Rasthe
(Rs. in crores)
Opening
Balance
Central
Grant State Grant Total
Financial
Progress
Physical Progress
in Kms
360.00 - 845.75 1205.75 1143.95 2492.09
District wise details are given in Annexure 5.2(B)
Achievement in Administrative Activities and Human Resource Management
Details of Officers/staff worked during the year 2013-14
Sl.No Class No. of Officers/
Staff
Male Female S.C. S.T.
1. A 115 113 2 11 4
2. B 399 387 12 40 7
3. C 425 390 35 29 8
4. D 156 146 10 13 11
Total 1095 1036 59 93 30
Details of Vacant posts, Retired/To be retired during the year 2013-14
Sl.No Class Vacant Position Retired To be Retired
1 A 3 1 5
2 B 98 2 2
3 C 147 - 6
4 D 12 - -
Total 260 3 13
Details of Employees taken from outsourcing during the year 2013-14
Sl.No Post Total
1 Personal Assistant -
2 Group D 117
3 Drivers 07
4 Project/field engineers 17
5 Others(Data Entry Operators) 110
6 System administrator 2
Total 253
Rural Development & Panchayat Raj Department Annual Report 2013-14
57
Details of Officers attending the Training programme during the year 2013-14
Sl.No Class Training
program in
State
Training
program outside
state
Training
program outside
the country
1 A 13 24 -
2 B 119 19 -
3 C 23 - -
4 D - - -
Total 155 43 -
Details of Legislative Assembly/Council/Call Attention answered during the
year 2013-14
LA Question LC Question Call Attention Notice Replies to be given in
Next Session
Total
Received
Replied Total
Received
Replied Total
Received
Replied Total
Received
Replied
116 116 25 25 06 06 - -
Right to Information Act
Received
Applications
Replied within
stipulated
period
Fee collected for
the copy of the
Documents (Rs)
Applications Settled after appealing
to Higher Authorities
Penalty
levied
Settled by
Appealing
Authority
Settled by Right to
Information
Commission
78 78 2028 - - -
Audit Report: 2013- 14 financial year concluded on 31st March. Details will be submitted
after obtaining Annual Audit Report .
* * * * *
5.3 Karnataka Rural Infrastructure Development Limited
HISTORY
The Karnataka Land Army Corporation Limited was established as an undertaking of
the Government of Karnataka on 9th
August 1974. The Directors of the company felt that the
name of the company was not representing the activity it is carrying out and hence with the
approval of the Ministry of Corporate Affairs and the shareholders and Government of
Karnataka, the name of the Company was changed from Karnataka Land Army Corporation
Limited (KLAC) to Karnataka Rural Infrastructure Development Limited (KRIDL) with
effect from 06-08-2009. Except the name of the Company all other terms of constitution of
the Company remain unchanged.
Rural Development & Panchayat Raj Department Annual Report 2013-14
58
The Company was started by Government of Karnataka with an authorized share
capital of Rs.1.00 crore and subscribed capital of Rs.25.00 Lakhs. With a staff of 15
Engineers to undertake Civil construction of tanks, irrigation works, low cost housing, roads,
culverts and buildings etc. in rural areas employing rural youth. KRIDL (KLAC) was a
unique experiment, the kind of which not ventured anywhere earlier in the country. With hard
and dedicated work of all those involved in the formative years, the Organization has grown
from strength to strength to make the experiment a grand success and today with an annual
turnover of more than Rs.1000.00 crores with a staff around 1000 including nearly 360 highly
dedicated and Qualified Civil Engineers handling Civil works all over the state and outside
the state also. The Government of Karnataka in the year 2006 has further invested Rs.12.00
crores as share capital and thus as on date the share capital of the Company is Rs.12.25 crores
and the authorized share capital is Rs.15.00 crores.
The Company is headed by a Managing Director and is under the administrative
control of Rural Development and Panchayat Raj Department. The activities of KRIDL are
controlled and managed by the Board of Directors nominated by the State Government. The
Head Quarters is situated at “Grameenabhivruddhi Bhavana” 4th
& 5th
Floor, Ananda Rao
Circle, Bangalore-560 009 and presently there are 06 Zones, 34 Divisions and 80 Sub-
divisions functioning all over the state. Main objective of the Organization is to undertake
Developmental works in Rural areas including employment oriented works entrusted by the
state Government Departments, Public Sector undertakings, statutory Boards and Local Self
Government under various schemes and programmes.
The works are executed directly at Government (PWD) Scheduled Rates avoiding
middlemen (contractors). The Organization has built infrastructure in order to take up any
kind of work of any magnitude anywhere in the State, and is declared as a Designated
Agency of the State Government for the purpose of departmental execution of works.
The company has achieved a ever highest turnover of Rs.1362.84 crore (provisional)
crore during the financial year 2013-14. The company has achieved a net profit of Rs.65.00
crore (provisional) after providing for Income tax. The company is making every efforts
relentlessly to increase the turnover by approaching different Government Departments to get
entrustment works.
ASSETS OF THE COMPANY
The Company‟s net worth has increased 41.70% over past year from Rs.155.84 crore
to Rs.220.84 crore (Provisional) during the year 2013-14.
OBJECTIVES
a) Execution of Rural Development projects concentrating on Labour oriented works, so
that rural unemployed and under employed youth are provided with adequate
employment opportunities to improve their skill and economic conditions.
Rural Development & Panchayat Raj Department Annual Report 2013-14
59
b) To undertake all rural development Civil works directly supervised and executing
departmentally by eliminating middlemen, to avoid more premium and exploitation of
the rural poor, thereby passing on the full worth of money to the people.
c) Help to build infrastructure, which is vital for development projects relating to
integrated Area Development. Water resources Development, Dairy, Fisheries, Minor
Irrigation, Rural Communication, Bridges, Roads Buildings, like Schools, Hospitals,
Houses, and soil conservation works are undertaken by KRIDL.
CURRENT PLANS
Under Transparency Act 1999-2000 KRIDL has got exemption from
01-04-2014 to 31-03-2015 for entrustment of work up to Rs.200.00 Lakhs on direct
entrustment. Due to transparency exemption the direct entrustment of works to KRIDL has
been increased and works of more than Rs.2006.00 Crore have been entrusted.
FUTURE OUTLOOK
Company expects better turnover and profitability due to sufficient entrustment of
works, because of exemption under section 4 (g) of KTPP Act, under various schemes of
RDPR and other departments like Social Welfare, Backward Classes and Minority,
Horticulture, Agriculture, Youth Services and Sports Departments, BBMP, BMRCL etc.,
Company needs similar support of Government at least for the next 4-5 years to face
competition and to consolidate its financial position. The Company is confident that it will
be in a position to meet the challenges of future through well defined objectives and
strategies to improve the overall performance and profitability in the coming years.
TARGET AND ACHIEVEMENT FOR THE YEAR 2013-14
(Rs. in Crores)
Sl.
No
Name of the Zone/Division Target fixed
(2013-14)
Progress achieved
during 2013-14
Percentage of
achievement v/s
Target
01 BANGALORE ZONE (Bangalore,
Kolar, Chickballapur, Tumkur)
120.00 132.64 110.53
02 BBMP ZONE (BBMP 1, 2, 3, Divisions), 450.00 509.69 113.26
03 MYSORE ZONE (Mandya, Hassan,
Madikeri, Mysore, Mangalore,
Chickmagalore, Chamarajnagar)
110.00 161.34 146.67
04 CHITRADURGA ZONE (Chitradurga,
Challakere, Davanagere, Bellary, Huvina
Hadagali, Shimoga)
170.00 157.20 92.47
05 BELGAUM ZONE (Bagalkote, Karwar,
Gokak, Belgaum, Chikkodi, Kittur,
Bijapur, Dharwad, Haveri)
200.00 220.39 110.19
06 GULBARGA ZONE (Bidar, Gulbarga,
Koppal, Raichur, Yadgir,
200.00 181.58 90.79
All Zones Total 1250.00 1362.84 109.02
Rural Development & Panchayat Raj Department Annual Report 2013-14
60
PERFORMANCE OF THE COMPANY
Details of progress achieved, Profit made for the last 05 years i.e., from the year
2009-2010 to 2013-14 (Provisional) are as under.
(Rs. in Lakhs)
Sl.No Financial Year Progress Profit/Loss after Taxes
1 2009-10 38005.00 (+) 1678.00
2 2010-11 60121.19 (+) 1661.00
3 2011-12 78897.56 (+) 3143.96
4 2012-13 105032.00 (+) 5130.18
5 2013-14
(Provisional)
136284.00 (+) 6500.00
HUMAN RESOURCES & DEVELOPMENT
Details of Officers/ Staff worked during 2013-14
Sl.No. Category No. of Officers/ Staff Male Female SC ST
01 A 139 136 03 29 7
02 B 184 167 17 20 2
03 C 428 393 35 44 13
04 D 214 190 24 45 15
TOTAL 965 886 79 138 37
Details of posts vacant posts/ retired/ to be retired during 2013-14
Sl. No. Category Post vacant Retired To be Retired
01 A 05 07 00
02 B 18 02 00
03 C 76 14 00
04 D 10 12 00
TOTAL 109 35 00
Rural Development & Panchayat Raj Department Annual Report 2013-14
61
Details of employees engaged on outsource during 2013-14
Sl.No. Post Numbers
01 Asst. Engineers/ Junior Engineers 134
02 Data Entry Operators, Office Assts. and Group „D' employees 244
03 Drivers 27
Total 405
Details of officers/ employees deputed for various training programme during 2013-14
Sl.No. Category Within State
Training Programme
Out of State Training
Programme
Foreign Training
Programme
01 A 107 06 --
02 B 24 01 --
03 C 35 05 --
04 D 00 00 --
Total 166 12 --
Details of Legislative Assembly/ Legislative Council / Call Attentions answered
Legislative Assembly
Question
Legislative Council
Questions
Answer to Call
Attentions
Questions to be
answered in the next
Session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
18 18 9 9 -- -- -- --
CONSULTANCY SERVICE
KRIDL has established Consultancy services, under the name “KLAC TECS”. During
the Financial Year 2006-07, (now KRIDL TECS) through this the company is extending
services in the field of Civil Engineering, with regards to the functional areas of services
which includes structural designs and Architectural designs, preparation of estimates, calling
tenders, Technical and Financial bid details and assisting for calling E-Tendering etc., The
company has so far earned Rs.853.02 lakh as consultancy charges since beginning of the
service.
QUALITY CONTROL
A system of compulsory inspection of works of Karnataka Rural Infrastructure
Development Limited by senior officers has been put into practice. As part of this, three
Chief Engineers and six Superintending Engineer are on compulsory monthly inspection to
monitor the works and related issues in respect of the districts attached to them. The third
Party Inspection for quality and quantity audit and by local Engineering Colleges and reputed
firms have been introduced. And also get verified through Executive Engineers,
Rural Development & Panchayat Raj Department Annual Report 2013-14
62
Superintending Engineers, and Chief Engineers on stratified samplings. By this a lot of
improvement is achieved regarding quality of works.
The Company continues to give emphasis on executing quality work and timely
completion of works the works are executed generally without Time and Cost overrun.
Quality and Reliability of services are identified as the key thrust area.
The Company has adopted three tier quality monitoring system for all the works of
the Government for which action has been taken to appoint State level Quality Monitoring
and District level Quality Monitoring all over the State for empanelment. Tenders have been
already invited for the purpose.
Ranga Mandira at Gulbarga, Zilla Panchayath building at Belgaum, houses for
displaced families of Metro, Bangalore and other works which are executed satisfactorily.
The Government of Karnataka has awarded the Chief Minister‟s “RATNA AWARD”
for the year 2011-12 for excellent performance.
IMPLEMENTATION OF OTHER DEVELOPMENTAL WORKS
RO plants for providing pure drinking water for 1000 villages in Phase-I at the cost of
Rs.5.33 lakh each have been taken up.
12 Nos., of Sri Rajeev Gandhi Panchayat Shasastrikaran Abhyan works have been
taken up at cost of Rs.100 lakh each.
Developmental works under Dr.Babu Jagajeevanram Lidker Scheme consisting 7
work costing Rs.235.14 lakhs have been taken up.
Veterinary Hospital at 23 places at a cost of Rs.26.46 lakh each all over the State have
been taken up.
Additional work to Hostel building for 273 hostels at a cost of Rs.91.55 crores and
repairs and renovations to hostel building at a cost of Rs.21.80 crores have been
entrusted.
19 works of Tourism Department at a cost of Rs.11.49 crores is entrusted.
Chief Minister‟s Grameena Sadak Yojana works (91 works) at a cost of Rs.23.34
crores have been entrusted.
E-GOVERNANCE
Transparency in public Procurement Act 1999 and Right to information Act 2000
legislated by the Government are followed in KRIDL in all its level of activity. The Company
has committed itself to deliver on principle of Transparency and Right to information,
quality, cost effective and timely Services. To meet these commitments, KRIDL has taken
steps to introduce Computerization with Internet facilities in all its Zones, Divisions and
Sub- Divisions by introducing Tally System of Accounting from the Financial year 2009-10
Rural Development & Panchayat Raj Department Annual Report 2013-14
63
and training is also given to all the Accountants to keep book of Accounts under Tally.
Training has been given to staff working in Accounts Section in Tally-9.0 software.
IN HOUSE TRAINING
KRIDL is continuously encouraging employees to acquire and update the latest
development and techniques in construction activity. KRIDL organizes some in-house
training programmes and deputes employees for training to reputed institutions in and outside
the state. The Company has given Training on to Tally about 120 Accounting Staff in the
Company during the year to upgrade their knowledge and implement the System in the
Company. Worksoft being implemented by RD&PR Department is also being followed at
KRIDL. Testing of the Software on Auditing is going on. It will be implemented in the
project offices.
DETAILS OF COURT CASES
There are 46 cases pending at various courts. Most of the cases are pertaining to
administrative/ service matters.
* * * * *
5.4 Western Ghats Development Programme
VISION:
Developing hilly areas
Conservation of forests and maintenance of ecology
Providing irrigation facilities to the farmers of hilly region
Providing Agriculture, Horticulture, Sericulture, Animal Husbandry activities to the
residents of hilly areas
Providing marketing to the outputs generated at these areas
Providing vented dams cum foot over bridges for cultivation of second crop in the
year
MISSION:-
Watershed approach to ensure the water sources to the land and to prevent further
degradation of these ecologically fragile areas
Developing, regular repairs and extension of irrigation canals existing in these areas
Implementing schemes for bio-diversity conservation developing afforestation
through Forest Department by growing medicinal plants, bamboo, jatropa and
plants.
Construction of vented dams cum foot over bridges for production of second crop in
the year and easy movement of farmers of hilly region
Rural Development & Panchayat Raj Department Annual Report 2013-14
64
Providing schemes for income generation by cultivating the medicinal plants,
bamboo, jatropa and agro forestry
Developing fish ponds, rearing of giriraja birds and bee-keeping activities
Supply of sewing machines, masonry, fodder, carpentry kits etc.,
OBJECTIVES:-
Capacity building for effective implementation of the programme by providing
training facilities to the officers of Hilly Area Development Programme (HADP) and
Western Ghats Developement Programme (WGDP)
Programme of eco-preservation and eco-restoration with a focus on sustainable use
of bio-diversity
Soil and water conservation through land development activities such as leveling,
bench terracing, land reshaping, amalgamation of paddy fields, land reclamation,
contour bunding etc.,
Water harvesting and erosion control structures like check dams, vented dams, nala
bunding, boulder bunds and checks, gully checks, ravine reclamation structures etc.,
Construction of farm ponds, diversion channels, waterways, vegetative filter strips
etc., to regulate the flow and disposable of excess water
Focus on the needs and aspirations of local communities ensuring community
participation in the strategies for conservation of bio-diversity and sustainable
livelihoods
Development of watershed based activities
Development of spreading of technology/ instruments/ materials which are useful to
the hill economy/society which are suitable to the small holdings to provide bio-
fertilizers, seeds and other inputs
Providing schemes for income generation by cultivating the medicinal plants,
bamboo, jatropa and agro forestry
Providing gap filling infrastructure such as laying of water pipelines, construction of
foot over bridges etc.,
Development activities through animal husbandry viz., artificial insemination for
upgrading cattle, fodder development plots in farmers holding and Government
farms, poultry development, piggery development, rabbit development, health camps
and distribution of medicines, mineral mixtures and food ingredients
Constant monitoring/providing funds to the Spice Board for regular growth of spices
Rural Development & Panchayat Raj Department Annual Report 2013-14
65
Organogram Chart of the Directorate:
Budget allocation of Rs.3240.00 lakhs has been earmarked by the Planning
Commission, Government of India. Rs. 2916.00 lakhs and Rs. 324.00 lakhs has been released
by the Central and State Governments in the ratio of 90:10.
