Hunter Expressway Alliance
ECMS – General Construction
Attachment B
Overview of Environmental Construction MethodStatements
GENHEA GIS
HUNTER EXPRESSWAY ALLIANCEStatus
Original Size
Coordinate System
Height Datum
Drawn
Designed
Date Printed
A3MGA ZONE 56
AHD
NOT USED FOR CONSTRUCTION
Company Zone Type Figure No. Issue
DescriptionIssue Date Approved
0
1000
200030
00
4000
5000
6000
7000
8000
9000
10000
11000
12000
0001
0010
0005
0006
0007
0008
0009
0003
0002
0004
5
10
6
12
7
3
6
8
8
8
11
8
4
9
8
8
88
8 F3 FRE
EWAY
JOHN RENS
HAW DRIVE
GEORGE BOOTH DRIVE
BLACKHILL ROAD
LENAGH
ANS DR
IVE
WOOD
FORD
STR
EET
BUCHANAN ROAD
MINMI RO
AD
NEWCASTLE LINK ROADC A MER
ON PARK DRIVE
BLACK HILL ROAD
LANG S
TREET
MAITL
AND
ROAD
F3 FREEWAY
9
Scales BERESFIELD
Viaducts
Rest areaBuchanan interchange
Newcastle interchange
Kurri Kurri interchange
Skyline Ridge cut
JOHN RENSHA W DRIVE
GEORGE BOOTH DRIVE
BLA CKHILL ROAD
MINMI ROAD
LEGGE
TTS
DRIVE
SYDN
EY NE
WCAS
TLE F
REEW
AYBUCH
ANAN
RO
AD
NEWCASTLE
LINK ROAD
KURRI KURRI
NEWCASTLE1:40000
0 1,000 m
Map sheetConstruction Method Statement zoneRoad design (DES HEA 007)Construction compound
RoadsMotorwayPrimary roadArterial roadSub-arterial road
EN133 A
ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT
A FOR INFORMATION 13 JUL 10
PRELIMINARY
AZDB
Draft date: Thursday, July 15, 2010 9:56:31 AMFile name: \\10.10.25.35\Data\HEA\L-GIS\A_Current\B_Maps\HEA-GEN-GIS-EN133-Construction method statement-General-A.mxd 0000
50 mm on Original
15 JUL 10OVERVIEW
GENERAL ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT COVERAGE
1 - GENERAL CONSTRUCTION2 - CLEARING AND TOPSOIL MANAGEMENT13 - SITE STABILISATION AND REHABILITATION WORKS
SITE SPECIFIC CONSTRUCTION METHODSTATEMENTS
3 - CONSTRUCTION SITE COMPOUNDS4 - CONCRETE PRODUCTION AND DELIVERY (BATCH PLANT)5 - ACCESS TRACKS FOR MINE VOID TREATMENT AND VIADUCTS6 - TREATMENT OF MINE VOIDS7 - NEWCASTLE INTERCHANGE AT THE F38 - TEMPORARY WATERWAY CROSSINGS9 - BRIDGE STRUCTURES OVER WALLIS CREEK, MINMI CREEK AND SURVEYORS CREEK10 - BUCHANAN INTERCHANGE11 - VIADUCTS IN THE SUGARLOAF RANGES12 - KURRI SANDS SWAMP WOODLAND
GENHEA GIS
HUNTER EXPRESSWAY ALLIANCEStatus
Original Size
Coordinate System
Height Datum
Drawn
Designed
Date Printed
A3MGA ZONE 56
AHD
NOT USED FOR CONSTRUCTION
Company Zone Type Figure No. Issue
DescriptionIssue Date Approved
-800
-700
-600
-500
-400
-300
-200
-100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900200
0210022
00
230024
00250026
00270028
00290030
003100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
10000
10100
10200
10300104
0010500106
0010700108
0010900110
0011100112
0011300114
0011500116
00
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
NOTE: AHM ZONE 4 - MINMI CREEK EXCLUSION ZONE APPLIES. NO SECTION 90 CONSENT OVER MINMI CREEK. REFER TO IHMSP.
