+ All Categories
Home > Documents > ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr....

ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr....

Date post: 16-Dec-2015
Category:
Upload: jack-oswin-morris
View: 220 times
Download: 0 times
Share this document with a friend
19
ENGR/PHIL 482 Engineering & Ethics
Transcript
Page 1: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

ENGR/PHIL 482Engineering & Ethics

Page 2: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

2

Instructorso Dr. Ray James, P.E. (Civil

Engineering)o 140 CE—845-7436o [email protected]

o Dr. Charles E. (Ed) Harris, Jr. (Philosophy)o Bolton Hall—845-5697o [email protected]

Page 3: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

William LeMessurier and the CitiCorp Center

A case study in engineering and ethics.

Page 4: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

4

Backgroundo William LeMessurier was the structural

engineer in responsible charge of the 1977 Citicorp building

o Site constraint--historic St. Peter’s Lutheran Church obstructed part of the site

o Innovative design solution used “air rights” above the church, built a new church

o Required unusual first floor column layout

Page 5: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

5

Citicorp Center Statistics

o Located in New York Cityo 59 stories, 915 ft, steel skeletono Engineer: William LeMessurier and Assoc.o First tall building to include a tuned-mass

damper to improve serviceability under wind loading

o Completed 1977 at a cost of $175 million

Page 6: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

6

LeMessurier’s innovative column

layout

Conventional column layout

Innovative column layout

Page 7: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

7

Citicorp building site challenge...

© Norman McGrath

Page 8: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

8

Design of the structure

To employ the innovative

column layout, LeMessurier developed a

series of diagonal braces

to transfer the upper floor

loads to the four columns.

Page 9: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

9

Design of the steel structure

Then he performed an otherwise conventional

structural analysis. To analyze wind loads, he

adopted the usual simplifying assumption

that the critical wind direction was

perpendicular to the widest side of the building.

Page 10: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

10

Design of the steel structure,

cont’d...

An innovative tuned mass

damper system was designed to reduce building sway in design

winds.

Page 11: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

11

Completion, 1977

The Citicorp Center building was

completed in 1977.

In 1978, LeMessurier got a telephone call from an engineering

student...

Page 12: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

12

A new, and serious question is raised...

o Stimulated by the student’s question, LeMessurier initiated additional analyses which led him to discover that, because of the unusual column layout, the critical wind direction was not what he had assumed, but rather, a direction diagonal to the building.

Page 13: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

13

Analysis for diagonal winds...

o His calculations indicated that there would be more wind load in the diagonal members than he had anticipated, so he reviewed their design.

Page 14: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

14

Review of structural capacities...

o LeMessurier had previously learned that a change order during construction had resulted in the substitution of (weaker) bolted connections in the diagonal members rather than the called-for welded connections.

o At the time, the bolted connections appeared to have adequate capacity, so his staff approved the change order.

Page 15: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

15

His disturbing conclusions:

o The structural analysis error (incorrect critical wind direction assumption) coupled with the weaker bolted connections in the diagonal members meant that the diagonal members were overloaded by a design wind from a quartering direction.

o Basically, the Citicorp Center building could collapse in a moderate hurricane.

Page 16: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

16

So…..o You have just learned that your

prize project could, with reasonable likelihood, collapse with casualties in the thousands and losses in the billions.

o What do you do?

Page 17: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

17

What did LeMessurier do?

o Advised his architect client’s lawyer and client’s insurance company

o Advised Citicorp, the building ownero Advised the city authoritieso Installed back-up generators for the

tuned mass damperso Retained a team of meteorological

experts to determine the risk of damaging windstorms

Page 18: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

18

What did LeMessurier do, cont’d?

o Initiated a repair plan whereby the bolted diagonal splices would be reinforced with welded plates to increase their capacity

o Developed an emergency evacuation plan for the area within a 5-block radius of the structure, involving 2000 Red Cross volunteer workers

Page 19: ENGR/PHIL 482 Engineering & Ethics. 2 Sept 2002LeMessurier and Citicorp Center2 Instructors o Dr. Ray James, P.E. (Civil Engineering) o 140 CE—845-7436.

2 Sept 2002 LeMessurier and Citicorp Center

19

What did LeMessurier do, cont’d?

o Created a cover story to provide for the press, to explain the night-time welding operations in progress as an upgrade to reflect a recent change in the NYC building codes.


Recommended