+ All Categories
Home > Documents > ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined!...

ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined!...

Date post: 24-Jul-2020
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
22
1 UN CLASSIFICATION ENTERPRISE WIDE KPI MANAGEMENT Warren Armstrong Control Technology Specialist Anglo American Platinum
Transcript
Page 1: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

1

UN CLASSIFICATION

ENTERPRISE WIDE KPI MANAGEMENT

Warren ArmstrongControl Technology SpecialistAnglo American Platinum

Page 2: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

2

UN CLASSIFICATION

AGENDA• Anglo American Platinum

• Business Challenge

• What are plant KPIs?

• The old-system

• The new-system

• Contextualisation

• Results

• Benefits

• Next Steps

Page 3: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

3

UN CLASSIFICATION

ANGLO AMERICAN PLATINUM (AMPLATS)

World’s leading primary producer of Precious Group MetalsSupplying ~40% of the world’s newly refined Platinum.

Process Division:14 Mines 18 Concentrators* 3 Smelters 1 Converter 2 Refineries 9 geographic operational areas

* Including managed and non-managed

Page 4: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

4

UN CLASSIFICATION

BACKGROUND

For 1gm of Platinum Amplats mines 1400 kg of rockMills 600 kg To 80% less than 75 microns (mm)

or 0.075 mm

2013 tonnages100 million mined44 million milled71 tonnes Platinum

Why so fine?UG2 Platinum Group Metal mineral size!

Typically 5 microns

Page 5: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

5

UN CLASSIFICATION

SO HOW FINE IS BUG DUST?

Page 6: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

6

UN CLASSIFICATION

AMPLATS VALUE CHAIN

Ore3.2 g/t

Refineries99.9200 %

Smelters2700 g/t

Concentrate125 g/t

Page 7: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

7

UN CLASSIFICATION

BUSINESS CHALLENGE

The KPI-calculation-maintenance needed to be streamlined!

“Please set up the KPI reports on our plant…”“Please add these KPIs….”

• Creating a new KPI took 30 minutes

• KPIs were difficult to trouble shoot

• 1 site had 9 KPI reports

The one site had 320 unique KPIs, from multiple requests

Multiple configuration linking

With 3 sites to go...

Page 8: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

8

UN CLASSIFICATION

WHAT ARE PLANT KPIS?

Daily plant health check: (areas, sections, equipment)

Daily, Weekly, Monthly, Yearly aggregations with standard deviations

Optional run-condition

The process engineers on site look after areasKPIs are defined in areas of responsibility

So KPIs change as problems and people change

Page 9: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

9

UN CLASSIFICATION

OLD-SYSTEM

• Daily Aggregations done in historian (PI Totalizers)• Weighted roll-ups to predefined periods Advanced calculation engine, saving to historian

• Configured in a flat structure of inputs, outputs and properties (PI Module Database)

• 4 calculation instances Running 484 KPIs Using 2969 historian tags From 7409 configuration entries

Page 10: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

10

UN CLASSIFICATION

OLD-SYSTEM: ORIGINS

This first KPI-system replaced multiple Excel implementations

Needless to say; this grew!–From: 4 reports and 120 KPIs–To: 8 reports and 437KPIs–…

Page 11: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

11

UN CLASSIFICATION

OLD-SYSTEM: TO ADD ONE KPI

1. Create 2 daily total tags; KPI, Standard Deviation, Weighting?

2. Create 4 roll up tags

3. Create configuration import – 14 items per KPI

4. Create KPI targets in SharePoint list

5. Update Excel report

6. Upload Excel report to SharePoint (Excel web services)

Procedure to add one KPI

Page 12: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

12

UN CLASSIFICATION

NEW-SYSTEM REQUIREMENTS

• Simplify configuration

• Let the reporting do the aggregations -dynamically

• Have one report

• Get users to start maintaining their own KPI’s

• Maintainable

Page 13: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

13

UN CLASSIFICATION

DESIGN AND IMPLEMENTATION

• Consult with partners (OSIsoft and Microsoft)

• What has been done elsewhere?

• Long term reporting architecture

• Contextualisation!

Page 14: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

14

UN CLASSIFICATION

ARCHITECTURE

PI Asset FrameworkPI OLEDB Enterprise

PI Server

Microsoft Analysis Services

Excel PivotTable ReportStores high frequency plant data

Aggregates this to shift or daily data

Plant HierarchyKPI ConfigurationProvider of consolidated data

Data Aggregation to longer time periodsProvides multiple views and filtering capabilities on the data

Report generation and formatting

Page 15: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

15

UN CLASSIFICATION

CONTEXTUALISATION

• Contextualise enterprise• Structure and Values in

one place• Ad-hoc trends

Page 16: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

16

UN CLASSIFICATION

CONFIGURATION DEMONSTRATION

Page 17: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

17

UN CLASSIFICATION

NEW-SYSTEM: TO ADD ONE KPI

1. Create 2 daily total tags; KPI, Standard Deviation, Weighting?

2. Create Elements; KPI, (create Trend, Target only)

3. Check display order

Procedure to add one KPI

Currently 656 KPIs 3 Sites

It took only 8 hours to translate the old KPIs (~450) into the new

system.

Page 18: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

18

UN CLASSIFICATION

RESULTS

• KPI creation was reduced from 6 to 3 steps

• One report

• Quick rollout (30min for a new site)

• More user control

• Flexible reporting (Period comparisons)

• Quicker access to data

Page 19: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

19

UN CLASSIFICATION

REPORT DEMONSTRATION

Page 20: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

20

UN CLASSIFICATION

BENEFITS: AFTER 2 MONTHS

• Improved Maintainability 2 sites added – 8 hours saved 172 KPI’s added – 52 hours saved

• User Interaction Added 10 KPI’s – 3 hours saved Modified 50 – 4 hours saved

• …

Page 21: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

21

UN CLASSIFICATION

NEXT STEPS

• PowerView in Excel 2013

• Production reports

• Continue rollout

• Office 365, SharePoint and BI in the Cloud

Page 22: ENTERPRISE WIDE KPI MANAGEMENT - SACAC · The KPI-calculation-maintenance needed to be streamlined! “Please set up the KPI reports on our plant…” “Please add these KPIs….”

22

UN CLASSIFICATION

WARREN [email protected] TECHNOLOGY SPECIALISTANGLO AMERICAN PLATINUM


Recommended