NOTE: SEAHAMPTON 1 AND 2, MINMI CREEK STONE ARRANGEMENTS 1, 2, AND 3 AREA FOR CONSERVATION.
BW004
BW01BW02
BW03
BW06
BW024
BW07
BW07
BW05
SEE CMS 5: ACCESS TRACKS FOR MINE VOID TREATMENT AND VIADUCTSFOR FURTHER INFORMATION
SEE CMS 7: NEWCASTLE INTERCHANGE AT THE F3FOR FURTHER INFORMATION
SEE CMS 6: TREATMENT OF MINE VOIDSFOR FURTHER INFORMATION
SEE CMS 9: BRIDGE STRUCTURES OVER CREEKSFOR FURTHER INFORMATION
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
Isolated Find 5European Brick Weir
Minmi Creek Stone Wall
European Stone and Brick Weir
Sugarloaf 1 Artefact Scatter & PAD
Aboriginal pathway(impact to be minimised)
38-4-0394 Seahampton 1 Grinding Groove Site
38-4-0393 Seahampton 2 Grinding Groove Site
38-4-0392 Seahampton 3 Grinding Groove Site
Minmi Creek Stone Arrangements 1
Minmi Creek Stone Arrangements 2 & 3
Fan Shaft (Mining shaft)Sandstone slab with slots
AHM zone 1
AHM zone 5
AHM zone 2
AHM zone 4
AHM zone 3
F3 FRE
EWAY
NEWCASTLE LINK ROAD
WOODF
ORD ST
REET
CAMERO
N PARK
DRIVE
F3 FRE
EWAY
1 Seahampton
MC-D
MC-U
MINMI C
REEK
Scales BERESFIELD
Viaducts
Rest areaBuchanan interchange
Newcastle interchange
Kurri Kurri interchange
Skyline Ridge cut
JOHN RENSHA W DRIVE
GEORGE BOOTH DRIVE
BLA CKHILL ROAD
MINMI ROAD
LEGGE
TTS
DRIVE
SYDN
EY NE
WCAS
TLE F
REEW
AYBUCH
ANAN
RO
AD
NEWCASTLE
LINK ROAD
KURRI KURRI
NEWCASTLE1:5000
0 200 m
DesignConstruction boundaryRoad design (DES HEA 007)Bridge footprintConstruction compoundFauna fence
Construction accessExisting trackExisting road utilised as isExisting track upgraded without wideningExisting road widened to 8 m for accessNew minor access roadNew 8 m wide access roadNew grouting access track
RoadsMotorwayPrimary roadArterial roadSub-arterial road
Threatened species (Biosis, 2009)Threatened flora locationThreatened fauna location
HeritageEuropean heritage locationIndigenous heritage location
Monitoring locationsAir monitoring locationWater monitoring locationNoise monitoring locationNoise and vibration sensitive receiverVibration sensitive receiver
Acid sulfate soil risk categoriesHigh probability of occurrenceLow probability of occurrenceDisturbed TerrainNo known occurrence
Vegetation (combined CK2009)Vegetation community (EEC)Vegetation community (non-EEC)
EN133 A
ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT
A FOR INFORMATION 13 JUL 10
PRELIMINARY
AZDB
Draft date: Thursday, July 15, 2010 9:56:31 AMFile name: \\10.10.25.35\Data\HEA\L-GIS\A_Current\B_Maps\HEA-GEN-GIS-EN133-Construction method statement-General-A.mxd 0001
50 mm on Original
15 JUL 10ENVIRONMENTAL CONSTRAINTS MAP
Aboriginal Heritage Management (AHM) Zones
Conservation/partial conservation
High level of aboriginal cultural heritage and archaeological sensitivity.
Area of site outside road corridor to be protected
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Significant sites in close proximity to road corridor
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Impact minimisation
Moderate aboriginal cultural heritage and archaeological sensitivity.
Cleared under s.90 consent
Low aboriginal cultural heritage and archaeological sensitivity.
See the IHMSP for details of management requirements foreach zone.
