Div 3BILL No. 4 Third Ring Rd Project/Commerical Building -
The work of the concrete structure and buildings
Total PriceUnit priceQTYUnitDescriptionS.No
PreprationStintStintAll preparatory items include a preview preview due diligence site and processing Consultative office equipment and tools and provide electricity, water and work wall protection and number 2 plate illuminated for the project, cranes, scaffolding, guard and work borings and necessary business space and review structural design
StintStintCleanliness and the evacuation of the site and include the removal of waste and the roots of the plant and remove any old facilities or trees, if any, and all the necessary to start a business
Civil works
The general locationExcavation, backfilling and compaction and settlement
2169m3Includes drilling in all types of soil, including rock materials soil, which coincides with the drilling of the level of the current location and even the level of depth that allows to establishment them and dewatering when found necessary to protect and support aspects of the mechanical and dad to carry out reclamation and procedures so that the level of the bottom of the floor slab by elevations required drawings and specifications and the transfer of drilling output to the approved places and not to use the output of drilling in the rubble as instructed by the supervising engineer's report and recommendations of the soil
303m3Backfill soil fit your hand and mechanically with the use of water on the layers every 30 cm according to the plans and specifications and report soil and instructions
1According to the outer wall charts
Ready-mix concrete Work
Concrete in contact with the soil
227m3The supply of ordinary concrete is poured armed with a thickness of 150 mm, including the intensity of wood and leveling up the level of drilling and using sulfur resistant cement and concrete fracture strength of not less than 250 kg / cm 2 with a barrier halitosis down foundations thickness of 500 microns.2722m3Supply and pour concrete for Bashh including the intensity of wood and fittings SABIC greased epoxy and preparation surfaces, processing and use of sulfur resistant cement and not less breakage strength 300 kg / cm 2 after 28 daysm3383m3Kh.m armed walls like the previous item0.00.00.0348m3Kh.m water tank (comprehensive walls and columns)Non-contact with the soil concreteSupply and pour concrete for the following parts including the intensity of wood and fittings SABIC and treatment of surfaces and ordinary Portland cement used on the fracture strength of not less than 350 kg / cm 2 after 28 days from the date of casting
0.00.01745m3Kh.m columns (of the role of the basement until the surface) comprehensive walls of the elevator
0.00.05868m3Kh.m Bishop + beams
0.0TOTAL SR
building work
Maan AlMaddah: Maan AlMaddah:Div 4 Masonary workSupply and Building
Block Larry discharger (volcanic) and Red Ward vertical schemes by
using cement mortar necessary according to the specifications and
drawings with the work of the corners Gelovanez necessary to
install with columns and beams and installation of iron clasped
each Mdemaqin insulator with a foreign buildings from the
inside
4833m2Block discharger thickness of 200 mm for external walls
4361m2Block discharger thickness of 100 mm with the internal walls of the confrontation external walls
7778m2Block discharger 200 mm internal walls
0.0Total SR
Insulation work
0.00.01315m2Isolate bathrooms and kitchens
0.00.03798m2Isolate down Allepeshh Foreign walls of basements and reservoir
0.00.04360m2Aspro isolate thermal foam surfaces thickness of 50 mm
0.00.01327m2Isolating aspects of the walls surfaces with floors offer 25 cmm2215m2Supply blocker water leak water tank thickness of 250 mm
1171m2Supply and poured concrete foam tendencies surfaces average thickness of 8 to 13 cm
3798m2isolate the water tank from the inside epoxy
0.0Total SRArchitectural worksThe general location
2522Supply and poured concrete floors external pier thickness of 100 mm according to the plans and specifications
3852Antrlk business facilities as required drawings and specifications
102.Supply and installation works of Foreign edgings Normal and Agricultural according to the charts and technical assets and instructions Engineer
2522
73Aluminium door size; 2.10x1.80m D-1 ( TYPE A ) 1
152Wooden Door size ; 0.80x2.10mD-1a ( TYPE A ) 3
42Wooden Door size; 0.90x2.10m D-D ( TYPE D ) 2
2
1
136.00Aluminium window size 2.10x0.60mW 3 ( TYPE C )1
26.00Aluminium window Size; 2.10x0.50m W 4 ( TYPE C )3
88.00Aluminium window size 0.50x2.10mW 6 ( TYPE D )4
1,968.002
312.002
12072 Material cost not Exceeded sr250/m2
1175.
8136.
28822 300 600 materialo purchase not Exceeded SR 250/ m2
12352 material cost not Exceeded SR 250/m2
7592 -
4012. ()
51592
63002 2 +3 Epoxy paint
11712
0.0 SR
35.0043132
35.00197402
45.00190232
45.0043132
250.0074792
250.007582
45.0012352
0.031602 Material l cost not Exceeded SR 350/ m2
15,000.002
250.00195
1,250.00324.
45.0037202
125.00636. 45
85.00483.
115,000.001
SR
:
004 (SCREW) 200 120 54/44 () :
:
005 (END SUCTION) 480 / 100 :
:
((FCU 0.2" 2 : :
004(FCU-01) 6 2400 3/
0011(FCU-02) 4 1600 3/
001(FCU-03) 3 1200 3/
:
0014 (AXIAL) 500 3/
0 SR
:
(AXIAL) 300 1.5 : :
001(EX.F.-01) 12000/24000 3/
001(EX.F.-02) 12000/24000 3/
001(EX.F.-03) 12000/24000 3/
001(EX.F.-04) 12000/24000 3/
001(EX.F.-05) 12000/24000 3/
:
(PRESSURIZATION FAN) : :
001(S.F.-1) 20000 3/
001(S.F.-1) 20000 3/
001 40
002 BUTTERFLY VALVE 5
0022 BUTTERFLY VALVE 4
002 BUTTERFLY VALVE 3 0012 BUTTERFLY VALVE 2.5
00138 BALL VALVE 2
001 BALANCE VALVE 5
0011 BALANCE VALVE 4
001 BALANCE VALVE 3
006 BALANCE VALVE 2.5
0069 BALANCE VALVE 2
0 SR
001 (SMACNA)
001 0.6 (SMACNA)
001 24 /3 1
001 84 /3 2
:
003224" 24"
004020" 20"
:
003224" 24"
0020026" 8"
001 0.5 3
001
001 (B.M.S.) .
