Gastech 2005 Gastech 2005 Gastech 2005 Gastech 2005 Enhanced Reliability, Efficiency, and Availability LNG Facilities Enhanced Reliability, Efficiency and Availability Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao, Spain Session 11: Applications & Utilizations of Gas Technical Developments in Equipment & Processing
Transcript
Page 1: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Enhanced Reliability, Efficiency, and Availability LNG Facilities

Enhanced Reliability, Efficiency and AvailabilityEnhanced Reliability,

Efficiency and Availability

Prepared for Gastech 2005 March 16, 2005 - Bilbao, Spain

Session 11: Applications & Utilizations of GasTechnical Developments in Equipment & Processing

Page 2: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

AuthorsAuthors

Wes Qualls

Technology Licensing Director

ConocoPhillips

(713) 235-4521

Dr. Anthony Eaton

Formerly - Product Development Center

Director ConocoPhillips

(713) 432-3073

Dr. Howard Schmidt

Project Engineering Manager – Bechtel

(713) 235-3361

Page 3: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Presentation AgendaPresentation Agenda

� Introduction – Increased Importance of Reliability

– Important Applications & Project Timing

� Definition of Terms– Availability

– Production Efficiency

� Reliable Configurations– Review of “Two-Trains-In-One” Concept

– Large Train Configurations

� Study Premises

� Cases Considered

� Study Results

� Conclusions

Page 4: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

IntroductionIntroduction

RAM = Reliability, Availability and Maintainability

0

1

2

3

4

5

6

7

8

9

1960 1970 1980 1990 2000 2010 2020

Under construction & planned

7-8 MTPA

5 MTPA

3-4 MTPA

Historical Approach:

1) Minimum of 93%

Availability Premised at

Beginning of

FEED.

2) Verified by

Independent

Third Party Near End of FEED.

As Production Increases,

The Importance of Reliability Increases.

Page 5: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Importance & Timing of RAM AnalysisImportance & Timing of RAM Analysis

� Important Applications– Life Cycle Cost Analysis

– Technology Selection

– Selection of Options Within a Given Technology

– Critical Equipment Sparing Philosophy

– Performance Comparison – Operational Facility

� Project Timing– Beginning of FEED – Technology Selection

– Selected Cases Throughout FEED

– Update at end of FEED

– Critical Equipment Sparing Philosophy

Page 6: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Availability DefinitionAvailability Definition

Delay) LogisticsMean MTTR(MTTF

MTTFtyAvailabili (1)

++

=

� MTTF = Mean Time To Failure.

� MTTR = Mean Time to Repair

� Mean Logistics Delay = Mean time required to assemble necessary items to perform repair, such as manpower, tools, parts, etc.

Page 7: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Performance Based MetricPerformance Based Metric

Production Potential

Production Achieved Predicted Efficiency Production (2) =

� Predicted Achieved Production = Total field life production as predicted by the RAM model, while taking all production criticalfactors into account.

� Potential Production = Field life production as determined by deliverability profile for the system.

Production Efficiency and Thermal Efficiency are Equally Important

Page 8: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Traditional “Two-Trains-In-One” ConceptTraditional “Two-Trains-In-One” Concept

Kenai Alaska LNG Plant

Page 9: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Traditional “Two-Trains-In-One” ConceptTraditional “Two-Trains-In-One” Concept

� Overall Plant Availability >98%

– Kenai – Over 35 Years Operation

� Operational Flexibility 0 – 105%

– Full Rate 80 - 105%

– One D/C Down 60 – 80%

– Half Rate 30 – 60%

– Idle 0 – 30%

GasConditioning

100%

PropaneCycle100%

EthyleneCycle100%

MethaneCycle100%

Storage &Loading

100%

D/C50%

D/C50%

D/C50%

D/C50%

D/C50%

D/C50%

Page 10: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Large Train – GE-7EA or 9E W/ Waste Heat Recovery“Two-Trains-In-One” Approach

Large Train – GE-7EA or 9E W/ Waste Heat Recovery“Two-Trains-In-One” Approach

C3 C2=

GE-7EA C3 C2=

M

M

GE-7EA

HRSG

HRSG

Stm Turb C1 C1 C1

Stm Turb C1 C1 C1

Propane & Ethylene Refrigeration Compressors On Same Shaft

Page 11: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Turbine/Compressor Configuration“Two-Trains-In-One” Approach

Turbine/Compressor Configuration“Two-Trains-In-One” Approach

Configuration with C2=/C3 on the same driver shaft

2x Steam Turbine (or 1 Steam Turbine)2x Steam Turbine (or 1 Steam Turbine)

Page 12: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Motor/Compressor Configuration“Two-Trains-In-One” ApproachMotor/Compressor Configuration“Two-Trains-In-One” Approach

2 x 50% Configuration2 x 50% Configuration

Plant Capacity: Up to 8.0 mtpa

Page 13: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM PremisesRAM Premises

� Reputable, Independent Third Party to Perform RAM Analysis - Jardine & Associates, recently acquired by Detnorske Veritas

� MTTF & MTTR data in third party data base used without modification

� Scheduled maintenance fully verified through vendor data and recommendations

� Startup, ramp-up and chilldown times fully credible and physically demonstrated where possible, all falling within equipment specifications

Page 14: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM Premises - ContinuedRAM Premises - Continued

� For “Two-Trains-In-One” designs, detailed simulations utilized to provide production when one or more

drivers are offline

� No credit taken for potential production in excess of equipment design margins.