AREA 1 - NEWCASTLE INTERCHANGE
GENHEA GIS
HUNTER EXPRESSWAY ALLIANCEStatus
Original Size
Coordinate System
Height Datum
Drawn
Designed
Date Printed
A3MGA ZONE 56
AHD
NOT USED FOR CONSTRUCTION
Company Zone Type Figure No. Issue
DescriptionIssue Date Approved
-800
-700
-600
-500
-400
-300
-200
-100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900200
0210022
00
230024
00250026
00270028
00290030
003100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
10000
10100
10200
10300104
0010500106
0010700108
0010900110
0011100112
0011300114
0011500116
00
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
SEE CMS 11: VIADUCTS IN THE SUGARLOAF RANGESFOR FURTHER INFORMATION
NOTE: SEAHAMPTON 1 AND 2, MINMI CREEK STONE ARRANGEMENTS 1, 2, AND 3 AREA FOR CONSERVATION.
Stockrin
gton Roa
d
BLUE G
UM CRE
EK
GROUTING ACCESSTRACKS
BW09BW09
BW10BW10
BW11BW11
BW024
BW08
SEE CMS 6: TREATMENT OF MINE VOIDSFOR FURTHER INFORMATION
SEE CMS 5: ACCESS TRACKS FOR MINE VOID TREATMENT AND VIADUCTSFOR FURTHER INFORMATION
SEE CMS 11: VIADUCTS IN THE SUGARLOAF RANGESFOR FURTHER INFORMATION
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
SEE CMS 9: BRIDGE STRUCTURES OVER CREEKSFOR FURTHER INFORMATION
Isolated Find 5
Blue Gum Creek 1Blue Gum Creek 2
Blue Gum Creek 4 & PAD
Sugarloaf 1 Artefact Scatter & PAD
PAD 10 Rock shelter on Burnt Creek
Aboriginal pathway(impact to be minimised)
Area of High Cultural Heritage Value
38-4-0392 Seahampton 3 Grinding Groove Site
Burrenjim Dam
Jewboy Bushrangers Cave
End of southwest cutting and Rail Tunnel 134
Sandstone slab with slots
AHM zone 7
AHM zone 5
AHM zone 6
AHM zone 8
BLUE GUM
CREEK
Scales BERESFIELD
Viaducts
Rest areaBuchanan interchange
Newcastle interchange
Kurri Kurri interchange
Skyline Ridge cut
JOHN RENSHA W DRIVE
GEORGE BOOTH DRIVE
BLA CKHILL ROAD
MINMI ROAD
LEGGE
TTS
DRIVE
SYDN
EY NE
WCAS
TLE F
REEW
AYBUCH
ANAN
RO
AD
NEWCASTLE
LINK ROAD
KURRI KURRI
NEWCASTLE1:5000
0 200 m
DesignConstruction boundaryRoad design (DES HEA 007)Bridge footprintConstruction compoundFauna fence
Construction accessExisting trackExisting road utilised as isExisting track upgraded without wideningExisting road widened to 8 m for accessNew minor access roadNew 8 m wide access roadNew grouting access track
RoadsMotorwayPrimary roadArterial roadSub-arterial road
Threatened species (Biosis, 2009)Threatened flora locationThreatened fauna location
HeritageEuropean heritage locationIndigenous heritage location
Monitoring locationsAir monitoring locationWater monitoring locationNoise monitoring locationNoise and vibration sensitive receiverVibration sensitive receiver
Acid sulfate soil risk categoriesHigh probability of occurrenceLow probability of occurrenceDisturbed TerrainNo known occurrence
Vegetation (combined CK2009)Vegetation community (EEC)Vegetation community (non-EEC)
EN133 A
ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT
A FOR INFORMATION 13 JUL 10
PRELIMINARY
AZDB
Draft date: Thursday, July 15, 2010 9:56:31 AMFile name: \\10.10.25.35\Data\HEA\L-GIS\A_Current\B_Maps\HEA-GEN-GIS-EN133-Construction method statement-General-A.mxd 0002
50 mm on Original
15 JUL 10ENVIRONMENTAL CONSTRAINTS MAP
Aboriginal Heritage Management (AHM) Zones
Conservation/partial conservation
High level of aboriginal cultural heritage and archaeological sensitivity.