Financial Performance
Details of financial progress during the last five years are given below
(Rs. in Crores)
Year Target Achievement
2008-09 29.24 25.64
2009-10 29.24 21.97
2010-11 29.24 20.06
2011-12 32.30 21.25
2012-13 32.40 26.00
2013-14 (upto Mar.2014) 32.40 32.61
(including O.B.)
District-wise details are given in Annexure 5.4 (A)
Deputy Director(1)
Director, (Suvarna Gramodaya) (WGDP)
Sr.Deputy Director(1)
Assistant Director(3)
Driver (1) TYPIST
(2)
S.D.A.(1)
A.S.O.(2)
F.D.A.(1)
Dalayat(2)
Rural Development & Panchayat Raj Department Annual Report 2013-14
66
FUNCTIONS:-
Formulation of Action Plan at district level by considering the needs of the hilly
areas and available resources
Obtaining approval from the Planning Commission, Government of India with the
recommendation of State Government of Karnataka
Obtaining releases from the Planning Commission and releasing to the districts
according to the approved Action Plans
Monitoring of expenditure in implementation of the scheme - sector wise
earmarked
Submission of MPICs, Annual Reports, Utilization Certificates and Audit Reports
Development of Western Ghats in harmony with the environment and conservation of
its fragile eco-system is the main objective of the programme. This programme is
implemented on an integrated watershed approach to improve the management of land and
water involving various departments such as agriculture, horticulture, animal husbandry,
forest, fisheries, minor irrigation, engineering, sericulture and industries. This programme is
implemented in 40 taluks of 11 districts.
Evaluation and submission of Report:
Evaluation study on implementation of the scheme has been entrusted to ISEC,
Bangalore. Evaluation study has been completed by ISEC in the month of March 2013 and
the same is submitted to the Government.
Human Resources & Development
Details of Officers/officials worked during the year 2013-14
Sl.No. Cadre No. of Officers/Staff Male Female SC ST
1 A 1 1 0 0 0
2 B 3 0 3 0 0
3 C 5 1 4 0 0
4 D 1 1 0 1 0
Total 10 3 7 1 0
Details of posts vacant posts / retired / to be retired during the year 2013-14
Sl.No. Cadre Vacant posts Retired To be Retired
1 A 1 0 0
2 B 0 0 0
3 C 2 0 0
4 D 1 0 0
Total: 4 0 0
Rural Development & Panchayat Raj Department Annual Report 2013-14
67
Details of Officers/Officials trained during the year 2013-14
Sl.No. Cadre Trained in the
State
Trained outside
the State
Trained
abroad
1 A 0 2 0
2 B 0 0 0
3 C 0 0 0
4 D 0 0 0
TOTAL 0 2 0
Administrative inspections conducted during the year 2013-14
Sl.
No.
Year No. of Administrative
inspections conducted
Action initiated
against
officer/official State
level
District
level
1 2011-12 1 0 -
2 2012-13 6 11 -
3 2013-14 7 - -
At the district level, Deputy Secretary/ Chief Planning Officer, Assistant Programme
Officer and District Watershed Development Officer have inspected the works during the
implementation and have monitored the progress.
The programme has been implemented as per the guidelines of Planning Commission,
Government of India. Hence, no action has been taken against any Officer for violation of
programme guidelines.
****
5.5 Suvarna Gramodaya Yojane
It is a new initiative programme of the Government of Karnataka in developing
vibrant village communities by adopting an intensive and integrated approach to rural
development. This programme is Launched on the occasion of Golden Jubilee Celebrations
of the formation of the State of Karnataka. With the joint efforts of the Government, Non
Governmental Organizations and the village communities.
His Excellency The President of India has launched the Suvarna Gramodaya Yojane
on 25.02.2007. Suvarna Gramodaya Yojane is a state sector scheme.
Rural Development & Panchayat Raj Department Annual Report 2013-14
68
Heads of Account:
1 4215-02-800-0-02-132 (Plan) Capital Expenses
2 4215-02-800-0-02-422 (Plan) Special Component Plan
3 4215-02-800-0-02-423 (Plan) Tribal Sub Plan
Objectives of the scheme:
(a) To upgrade the physical environment of the selected villages for improving the
quality of life.
(b) To provide full and adequate infrastructure for human resources development
including education, health services, childcare facilities etc.
(c) To generate significant levels of non agricultural employment, especially for educated
unemployed youth.
(d) To support community awareness and development through self-help groups, cultural
associations etc.
Selection of Villages:
The population in each taluk was determined based on the rural population in that
taluk in relation to total rural population of the entire State. The provision is made to select
the villages by the concerned Hon‟ble Member of Legislative Assembly keeping in view
2001 census and population of the each Legislative Constituency on the basis of the
population limit fixed for the particular Taluk.
Scheme Grant Details :
Provision is made as per 2001 census and on the basis of the population of the village,
per capita grant of Rs.2500/- is fixed in the scheme.
I Phase : (2006-07 and 2007-08)
1204 villages selected in 1st Phase is completed on 30-06-2010.
II Phase : (Gulbarga revenue division):(2008-09)
No. of villages selected : 222
Allocation : 208.20 crore
Releases : Rs.191.00 crore and Expenditure : Rs.189.00 crore
Road, drainage, anganawadi centres, samudaya bhavana works completed in 218
villages
Completed road length (Kms) : 354.53 Kms.
Completed drainage length (Kms) : 176.66 Kms.
No.of Anganawadi centres & Samudaya Bhavana Buildings completed: 376
Rural Development & Panchayat Raj Department Annual Report 2013-14
69
III Phase: (2009-10)
No. of villages selected : 1573
Allocation : 1012.05 crore
Releases : Rs.961.00 crore and Expenditure : Rs.959.00 crore
Road, drainage, anganawadi centres, samudaya bhavana works completed in 1195
villages
Completed road length (Kms) : 2296.88 Kms.
Completed drainage length (Kms) : 995.28 Kms.
No.of Anganawadi centres & Samudaya Bhavana Buildings completed: 2195
IV Phase: (Gulbarga revenue division):(2010-11)
No. of villages selected : 381
Allocation : 214.09 crore
Releases : Rs.192.00 crore and Expenditure : Rs.190.00 crore
Road, drainage, anganawadi centres, samudaya bhavana works completed in 150
villages
Completed road length (Kms) : 264.10Kms.
Completed drainage length (Kms) : 119.14 Kms.
No. of Anganawadi centres & Samudaya Bhavana Buildings completed: 247
IV Phase : (2012-13)
No. of villages selected : 2174
Allocation : 1000.00 crore
Releases : Rs.281.33 crore and Expenditure : Rs.256.74 crore
Road, drainage, anganawadi centres, samudaya bhavana works completed in 470
villages
Completed road length (Kms) : 739.69 Kms.
Completed drainage length (Kms) : 187.45 Kms.
No. of Anganawadi centres & Samudaya Bhavana Buildings completed: 75
Phasewise Financial Progress Report
(Rs. in crores)
Stage No. of selected
villages
Budget Allocation (Outlay)
Released
Expenditure
I 1204 1000.60 950.90 950.00
II 222 208.20 191.00 189.00
III 1573 1012.05 961.00 959.00
IV 381 214.09 192.00 190.00
V 2174 1000.00 281.33 256.74
Rural Development & Panchayat Raj Department Annual Report 2013-14
70
Details of Suvarna Gramodaya Scheme Financial Progress
(Rs. in crore)
District wise details are given in Annexure 5.5 (A)
Details of Suvarna Gramodaya Scheme Physical Progress
Phase No. of
selected
villages
Villages that
have
completed all
works
Length of
road
completed in
km.
Length of
drainage
completed in
km.
No. of
anganawadi &
community halls
completed
I 1204 1204 Works completed
II 222 218 354.53 176.66 376
III 1573 1195 2296.88 995.28 2195
IV 381 150 2641.10 119.14 247
V 2174 470 739.69 187.45 75
Details of villages selected under Suvarna Gramodaya Yojane (Nos)
Sl
No
District PHASE
I II III IV V Total
1 Bagalkote 45 42 58 145
2 Bangalore-(U) 24 32 55 111
3 Bangalore-(R) 31 40 52 123
4 Belgavi 97 88 119 304
5 Bellary 32 38 38 48 52 208
6 Bidar 49 35 46 68 69 267
7 Bijapur 34 47 62 143
8 Chickaballapur 34 56 85 175
9 Chamarajnagar 24 25 33 82
Year Budget
Allocation
Opening
Balance
Released
Available
Fund
Expenditure
2006-07 200.00 - 163.24 163.24 -
2007-08 350.00 163.24 179.54 324.78 213.09
2008-09 300.00 129.69 295.22 425.91 366.65
2009-10 302.00 58.26 299.74 358.00 251.41
2010-11 402.79 106.59 402.59 509.18 431.07
2011-12 700.00 78.11 695.36 773.47 445.31
2012-13 449.14 328.16 331.34 659.50 462.35
2013-14 209.67 199.12 208.53 407.65 376.87
Rural Development & Panchayat Raj Department Annual Report 2013-14
71
Sl
No
District PHASE
I II III IV V Total
10 Chikkamaglur 30 72 88 190
11 Chitradurga 32 52 70 154
12 D.Kannada 32 33 32 97
13 Davangere 35 48 56 139
14 Dharwad 16 16 22 54
15 Gadag 19 21 27 67
16 Gulbarga 43 44 67 82 116 352
17 Hassan 102 118 157 377
18 Haveri 29 40 59 128
19 Kodagu 21 16 24 61
20 Kolar 46 85 91 222
21 Koppal 31 25 32 61 51 200
22 Mandya 61 83 74 218
23 Mysore 46 78 112 236
24 Ramanagar 34 54 59 147
25 Raichuru 47 50 59 63 105 324
26 Shimoga 45 57 87 189
27 Tumkur 67 98 176 341
28 U.Kannada 48 66 90 204
29 Udupi 26 26 30 82
30 Yadgir 24 30 38 59 63 214
Total 1204 222 1573 381 2174 5554
Note: 2nd and 4th phase is being implemented in 6 districts of Gulbarga revenue division.
Evaluation Studies commissioned by the Dept. & its subordinate office
Year Name of the Scheme Evaluation studies
Commissioned (Nos)
Study Reports
Received (Nos)
2009-10 Suvarna Gramodaya
Yojane
- -
2010-11 - -
2011-12 - -
2012-13 - -
2013-14 1st Stage 01
Rural Development & Panchayat Raj Department Annual Report 2013-14
72
Human resource management and Administrative activities progress
Details of Officers/Staff worked during the year 2013-14
Sl. No Cadre No. of Officers/Staff Male Female S.C S.T
1 A 2 2 - - -
2 B - - - - -
3 C 1 - 1 - -
4 D 1 1 - - -
Details of posts Vacant/ Retired/ To be retired during the year 2013-14
Sl. No Cadre Vacant posts Retired To be retired
1 A - - -
2 B - - -
3 C 2 - -
4 D - - -
Details of Legislative Assembly/Council Questions attended
Details
Year
2009-10 2010-11 2011-12 2012-13 2013-14
No. of questions received
/admitted
11 19 32 27 22
No. of questions answered 11 19 32 27 22
Right to Information Act - 2005
No. of
Applications
received
No. of
Applications
Replied
No. of
Applications
Rejected
No. of Balance
Application
Remarks
3 3 - - -
* * * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
73
6. Rural Infrastructure Facilities – II
6.1 Aajeevika – National Rural Livelihood Mission – “SANJEEVINI”
The Government of India, Ministry of Rural Development has restructured SGSY as
“Aajeevika”- National Rural Livelihoods Mission (NRLM) and being implemented from
2010-2011. The State Government is implementing this scheme in phases through Karnataka
State Rural Livelihood Promotion Society in the name of “Sanjeevini”.
The State has chosen 20 Intensive blocks in 5 districts, Namely, Mysore (H.D Kote,
Hunsur, Nanjangud, T. Narsasipura), Tumkur (Pavagada, C.K.Halli, Madhugiri, Sira), Gadag
(Shirahatti, Naragunda, Gadag, Mundaragi, Ron), Koppal (Yelburaga, Kustagi, Koppal), &
U. Kannada (Ankola, Joidai, Kumta, Yelapura). The remaining 156 talukas remaining
districts are to be called as NRLM non intensive blocks.
Details of Progress achieved for the year 2013-14 (upto March-2014) in Sanjeevini
(KSRLPS).
Office set up:
A separate office has been set up for the State Mission Management Unit at hotel I-145,
1st Floor, Infantry Road, Bangalore 560 001.
Annual Action Plan:
The Empowered Committee meeting on 25-06-2013 has approved the AAP of KSRLM
for the year 2013-14 and allocation has been given as follows :
Approved Action Plan of KSRLPS for 2013-14
Sl.
No Details
Allocation (Rs. in lakhs)
Central State Total
1 NRLP 2335.88 778.63 3114.51
2 NRLM *(including Administration expenditure) 4352.00 1450.67 5802.67
3 Interest Subsidy 5137.00 1712.33 6849.33
4 R-SETI 682.00 - 682.00
Administration Expenditure : Central Rs.573.00 lakhs, State Rs.191.00 lakhs, Total Rs.764.00 lakhs.
Staff Recruitment:
Recruitment process for the Karnataka State Rural Livelihood Mission (KSRLM) at
State, District and Taluk Level is completed. 164 Officer/Officials are working. Details are
as follows:
Rural Development & Panchayat Raj Department Annual Report 2013-14
74
Unit Working (in Nos.)
State Mission Management Unit (SMMU) 26
District Mission Management Unit (DMMU) 35
Taluk Mission Management Unit (TMMU) 106
Total 167
District wise Staff Recruitment Report
Sl.No District DMMU TMMU Total
1 Mysore 5 23 28
2 U. Kannada 9 21 30
3 Gadag 8 25 33
4 Koppal 7 17 24
5 Tumkur 6 20 26
Total 35 106 141
6 SMMU - - 26
Total 35 106 167
Exposure Visits to other States
Various members of the KSRLM team have made field visits to Andhra Pradesh,
Kerala, Tamil Nadu. The team has studed the various successful implementation points of
concerned States. Based on this study the State is framing its strategy. Pilots are also being
taken on this.
Social mobilization and Capacity Building
Following programs were conducted under social mobilization and capacity building
during the year 2013-14.
1. SGSY facilitators training Immersion visit
2. Staff training and Immersion visit
3. CRPs training
4. SHG training
5. Signing MOU with SERP for resource block strategy
6. Signed MOU with Kudumbhashree Kerala
7. Revolving fund distribution
SGSY facilitators training & Immersion visit
79 SGSY facilitators were trained in 3 batches. This training program was conducted in
the month of August and September 2013. The training session was handled by subject
Rural Development & Panchayat Raj Department Annual Report 2013-14
75
experts from SIRD Mysore and MYRADA. 3 days immersion program also organized for
one batch consisting of 35 persons to Kasaragod Kerala in the month of September 13.
Staff training & Immersion visit
KSRLM has recruited staff at District level and Taluka level for intensive districts. All
the staff were given five days foundation training on Sanjeevini program. The staff training
program was organized at SIRD Mysore in 4 batches. 30 persons from DMMU ( District
Mission Management Unit) and 112 persons of TMMU ( Taluk Mission Management Unit)
were participated in the foundation training program. The training programs were organized
in the month of September and December 13. All the training program was conducted at
SIRD Mysore by inviting subject experts from MYRADA and SIRD. After the foundation
training program DMMU were sent for the immersion program to Kerala and Tamlinadu for
a week.
Community Resource Persons (CRPs) training
Communitisation of the program is one of the objectives of Sanjeeviin program.
Accordingly 1756 CRPs trained in the year 2013-14. All the CRPs were selected from the
community itself by the SHG members. All the CRPs had undergone 3 days TOT. Further
these CRPs conducted SHG training on credit linkage. In the coming years trained CRPs will
be used for VO formation and convergence of government programs. Trained SYSG
facilitators, DMMU and TMMU staff conducted TOT for CRPs.
SHG training
SHG formation and SHG strengthening is the important activity of Sanjeevini program.
84343 members attended the training from 6907 SHGs during the year 2013- 14. The training
was focused on Bank linkage. The training was organized at village level itself. The training
program was organized with the help of Taluka Panchyath Eexecutive Officers.
Resource block strategy.