� No scheduled downtime assumed outside of normally

scheduled maintenance requirements such as for state

or country required shutdowns for internal inspections

Page 15: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM Case StudiesRAM Case Studies

Partial (Plant down if methane turbine offline)

2 GE Frame 7EA w/ with propane and ethylene on same shaft and variable frequency drive helper motors. 1 Frame 7EA on methane refrigerant cycle.

2A

No3 GE Frame 7EA w/ Variable Frequency Helper Motors. One GE Frame 7 on each of propane, ethylene and methane refrigerant cycles.

2

Yes

2 GE Frame 7EA w/ propane and ethylene cycles on the same shaft and Variable Frequency Helper Motors. Waste heat recovery used to power parallel steam turbines on the methane refrigerant cycle.

1

Yes6 GE Frame 5D Turbines with parallel turbines on each of propane, ethylene and methane cycles.

Base

“Two-Trains-In-One”Design

(Yes/No)

Configuration DescriptionCase ID

Page 16: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM Case Studies – Cont’dRAM Case Studies – Cont’d

Yes

2 GE Frame 9E with propane and ethylene on same shaft and variable frequency drive helper motors. Parallel electric motors on methane cycle with 2 Frame 9E in power generation service.

3A

Yes

2 GE Frame 9E w/ propane and ethylene cycles on same shaft and variable frequency drive helper motors. Waste heat recovery used to power parallel steam turbines on methane cycle.

3

Yes6 GE Frame 5D Turbines with parallel turbines on each of propane, ethylene and methane cycles.

Base

“Two-Trains-In-One”Design

(Yes/No)

Configuration DescriptionCase ID

Page 17: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM Case Studies – Cont’dRAM Case Studies – Cont’d

Yes

2 electric motors with propane and ethylene on same shaft and startup only VFDs. 2 electric motors on methane refrigerant cycle with startup only VFD. N+0 power generation for the facility.

4C

Yes

2 full VFD electric motors with propane and ethylene cycles on same shaft. 2 full VFD electric motors on methane refrigerant cycle. N+1 power generation for the facility.

4B

Yes

2 full VFD electric motors with propane and ethylene cycles on the same shaft. 2 full VFD electric motors on methane refrigerant cycle. Power taken from grid.

4A

No3 full VFD electric motors on each of propane, ethylene and methane refrigeration cycles. Power taken from grid.

4

Yes6 GE Frame 5D Turbines with parallel turbines on each of propane, ethylene and methane cycles.

Base

“Two-Trains-In-One”Design

(Yes/No)

Configuration DescriptionCase ID

Page 18: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

RAM Case Studies – Cont’dRAM Case Studies – Cont’d

Yes6 GE LM-6000 (Aeroderivative) with parallel turbines on each of propane, ethylene and methane cycles.

5A

Yes6 Rolls Royce Trents DLE (Aeroderivative) with parallel turbines on each of propane, ethylene and methane cycles.

5

Yes6 GE Frame 5D Turbines with parallel turbines on each of propane, ethylene and methane cycles.

Base

“Two-Trains-In-One”Design

(Yes/No)

Configuration DescriptionCase ID

Page 19: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Case Study Availability ResultsCase Study Availability Results

99.699.799.699.2

97.097.0

95.1

97.1

98.8

99.5

98.498.7

90.0

91.0

92.0

93.0

94.0

95.0

96.0

97.0

98.0

99.0

100.0

Base 1 2 2A 3 3A 4 4A 4B 4C 5 5A

Case ID

Availability

5D 7EA 9EElectric Motors

Aeros

Not Two-Trains-in-One Design

Page 20: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Case Study Production Efficiency ResultsCase Study Production Efficiency Results

95.695.5

96.897.1

96.0

92.1

94.0

96.0

95.1

97.1

98.1 97.9

90.0

91.0

92.0

93.0

94.0

95.0

96.0

97.0

98.0

99.0

100.0

Base 1 2 2A 3 3A 4 4A 4B 4C 5 5A

Case ID

Production Efficiency

5D 7EA 9E Electric Motors Aeros

Not Two-Trains-in-One Design

Page 21: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

Comparison of Availability & Production Efficiency

Comparison of Availability & Production Efficiency

88.0

90.0

92.0

94.0

96.0

98.0

100.0

Base 1 2 2A 3 3A 4 4A 4B 4C 5 5A

Avail &

Pro

d. E

ff.

Availability Production Eff.

5D 7EA 9E Electric Motors Aeros

Not Two-Trains-in-One Design

Page 22: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

ConclusionsConclusions

� A Thorough and Accurate RAM is an Invaluable Tool Throughout All Phases of a LNG Project.

� A RAM Analysis Should Begin Early in FEED or Pre-FEED Process and be Utilized Well After Startup

� Production Efficiency Should be Utilized for Life Cycle Cost Analysis – Not Availability

� Production Efficiency and Thermal Efficiency Should

be Given Equal Importance

� With Typical Production Efficiencies Ranging From 94

to 97% and Higher, the CoP LNG Process Offers an Attractive LNG Solution

Page 23: Enhanced Reliability, Efficiency and Availability Conferences...LNG Facilities Enhanced Reliability, Efficiency and Availability Prepared for Gastech 2005 March 16, 2005 - Bilbao,

Gastech 2005Gastech 2005Gastech 2005Gastech 2005

THANK YOU