Public Meeting #1April 07, 2010
Clifton Boulevard Transportation
Enhancement Program
2
Collaboration
A Project of the Greater Cleveland Regional Transit Authority
in partnership with the City of Cleveland and
the City of Lakewood
3
Tonight’s Agenda
1. Introduction of Project Team
2. Clifton Boulevard Overview: Where we have been
Where we are nowWhere we are going
4
Consultant Team• Richard L. Bowen + Associates (RLB+A): Lead Consultant• Arcadis: Traffic and Roadway Design • L.V. Surveying: Surveying • McKnight Associates: Landscape Architects • Cleveland Urban Design Collaborative: Community
Engagement and Design • Wanix Architects: Rendering and Station Design • Somat Engineering: Geotechnical Engineering • EdArch Associates: Cost Estimating
5
The Project
To design and engineer enhancements for Clifton Boulevard that have broad public approval and will lead to construction
6
Project Map
7
Overview: Where we have been
Previous Studies
Joint City of Lakewood, Cleveland Planning Study 2006
8
1.IDENTITY: A boulevard is a civic element2.ACCESS: A boulevard makes pedestrian movement easier and safer3.COMFORT: A boulevard reduces the negative impact of traffic on the surrounding neighborhoods
Community Wide Input = Consensus
Joint City of Lakewood, Cleveland Planning Study 2006
9
• Median Functionality• Pedestrian Safety• Quality of Life
Joint City of Lakewood, Cleveland Planning Study 2006
10
• Design Options• Plant Diversity
Joint City of Lakewood, Cleveland Planning Study 2006
11
Diversity of Conditions
Joint City of Lakewood, Cleveland Planning Study 2006
12
• Comprehensive Streetscape Improvements
West 115 St.- Hird Ave.
Joint City of Lakewood, Cleveland Planning Study 2006
13
Components of the Study
Cleveland City Planning Update 2008
14
West 117th & 116th West 110th
Cleveland City Planning Update 2008
Raised Planters in Streetscape
15
16
Overview: Where we are now
• New process of collaboration with the Community• Developing design that will lead to construction documents
Concept Design Build
We need your input
Past Present Future
FundingOngoing
17
Design and engineer improvements of the street from sidewalk to sidewalk
• Determine design and locations for a landscaped medians• Select Sustainable plantings
Project Scope
18
• Enhanced crosswalks at select locations– Increase pedestrian safety
• New concrete bus pads at bus stops• New bus shelters at selected locations with
amenities
Project Scope
Project Scope
What are you looking for?
20
• New traffic signalization • Historic tree preservation and new tree
selection• Signage and way-finding
Project Scope (cont.)
21
• Streetscape redesign in commercial areas• Pedestrian scale lighting• New landscaping
• ADA compliance• Prioritize Enhancements and Estimate
Costs
Project Scope (cont.)
22
Technical Committee
• Joe Shaffer, RTA • Bryan Moore, RTA• Michael Bosak, Cleveland • Scott Frantz, Cleveland• Rob Mavec, Cleveland • Andy Cross, Cleveland• Nathan Kelly, Lakewood • Dru Siley, Lakewood• Joe Beno, Lakewood • Bill Corrigan, Lakewood• Pat Lewis, Lakewood • Bob Greytak, LakewoodCommittee Role:• To ensure that the plans that are prepared meet applicable engineering
and technical requirements of Ohio, the RTA, Lakewood and Cleveland.
23
Civic Advisory Committee• Danielle Willis, RTA• Brian Powers, Coucilman,
Lakewood• Nathan Kelly, Lakewood• Joyce Williams, Cleveland• Michael Dever, Lakewood• Anita Brindza, Cudell Improvement• Mick Cochrane, Cleveland• Paul Nickels, Lakewood• John Katsaros, Cleveland• Tom Einhouse, Lakewood
• Michael Ruffing, Cleveland• Mary Anne Crampton, Lakewood• Jay Westbrook, Councilman, Cleveland• Dona Brady, Councilwoman, Cleveland• Patty Ryan, Lakewood• John Brich, Lakewood• Calvin Johnson, Cleveland• Howard Davis, ABC Management• Ramon Gohel, Edgewater Homeowners• Charles Slone, Cleveland
Committee Role:• To ensure that the plans represent the consensus of the Community
Vision for Clifton Boulevard and its neighbors.
24
Project LaunchJanuary 12, 2010
Public Meeting #1 (Cleveland & Lakewood) April 07, 2010Field Survey Complete
April 12, 2010Conceptual (30%) Design
June 11, 2010Public Work Session (Cleveland) Early July, 2010Public Work Session (Lakewood) Early July, 2010Preliminary (60%) Design
August 10, 2010Construction (90%) DocumentsSeptember 9, 2010Public Meeting #2 (Cleveland & Lakewood) Early October, 2010Construction (100%) Documents October 11, 2010
Project Schedule
25
Process
Conceptual Design
Refine Design, Engineering & Project Costs
Complete Documents, Secure Funding, Bidding & Construction
Data Collection, Review Previous Work PUBLIC INPUT
Committee Input PUBLIC INPUT
Committee Input PUBLIC INPUT
26
Continuous Engagement
www.EnhanceClifton.com
Computers are always available at the Public Library
27
Overview: Where we are going
Explore Design Alternatives
28
Clifton Boulevard Today
Complete Land Survey and Field Work
Existing Section – Residential District
29
Near W. 106th
• Preliminary Median Designs: Width, Location• Preliminary Station Designs: Context,
Integration into pedestrian system.
• Preliminary Designs for Special Crosswalks30
31
• Preliminary Landscape Designs: Diversity, Maintenance
32
Existing Commercial District
Existing Section @ Commercial District
33
Near W. 116th
Commercial Area:• Preliminary Designs of Streetscape
Elements• Determine Extent of Streetscape
Enhancement34
35
Next Steps
1. Input from you! * Tonight and through the web *
2. Preliminary Design and Details3. Committee Review of Preliminary Design
4. More Input from You!!
36
Thank You…
Questions?
Comments?
www.EnhanceClifton.com