KSRLPS has signed MOU with Society for elimination of Rural Poor, Andhra Pradesh
on 3rd
march 2014 for implementation of resource block program. This program will be
implemented in block each in Tumkur, Gadag and Koppal districts. MOU was signed for the
period of one year. The total cost of the program is Rs 2.32 crores.
PRI convergence program
KSRLPS has signed MOU with Kudumbhahsree Kerala on 20th
Jan 2013 to implement
PRI convergence program in Karnataka. The time period of the program will be 18 months.
Gubbi & Pavagada in Tumkur and Koppal & Gangavathi in Koppal District covering 10
panchayats in each block. Following activities will be conducted under PRI convergence
program.
Rural Development & Panchayat Raj Department Annual Report 2013-14
76
Exposure visit of Partner State of Kerala (Kudumbashree), Scoping study,
Capacitization of PR representatives, Training of LRGs Gram Sabha, Capacitization of
women elected representatives & LRG, TRG formation, Organizing Jan Sabha, PRI- CBO
interface for CSS (MGNREGS), Formation of village, GP/TP level CBO, Livelihood
Planning, Community Professional Institution for handholding to CBOs, Formation of
supporting institution to CBOs, PRI- CBO interface for SSS (Women and Child Dev. Dept),
PRI- CBO interface for SSS (TSC)The total budgetary requirement of the proposal is Rs.4.76
cores
Distribution of revolving fund to SHGs
Financial management and taking income generating livelihood activity by SHG
members are the core component of Sanjeivi program. Revolving fund is a grant to SHGs by
Sanjeevini program to take up IGAs by rotating the money among the members along with
their internal savings. Accordingly Rs 10.63 cores was distributed to 7089 SHG of 27
districts during 2013-14. Districts were selected as per the Dr. Nanjudappa report.
Accordingly 75 SHGs were selected from most backward taluks, 50 SHGs were selected
from more backward and 25 SHGs from backward talukas.
Partnerships:
I. Skill development on Coconut Plant Protection and claiming by using equipments:
Friends of Coconut Tree (FoCT) is an innovative skill development training
programme for rural youth for Coconut Plant Protection by using equipments provided by
the Coconut Development Board, Kerala and Krishi Vignana Kendra. KSRLPS had proposed
to provide training for 1500 unemployed rural youths with a budget of Rs.1 crore, of which
1,220 rural youth have been trained so far by utilizing an amount of Rs.0.57 crores.
II. Socio-economic development of rural women through dairy farming in collaboration
with Karnataka Milk Federation:
KSRLPS proposes to extend financial support to KMF for the formation of 250
women dairy cooperative societies across 28 districts of Karnataka targeting 10,000 rural
women. The proposed project cost of Rs.17.10 crores, for a period of 3 years, will be shared
by KSRLPS to an extent of Rs 14.85 crores and KMF (the implementation agency) to an
extent of Rs 2.25 crores.
Rs.4.90 Crores has been released as first installment to cover 2,880 target women
under 72 Women Dairy Co-operative Societies.
III. Mahila Kisan Sashakthikarna Pariyojana
In order to improve the present status of women in Agriculture, and to enhance the
opportunities for empowerment, the Government of India has announced “Mahila Kisan
Sashaktikaran Pariyojana” (MKSP), as a sub component of the National Rural Livelihood
Mission (NRLM). The primary objective of the MKSP is to empower women in agriculture
by making systematic investments to enhance their participation and productivity, as also
Rural Development & Panchayat Raj Department Annual Report 2013-14
77
create and sustain agriculture based livelihoods of rural women. Ministry of Rural
Development (MoRD) would provide funding support of up to 75% to the project submitted
by the State Governments/PIAs under MKSP. Balance is to be contributed by the respective
state governments or any other donor agencies, national and international. MKSP will be
implemented indirectly through a Project Implementing Agency (or NGO).
The Government of India has sanctioned an MKSP project to the Green Foundation
(PIA) amounting to Rs 6.25 crores for the implementation of MKSP project in Ramanagara
and Chitradurga districts. Accordingly an amount of Rs 3.61crores has been released to
Green Foundation. Further GOI has sanctioned an MKSP project to the Initiative for
Development Foundation (IDF) with sanctioned budget of Rs.15.00 crores for the
implementation of project in Tumkur and Belgaum districts. 1st installment of Central &
State share of Rs 2.84 crores has been released to IDF.
The Government of India has also sanctioned an MKSP project at Gulbarga District
to MYRADA with a total budget allocation of Rs.3.21 crores. As part of the 1st installment of
Central Share, an amount of Rs.0.54 crores has been released to MYRADA. Overall 19,000
Women Farmers will be benefitted through MKSP project in Karnataka State.
Self Help Group (SHG) Database
Profiling the Data base of all the SHGs in the State is very important for smooth
implementation of Sanjeevini Programme. The State has target of profiling about 3,15,541
SHGs of which 2,01,339 SHGs profiling has already been completed & the Data has been
entered into Panchatantra Software.
Districtwise programme is enclosed in Annexure – 6.1 (A)
Interest Subvention
In order to improve credit linkage to the SHGs, Government of India has announced
that all Women SHGs will be eligible to avail credit at 7% rate of interest p.a. up-to Rs.3
Lakhs. Banks (PSBs and RRBs) will be sub-vented to the extent of difference between the
weighted average interest charged (WAIC as specified by Ministry of Finance, Department of
Financial Services) and 7% subject to a maximum of 5.5% for the year 2013-14. This
subvention will be available to all Public Sector Banks and RRBs on the condition that they
make SHG credit available at 7% in 150 districts (4 districts in Karnataka). SHGs which
have availed capital subsidy under SGSY in their existing loans, will not be eligible for
benefit for their subsisting loan under this scheme. The Women SHGs will get an additional
Interest Subvention of 3% if they repay the loans in time, thereby reducing the effective rate
of Interest to 4%. This initiative, in its first phase is implemented in 150 districts in the
country identified by the Government of India (out of which 4 districts have been allotted to
Karnataka). The Interest Subvention in these 4 districts will be administered and the entire
cost of Interest Subvention will be borne by the Central Government. The State Government
has identified 4 districts namely Mysore, Tumkur, Gadag & Koppal for the same.
Rural Development & Panchayat Raj Department Annual Report 2013-14
78
In the remaining 26 districts in Karnataka, all NRLM Compliant Women SHGs will be
eligible for Interest Subvention to avail the facility up-to Rs.3 lakhs at an interest rate of 7%.
Banks will charge SHGs interest rate as per their respective lending norms and the difference
between lending rates and 7% subject to maximum of 5.5% will be sub-vented in the loan
accounts of SHGs, who have been prompt in repayment of the loans, by KSRLPS. The cost
of Interest Subvention is to be shared in the ratio 75:25 by the Central and State Government.
Under NRLM the Rs.68.49 crore has been approved in the Annual action plan 2013-14 for
interest subvention. The Government of India has already released Rs.25.69 Crores towards
interest subvention and the amount will be released to the eligible SHGs in the coming days.
In order to have parity in implementation of the scheme across the state, Hon.ble Chief
Minister in his budget speech has announced to extend the additional interest subvention
scheme in remaining 26 districts of the State covering upto 1 lakh SHGs, during the year
2013-14 for which Government Order has already been issued. During 2013-14 Rs.29.35
lakhs has been provided in Supplementary Budget.
Under category-2 districts, 5,382 Self Help Groups benefited worth Rs.2.55 Crores
towards inter subvention scheme across 23 districts of the State.
Financial Progress under Sanjeevini-NRLM
The expenditure incurred under the program for the financial year 2013-14 is
summarized in the below tables
Details of Expenditure from 2011-12 to 2013-2014
(Rs. in Lakhs)
Year Particulars Expenditure
2011-12
Administrative Expenses 3.44
Field visits 1.00
Other expenses 4.23
Sub total 8.67
2012-13
Administrative Expenses 109.13
Field visits 6.49
Other expenses 12.04
Sub total 127.66
Rural Development & Panchayat Raj Department Annual Report 2013-14
79
(Rs.in lakhs)
Year COMPONENT
NR
LP
NR
LM
MK
SP
INT
ER
ES
T
SU
BS
IDY
RS
ET
I
AA
JE
EV
IKA
SK
ILL
S
TO
TA
L
20
13-1
4
Administrative
Expenses
218.33 10.12 - - - - 228.45
Field visits 24.08 - - - - - 24.08
Other expenses 326.13 1334.35 544.03 256.16 39.13 921.71 3421.51
Total 568.54 1344.47 544.03 256.16 39.13 921.71 3674.04
Rajiv Gandhi Chaitanya Yojane (RGCY)
Hon‟ble Chief Minister in his Budget speech 12-07-2013 announced to start “Rajiv
Gandhi Chaitanya Yojane” to provide skill training, loan, self employment and placement
opportunities for 2 lakh rural unemployed youth benefitting 40-50 youth per Gram
Panchayat.
Youth is considered to be the most valuable resource of the country. However, youth
between the ages of 18-35 face difficulties due to lack of direction, employment opportunities
and general awareness. In the present scenario it is seen that, only a few of them are provided
with vocational education and skill training. A large number of drop outs in particular girls
are known to drop out of schools and colleges. Further, there is an absence of skill training in
job oriented courses. Therefore, they are hesitant to take up self employment owing to fear of
failure. Many rural youth migrate to urban areas in search of employment especially in
regions of drought. Likewise, rural youth have abandoned agriculture due to its inability to
provide continuous employment. Rural youth lacking in self confidence resort to illegal
activities to overcome financial difficulties, physical ailments and depression. In order to
avoid deficit to the National Economy, it is imperative to utilize the potential of the youth.
The State Government has sanctioned the implementation of Rajiv Gandhi Chaithanya
Yojana in current budget. The project will be implemented at the State, District and Taluka
levels. Using wide publicity campaigns around 40 youth per Gram Panchayat will be selected
through Grama Sabhas totaling to 2 lakhs. Out of 2 lakh rural youth, self employment will be
provided to 1 lakh and skill training and placement to 1 lakh. This programme is a part of
Sanjeevini- KSRLM.
To implement the project during 2013-14, Finance Department has provided Rs.105.00
crores in supplementary Budget-1 under Head of Account 2501-00-101-0-05 (2501-01-198-
6-01).
The beneficiaries 40 per Gram Panchayat will be selected through Gram Sabha by
giving priority to SC/ST, Minorities and other Backward classes. SATCOM transmission
Rural Development & Panchayat Raj Department Annual Report 2013-14
80
program is conducted to Youth selected through Grama Sabha, on Entrepreneurship
Awareness Program (EAP) in collaboration with the Abdul Nazeer Sab Rural Training
Institute,(ANSSIRD) Mysore during the SATCOM program during January & February
2014. 1,62,052 Rural Youths have attended the SATCOM Programme. Out of which,
1,02,071 have selected for self employment, 54,485 have selected for skill training and
placement and 5,496 have not selected either of the two.
Those youth opted self employment will be supported by the Project Supporting
Agencies. 19 Project Supporting Agencies have been identified for 23 districts. Project
Supporting Agencies have to be identified for the remaining districts.
Those youth opted skill and placement will be trained through Project Implementing
Agencies. 24 Project Implementing agencies have been identified and the Rural youths are
trained and will be suitably placed in different sectors.
Under Rajiv Gandhi Chaithanya Yojana, Finance Department has concurred to release
Rs.50.00 Crores out of the allocation of Rs.105.00 Crores.
District wise details of allocation, release and expenditure is shown in Annexure–6.1 (B).
TRAINING INSTITUTE
R-Seti Training Centres
33 RUDSETI / RSETIs have been established in 29 districts of the State and Basic
Orientation Programmes and Skill Development Training are being implemented through
these institutions
26 Apparel Training and Designing Centres have been established in 24 districts in
collaboration with AEPC, RSETIs and recognized NGOs through which training is being
imparted.
Special Projects
At the National level, 15% of the total outlay of SGSY is reserved for implementation
of special project/programmes, but under NRLM 25 % will be reserved. These special
projects are being implemented through Government departments, Semi Government, NGOs
and Self Service Organisations.
Each special scheme is a time bound one with the objective of bringing above the
poverty line, definite number of families below the poverty line through self- employment
programmes is the main aim. Organizing the rural poor, providing infrastructure, technology,
marketing facilities, training through other activities, sustainable employment opportunities
will be created.
Since inception of the programme, 22 proposals worth Rs.177.76 crores have been
submitted to GoI. Out of these, 2 projects in each district i.e., D.Kannada, Bagalkote and
Mysore and 1 each in Kolar, Bellary and Dharwad have been sanctioned amounting to
Rs.71.05 crores.
Out of 10 approved Special Projects by Government of India, 5 are under progress, 3
have been completed, and two projects have been cancelled by the State Government as the
Rural Development & Panchayat Raj Department Annual Report 2013-14
81
implementation was not done during the stipulated period. Projects under progress are as
follows.
1. Skill Based Training at Bagalkote. - IA: BVV Sangh, Bagalkote
2. Uplifting of dairy farmers in Kolar Milk Union. - IA: Kolar Dairy
3. Poverty Alleviation & Sustainable Development in Dharwad District.- IA: BAIF
4. Income Generation to BPL SHGs through Agri Enterprises.- IA: JSS, Mysore
5. Skill Development & Training : IA - Shree Shakthi Association, Harihara
Government of India has modified the SGSY Special Project Guidelines to Skill
Development Training and Employment programme under “Aajeevika Skills” from 2013-14.
Government of India has sanctioned 15 Special project out of 35 Special project proposals
sent to Government of India upto March 2014 & released Rs.2765.14 lakhs to Technical
Support Agency NIRD, Hyderabad for 8 special projects. MoU has been made with the
Project implementing agency by KSRLPS. Tripartite MoU proposals have been sent to
NIRD, Hyderabad.
Details of funds released by GoI to the approved projects is as follows
(Rs. in Lakhs)
Sl.No Name of the Project
Implementing Agency
Project
Cost
Amount Released
Central State
1 Ikkya 1465.83 274.84 91.61
2 ILFS 4690.49 879.47 293.16
3 KAPSTONS 495.45 92.90 30.97
4 New Horizons 2419.24 453.61 151.20
5 Technopak 2237.32 419.50 139.83
6 Wazir 1497.34 280.75 93.58
7 ITCOT 1342.52 251.72 83.91
8 Laurus 599.25 112.36 37.45
Total 14747.44 2765.15 921.71
Details of 7 approved project implementing agencies by MoRD, New Delhi.
Sl. No. Name of the Project Implementing Agency
1 Avon Facility Management Services Pvt. Ltd.,
2 Helios & Matheson IT
3 Nexgen Edusolutions Pvt. Ltd.,
4 Orion Edutech Pvt Ltd.,
5 Amalgamated Beam Coffee Trading Company Ltd.,
6 ITCOT consultancy & Services Ltd.,
7 APITCO Ltd.,
Rural Development & Panchayat Raj Department Annual Report 2013-14
82
State Government is expecting Central release for the 7 approved proposals.
SARAS Fair conducted for SHGs.
The State is conducting Regional SARAS fair for providing marketing to SGSY
products produced by SHGs. During 2013-14 SGSY has been restructured as NRLM. This
scheme is implemented in the State in the name of “SANJEEVINI” during the year, regional
SARAS fair organized alongwith world famous DASARA for 90 days. The details of last 5
years are shown below:
Sl. No. Year Place of
SARAS Fair
Value of Marketed
Products (in Rs.)
Remarks
1 2009-10 Belgaum 2.85 Crores 12 Days
2 2010-11 Hubli 4.94 Crores 12 Days
3 2011-12 Davanagere 2.02 Crores 11 Days
4 2012-13 Tumkur 3.75 Crores 13 Days
5 2013-14 Mysore 90 days
* * * * *
6.2 Centrally Sponsored Plan Scheme for Rehabilitation of Bonded
Labourers
The main aim of the scheme is to identify, release and rehabilitate the Bonded Labourers
in all parts of the State. The Bonded Labourers are identified by State Revenue Officers &
their staff at their jurisdiction and the same is reported to Rural Development and Panchayath
Raj department for eradication of bonded labour system.
Centrally sponsored scheme for rehabilitation of Bonded Labourers came into existence
in 1978 to provide rehabilitation by means of financial assistance to the released Bonded
Labour & Child Labourers.
