Date post: | 02-Jun-2018 |
Category: |
Documents |
Upload: | michael-germanovsky |
View: | 214 times |
Download: | 0 times |
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 1/18
DJLU Architect1 Beekman Street, Suite 506,New York, NY 10038646.820.3558
DE-JAN LU, RA
110 Broadway,Brooklyn, NY 11211
718.569.2200
J FRANKL ASSOCIATESDesign Consultants
OWNER
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
MECHANICAL ENGINEER
ARCHITECTURAL TEAM Architect
ARCHITECTURAL DRAWINGS
1 T-000.00 Cover Sheet, Drawing Index, Project Index2 Z-000.00 Zoning Data, P lot Plan Diagram3 Z-001.00 Zoning Data Continued, Height & Setback Diagram4 Z-002.00 Floor Area Diagram5 G-001.00 General Notes6 A-000.00 Existing vs. Proposed Plot Plan7 DM-001.00 Demolition Plans8 A-100.00 Proposed Floor Plans9 A-101.00 Proposed Floor Plans10 A-102.00 Proposed Floor Plans
11 A-200.00 Proposed E levations12 A-300.00 Long itudinal Section13 A-400.00 Details
PLUMBING DRAWINGS
18 P-700.00 Plumbing & Gas Riser Diagrams
BGM ENGINEERING2123 45th Rd.Long Island City, NY 11101203.452.9408
HARMAN REALTY74 SPENCER STREET, #1RBROOKLYN, NY 11205
T000.00 01 OF 18
DOB BSCAN CODE
ARCHITECTURAL DRAWINGS
14 A-401.00 Details15 A-500.00 Details16 A-501.00 ADA Details17 EN-600.00 Energy Compliance, Schedules
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 2/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 3/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 4/18
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
Z-002 04
AS NOTED
1ST FLOOR AREA1/8" = 1'-0"1
1ST & 2ND FLOOR AREA1/8" = 1'-0"2
TOTAL CALCULATIONSN.T.S.4
3RD FLOOR AREA1/8" = 1'-0"3
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 5/18
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
G-001 05
AS NOTED
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 6/18
ADJACENT2 STORYFRAME &
B'SMT
ADJACENT2 STORYFRAME &
B'SMT
ADJACENT2 STORYFRAME &
B'SMT
ADJACENT2 STORYFRAME &
B'SMT
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
A-000 06
AS NOTED
EXISTING PLOT PLAN1/8" = 1'-0"1 PROPOSED PLOT PLAN
1/8" = 1'-0"2
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 7/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 8/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 9/18
A-4013
A-4013
MITSUBISHI ELECTRICSPLIT-SYSTEM UNITSMUZGE18NAMEA 123-06-E
A.O. SMITHMEA # 25-05-E VOL. 2FAI PER MC 701 AND MC702
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
A-101 9
AS NOTED
PROPOSED 2ND FLOOR PLAN1/4" = 1'-0"2
PROPOSED 1ST FLOOR PLAN1/4" = 1'-0"1
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 10/18
M I N
. S L O P E
1 / 4 " P E R 1 ' - 0 "
MIN. SLOPE1/4" PER 1'-0"
M I N .
S L O P
E
1 / 4 " P
E R 1 ' -
0 "
M I N
. S L O P E
1 / 4 " P E R 1 ' - 0 "
MIN. SLOPE1/4" PER 1'-0"
M I N . S L O P E
1 / 4 " P E R 1 ' - 0 "
M I N
. S L O P E
1 / 4 " P E R 1 ' - 0 "
MIN. SLOPE1/4" PER 1'-0"
M I N . S L O P E
1 / 4 " P E R 1 ' - 0 "
M I N
. S L O P E
1 / 4 " P E R 1 ' - 0 "
MIN. SLOPE1/4" PER 1'-0"
M I N .
S L O P
E
1 / 4 " P
E R 1 ' -
0 "
MITSUBISHI ELECTRICSPLIT-SYSTEM UNITSMUZGE18NAMEA 123-06-E
A.O. SMITHMEA # 25-05-E VOL. 2FAI PER MC 701 AND MC702
MITSUBISHI ELECTRICSPLIT-SYSTEM CONDENSERS
MUZGE18NAMEA 123-06-E (TYP.)