Area of site outside road corridor to be protected
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Significant sites in close proximity to road corridor
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Impact minimisation
Moderate aboriginal cultural heritage and archaeological sensitivity.
Cleared under s.90 consent
Low aboriginal cultural heritage and archaeological sensitivity.
See the IHMSP for details of management requirements foreach zone.
AREA 1 AND AREA 2
GENHEA GIS
HUNTER EXPRESSWAY ALLIANCEStatus
Original Size
Coordinate System
Height Datum
Drawn
Designed
Date Printed
A3MGA ZONE 56
AHD
NOT USED FOR CONSTRUCTION
Company Zone Type Figure No. Issue
DescriptionIssue Date Approved
-800
-700
-600
-500
-400
-300
-200
-100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900200
02100220
0230024
00250026
00270028
00290030
003100320
0
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
10000
10100
10200
10300104
0010500106
0010700108
0010900110
0011100112
0011300114
0011500116
00
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
SEE CMS 11: VIADUCTS IN THE SUGARLOAF RANGESFOR FURTHER INFORMATION
SEE CMS 6: TREATMENT OF MINE VOIDSFOR FURTHER INFORMATION
Daracon Road
BW10BW10
BW11BW11
BW12
SEE CMS 6: TREATMENT OF MINE VOIDSFOR FURTHER INFORMATION
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
PAD 6
Rail Tunnel 139
Blue Gum Creek 1Blue Gum Creek 2
Blue Gum Creek 3
Blue Gum Creek 4 & PAD
PAD 10 Rock shelter on Burnt Creek
Area of High Cultural Heritage Value
Blue Gum Creek 5 Grinding Groove Site
38-4-0236 Blue Gum Creek Grinding Grooves38-4-0235 Blue Gum Creek Grinding Grooves
Burrenjim Dam
Jewboy Bushrangers Cave
End of southwest cutting and Rail Tunnel 134
AHM zone 7
AHM zone 10
AHM zone 9
AHM zone 8
GEORGE BOOTH DRIVE
BGC-D
BGC-UBLUE
GUM CREE
K
BURN
T CRE
EK
SURVEYOR
S CREEK
Scales BERESFIELD
Viaducts
Rest areaBuchanan interchange
Newcastle interchange
Kurri Kurri interchange
Skyline Ridge cut
JOHN RENSHA W DRIVE
GEORGE BOOTH DRIVE
BLA CKHILL ROAD
MINMI ROAD
LEGGE
TTS
DRIVE
SYDN
EY NE
WCAS
TLE F
REEW
AYBUCH
ANAN
RO
AD
NEWCASTLE
LINK ROAD
KURRI KURRI
NEWCASTLE1:5000
0 200 m
DesignConstruction boundaryRoad design (DES HEA 007)Bridge footprintConstruction compoundFauna fence
Construction accessExisting trackExisting road utilised as isExisting track upgraded without wideningExisting road widened to 8 m for accessNew minor access roadNew 8 m wide access roadNew grouting access track
RoadsMotorwayPrimary roadArterial roadSub-arterial road
Threatened species (Biosis, 2009)Threatened flora locationThreatened fauna location
HeritageEuropean heritage locationIndigenous heritage location
Monitoring locationsAir monitoring locationWater monitoring locationNoise monitoring locationNoise and vibration sensitive receiverVibration sensitive receiver
Acid sulfate soil risk categoriesHigh probability of occurrenceLow probability of occurrenceDisturbed TerrainNo known occurrence
Vegetation (combined CK2009)Vegetation community (EEC)Vegetation community (non-EEC)
EN133 A
ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT
A FOR INFORMATION 13 JUL 10
PRELIMINARY
AZDB
Draft date: Thursday, July 15, 2010 9:56:31 AMFile name: \\10.10.25.35\Data\HEA\L-GIS\A_Current\B_Maps\HEA-GEN-GIS-EN133-Construction method statement-General-A.mxd 0003
50 mm on Original
15 JUL 10ENVIRONMENTAL CONSTRAINTS MAP
Aboriginal Heritage Management (AHM) Zones
Conservation/partial conservation
High level of aboriginal cultural heritage and archaeological sensitivity.