This programme has been revised during the month of May 2000. Under this
programme both central and state Governments have to incur the expenditure at the ratio of
50:50. That is each Bonded Labour/Child Labour will be released Rs.20,000/- of
rehabilitation assistance. Both Central and State Governments has to release fund of
Rs.10,000 each. Out of Rs.20,000/-, Rs.1,000/- has to be given as subsistence allowance
immediately on the release of a bonded laborer. Under this program, Rehabilitation for the
balance Rs 19000/- facilities like Domestic Animals, Agricultural lands, supply of raw
materials, Ploughing equipments, petty shops, are provided in terms of material.
The bonded labourers/Child labourers who are identified & released by concerned
Deputy Commissioners, Revenue Assistant commissioners, & the Zilla Panchayath will
submit the proposal seeking Rehabilitation Assistance in the prescribed Check list along with
Rural Development & Panchayat Raj Department Annual Report 2013-14
83
screening committee proceedings & list of released bonded laborers containing Break up
details of SC/ST & Others to the Government. Further, the State Government has to submit
the recommended proposal to GOI. GOI after considering the proposal will release Central
share of Assistance to the State. Further the State government will release its Rehabilitation
assistance to Grama Panchayaths through ZPs along with Central share of Funds.
In view of above facts, each released bonded labourers during the process of their
Rehabilitation, they are being provided Financial assistance of Rs 300/- per month for a
period of two years under State sponsored Rehabilitation Scheme with effect from
21-01-2006. Likewise the information of released bonded laborers which is being collected
from concerned D.Cs are submitted through Zilla Panchayaths to Government to avail
monthly assistance from government. The Amount which is received from Government by
Zilla Panchayaths are credited monthly to the local Bank savings account of released bonded
laborers.
As per the Scheme Guidelines, the Survey of Bonded Labourers in the State has to be
conducted once in 3 years. Ministry of Labour & Employment, GOI will release Rs 2.00
lakhs to each district for this purpose. The Survey was conducted during 2000-01 & 2001-02
in all districts of the State. Since then, the survey was not taken up in the State. During the
Fag end of 2012 i.e., on 28-03-2012 GOI has released Rs 60.00 lakhs to all the 30 districts.
Further this amount has been released to all the Deputy Commissioners during 2012-13 on
13-06-2012. The survey work is under progress. UC¸ & final Survey report is being received
from few districts. Reminders and DO letters are written to concerned DCs of pending
districts to submit the final survey reports along with UCs immediately to the Government.
The details of the total amount allotted and released under head of account
2230-01-198-6-01-300 (2230-00-101-0-01) are given below :
Note:
The state has submitted proposal for sum of Rs. 75.80 lakhs towards Central Share of
rehabilitation assistance of Bonded Labourers. This claim is for 119 & 386 bonded
labourers released (vide Order dated 29-11-2011) in Madhugiri and Pavgada Taluks
of Tumkur District respectively. This claim is also for 92 bonded labourers released
(vide order dated 31-10-2011) in H.D. Kote Taluk of Mysore District and 161 already
released (vide order dated 15-2-2012) totalling to 758.
Awaiting release of the same from Ministry of Labour, GOI.
Sl.
No. Year
Budget provision Releases against budget
provision
Head of account Central
share
State
share
Total Central
share
State
Share
Total
1 2013-14 2230-01-198-6-01 (2230-01-
101-0-01) Lump sum Provision
126.90 183.90 310.80 -
-
18.22
27.79
18.22
27.79
Total 126.90 183.90 310.80 - 46.00 46.00
Rural Development & Panchayat Raj Department Annual Report 2013-14
84
Under Central Share of Rehabilitation assistance no releases are made during
2013-14. The state has submitted proposals of 758 released bonded labourers to
Ministry of Labour on dt:03-10-2013, 18-01-2014 & 31-01-2014 (Tumkur =119+
386, Mysore=253) and has requested to release Central Assistance of Rs.75.80 lakhs.
As soon as the central assistance is received, the state share of Rs.75.80 lakhs will be
released along with central assistance to the concerned ZPs during 2014-15.
* * * * *
6.3 Rural Energy Programmes
The Three main schemes are being implemented under Rural Energy Programme.
They are
1. National Biogas Manure and Management Programme ( NBMMP)
2. Karnataka State Bio-fuel Policy –2009
3. Soura Belaku
1. National Biogas Manure and Management Programme ( NBMMP)
National Biogas Manure and Management Programme is a Centrally Sponsored
Scheme being implemented since 1982-83. This is mainly 100% women programme.
Head of Account
1. 2810-00-101-0-01 ( Plan)
2. 2810-00-101-092 ( Anila Yojane)
Objectives :
1. Abundantly available, perennial and environmentally safe, renewable energy sources
constitute safe, sure and sustainable alternatives. Besides being affordable and
viable, they offer an equitable distribution of resources.
2. Being a tropical country, India is blessed with bountiful resources, significant
potential from Solar, wind biomass, biogas and mini hydro sources. The need of the
hour is for non-conventional or renewable sources, backed by a desire to change and
a willingness to explore options.
3. Biogas is a clean, non-polluting, smoke and soot-free fuel, containing methane gas
produced from cattle dung, human waste and other organic matter in a biogas plant
through a process called anaerobic digestion.
4. The digested slurry can be used as a good quality manure in agricultural fields.
Rural Development & Panchayat Raj Department Annual Report 2013-14
85
Subsidy :
Government of India has increased central subsidy with effect from 1st November
2009. The details of revised subsidy is given below
Particulars Subsidy
(in Rs.)
Central Subsidy 8000
Turn Key Fee 1500
Latrine Linked Biogas Plants - incentives 1000
State subsidy of Rs.3500/- per plant is given by Government of Karnataka.
Implementation :
Based on the cattle population in the State, 6.80 lakh biogas plants can be constructed,
of which, up to March 2014, Rs. 4.25 lakhs of biogas plants have been constructed.
Beneficiaries are selected at Grama Panchayat level under NBMMP.
Funds :
For the financial year 2013-14, budget provision of Rs. 1465.91 lakhs has been
provided and Rs. 1300.62 lakhs has been released up to end of March 2014
Physical and Financial Progress under National Project on Biogas Development
Year Physical (Nos.) Financial (Rs.in lakhs)
Target Achievement
(S+C)
Target
(S+C)
Achievement
(S+C)
2007-08 4000 4573 756.50 337.57
2008-09 10000 6579 645.29 557.90
2009-10 10000 6954 841.33 693.37
2010-11 16000 12902 1463.08 997.79
2011-12 15000 10531 1503.20 1359.93
2012-13 12000 11985 1495.20 1161.19
2013-14
(up to Mar-14)
10300 9700 1465.91 1300.62
Rural Development & Panchayat Raj Department Annual Report 2013-14
86
Details of Target and Achievement under NBMMP for the year 2013-14
Sl.
No. Zilla Panchayath
Annual Target Achievement
Financial
(Rs.in lakhs)
Physical
(No.s)
Financial
(Rs.in lakhs)
Physical
(No.s)
1 Bagalkote 40.00 259 28.86 359
2 Bangalore Rural 40.00 259 31.49 200
3 Bangalore Urban 40.00 259 36.04 125
4 Belgaum 320.00 2586 202.14 2557
5 Bellary 48.00 310 30.45 57
6 Bidar 40.00 259 12.90 107
7 Bijapur 40.00 259 27.22 236
8 Chamarajanagar 40.00 259 31.32 50
9 Chikkaballapur 40.00 259 6.54 126
10 Chikkamagalur 24.00 155 33.04 155
11 Chitradurga 20.00 129 17.59 55
12 Dakshinakannada 40.00 259 107.27 809
13 Davanagere 40.00 259 29.46 270
14 Dharwad 40.00 259 34.19 40
15 Gadag 15.00 92 23.62 42
16 Gulbarga 15.83 102 6.65 101
17 Hassan 115.00 862 101.96 616
18 Haveri 40.00 259 32.05 259
19 Kodagu 20.00 129 27.30 80
20 Kolar 8.00 52 4.75 18
21 Koppal 40.00 259 23.28 63
22 Mandya 40.00 259 19.11 150
23 Mysore 80.00 517 88.17 190
24 Ramanagara 8.00 52 13.36 145
25 Raichur 40.00 259 42.33 119
26 Shivamoga 120.00 862 159.04 1464
27 Tumkur 48.08 311 34.81 151
28 Udupi 20.00 231 47.70 931
29 Uttar kannada 24.00 155 29.20 155
30 Yadagiri 20.00 129 18.78 70
TOTAL 1465.91 10300 1300.62 9700
Rural Development & Panchayat Raj Department Annual Report 2013-14
87
Evaluation :
TERI has submitted Evaluation Report. Action taken on the recommendations of the
Evaluation report under NBMMP.
2. KARNATAKA STATE BIO FUEL DEVELOPMENT BOARD
The Karnataka State Bio fuel Development Board is entrusted with the responsibility of
planning and executing the schemes related to the development of bio fuels since its inception
from 2010-11. The broad objectives of Board are given below:-
i. To create a conducive atmosphere for the supply and development of bio fuel
resources.
ii. Appropriate implementation of bio fuel policy in the State.
iii. Identification of various bio fuel seedlings suitable for various regions, identification
of land and take up plantations.
iv. To develop bio fuel activity without harming the food security.
v. To encourage farmers in growing bi fuel crops and provide additional opportunities in
rural areas.
vi. To increase the income of the farmers by taking up value addition activity.
vii. To create market for bio fuel.
viii. Encourage for research and development.
ix. To develop easy ways for the use bio ethanol and bio diesel blends, taxation and bring
in investment from private industries.
x. To develop Information and technology.
2013-14 Budget:
A budgetary allocation of Rs. 400.00 lakhs are has been provided for the year 2013-14
and an expenditure of Rs. 614.00 lakhs are incurred up to the end of December 2013
including the opening balance against a release of Rs.200.00 lakhs.
Bio fuel Schemes:
Karnataka State Bio fuel development Board has designed and implementing various
environment and farmer friendly innovative schemes for the development of bio fuels in the
State. Following are the prominent among them.
1. Hasiru Honnu Scheme: Plantation of bio fuel seedlings along the Bunds, hedges and
waste lands of farmers with the use of funds under Mahathma Gandhi Rural
Employment Guarantee Scheme in all the Gram Panchayaths limits. The scheme
started in the year 2009-10 and planted 60 lakhs bio fuel seedlings in 15,000 hectares
of land benefiting 60,000 farmers during 2012-13. It is aimed to plant 1.0 lakh
seeding in every Taluka in 10 selected gram panchayats.
2. Baradu Bangara Scheme: Plantation of bio fuel seedlings in waste land, wasted
forest land, grazing land and other community land with the involvement of village
Rural Development & Panchayat Raj Department Annual Report 2013-14
88
forest committees. Planted 80 lakh bio fuel seedlings in 20,000 hectares of waste land
during 2012-13. It is aimed to plant 35 lakh seedlings in the State selecting at least 50
ha. of land in each taluka totally 8,800 ha. in 2013-14.
3. Information and Demonstration Centers: with an aim to provide information on
bio fuels and procure collection of bio fuel seeds from the farmers 32 information and
Demonstration centers are established in all the districts. Collected 113 tones of bio
fuel seeds up to the end of December, 2013 against a target of 100 tons and produced
17,584 liters of oil & 59,611 kg of oil cake & 8,579 liters bio diesel with 2,003 liters
of glycerin by 32 I & D centers during 2013-14.
4. Hombelaku and Hongirana programmes: KSBDB has launched a new scheme
called “Hombelaku” for the decentralised production of oil with the active
involvement of Women‟s Self Help Groups. Small scale bio fuel oil expelling units
are provided to these SHGs and provided assistance for collection of seeds and
extraction of oil locally. It is also aimed to provide employment for the rural people
apart from encouraging use of bio fertilizers in rural areas. An allocation of Rs. 23.00
lakhs are provided for extending benefit to 10 SHGs during 2013-14.
KSBDB has also launched another new scheme named “Hongirana” during
2012-13 under which bio fuel marts are established in every district headquarters with
the involvement of bio fuel Lead NGOs. It is aimed to provide information on bio
fuels and sell bio fuel seedling, oil, oil cake and other products of bio fuel apart from
procurement of bio fuel seeds from farmers. During the year a bio fuel mart in
Bijapur district is started and aimed to establish such marts in all the districts in the
next two years.
5. Establishment of Clonal Orchards: Clonal Orchards are established with the
assistance of State Forest Department for the development of high quality and high oil
yielding bio fuel seedlings. Total 6 bio fuel Clonal Orchards are established in the
State. The list of Clonal Orchards are shown below:-
Details of Bio Fuel Colonel Orchards are developed in the State for the year 2013-14.
Sl.No Forest Research
Circle
Place of Clonal Orchards
1 Bangalore Makali (Social Forestry) Magadi Taluk
2 Madikeri Panchavalli, Thitimathi
3 Dharwad Adavi Somapura, Shigao, Shigao Taluk.
4 Dharwad Mallapura, Shimoga Taluk.
5 Dharwad Muttalagiri,Badami Taluk.
6 Dharwad Yadajarvi, Savadatti Taluk, Belagavi District.
Rural Development & Panchayat Raj Department Annual Report 2013-14
89
6. Bio fuel Park: with an aim to provide training processing, formation of farmers
groups, development of high oil yielding seedlings and to take up research and
development work in the field of bio fuels, a bio fuel park is established in Madenur,
Hassan district. The park is established in an area of 50 acres has created awareness
among 1041 farmers in the field of bio fuels and created 70 bio fuel villages. The
park is considered as one of its kind in the country that is catering to the needs of
farmers who have adopted bio fuel cultivation.
During 2012-13, the KSBDB has initiated action for the establishment of two more bio
fuel parks one at Dharwad under the University of Agricultural Sciences of Dharwad and the
other at Thinthini in Yadgir district under the University of Agricultural Sciences of Raichur.
KSBDB is examining for the establishment of a 4th
bio fuel park in Bangalore region.
7. Community involvement: KSBDB has involved community for the implementation of
bio fuel schemes. Identified an NGO as a Lead NGO in the district to take forward the
bio fuel activities. KSBDB has constituted an expert committee for short listing the
NGO for being considered as district bio fuel lead NGO. KSBDB has identified and
appointed 32 district lead NGO for being involved actively for the development of bio
fuels.
8. Use of bio fuels in transport : KSBDB is encouraging use of ethanol blended diesel
and bio diesel blended in the buses run by KSRTC. The KSRTC has also studied the use
of different blends of bio diesel in its fleet and has come up with encouraging results.
9. Use of ethanol blended petrol: Karnataka is one among the few states that is using 5%
ethanol blended petrol and in effort is being made by KSBDB to enhance its use to 10%.
KSBDB has taken up the issue with the oil companies in this initiative.
Rural Development & Panchayat Raj Department Annual Report 2013-14
90
10. Research and Development: KSBDB is encouraging to take up research in the field of
bio fuels in all the I & D centres across the State. The Board has funded 22
Engineering Students Projects and 9 M.Tech Students Projects during 2012-13. Under
the students sponsored programme, 50 projects are being funded by KSBDB during
2013-14.
11. Demonstrations, trainings and workshops: KSBDB has organized various
demonstrations exhibitions including the one at Mysore Dasara, organized Krushi Mela,
celebrated world bio diesel day and organized various workshops at village, Taluk and
district headquarters with the active involvement of Panchayath Raj institutions.
12. Information and Publicity: the KSBDB has adopted mainly three Medias such as print
media, visual media and use of audio visual aids in disseminating bio fuel message to the
masses. Published and distributed various brochures and created awareness at village
block and district level with the active involvement of village forest committees, water
shed societies, tank users groups, SHGs, NGOs and public representatives.
3. Soura Belaku : ( Installation of Solar Street Lights at Grama Panchayats)
Soura Belaku Programme is started in the year 2009-10 for installation of Solar
Street Lights at Grama Panchayath level.
Head of Account :
2810-01-198-1-01 ( Plan)
Implementation :
The Programme is implemented during the year 2013-14 only in selected pilot
districts from four revenue divisions i.e., Gadag, Kolar, Mandya, Uttara Kannada and
Yadgiri. The programme is implemented through E-Procurement.
Fund :
In the State budget, for the year 2013-14, Rs.310.00 lakhs has been provided and
Rs.310.00 lakh has been released to 5 Pilot Districts. Upto March-2014.