0073 (BTU-METER) .
001
001
0 SR . 1 . 2 . 3 . 4 SDR7.4 (20 ) ( ).5 uPVC 10 . 6 . 7 .8 uPVC 6 .9 uPVC .10 . 11 .12 .13 .14
:
00150 .
00160 60 .
0081 .
00150 3 .
004 4 .
00156 50
.
002 3
006 4
0 SR
04 4 .
033 Garage drain 4 .
: SDR7.4 20 .
0020. 32
0020. 40
00105. 50
0075. 63
00165. 75
00175. 90
00245. 110
0020. 125
0020. 160
.
0039 32
002 40
001 50
004 75
002 90
002 110
001 125
001 160
0 SR
01 3 10 3
01 3 20 3/ 85 (1 +1 + 1 ) :- . . . K.S.B ( ) ( ) ( )
01 2 Circulating pumps 60 3/ 20.
:
(6 )
00180. 6
001,375. 4
00330. 3
00195. 4
003 6
0014 4
0016 3
002 2
004 - :-- 6060 1.0 6060 125
001 3 3 1.5
001 (3) 5 / 15 .0 SR
0040. (10 ) 4 .
001 0.60*0.6 .
001 60*60 .
001 60*60 90 90 .
001 90 .
0 SR
: 1 NFPA UL listed & FM approved.2 Shop drawings ( ).3 As built ( & ( As built ).4 NFPA .5 Inner diameter.6 .7 .8 ( ).9 10
ASTM A53 40 .... NFPA.
001,359. 1
00750. 1.5
00300. 2
00250. 2.5
00600. 3
00900. 4
00150. 6
(ZONE CONTROL STATION) : OS & Y ULFM (TEST & DRAIN) TAMPER SUPERVISORY SWITCH (WATER FLOW SWITCH)
001 3
004 4
004 6
0 SR006 1
OS & Y (Pressure gauge , flow switch) UL/FM.
005 4
001 6
0038 1
00135 (PENDENT) UL/FM 68 5.6
00655 (UPRIGHT) UL/FM 68 5.6
:0044 1 30 1.5 1 6 .
:0048 2.5 30 3 2.5 (Landing Valve) . 6
001 () (4/2.52.5 ) 4 4 .
00155 6 (A,B,C) .
008 CO2 10
003 Dry Pouder 6 .
( horizontal split case fire pump) UL/FM NFPA 20 :: 750 /001: 125
0 SR
(pump vertical turbine multi_stage jokey) :: 75 /001: 185
: . . . ( - - - ). . Flow metar main pressure reducing valve unti-vortex fire pump suction palte with elbows001 .
001
001 2 2.5 4 4
001 6 .
0080 OS & Y 2.5
0 SR
002 1600 ... -380/13800 - 50 / cable box,b-bar box and housing )
(13.8.) (RMU) (R.M.U)
3 L.B.S 630 1 L.B.S 630 0021
0080. (380 ) 2500 .
0075. 13.8 .. 3*120 2 XLPE P.V.C
001 400 ... 50 0.8-50/-380 - - - - - - - 12
001 600 .
.
001MDB-01
001MDB-02
001EMDB
0 SR
(XLPE\PVC) (UPVC) .
0030. 4*25+16 2
002,500.4*35+162
0030.4*120+702
0020.2(4*240+120) 2
00200.4*240+120 2
0050.4*185+95 2
0060.4*50+25 2
:
001ELP-B2
001ELP-B1
001ELP-G
001ELP-P1
001ELP-P2
001ELP-P3
001ELP-S
001ELP-(TY)F
001DB-FAN
001DB-PUMP
001LP-G
(P.V.C)
0082 16
002 -16
0026 16 ()
0 SR
003 LCP
(Isolators)
:
0014 20 - 220
0013 25 - 220
004 32 - 220
004 60 - 380
0076 60 - 380
004 400 - 380
005 100 - 380
001 250 - 380
001 60 - 380
005 60 - 380
.
006 1 - 16
0016 2 - 16
.
001,180 .
. ( ) .
00670 F1
00120 F2
00234 S1
008 S2
00127 WM1
0021 WM2
0045 EM1
0022 EM2
0 SR
001 1 )
001 0.1
001 (PABX) 30/3 (/) (S.L.A) 8 400 - 2
0012 CAT3(40.6) 2 (RJ11)
:
0076 5
001 40
001 200
00400. 3
0020. 30
:
003 32" HR
03 DVR 16 :-DVD writer and RJ45 port & 400-fps recording for each camera Hard disk calculations should be based on 2CIF & a fps for (3) month minimum 00163/1 H-R ( auto iris ,varry focal lens) 16
0021 IP44
0 SR
001 3
() 750 2*1 2
00225
00172
0025 ( )
0027 (95 /)
0019
0019
:
001 (EARL STREAMER) 65 .
001
0079
0 SR
0.00.04 800 . 22 . 1.75/
0.0 SR
BILL No. 4 Third Ring Rd Project/Commerical Building -
GENERAL SUMMARY
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 8
0.0
Page &P of &N
Div 3 (2)
BILL No. 4 Third Ring Rd Project/Commerical Building -
Summary
0 10 20 30 40 50 60 70 8
0
Page &P of &N
Sheet1