M I N. S
L O P E
1 / 4 " P
E R 1 ' -
0
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
A-10210
AS NOTED
PROPOSED ROOF PLAN1/4" = 1'-0"2
PROPOSED 3RD FLOOR PLAN1/4" = 1'-0"1
BULKHEAD ROOF PLAN1/4" = 1'-0"3
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 11/18
WEST PROP LINE
ROOF PARAPETWALL @ 42" AFF
BH PARAPET WALL@ 12" AFF
EAST PROP LINE
EAST PROP LINEEAST PROP LINE WEST PROP LINE
GOOSE NECK LADDERBEYOND
PROPOSED 3" LEADER
GOOSE NECK LADDERBEYOND
CONDENSERUNITS BEYOND
CONDENSERUNITS BEYOND
FDC (SEE SPRINLKERDRAWINGS)
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
A-200 11
AS NOTED
FRONT ELEVATION1/4" = 1'-0"1 REAR ELEVATION
1/4" = 1'-0"2
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 12/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 13/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 14/18
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
A-401 14
AS NOTED
PARTY WALL SECTION1
2"=1'-0"1
SEQUENCE OF CONSTRUCTION3
4"=1'-0"2
WALL DETAIL3
4"=1'-0"3
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 15/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 16/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 17/18
8/10/2019 Enlargement of 24 Harman St.
http://slidepdf.com/reader/full/enlargement-of-24-harman-st 18/18
REVISION TABLENo. Date Description
CAD files, sealed drawings and specificatiinstruments of service whose ownership belongs to Lu, RA. Unauthorized use, changes or publicaprohibited unless expressly approved by De-Jan LInfringements will be prosecuted. Contractor shall field conditions and dimensions and be responsible fit and quantity of work. No allowances shall be behalf of the contractor for any error or neglect onIn a conflict between sealed drawings and electronthe sealed drawings will govern.
SIGNATURE
24 HARMAN
DJLU1 Beekman Street, S
New York, N646
24 HARBROOKLYN, N
DE-JAN LU
110Brooklyn,
718
J FRANKL ASSOCIADesign C
.00
DOB JOB #BIN #DATEDRAWN BYSCALE
OF 18
307498707-17-2013
DL
General Contra
DOB BSCAN CODE
Structural Engin
Mechanical Engin
BGM ENGIN2123
Long Island City, N203
JERRY PITERA P.E.JWSPRINKLER
5 Mezbish PlaceMonroe,
845
320843352
P-700 18
AS NOTED
PLUMBING RISER DIAGRAM1ALL EQUIPMENT MUST BEMEA/ BSA/ REF. STANDARDAPPROVED
PLUMBING NOTES1. COMPLETE PLUMBING SYSTEM & DRAINAGE SYSTEM
INSTALLATION SHALL COMPLY WITH ARTICLE 16 &RS16-1.
2. PROVIDE CLEANOUT AT BASE OF ALL STACKS.3. PROVIDE AIR CHAMBERS AT TOP OF WATER RISERS
MIN 18" TO 1 " DIAMETER.4. STANDARD WEIGHT BLACK STEEL PIPE FOR GAS
SYSTEM WITH GALVANIZED STEEL FITTINGS.5. FLOOR DRAINS SHALL BE PROVIDED WITH
REMOVABLE STRAINER AS PER RS 16.6. TRAPS FOR FLOOR DRAINS SHALL BE DEEP SEAL
TYPE.7. ROOF GUTTERS SHALL BE AS PER RS 16-19.8. PLUMBING CONTRACTOR SHALL VERIFY ALL INVERT
AND EXISTING CONDITIONS PRIOR TO THEINSTALLATION OF NEW WORK.
9. ALL HOT AND COLD WATER LINES TO BE INSULATEDWITH 1" FIBERGLASS FOIL BACKED.
10. PROVIDE SHUT OFF VALVES ON ALL WATERSUPPLIES IN FIXTURE.
11. PURGE ALL WATER AND GAS LINES BEFORE FINALCONNECTIONS.
PLUMBING FIXTURE SCHEDULE
*HOT WATER HEATERSEE EQUIPMENT SCHEDULE