The Physical and Financial progress under Soura Belaku Yojane
2009-10 (Rs. in lakhs)
Name of the district Annual Target Achievement
Physical Financial Physical Financial
Bagalkote 178 50.00 178 50.00
Bellary 178 50.00 178 50.00
Dak.Kannada 178 50.00 219 50.00
Shimoga 180 50.00 204 50.00
Total 714 200.00 779 200.00
Rural Development & Panchayat Raj Department Annual Report 2013-14
91
2010-11 (Rs. in lakhs)
Name of the district
Annual Target Achievement
Physical Financial Physical Financial
Chamarajanagar 180 50.00 180 50.00
Dharwad 180 50.00 180 50.00
Kolar 180 50.00 0 12.50
Raichur 180 50.00 180 50.00
Total 720 200.00 540 162.50
2011-12 (Rs. in lakhs)
Name of the district
Annual Target Achievement
Physical Financial Physical Financial
Belgaum 450 110.00 458 110.00
Chitradurga 208 50.00 254 50.00
Dharwad 208 50.00 257 50.00
Koppal 208 50.00 277 50.00
Mysore 208 50.00 224 50.00
Total 1282 310.00 1470 310.00
2012-13 (Rs. in lakhs)
Name of the district
Annual Target Achievement
Physical Financial Physical Financial
Tumkur 210 55.00 311 55.00
Chickmagalore 210 50.00 255 50.00
Gadag 210 50.00 288 50.00
Dharwad 210 55.00 244 55.00
Gulburga 210 50.00 273 50.00
Bidar 210 50.00 210 50.00
Total 1260 310.00 1581 310.00
Rural Development & Panchayat Raj Department Annual Report 2013-14
92
2013-14 (Rs. in lakhs)
Name of the district
Annual Target Achievement
Physical Financial Physical Financial
Gadag, 252 70.00 326 70.00
Kolar, 252 60.00 276 60.00
Mandya, 252 60.00 302 60.00
Uttara Kannada 252 60.00 302 60.00
Yadgiri 252 60.00 329 60.00
Total 1260 310.00 1535 310.00
* * * * *
6.5 Mahathma Gandhi Institute of Rural Energy and Development, Jakkur
Vision, Mission & Objectives of the Institute
Mahatma Gandhi Institute of Rural Energy and Development is a Southern Regional
Institute established with the assistance of Ministry of New and Renewable Energy,
Government of India and the Department of Rural Development and Panchayath Raj,
Government of Karnataka. The Institute is a registered society set up in the year 2000 to
cater to the training needs of Southern States/Union Territories.
It is the vision of the MGIRED to create awareness and propagate the latest
development in the Rural Energy., Ground Water Conservation, Rain Water Harvesting and
Environmental Protection to the rural masses.
In this Mission, the MGIRED is committed itself to the following:
Capacity Building
Demonstration of Rural/Renewable Energy Technologies.
Demonstration of De-centralized Rural Energy Based Industry.
Documentation and dissemination of information on Rural Energy Development/Rain
Water Harvesting/Environmental Protection etc.
Research on Rural Energy.
Advisory Services and Consultancy on Rural Energy.
Village Adoption for implementing Rural Energy and related Rural Development
Programmes.
Rural Development & Panchayat Raj Department Annual Report 2013-14
93
Organizational Structure
Physical Information
Grants received from Central & State Government, Financial & Physical information
(Specified format)
i. Central Government: Nil
ii. Grants released by Rural Development & Panchayat Raj Dept, Govt. of Karnataka.
i) Grant fixed for Administrative Expenses 289.00 Lakhs
ii) Grants released (till end of March-2014) 289.00 Lakhs
Sl.
No. Particulars Target Achievement
1 Training organized on Renewable Energy, Rain Water
Harvesting and Environment Protection.
60 80
2 No. of Trainees participated 1800 7604
Financial Information
(Rs in Lakhs)
Sl.
No.
Releases Expenditure
(Recurring & Training)
1 Till date grants released for Recurring
Exp
289.00 141.81
Administration
Admin & Accounts Officer
Executive Assistants
Senior Faculty
Junior Faculty
Senior Faculty
Junior Faculty
Senior Faculty
Project Manager
Trg & Capacity
Building Research & Develop Extension Activity
Executive Director
Rural Development & Panchayat Raj Department Annual Report 2013-14
94
Mahatma Gandhi Institute of Rural Energy and Development (MGIRED) during the
year April to March 2014, conducted several training programmes on creating awareness
in the areas of renewable energy, energy conservation, rain water harvesting for different
categories of participants as described below.
1. a) Training Programme on Renewable Energy for Gram Panchayat Representatives
b) Training Programme on Soura Belaku Yojane for Gram Panchayat
Representatives
2. Programmes for Women
3. School Children Programme
4. College Students Programme
5. Exhibition Programmes
6. Training Programmes for Government Officials
7. A special programme to train Rural Youth on Repair & maintenance of Solar Devices
8. Akshaya Urja Programme
9. State Level Workshop on Energy Conservation in Agriculture
10. Seminar & Workshop attended by the Faculty
Progress of training at a glance as on 31.03.2014
Sl. No. Name of the programme No.
No. of
persons
participated
1 Grama Panchayath 21 707
2 SHG 02 70
3 School 25 1353
4 College 14 573
5 Exhibitions 02 4200
6 PRI & Other Officials 04 93
7 Solar technicians training 06 396
8 Akshaya Urja Day 01 41
9 Bankers 01 37
10 State level Workshop 01 45
11 Soura Belaku Training 03 89
Total 80 7604
The details of the Programmes are available in the Institute’s website
www.mgired.kar.nic.in
Rural Development & Panchayat Raj Department Annual Report 2013-14
95
Achievement in Human Resource Management and Administrative Activities
Details of Officers/Staff worked during 2013-14
Details of outsourcing employees working on contract basis during the year 2013-14
* * * * *
Sl. No. Category No. of Officers/ Staff Male Female S.C S.T
1 A 1 1 - ---- ----
2 B 2 -- 2 1 ---
3 C 3 2 1 ---- ----
4 D ---- ---- ---- ---- ----
Total 6 3 3 1 ----
Details of Vacant posts, Retired/To be retired during the year 2013-14
Sl. No. Category Vacant Post Retired To be retired
1 A -- -- --
2 B 7 -- --
3 C 9 -- --
4 D 3 -- --
Total 19 -- --
Sl. No. Designation Posts
1 Senior Faculty 3
2 Project Manager 1
3 Personal Assistants / Executive Assistants 5
4 Group D 3
5 Vehicle Driver 3
6 Other (Data Entry Operators, Technician) 1
Total 16
Rural Development & Panchayat Raj Department Annual Report 2013-14
96
7 Rural Water Supply and Sanitation
7.1 Rural Water Supply
Supply of adequate and safe drinking water to all the 59,753 rural habitations of the
State is given utmost importance in order to improve the Living Standards of the rural
masses. It is programmed to provide 55 litters of drinking water to each person per day (as
per the NRDWP guidelines - 2013). Potable drinking water is being supplied to rural areas
through the following schemes:
1. Borewells fitted with Hand pump
2. Mini Water Supply Scheme
3. Piped Water Supply Scheme
4. Multi Village Water Supply Scheme
The Rural Water Supply Programmes are being implemented as per KTPP Act and
rules through Panchayath Raj Institutions. Priority is given to the partially covered, quality
affected and slipped back habitations/ villages. The type of water supply scheme to be taken
up is decided on the basis of the total population of the village / habitation. Multi Village
Water Supply schemes are also being implemented with surface source to cover cluster of
villages, where water quality and slipped back habitation problems are noticed.
Revised Guidelines of GOI
Rural Water Supply schemes are being implemented as per 2009-10 revised guidelines
of NRDWP (National Rural Drinking Water Programme).The main objective of the
Programme is to provide every rural person with adequate safe water for drinking, cooking
and other domestic basic needs on a sustainable basis. Under the Sustainability component of
NRDWP 100% grant will come from GoI for implementation of ground water conservation
and rain water harvesting structures to achieve source sustainability. 10% of annual allocation
of NRDWP funds is earmarked for this component.
As per the revised guidelines, State Water and Sanitation Mission (SW&SM) has been
established along with the Mission Director. The financial transactions of GoI funds and State
share funds are being made through SW&SM bank account. State level Scheme Sanctioning
Committee (SLSSC) has been constituted to approve RWS Action Plans, and to suggest
improved measures / to rationalize policies appropriately from time to time. There is a
provision to continue HRD/IEC program under the Support Activity Component as per GOI
norms.
Rural Development & Panchayat Raj Department Annual Report 2013-14
97
Componentwise grants allocation and funding pattern under NRDWP
Sl
No. Components
% of Annual
allocation
Central:State
Funding pattern
1 NRDWP- Coverage & Quality – including 5%
earmarked fund for Quality (Chemical)
67% 50 : 50
2 Sustainability 10% 100 : 0
3 O & M 15% 50 : 50
4 Support Activities 5% 100 : 0
5 WQM&SP 3% 100 : 0
Total 100%
As per NRDWP guidelines, the norm for categorization of habitations having Provided
safe drinking water supply is based on % of population covered in a habitation instead of
previously adopted LPCD norm. As per NRDWP guidelines, a habitation where 55 LPCD
Safe Water is being supplied is considered as fully covered habitation. The status of
habitations having provided safe drinking water supply as on 01-04- 2013 is as follows:-
(Including quality affected habitations)
Category 0%
Covered
>0% ≤
25%
>25% ≤
50%
>50% ≤
75%
>75% ≤
100% 100% Total
WQA
Habitation 0 704 1543 960 0 0 3207
Non-WQA
Habitation 0 5223 16161 19469 10112 5581 56546
District wise details are given in Annexure 7.1 (A)
NRDWP- PHYSICAL TARGET & ACHIEVEMENT
Sl.
No. Habitation Category
Status as on
1/4/2013 as
per IMIS
Physical
Targets
2013-14
Physical
achievement
1 0% population coverage 0 0 0
2 0-25% population coverage 5223 4865 2942
3 25-50% population coverage 16161 6080 5506
4 50-75% population coverage 19469 1445 4715
5 75-100% population coverage 10112 452 1921
6 100% population coverage 5581 65 490
7 Water Quality Affected Habitations 3207 2568 1948
Total Target (as per data entered in Online IMIS) 59753 15475 17522
District wise details are given in Annexure 7.1 (B)
Rural Development & Panchayat Raj Department Annual Report 2013-14
98
NRDWP- PHYSICAL TARGET & ACHIEVEMENT
(Water Quality affected habitations)
Sl.
No Habitation Category
Status as on
1/4/2013 as per
IMIS
Physical
Targets
2013-14
Physical
achievement
1 Arsenic affected habitations 16 13 6
2 Fluoride affected habitations 1503 1315 960
3 Iron affected habitations 556 374 293
4 Salinity affected habitations 377 244 179
5 Nitrate affected habitations 755 622 510
Total 3207 2568 1948
District wise details are given in Annexure 7.1(C)
NRDWP- FINANCIAL TARGET & ACHIEVEMENT (Rs. in lakhs)
Sl .
No. Components
Allocati
on
Opening
Balance +
Int.
Release Available
Fund
Total
Expd.
I. Central Sector (Programme)
1
NRDWP-Coverage &
Water Quality and
O&M and
Sustainability
43223.19 8399.43 65184.93 73584.36 69750.93
2 Deseart Development
Programme 12946.11 5613.65 17524.03 23137.68 18855.77
3 Water Quality Focus
Funding (Chemical) 5289.68 3832.09 4907.03 8739.12 2083.54
4 Calamities 0.00 1357.17 0.00 1357.17 716.22
5 Support Activity
(Central) 3375 756.56 0.00 756.56 557.71
6
Water Quality &
Surveillance
Programme
2025.54 650.80 500.02 1150.82 939.85
Total 66860.42 20609.70 88116.01 108725.71 92904.02
7 State Head Quarter 0.00 6168.85 0.00 6168.85 0.00
TOTAL 66860.42 26778.55 88116.01 114894.56 92904.02
II. State Sector (Programme)
1 NRDWP-State Sector 63546.55 0.00 90794.98 90794.98 90414.02
GRAND TOTAL 130406.97 26778.55 178910.99 205689.54 183318.04
District wise details are given in Annexure 7.1 (D)
Rural Development & Panchayat Raj Department Annual Report 2013-14
99
Rural Drinking Water Supply schemes established in the State since inception are as
follows:
Borewells with Hand pumps 2,18,863
Mini Water Supply Schemes 45,241
Piped Water Supply Schemes 32,705
Total 2,96,809
A) BOREWELLS WITH HANDPUMP/SCHEME:
Bore wells fitted with hand pumps are the major source of potable drinking water in
rural areas. Since inception of the programme 2,18,863 borewells have been drilled in the
State up to March 2014. An amount of Rs.1000/- per Borewell is being provided for the
annual maintenance of Borewells. Gram Panchayaths are taking care of these Borewells.
The financial and physical progres achieved under this scheme during the last 5 Years
are shown below:
Year Financial (Rs. in Crore) Physical (Nos.)
Target Achievement Target Achievement
2009-10 101.68 41.90 3038 3782
2010-11 7.04 5.00 938 667
2011-12 11.24 9.25 1014 900
2012-13 20.35 20.35 1755 1755
2013-14 16.66 21.50 1774 2035
Drilling of Borewells are as per IMIS entry. Task Force data are not included in the
above statement.
B) MINI WATER SUPPLY SCHEME:
In this scheme, water is pumped to a small tank (Cistern) fitted with 3-4 taps, from
where water can be collected by households. Since the inception of this programme, 45,241
Mini Water Supply schemes have been completed and commissioned up to March 2014.
Gram Panchayaths are maintaining the schemes, for which, an amount of Rs.5,000/- per
annum is provided to each MWS scheme.
The Financial and Physical progress achieved under this scheme during the last 5 Years
are shown below:-
Year Financial (Rs. in Crore) Physical (Nos.)
Target Achievement Target Achievement
2009-10 88.97 94.11 2661 3227
2010-11 77.28 39.84 1288 664
2011-12 140.70 84.40 2814 1970
2012-13 221.30 177.44 5419 4345
2013-14 350.00 203.67 8774 4526
Rural Development & Panchayat Raj Department Annual Report 2013-14
100
PIPED WATER SUPPLY SCHEME:
Under this programme, since inception, 32,705 PWS schemes have been completed and
commissioned both under State and Central Sectors. Grama Panchayaths are maintaining
Piped Water Supply Schemes, and an amount of Rs.10,000/- per Piped Water Supply Scheme
is being provided per annum towards O & M purpose.
The Financial and Physical progress achieved during the last Five Years is shown
below:
Year Financial (Rs. crore) Physical (Nos.)
Target Achievement Target Achievement
2009-10 63.55 141.16 1905 1943
2010-11 233.35 94.05 1489 627
2011-12 498.60 316.00 3324 1980
2012-13 388.50 233.08 5237 3142
2013-14 345.00 305.00 3465 3065
C) DESERT DEVELOPMENT PROGRAMME (DDP):
Additional rural water supply schemes in drought prone districts of Bagalkot, Bellary,
Bijapur, Davanagere, Raichur and Koppal are being implemented under this centrally
sponsored Desert Development Programme (DDP) since 1997-98. It is contemplated to
provide 70 Lpcd of water for human being and cattle in these drought affected DDP Districts.
The implementation of schemes such as PWS, MWS and borewells are taken up under this
programme, including Rural schools and Anganwadis.
The financial and physical progres achieved under this scheme during the last Five
years are as under:
Year
Financial
(Rs. in Crore) Physical
(in Nos.)
Target Achieve
ment
Target Achievement
PWSS MWSS BWS PWSS MWSS BWS
2009-10 38.21 25.33 202 260 300 173 243 296
2010-11 68.60 48.60 272 212 78 156 120 78
2011-12 137.80 103.30 628 286 48 440 215 48
2012-13 268.11 211.64 746 416 119 589 328 119
2013-14 205.09 188.55 938 405 745 433 324 738
D) Multi Village Water Supply Scheme Project:
Drinking water supply schemes under Rajiv Gandhi National Drinking Water Mission
have been formulated in rural areas with surface water as source to tackle water quality
Rural Development & Panchayat Raj Department Annual Report 2013-14
101
problem. Habitations having chemical contamination like Arsenic, Fluoride, TDS, Nitrate and
Iron in drinking water are provided safe drinking water after treating the surface sources.
440 MVS Schemes costing Rs.4501.19 crores are administratively approved since
NRDWP guidelines came into existence during 2008-09. Out of these, 182 schemes
are completed with an expenditure of Rs.694.12 crores 151 schemes are under
progress with an expenditure of Rs.1636.99 crores till date. The Tender process is in
progress for 47 schemes costing Rs.1162.29 crores and technical sanction is under
progress for the balance 60 schemes costing Rs.1007.77 crores (Details are given in
Annexure-7.1(E)).