Area of site outside road corridor to be protected
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Significant sites in close proximity to road corridor
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Impact minimisation
Moderate aboriginal cultural heritage and archaeological sensitivity.
Cleared under s.90 consent
Low aboriginal cultural heritage and archaeological sensitivity.
See the IHMSP for details of management requirements foreach zone.
AREA 2
GENHEA GIS
HUNTER EXPRESSWAY ALLIANCEStatus
Original Size
Coordinate System
Height Datum
Drawn
Designed
Date Printed
A3MGA ZONE 56
AHD
NOT USED FOR CONSTRUCTION
Company Zone Type Figure No. Issue
DescriptionIssue Date Approved
-800
-700
-600
-500
-400
-300
-200
-100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900200
02100220
0230024
00250026
00270028
00290030
003100320
0
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
10000
10100
10200
10300104
0010500106
0010700108
0010900110
0011100112
0011300114
0011500116
00
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
Daracon Road
Daracon Road
BW12
BW13BW13
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
SEE CMS 8: TEMPORARY WATERWAY CROSSINGSFOR FURTHER INFORMATION
PAD 6
PAD 5
Rail Tunnel 139
Surveyors Creek RTA 5
Surveyors Creek RTA 4
Surveyors Creek RTA 3 IF
Surveyors Creek RTA 9 IF
GEORGE BOOTH DRIVE
SC2OC-U
SC2OC-D
SC1OC-D
SC1OC-U
SURVEYORS CREEK
SURVEYORS
CREEK
SURVEYORS CREEK
Scales BERESFIELD
Viaducts
Rest areaBuchanan interchange
Newcastle interchange
Kurri Kurri interchange
Skyline Ridge cut
JOHN RENSHA W DRIVE
GEORGE BOOTH DRIVE
BLA CKHILL ROAD
MINMI ROAD
LEGGE
TTS
DRIVE
SYDN
EY NE
WCAS
TLE F
REEW
AYBUCH
ANAN
RO
AD
NEWCASTLE
LINK ROAD
KURRI KURRI
NEWCASTLE1:5000
0 200 m
DesignConstruction boundaryRoad design (DES HEA 007)Bridge footprintConstruction compoundFauna fence
Construction accessExisting trackExisting road utilised as isExisting track upgraded without wideningExisting road widened to 8 m for accessNew minor access roadNew 8 m wide access roadNew grouting access track
RoadsMotorwayPrimary roadArterial roadSub-arterial road
Threatened species (Biosis, 2009)Threatened flora locationThreatened fauna location
HeritageEuropean heritage locationIndigenous heritage location
Monitoring locationsAir monitoring locationWater monitoring locationNoise monitoring locationNoise and vibration sensitive receiverVibration sensitive receiver
Acid sulfate soil risk categoriesHigh probability of occurrenceLow probability of occurrenceDisturbed TerrainNo known occurrence
Vegetation (combined CK2009)Vegetation community (EEC)Vegetation community (non-EEC)
EN133 A
ENVIRONMENTAL CONSTRUCTIONMETHOD STATEMENT
A FOR INFORMATION 13 JUL 10
PRELIMINARY
AZDB
Draft date: Thursday, July 15, 2010 9:56:31 AMFile name: \\10.10.25.35\Data\HEA\L-GIS\A_Current\B_Maps\HEA-GEN-GIS-EN133-Construction method statement-General-A.mxd 0004
50 mm on Original
15 JUL 10ENVIRONMENTAL CONSTRAINTS MAP
Aboriginal Heritage Management (AHM) Zones
Conservation/partial conservation
High level of aboriginal cultural heritage and archaeological sensitivity.
Area of site outside road corridor to be protected
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Significant sites in close proximity to road corridor
Variable levels of aboriginal cultural heritage and archaeological sensitivity.
Impact minimisation
Moderate aboriginal cultural heritage and archaeological sensitivity.
Cleared under s.90 consent
Low aboriginal cultural heritage and archaeological sensitivity.
See the IHMSP for details of management requirements foreach zone.
AREA 2