Under 13th Finance Commission Grants, Rs.300.00 crores is proposed to be released
in 4 years. Action Plan to take up 33 Multi-Village Schemes and 387 R.O. Units are
approved under this Programme. 338 RO Plants are installed out of which 200 plants
commissioned with an expenditure of 29.50 crores (Details are given in Annexure-
7.1(F)).
As proposed in the State budget speech 2013-14, 1000 pure drinking water plants with
building is sanctioned with an estimated cost of Rs.179.79 crores 512 plants are
installed out of which 64 plants are commissioned till date with an expenditure of
Rs.6.99 crores Building work is entrusted to KRIDL. (Details are given in
Annexure-7.1(G)).
7.1.2 THE WATER QUALITY TESTING - ALTERNATE SCHEMES:
To supply safe drinking water for the Quality Affected Habitations, schemes are being
proposed using surface water as the source under Multi Village Scheme, NRDWP. In
addition, 300 De-fluoridation plants, based on RO Technology is being installed with an
estimated cost of Rs. 30.00 crore (Expd. to be borne by Govt. & empanelled institutions in
the ratio 50:50). 296 DF Plants are installed out of which 249 plants are commissioned at an
approximate expenditure of Rs.17.76 crores (Details are given in Annexure-7.1(H)).
7.1.3 SUSTAINABILITY:
Sustainability structures such as Pits and trenches, Check dams, Percolation tanks, Roof
top rain water Harvesting etc are being constructed to make the water supply system
sustainable. 1,531 sustainability works at an expected expenditure of 217.20 Crs. is
incorporated in the approved Action Plan 2013-14 of NRDWP. 670 works are completed
with an expenditure of 50.92 Crs. till November-2013 (Details are given in
Annexure-7.1(I)).
115 Fluoride affected villages spread across 5 Taluks of Tumkur, Chikkaballapur and
Gadag districts are entrusted to an NGO namely BAIF, for providing safe drinking water and
to enrich ground water table on pilot basis. A sum of Rs.14.34 crore has been allocated for
implementing ground water recharge and Roof Top Rain Water Harvesting works thereby to
reduce water quality problem with a scientific approach, for providing employment and
Accelerating horticulture and agriculture activities throughout the year, out of Rain Water
Rural Development & Panchayat Raj Department Annual Report 2013-14
102
Harvesting methods, as a special package. This project has been successfully completed in
115 habitations; under this Pilot Project. 5,603 Roof Top Rain Water Harvesting, 28
waterbody recharge structures and 2177 agriculture/ horticulture ponds have been
constructed. In addition to the above 4,000 Roof Top Rain Water Harvesting, 02 water body
recharge structures and 600 agriculture/ horticulture ponds and 25 Borewell recharge
structures, construction is being undertaken in the 26 Fluoride affected habitations of
Pavagada taluk in Tumkur district at a cost of Rs.11.00 Crs.. Presently, the work is under
progress and it is being implemented through BAIF organisation.
7.1.4 HYDRO-FRACTURING PROGRAMME:
Ground Water table is depleting in the State owing to shortage of rainfall and
Indiscriminate exploitation of ground water. Therefore, while initiating water re-charge
measures action has been taken to retrieve / revive the existing borewell sources through
hydro fracture technology.
The progress achieved through hydro fracturing method is shown below:
Year No. of BW‟s Hydro-
fractured Successful Failure
% age
Success
2009-10 436 432 04 99.08
2010-11 313 277 36 88.498
2011-12 344 306 38 88.95
2012-13 385 345 40 89.61
2013-14 371 339 32 91.37
7.1.5 DRINKING WATER QUALITY TESTING AND SURVEILLANCE
PROGRAMME:
The Department of Mines and Geology is named as State Referral Institute (SRI) for all
water quality related issues. Water samples of all rural drinking water supply scheme sources
are collected and tested for quality through FTKs and in laboratories. Tests were conducted in
district laboratories, Mines & Geology Departments labs and other laboratories.
There are about 236892 rural drinking water sources in the state. During 2013-14,
146783 Nos. sources have been tested with FTK. Based on FTK results, 14818 samples are
tested in the district laboratories, out of which 8025 samples are found to be Quality
Affected. Details of the test results are: FLUORIDE - 4109, NITRATE - 1155, IRON - 2423,
Salinity – 316 and Arsenic – 22.
In the existing drinking water sources 3207 Habitations in the State are chemically
affected. During the year 2013-14, necessary training has been given to 500 engineers in joint
venture with SIRD.
Rural Development & Panchayat Raj Department Annual Report 2013-14
103
7.1.6 INTEGRATED MANAGEMENT INFORMATION SYSTEM (IMIS)
IMIS is a Web Based Monitoring System which enables online submission of annual
action plans and project shelf, physical and financial progress report on coverage of
habitations and rural schools and specially the coverage of quality affected habitations.
Online entry of monthly progress reports and other related details of the schemes taken up
under the programme are being fed regularly in the IMIS website. Public can also access the
website for basic information and view the Annual Action Plan, Progress reports, details of
the works/schemes under the programme, status of habitations etc. The DDWS-IMIS enables
all participating stakeholders for monitoring this programme in an efficient, effective and
transparent manner.
IMIS Website- www.indiawater.gov.in/imisweb
Dept. Of drinking water supply, GoI Website – www.ddws.nic.in
* * * * *
7.2 KARNATAKA RURAL WATER SUPPLY & SANITATION
AGENCY
Introduction of Karnataka Rural Water Supply & Sanitation Agency
The implementation of the World Bank Assisted Karnataka Integrated Rural Water
Supply & Environmental Sanitation Project – I has set an encouraging trend of reforms in the
sector of Rural Water Supply and Sanitation in the State. In the above circumstance, the
Government had approached the World Bank through Government of India for assistance for
a Follow-on Project. The negotiations were held with the World Bank on the scope and
components as well as key policy parameters to be followed in the Follow-on Project. The
World Bank launched its Project Preparation Mission for the Follow-on Project, which
visited the state during November – December, 2000, January – February, 2001 and May
2001. The various policy parameters as per the Strategy Paper – 2000-2005 for Rural Water
Supply and Sanitation in Karnataka with necessary modifications for the project were
discussed and finalized with the Project Preparation Mission of the World Bank. This Follow-
on Project is named as “Jal Nirmal” Project in G.O. No. RDP/145/ PPM/2000, dated 19th
June 2001 and had implemented Drinking Water project and Road & Drain schemes
successfully in 3061 villages / habitations of 744 Gram Panchayats of 11 northern districts
i.e. Bagalkote, Belgaum, Bidar, Bijapur, Dharwad, Gadag, Gulbarga, Haveri, Koppal,
Raichur and Uttara Kannada districts and the project has been closed as at the end of
June-2010. About 51 lakh people has benefited by the implementation of this project.
Rural Development & Panchayat Raj Department Annual Report 2013-14
104
The Government has given sanction for setting up a functionally autonomous
Karnataka Rural Water Supply and Sanitation Agency (KRWSSA) for monitoring &
supervising the Project. Memorandum of Association and rules for the KRWSSA has been
prepared keeping in view the parameters set by the World Bank.
The Hon‟ble Minister for Rural Development & Panchayat Raj is the President of the
Agency. The President of the agency guides the agency through policy decisions and
periodical review of performance. The Hon‟ble Minister chairs the meeting of the Annual
General Body.
The Governing Council under the Chairmanship of Additional Chief Secretary &
Development Commissioner meets and accords administrative approval in the matter
concerning implementation of the project and also reviews the progress of the project.
The Governing Council shall have a maximum of eight members. Not less than 50%
of the Members will be the quorum of the Governing Council. The Governing Council shall
meet as and when necessary with the permission of the Chairperson for the management of
the affairs of the Agency. The Governing Council, subject to the provision of the
Memorandum of Association and the Rules shall have the control and management of the
business and affairs of the Agency. It has all advisory, executive and financial powers to
conduct the affairs of the Agency through its Director. It will consider and also approve
annual budget and the action plan, annual report, financial statements along with Balance
Sheet and Receipts & Payment account. The Governing Council can delegates its power to
the Chairperson, the Vice-Chairperson and the Director.
Additional Chief Secretary to Government, Rural Development & Panchayat Raj is
the Vice Chairman of the Governing Council and by regular reviews and policy decisions,
guides the agency in carrying out its activities. The Vice Chairperson have powers to appoint
all categories of professional staff required for the Agency and to fix their remuneration,
define their powers and duties and to exercise other powers as delegated by the Agency and
the Governing Council.
The Director, KRWSSA is the Chief Executive of the Agency and will be the
Member Secretary of the Governing Council and General Body. The Director, KRWSSA is
responsible for the management of day to day affairs of the agency and for over all
responsibility for planning and executing the work. Director is also responsible for the
execution of all policies laid down by the Governing Council and controlling authority of all
the employees of the Agency and management, control of the day-to-day administration and
finances within the sanctioned budget with all the vested powers of the Director.
The Director, KRWSSA is managing the day-to-day activities of the agency and is
responsible for the successful implementation of the Jal Nirmal Additional Financing Project
and the centrally sponsored Nirmal Bharath Abhiyan programme entrusted to the agency.
Rural Development & Panchayat Raj Department Annual Report 2013-14
105
World Bank Assisted Second Karnataka Rural Water Supply & Sanitation Additional
Financing Support Project "Jal Nirmal"
The Second World Bank Assisted Karnataka Rural Water Supply & Sanitation Project
has been implemented successfully in 11 districts of North Karnataka namely, Bagalkot,
Belgaum, Bidar, Bijapur, Dharwad, Gadag, Gulbarga, Haveri, Koppal, Raichur and Uttara
Kannada, has come to end on 30th
June 2010. In view of the increased demand from the
community for taking up more number of schemes under the Jalnirmal project, and the need
to provide sustainable potable drinking water service to more number of villages affected
with water quality problems, it was proposed to take up water supply schemes to more
number of villages under existing project districts of Jal Nirmal Project and in the water
quality affected habitations of few other districts, to provide Additional Financing for the
project estimated cost of Rs.1100 crore, to recommend the proposal to World Bank for its
consideration, a letter was addressed to Government of India vide letter No: RDP/KWA/815/
2009, dated: 24-10-2009.
The World Bank had detailed discussion with the officials of the project and the State
Government in this regard during April 2010.
The World Bank mission visited the State from 29-04-2010 to 6-05-2010 and had
extensive discussions on the project proposal, procurement requirements and the financial
arrangements for the proposed Additional Financing Project with the project officials and the
Principal Secretary to Government, RD & PR Department. Keeping in view the limited
period of three years that would be available under the Additional Financing Project, the
proposal was reviewed by the Bank and the World Bank assistance that could be provided
was indicated as 99.300 M SDRs (150 Million US$, approximately Rs.700 cr.). Accordingly,
the project size was limited to Rs.816.18 cr. including State share.
Negotiations with the World Bank team were held on 17th
May 2010, in which the
representatives of the Department of Economic affairs, Ministry of Finance, Government of
India, Department of Drinking Water Supply, Ministry of Rural Development, Government
of India, Finance Department and Rural Development Department of the State Government
participated. The World Bank has agreed to share 85% of the expenditure on the different
components of the project. The Project Agreement and the Credit Agreement for the
Additional Financing Project were finalized during the negotiations.
The Board of Directors of the World Bank has considered the proposal in its meeting
held on 15th
June 2010 and approved the IDA credit of 150 M US$ for the project. The same
has been intimated by the World Bank in its Acceptance letter dated: 29-06-2010. Credit
Agreement and the Project Agreement for the Project have been entered into on 17-07-2010.
As per the Project Agreement, the project period of the Additional Financing Project
would be three years commencing from 1st July 2010. The IDA Credit for the project will be
effective from the date of completion of further formalities effective date of credit.
Rural Development & Panchayat Raj Department Annual Report 2013-14
106
The Planning and Finance Departments have concurred to the proposal to take up the
project.
1. a) Project overview, target fixed and objectives
Project overview
Improve the quality of rural water supply and sanitation service delivery
Target Fixed
To improve the quality of rural water supply and sanitation service delivery and to
achieve:
sustainable development
poverty reduction
sustainable health and hygiene benefits to the rural population
empowerment and inclusion of community in general and rural poor and women in
particular
strengthening the democratic decentralization process.
To promote the long term sustainability of rural water supply and sanitation sector by
identifying and implementing an appropriate policy frame work and strategic plan.
Objectives
Increasing rural communities' access to improved and sustainable drinking water and
sanitation services and Institutionalizing decentralization of rural water supply and sanitation
service delivery to Gram Panchayaths and user groups under the externally aided World Bank
Assisted Jalnirmal Additional Financing Project.
Administrative features of the Section
1. The GPs are the focal point for project implementation.
2. The GPs are primarily responsible for planning, procurement, construction and O&M
and management of Rural Water Supply & Sanitation facilities with Technical
Support of the Zilla Panchayats (ZPs) and District Support Units. The District Support
Unit is responsible to provide integrated support to the GPs.
3. The project planning and monitoring is done by an autonomous body viz. Karnataka
Rural Water Supply & Sanitation Agency (KRWSSA) at the state level. In
Government Order No.RDP/195/PPM/2000, dated 4-8-2001, sanction was accorded
for establishment of KRWSSA and also to register the Agency under Karnataka
Societies Registration Act, 1960. Accordingly, the Society was registered on
27-8-2001.
4. At the district level, the District Project Implementation Committee, District Project
Monitoring Committees are responsible for project implementation. There are District
Support Units (DSUs) at district level set up by the KRWSSA to assist the ZPs and to
act as facilitators.
Rural Development & Panchayat Raj Department Annual Report 2013-14
107
5. The Chief Executive Officer, Zilla Panchayat is responsible for project
implementation at the district level and he is the Project Manager for District Support
Unit (DSU). The DSU is responsible for monitoring and evaluation of project
activities and functioning of DSU is integrated with the ZP.
6. The project staff at the state and district level have adequate mix of government and
non government sector.
Salient features of Jalnirmal Additional Financing Support Project
Name of the Project Jal Nirmal Additional Financing Project
Project Area 12 districts of Northern Karnataka (i.e. Bagalkot, Belgaum,
Bidar, Bijapur, Dharwad, Gadag, Gulbarga, Yadgiri, Haveri,
Koppal, Raichur and Uttara Kannada) and the few districts
having accute water quality problem.
Credit effective date 17th
July 2010 Credit No. Cr 4768 IN
Funding Agency IDA- World Bank Project ID: P119828
Lead Ministry GOI (MOEA), GOK (RD&PR)
Implementing Authority Karnataka Rural Water Supply & Sanitation Agency, RD&PR
Department
Project Period July-2010 to June-2013 (Extended upto June-2014)
Project Objectives 1. Increasing rural communities access to improved and
sustainable drinking water and sanitation services and
2. Institutionalizing decentralization of rural water supply and
sanitation service delivery to Gram Panchayaths and user
groups
Project Principles 1. Decentralization forward
2. Community based
3. Capital cost sharing
4. Integrated approach to water and sanitation
5. Operation and Maintenance by the community.
Project Components,
main Community Development and Infrastructure Building
(Village Level)
Institution Building (Project Level)
Sector Strengthening Programs (State Level)
Project Scope
In the above back ground, drinking water supply schemes and internal roads & drains
works has been taken up in 12 districts of northern Karnataka i.e. Bagalkote, Belgaum, Bidar,
Bijapur, Dharwad, Gadag, Gulbarga, Yadgir, Haveri, Koppal, Raichur and Uttara Kannada
districts and the districts having acute water quality problem under the World Bank Assisted
Additional Financing Support Project.
Rural Development & Panchayat Raj Department Annual Report 2013-14
108
2. Details of amount released from Central & State Government and Financial &
Physical Progress (In the prescribed format)
World Bank Assisted Additional Financing Support Project is a demand driven
externally aided project and under this project there is no financial support from Central
Government. This project is taken up at an estimated cost of Rs.816.18 crores (99.300 million
SDRs, 150 million US$, About Rs.700 crores) including community, gram panchayat
contribution and state government share in three years. Because of depreciation in the value
of rupee to dollars and availability of more amount in the credit, the project cost has been
revised to Rs.940 crore.
Sharing pattern under project
World Bank Assisted Jalnirmal Additional Financing project is an externally aided
demand driven project, and it has a different shareholders in the project. Under this project,
the World Bank finances 85% and 15% from the community, gram panchayat contribution
and state government.
Budget Head of Account
World Bank Assisted Jalnirmal Additional Financing Project has been taken under the
Head of Account 4215-01-102-9-02 – 132.
4215 – Water Supply and Sanitation capital outlay expenditure
01 - Water Supply
102 - Rural Water Supply
9 - Externally Aided Projects
02 - Rural Water Supply and Environmental Sanitation Projects (Jalnirmal) - EAP
132 - Capital Outlay
Financial Progress under the project
Finance (Rs. in Lakhs)
Accounts 2011-12 Revised Estimate 2012-13 Budget Estimate 2013-14
Capital
Outlay
Revenue Capital
Outlay
Revenue Capital
Outlay
Revenue
21000 lakhs - 27500 lakhs - 27500 lakhs -
Expenditure (Rs. in Lakhs)
Accounts 2011-12 Revised Estimate 2012-13 Budget Estimate 2013-14
Capital Outlay Revenue Capital Outlay Revenue Capital Outlay Revenue
16443.59 lakhs - 27682.36 lakhs - 19987.91 lakhs -
Rural Development & Panchayat Raj Department Annual Report 2013-14
109
A grant of Rs.27500.00 lakhs have been provided from the state government for the
financial year 2013-14 and the same grant of Rs.27500.00 lakhs have been taken as target,
and out of that Rs.19987.91 has been released to gram panchayat to the end of March-2014.
An expenditure of Rs.64652.93 lakh has been incurred since inception to the end of
March-2014 and the details of the district-wise and year-wise financial progress under the
project has been given below. Proposal for reimbursement has been sent to World Bank for
Rs.53608.14 lakhs and all the amount was reimbursed.
Year-wise and district-wise financial progress under World Bank Assisted Jalnirmal
Additional Financing Support Project
(Rs. in lakhs)
Sl.
No. Office 2011-12 2012-13 2013-14 Total
1 Head Office,
Bangalore
338.52 324.18 406.28 1330.39
2 Bagalkote 1339.99 3293.63 2057.25 6759.09
3 Belgaum 2567.99 2210.89 1398.06 6251.8
4 Bidar 2123.58 2782.86 4394.83 9371.99
5 Bijapur 303.97 492.79 123.38 954.36
6 Dharwad 1041.89 1982.87 1666.23 4778.81
7 Gadag 951.08 915.59 1048.90 2984.64
8 Gulbarga & Yadgir 4248.75 6959.19 3549.01 14868.46
9 Haveri 188.17 177.50 121.96 509.50
10 Karwar 1008.74 1189.67 670.06 2943.75
11 Koppal 658.06 478.40 300.96 1477.33
12 Raichur 1672.85 6874.79 4250.99 12883.04
Total 16443.59 27682.36 19987.91 65113.16
Physical Progress under the Project
Physical achievement
2011-12 2012-13 2013-14
(As at the end of
Mar-2014)
Observations of two important audit enquiry
of 2013-14 / Audit Enquiry Para (Enter
Accounts Audit / Inspection date & reference
number of report). Enter if Accounts Audit /
Inspection have not been done.
(1) (2) (3) (4)
WS 124 closed WS 227
closed WS
105
closed NIL
R&D 454
closed R&D
27
closed R&D -
Rural Development & Panchayat Raj Department Annual Report 2013-14
110
File photos of the works carried out under World bank aided Project „Jal Nirmal‟
Hammagi SSI water supply scheme in Mundaragi Taluka of Gadag District.
KOTIKAL MULTI VILLAGE SCHEME in Badami taluka, Bagalkot District
As at the end of March-2014, 496 Water Supply Schemes have been taken up and all
the 495 schemes have been tendered & awarded. Since inception, 461 Water Supply schemes
have been completed including 105 Water Supply Schemes which are completed during the
financial year, as of March-2014.
Under Roads & Drain works, 481 Roads & Drain works have been taken up and all
the 481 Roads & Drain works taken up under the project have been completed.
An overview of physical progress under World Bank Assisted Jalnirmal Additional
Financing Support Project as at the end of March-2014 is given below:
Rural Development & Panchayat Raj Department Annual Report 2013-14
111
District-wise physical progress under World Bank Assisted Jalnirmal Additional
Financing Support Project
Sl.
No. District
Water Supply Schemes Roads & Drain Works
No. Achievement No. Achievement
1 Bagalkote 23 20 33 33
2 Belgaum 21 21 51 51
3 Bidar 23 11 85 85
4 Bijapur 43 42 00 00
5 Dharwad 11 11 13 13
6 Gadag 05 05 35 35
7 Gulbarga 101 96 125 125
8 Haveri 08 08 03 03
9 Karwar 166 162 51 51
10 Koppal 03 03 27 27
11 Raichur 61 56 43 43
12 Yadgir 31 26 15 15
Total 496 461 481 481
* Under the project, 461 schemes have been completed out of 496 Water Supply schemes taken up
excluding 18 MVS.
Under World Bank Assisted Additional Financing Project, total of 18 Multi Village
Water Supply Schemes have been taken up, and all the 18 Multi Village Water Supply
Schemes have been tendered and awarded. All the 18 Multi Village Water Supply Schemes
are under different stages of progress and 10 schemes are under trial run.
Action has been initiated to complete the balance Water Supply Schemes & Multi
Village Water Supply Schemes which are under different stages of progress with in the
project period i.e. June-2014.
3. Details of awards / recongnition in the reporting year
The World Bank Implementation Support Review Mission No.7 visited the state
during November-2013 to supervise water supply and sanitation activities under the World
Bank Additional Financing Second Karnataka Rural Water Supply & Sanitation Project
implementing through KRWSSA. The Aide Memoire of the above mission states that
During the past six (6) months, KRWSSA / GOK has achieved substantial physical and
financial progress and completed a good number of schemes.
Project has made efforts to involve women in planning and implementation phases of the
project.
The Mission recognized the good efforts made by the current State Level Leadership.
Rural Development & Panchayat Raj Department Annual Report 2013-14
112
Technology demystification led to the community not only to design and construct
complex water supply schemes based on surface water source but also to own and
manage them for over five years.
Project has planned for innovative measures towards supplementing/complimenting the
service delivery of the schemes by way of introducing a) SCADA b) Mobile purified
water distribution c) Solar pumping d) Water purification and KIOSK e) V-wire
technology etc.
Project has introduced a mechanism called Sustainability Monitoring Exercise (SME), a
participatory tool, to assess scheme‟s functioning/sustainability (Physically, Financially
and Institutionally) and measures to address issues emanating from the exercise.
4. Actions taken up in the effective implementation of the project and Evaluation
Study & Report
Karnataka Rural Water Supply and Sanitation Agency is taking regular reviews under
the chairmanship of Director for the effective implementation of the project. In review
meetings, if there is any problems in the implementation of project schemes, action is being
taken up to overcome from the concerned. If there is necessary, Director himself visit the
field with the concerned district nodal officer, concerned officers of technical and financial
and give suggestions / direction after the inspection, otherwise give direction to concerned
district nodal officer, concerned officers of technical and finance to visit the field and to
submit the Inspection Report. Based on the Inspection Report, he discusses with the other
senior officers of agency and if there is necessity, guidance from the subject experts, Vice
President of Governing Council or Principal Secretary to Government, RD & PR Department
and Chairman of Governing Council or the Additional Secretary to Government or
Development Commissioner to solve the problems and give directions. If there is a necessity,
the subjects have been sought under Governing Council and get the administrative and
technical approval to complete the schemes without delay or stop.
Further, at the District Level, Deputy Project Manager of DSU visits the works and
regular reviews are also being taken up by the Project Manager (CEO, ZP).
Capacity Building Activity Process:
Development of capacity of different stakeholders to effectively manage the assets
created as per the objectives and norms of the project, is the major objective of capacity
building activities. Bringing a change in the attitude and perception of different stakeholders
for sustainable management of water supply schemes is a continuous process. Training
programme incorporating sustainability, preparation of realistic budget, institutional
development of VWSCs, Joint Committee and GPs, Strategy for monitoring of Water Quality
and Staff functioning, reconciliation of power supply bills, exposure visits to the schemes
which are performing well, was designed in consultation with District Support Units and
emphasis has been given on strengthening of organization structure. Training programmes /
workshops / review meetings have also been conducted in all the project districts.
Rural Development & Panchayat Raj Department Annual Report 2013-14
113
Water Quality:
Under World Bank Assisted Jal Nirmal Additional Financing project, a three tier
water quality monitoring system is adopted as followed in the Jalnirmal Project. For testing
everyday residual chlorine Chloroscopes, Fluoroscopes for Fluoride test and H2S kit for
bacteriological contamination have been provided to project habitations for Water Quality
monitoring at the time of the implementation of the previous project. Under capacity building
training activity, various stake holders were trained in conducting water quality tests like
testing for Residual Chlorine, Fluoride & Bacteriological contamination as a regular activity
of GP/VWSC and also to record in the register. In the project districts, habitations are
considered as water quality affected habitations, where the ground water sources are affected
with high levels of chemical parameters like Fluoride, Nitrate, and TDS & Total Hardness.
For quality affected habitations, various measures have been undertaken to improve
the quality of drinking water which includes ground water source, blending, dual water
supply, DF/RO plants. In Jalnirmal Additional Financing project, a shift in focus to surface
sources for ensuring water sources are sustainable which will provide water services to
habitations having both quality and quantity issues
Construction Quality Surveillance:
For ensuring quality of civil works taken up under the project and for addressing
construction quality issues, apart from the regular monitoring by SA Engineers, DSU
Technical Team and KRWSSA Technical Team, the services of Independent Construction
Quality Surveillance Consultants (ICQSC) have been procured for the project. The ICQS
Consultants visit the project villages to inspect the quality and progress of works and submit
field visit reports to KRWSSA / Project Manager / VWSC. The main objectives of this
exercise are to monitor –
Quality of ongoing works and performance of completed works
The quality of Supervision at the field level
Construction Management Practices of the SAs / DSU
Quality of construction and construction materials used in works.
The strategy adopted to achieve the above said objectives is as follows –
Procurement of external ICQS Consultants who are assigned with monthly field visits
to project districts.
Compulsory Quality Tests of constructions materials and verification of material
quality test reports by Inspecting Officers.
Pre-shipment / Post-shipment / Third Party Inspections planned.
Technical Manual with detailed procedures and formats for various construction
materials prepared in Kannada & distributed to the project villages already.
Close monitoring and pursuance with implementing offices for compliance to the
observations made by ICQS Consultants during their field visits.
QA training to VWSC.
Rural Development & Panchayat Raj Department Annual Report 2013-14
114
QA training to the project implementing engineers.
QA Checklists prepared for completed schemes
Operation & Maintenance:
The Karnataka Panchayath Raj Act, 1993 has stipulated that the Operation &
Maintenance (O&M) of Rural Water Supply Schemes is one of the statutory responsibilities
of Gram Panchayath. The Government of Karnataka vide Order dated 17-12-1999 has
transferred the responsibilities of O&M of all Mini Water Supply and Piped Water Supply
Schemes to Gram Panchayaths. Similarly, the State Government vide order dated
26-02-2004, has transferred the responsibilities of O&M of Hand Pumps also to Gram
Panchayaths. The Government has also issued guidelines for constitution of Village Water
Supply and Sanitation Committee (VWSC) vide Circular dated 3-05-2005. Accordingly, the
water supply schemes after completion are dedicated to VWSCs for Operation and
Maintenance based on the user charges to be collected locally.
Monitoring & Evaluation:
To build up in house skill and capacity of Monitoring and Evaluation has been
internalized with the approval of the Governing Council. Accordingly, the existing M&E
coordinators at ZP – DSUs have been engaged on Individual Consultancy basis and are now
reporting directly to DSUs and KRWSSA.
Sustainability Monitoring Exercise:
The implementation of the World Bank Assisted Jalnirmal Additional Financing
Support Project is based on the premises to bring significant shift from conventional service
approach to demand responsive participatory approaches aiming at achieving accessibility,
reliability, equitability and greater sustainability of investments in water and sanitation sector
in the state as followed in the implementation of the Second Karnataka Rural Water Supply
and Sanitation Project namely Jal Nirmal Project.
The project has adopted a participatory tool called Sustainability Monitoring Exercise
(SME) to measure these achievements including the project‟s intended impact and
implementation results on the ground. SME is also considered as part of the Exit Policy of the
project aiming at ensuring physical, financial and institutional sustainability of schemes
implemented in the project villages. SME for completed water supply and sanitation schemes
(at least after six months), as adopted in the World Bank Assisted Jalnirmal Project, is
conducted through a multi-disciplinary team comprising engineers / social scientists from
NGOs / Consultants, representatives of Village Water Supply and Sanitation Committee
(VWSC), members of village community both men and women, representatives of Zilla
Panchayath District Support Unit (ZP-DSU) / Panchayath Raj Institutions (PRIs) who visit
and transect the village and subsequently carry out the SME following participatory
approaches. Each SME is of 24 hours duration covering water supply hours of both morning
and evening.
Rural Development & Panchayat Raj Department Annual Report 2013-14
115
Besides collecting information about the schemes using structured questionnaires, the
exercise also focuses on monitoring and analyzing of i) system functioning ii) user‟s
perceptions iii) operation, maintenance and management iv) organization and governance etc
for sustainability assessment results of the completed schemes representing in terms of
Highly Likely Sustainable, Likely Sustainable, Uncertain and Unlikely Sustainable.
In order to ensure long term sustainability of completed water supply scheme delivery
system and to improve its efficiency further, KRWSSA has been used in-house resources
across the project district and the First Round Sustainability Monitoring Exercises (SMEs)
has been taken up for 396 schemes, out of these, SME has been conducted for 273 schemes
and further exercises is under way. Second Round SME activities are also underway through
external agency, M/s. Ecorys India Pvt. Ltd., Bangalore for completed 300 schemes (225
schemes from WB Assisted Jalnirmal Project and 75 from Additional Financing Project). All
300 SME activities have been completed. Guidance is being given to Villages / GPs for to set
right the discrepancies found in the sustainability of the project.
a) New Rules & Regulations, Government Orders issued by the Department – If any
It is the responsibility of the state government to prepare the State Policy on
Operation and Maintenance of Rural Drinking Water Supply Schemes, and the same has been
given to KRWSSA. Accordingly, KRWSSA has prepared and placed the state O&M policy
note before the State Cabinet for acceptance, and the State Cabinet has approved the O&M
policy. A Government Order in this regard has also been issued which stipulates as under:
a) Adopting State Policy on Operation and Maintenance for Rural Drinking Water
Supply Schemes Statewide.
b) Establishing a revolving fund at the State and Zilla Panchayath Levels and to meet
the gap between the O&M cost of Rural Water Supply Schemes and the tariff
collected from the amount available under the Revolving Fund.
c) Moving from Bulk Water Supply System to Volumetric Water Supply System.
d) O&M for complex schemes, based on surface water source, to be outsourced to
private agency.
Achievement in Human Resource Management and Administrative Activities
Details of Officers / Staff worked during 2013-14
Sl. No. Category No. of Officers / Staff Male Female SC ST
1 A 07 3 4 - -
2 B 11 6 5 1 -
3 C 13 8 5 - -
4 D 7 7 - - 1
Rural Development & Panchayat Raj Department Annual Report 2013-14
116
Details of vacant posts, retired / to be retired during 2013-14
Sl. No. Category Vacant Posts Retired To be retired
1 A 3 2 -
2 B 4 1 -
3 C 7 - -
4 D 0 - -
Details of Officers / Staff taken up Training during the year 2013-14
Sl. No. Category State Training
Programmes
Out of State Training
Programmes
Foreign Training
Programmes
1 A 1 3 -
2 B - - -
3 C - - -
4 D - - -
Total 1 3 -
Details Legislative Assembly / Legislative Council / Call Attentions answered
Legislative Assembly
Questions
Legislative Council
Questions
Answer to Call
Attentions
Questions to be answered
in the next Session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Legislative
Assembly
Legislative
Council
13 13 2 2 1 1 - -
Right to Information 2005
Applications
received
Answered in
time
Fee received
for Forms +
Amount
received to
give copies of
records
Applications decided after
Higher Requisition
Penalty (in
Rupees)
No. of Cases
decided from
the Higher
Requisition
authority
No. of Cases
decided from
the RI
Commission
07 07 240 - - -
6) Audit Report
Under World Bank Assisted Jalnirmal Additional Financing Support Project
Rs.18178.65 lakhs is released expenditure has been incurred during the financial year 2013-
14. Procurement of Statutory Auditor for auditing 2013-14 project expenditure are under
progress.
* * * * *
Rural Development & Panchayat Raj Department Annual Report 2013-14
117
7.3 NIRMAL BHARAT ABHIYAN
Project overview, target fixed and objectives:
Aim of NBA: The Nirmal Bharat Abhiyan is a Centrally Sponsored programme. Its
aim is to free rural areas from dirtiness, filthiness, eradication of open defecation in rural
areas etc., and to achieve total sanitation in the rural areas . This programme was earlier
known as “Total Sanitation Campaign “and was introduced on “Mahatma Gandhi Jayanti
Celebrations Day “ on 2.10.2005 throughout the country for implementation in all rural areas
of the State . The TSC has been re-launched as “Nirmal Bharat Abhiyan” on 1.4.2012. It is a
time bound programme till 2022 and aims to achieve 100% targets by then.
The aims and objectives:
The objectives of the scheme is to see that every family, Schools and Anganwadis in
rural areas have access to use of toilet facilities,, roads are clean. wastages, and used water,
are disposed off in a proper and hygienic manner and ultimately to achieve total sanitation in
rural areas.
Project period: 2005 to 2022 (TSC - 2005-2012.; NBA 2012 – 2022
Project outlay: Rs.1084.75 Corers (2004 to 2012)
The aim of NBA is to improve the standard of living of the rural population by
educating them on the need of sanitation; individual cleanliness, family and community
oriented cleanliness; to provide sanitation facilities to all schools and anganawadis in the
villages, to inculcate good habits among the rural children; to see that community
themselves disposes off solid and liquid waste in proper manner. Achieving success in all
these areas, the primary objective of NBA.
Primary components of NBA:
Household Toilets. One of the primary objective of the NBA is to provide toilets to all
families in the villages and to ensure that they make use of the same.
The Government of India renamed the Total Sanitation Campaign as Nirmal Bharat
Abhiyan from 01.04.2012. Under the Nirmal Bharat Abhiyan Programme, both BPL and
APL (APL beneficiaries to be restricted to SCs/STs,) small & marginal farmers, landless
labourers with homestead, physically handicapped and women headed households) are
eligible for payment of incentive of RS. 4700/-(Rs. 3200/- by Central Govt, & Rs.1500 by the
State Govt. and Rs.4500/- being 26 man-days wages under MGNREGA and Rs. 800/- as
beneficiary contribution, totaling to Rs.10,000/- for construction of individual house hold
toilets. Further, the Government has also announced additional incentive payment of Rs.
5000 to be paid from State Grant under SCP & TSP of Social Welfare Department. to SC
& ST families With this, the SC & ST families will get incentive of Rs.15000/-
School and Anganwadis Toilets: - With the extension of sanitation facility in Government
Schools and Anganwadies, the habit of cleanliness in the children is being encouraged right
Rural Development & Panchayat Raj Department Annual Report 2013-14
118
from their childhood. The Central Government and State Government are granting subsidy
in the ratio of 70:30 for providing sanitation facilities in Schools and Anganwadis. The NBA
guidelines provides incentive of Rs., 35,500/- for schools and Rs.8000/- for Anganwadis for
construction of toilets.
It has come to the notice that the urinals/toilets existing in many of the Schools is
inadequate and is not in proportion to the strength of the children. Action is being taken to
provide adequate toilets/urinals based on strength of the children in collaboration with SSA
(Sarva Shikshan Abhiyan).
1. To create awareness on cleanliness and usage of toilets among the rural children of
Anganwadies in the districts, it has been decided to construct child- friendly toilets
and also to increase the present grant of Rs.8000/- to Rs.15000/-. (NBA-Rs.8000/-,
MGNREGA- Rs.4500/- Thirteenth Finance commission in GP – Rs.2500/-. Total
Rs.15000/-)
Solid and Liquid Waste Management:- To achieve total cleanliness in rural areas, more
importance is being given for management of solid and liquid waste disposal and 10% of
the total project outlay of the district is earmarked for this purpose. The share of Centre,
State and Community in this regard is 60:20:20 respectively. The Central Government has
made a provision for payment of Rs.7.00 lakhs to Rs.20.00 lakhs to each Gram Panchayat.
depending on the population of the GP, for management of Solid and Liquid disposal .
+Implementation Methodology: The NBA programme is being implemented through
Panchayat Raj Institutions. The responsibility of implementation NBA activities in villages is
fully lies with the concerned Gram Panchayat.
Administrative features of the Section
Mission Director
Additional Director (Water & Sanitation)
Account Assistant - (1) Consultant (IEC & HRD)- (2)
Data Entry Operator- (2)
Group „D‟ - (1)
Physical Progress
Sl.
No
Component Progress
1 Total IHHL‟s 505517
2 School Latrines 1503
3 Anganwadi Latrines 1416
4 Sanitary Complexes 88
5 Solid & Liquid Waste Management 101
District wise details given in annexure 7.3 (A)
Rural Development & Panchayat Raj Department Annual Report 2013-14
119
Financial Report for 2013-14
Sl.
No
Opening
Balance
Available funds (OB) Total
releases
Expenditure Total
expenditure Centre State Centre State
1 26439.58 6594.68 2866.00 35900.26 15257.41 3883.64 19141.06
The Districts wise details given in annexure 7.3(B) .
Details of awards / admiration in the year under report.
NIRMAL GRAM PURASKAR The Central Government, with a view to encourage
Panchayat Raj institutions to achieve total sanitation, has instituted an award viz. “Nirmal
Gram Puraskar” at Gram Panchayath, Taluk Panchayath and Zilla Panchayath levels. The
criteria adopted for awarding NGP is construction and usage of toilets by all households in
the villages, .proper management of Solid Liquid Waste disposal in the villages. The Nirmal
Gram Puraskar award is the highest honuor instituted by the Central Government for
awarding to GPs, TPs and ZPs who achieves Open Defecation Free (ODF). In addition to
the award, the Central Government also gives cash award of Rs.50,000 to 5.00 lakhs to
Grama Pnchayats Rs.15 to 20.00 lakhs to Taluk Panchyats; Rs.30 to 50 lakhs to Zilla
Panchayats, based on the population fixed for GPs,TPs and ZPs ,
Achievement of NGP in the State The Nirmal Gram Puraskar award with stipulated cash
award has been given to 1069 Gram Panchayaths, 6 Taluk Panchayaths and One Zilla
Panchayat in Karnataka since 2007.
Nairmalya Awards (State Awards): In spite of making all efforts to improve sanitation in
the rural areas, the progress achieved is not to the desired level due to various hurdles. There
is inspirational progress only in the Coastal and Malnad Districts of Dakshina Kannada ,
Uttara Kannada, Udupi, Shimoga, Kodagu and Chikmagalur districts. In majority of the
districts, the progress achieved is not satisfactory. The main reason for this is the difficulty
faced in persuading rural people and making them to unite in this regard. Though the toilets
have been provided, the people do not have inclination to use the same. Therefore, expected
results could not be achieved in the construction of toilets. The rural people can be
encouraged to have sanitation habits by educating them and involving community
participation and giving incentives to Panchayat Raj Institutions. With this background in
view, this programme has been taken on priority to achieve fruitful results and to encourage
the panchayat Raj Institutions, the State has put in motion awarding State Awards on Gandhi
Jayanti Day on 2.10.2009. This has been going on every year. To hasten the
implementation of rural sanitation, Acceleration Award for rural sanitation and Sustainability
Award for achieving sustainability in the Gram Panchayats which have been already
awarded. The ” Nairmalya Award” at Taluk Level ,Rajata Nairmalya” at District level and “
Nairmalya Rathna” at State levels are being awarded. The amount given is Rs.1 lakh to
Rs.19 lakhs to Grama Pnchayats, Rs.20.00 lakhs to Taluk Panchayats and Rs.30 lakhs to Zilla
Panchayats.
Achievement in Nairmalya awards: The State Government gives Nairmalya Award for
achieving total sanitation and sustainability. In the year 2010-11, 2 ZPs, 3 TPs and 129 GPs,
Rural Development & Panchayat Raj Department Annual Report 2013-14
120
88 schools and 82 Anganawadis have bagged this award and a total of Rs.491 lakhs has
been given as cash prizes. The process of selection of State Nairmalya Award for 2011-12
has been completed and preparation are under way for conducting the award function.
Rs.491 lakhs has been distributed as prize money to Gram Panchayaths, Taluk
Panchayaths and Zilla Panchayaths for the year 2010-11.
Evaluation:- The evaluation of progress achieved under Nirmal Bharat Abhiyan has been
entrusted to M\s Pragna Research & Consultancy and an agreement has been entered with
them to submit the complete report for the period ending July 2012 and the report received
has been submitted to the Government.
Evaluation GPs for NGP: The GRAM has been appointed for evaluation of GPs who have
been awarded NGP and a report in this regard has been received and action has already been
initiated on the report received .
Evaluation of Community Toilets: HKCAL has been appointed for evaluation of
community toilets and they have taken up evaluation in selected GPS
Management of Human Resource and progress of Administrative Activities
Details of officers / officials worked during 2013-14 (As at the end of March-14)
Sl.
No.
Category Total No. of
Officers / Staff
Men Women SC ST
1 A 1 - 1 - -
2 B - - - - -
3 C - - - - -
4 D - - - - -
Details of vacant posts, retired / to be retired during 2013-14
Sl. No. Category Vacant Posts Retired To be retire
1 A 1 - -
2 B - - -
3 C - -
4 D - - -
Details of outsourced employees during the year 2013-14
Sl. No. Post Nos,
1 Personal Assistants (Consultants) 2
2 Advisors / Programme Managers
(Account Assistant)
1
3 Others (Data Entry Operators) 2
2 Group-D 1
3 Drivers 0
Rural Development & Panchayat Raj Department Annual Report 2013-14
121
Details of Officers / Staff who have been trained during the year 2013-14
Sl.
No.
Category State Training
Programmes
Out of State
Training
Programmes
Foreign
Training
Programmes
1 A 3 - 1
2 B - - -
3 C - - -
4 D - - -
Total 3 - 1
Details of awards received during 2013-14
Sl.
No.
Award details If it is personal , the name
of the Officer / official
Staff Name
Remarks
1 National Award Nirmal Gram Puraskar Evaluation is under process
2 State Award
Narimalya Award The selection process has been
completed. Action is under way
for conducting the programme.
Details of Legislative Assembly / Legislative Council / Call Attentions answered
Legislative Assembly
Questions
Legislative Council
Questions
Answer to Call
Attentions
Questions to be
answered in the next
Session
Total
Received
Total
Answered
Total
Received
Total
Answered
Total
Received
Total
Answered
Legislative
Assembly
Legislative
Council
3 3 5 5 1 1 - -
Right to Information 2005
Application
received
Answered
within the
time limit
Fee received
for Forms +
Amount
received to
give copies
of records
Applications finalized after
Appeals made
Penalty
imposed
(In Rupees) No. of Cases
decided from
the Higher
Requisition
authority
No. of Cases
finalized
from the RI
Commission
6 6 - - - -
Audit Report
The Audit report on the audited accounts for the year 2012-13 has already been sent
to the Central Government.
Rural Development & Panchayat Raj Department Annual Report 2013-14
122
ANNEXURE
Rural Development & Panchayat Raj Department Annual Report 2013-14
123
Rural Development & Panchayat Raj Department Annual Report 2013-14
124
Annexure 2.1(A)
Details of Sanctioned, filled and vacant posts of different cadres in the Rural Development
and Panchayat Raj Department. (As on 31.03.2014).
Name of the Post
Sanctioned Filled Vacant
Chief Executive Officer of ZP 30 30 -
Deputy Secretary (Selection Grade)
(Pay scale: Rs.44250-60600)
13 13 -
Deputy Secretary (Senior Scale)
(Pay scale: Rs.40050-56550)
26 23 03
Project Director
(D.R.D.A.Cell)
30 28 2
Deputy Project Manager
(Jal Nirmal Scheme)
13 11 02
Executive Officer
(Pay Scale: Rs.28100-50100)
Group A (Junior Scale)
Assistant Secretary
176
39
66 (RDPR)
102
(Deputation)
Total 168
39
08
-
Asst. Project Officer,
(D.R.D.A. Cell)
30 28 02
Assistant Director (Rural Employment)
Pay Scale Rs. 22800-43200) Group-B
176 168 08
Panchayat Development Officer
(Pay Scale Rs. 20,000-36300)
Group-C
5629 4228 1401
Grama Panchayat Secretary Grade-1
(Pay Scale: Rs. 14550-26700) Group-C
2166 1350 816
Grama Panchayat Secretary Grade-2
(Pay Scale: Rs. 11600-20100) Group-C
3463 3260 203
Second Division Accounts Assistant,
(Pay Scale: Rs. 11600-20100)
Group-C
2500
14,291
712
10058
1788
4233
(a) Group-C Posts of all Zilla Panchayats
(b) Group-D Posts of all Zilla Panchayats
2955
1008
1757
733
1198
275
Total No. of Group-C and D Posts 3963 2490 1473
Group-C and D Posts of all Taluk Panchayats 7939 4643 3296
Total No. of all Group-C and D Posts of all Zilla
/ Taluk Panchayats 11902 7133 4769
Rural Development & Panchayat Raj Department Annual Report 2013-14
125
Annexure 2.1 (B)
Panchayat Raj Engineering Department
Name of the Post
Sanctioned Filled Vacant
Chief Engineer,
(Pay Scale: Rs.48900-63600)
2 2 -
Superintending Engineer
(Pay Scale: Rs.40050-56350)
Group-A Senior Scale
12 11 01
Executive Engineer
(Pay Scale: Rs.36300-53850)
87 79 08
Assistant Executive Engineer
(Pay Scale:.28100-50100)
Group-A Junior Scale
Equivalent Posts
217
71
288
207
68
275
10
03
13
Assistant Engineer
(Pay Scale:22800-43200)
Group-B
596 428 168
Junior Engineer
(Pay Scale Rs.17650-32000)
Group-C
1541 1036 505
Rural Development & Panchayat Raj Department Annual Report 2013-14
126
Rural Development & Panchayat Raj Department Annual Report 2013-14
127
Rural Development & Panchayat Raj Department Annual Report 2013-14
128
Rural Development & Panchayat Raj Department Annual Report 2013-14
129
Rural Development & Panchayat Raj Department Annual Report 2013-14
130
Rural Development & Panchayat Raj Department Annual Report 2013-14
131
Rural Development & Panchayat Raj Department Annual Report 2013-14
132
Annexure - 5.4 (A)
Progress for the year 2013-14 under Western Ghat Development Programme
(Rs. in lakhs)
Sl. No. District Budget
allocation for
2013-14
Total funds
released
Total
achievement
(including O.B.)
1 Belgaum 524.52 524.52 530.58
2 C.R.Nagar 97.75 97.75 88.56
3 C.magalur 300.55 300.55 288.99
4 D.Kannada 241.55 241.55 243.28
5 Dharwad 82.4 82.4 78.47
6 Hassan 239.77 239.77 264.75
7 Kodagu 273.75 273.75 266.33
8 Mysore 114.19 114.19 114.68
9 Shimoga 441.56 441.56 446.12
10 U.Kannada 562.85 562.85 531.05
11 Udupi 304.54 304.54 339.65
Total: 3183.43 3183.43 3192.46
12 WGDP Cell 56.57 56.57 69.09
GRAND TOTAL: 3240 3240 3261.55
Rural Development & Panchayat Raj Department Annual Report 2013-14
133
Rural Development & Panchayat Raj Department Annual Report 2013-14
134
Rural Development & Panchayat Raj Department Annual Report 2013-14
135
Rural Development & Panchayat Raj Department Annual Report 2013-14
136
Rural Development & Panchayat Raj Department Annual Report 2013-14
137
Rural Development & Panchayat Raj Department Annual Report 2013-14
138
Rural Development & Panchayat Raj Department Annual Report 2013-14
139
Rural Development & Panchayat Raj Department Annual Report 2013-14
140
Rural Development & Panchayat Raj Department Annual Report 2013-14
141
Rural Development & Panchayat Raj Department Annual Report 2013-14
142
Rural Development & Panchayat Raj Department Annual Report 2013-14
143
Rural Development & Panchayat Raj Department Annual Report 2013-14
144
Rural Development & Panchayat Raj Department Annual Report 2013-14
145
Rural Development & Panchayat Raj Department Annual Report 2013-14
146
¤zÉðñÀPÀgÀÄ, ¸ÀPÁðj ªÀÄÄzÀæuÁ®AiÀÄ, «PÁ À¸ËzsÀ WÀlPÀ, ¨ÉAUÀ¼ÀÆgÀÄ-01/PÁ ÀÆ 171-1000 ¥ÀæwUÀ¼ÀÄ (¦1)
Rural Development & Panchayat Raj Department Annual Report 2013-14
147