30
Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site in Ukraine IAEA International Workshop on Management and Regulatory Oversight of Uranium Legacy Sites 21-24 August 2012. Grand Junction. USA Prepared on a basis of Monitoring / Surveillance Program Data collection and Safety Assessment carried out in frame of State Uranium Legacy Site Remediation Program. Phase 1 (2009-2011), Funded by the Ministry of Energy and Coal Industry and State Nuclear Regulatory Inspectorate of Ukraine Environment Radiation Monitoring Department Ukrainian Hydrometeorological Institute Voitsekhovych O.V. Riazantsev Viktor State Nuclear Regulatory Inspectorate of Ukraine
Transcript
Page 1: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site in

Ukraine

IAEA International Workshop on Management and Regulatory Oversight of Uranium Legacy Sites 21-24 August 2012. Grand Junction. USA

Prepared on a basis of Monitoring / Surveillance Program Data collection and Safety Assessment carried out in frame of State Uranium Legacy Site Remediation Program. Phase 1 (2009-2011), Funded by the

Ministry of Energy and Coal Industry and State Nuclear Regulatory Inspectorate of Ukraine

Environment Radiation Monitoring Department Ukrainian Hydrometeorological Institute

Voitsekhovych O.V.

Riazantsev Viktor State Nuclear Regulatory Inspectorate of Ukraine

Page 2: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

CONTEXT Problem description The former State

Industrial Enterprise Pridneprovskiy Chemical Plant (PChP) was one of the largest metallurgical facilities, where uranium ores were processed from 1948 until 1991. .

• There has been no regular surveillance of the Uranium residue and other toxic waste and releases from the tailing sites.

• New monitoring programme launched in 2005 and founded by Ministry of Fuel and Energy of Ukraine

Page 3: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Uranium Production Legacy at Dneprodzerzhinsk (1947-1991)

Contaminated legacy site, 2 RW storage facilities, 7 U-residue tailings,

28 – contaminated building and engineering facilities used for U-production in past, which required clean-up technology application

Potential risks for workers at the industrial site and for Public at surrounding areas – seems to be high.

LTSM is still not defined

Clean-up and Remediation – required significant financial resources

Dneprodzerzhinsk industrial site

Sukhachevskoe Legacy Site

Page 4: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

CURRENT REMEDIATION ACTIVITIES. Key Mile stones • 1991-2000 U-Mill production at PChP was ceased. Decommissioning period of the

Legacy site / No regulation. No strategy. Bed economical situation

• 2000-2003 SE “Barrier” was created to provide safe Legacy Site Management . First site characterization studies (2002) UkrNIPIIpromtechnology develops the First Remediation Program to provide safe condition and remediation at the PChP Legacy Site. Only first priority Safety protection actions were taken in consideration

• 2003-2007 First priority actions done (decontamination, removal most contaminated facilities and pipe. The site specific Monitoring& Surveillance program were established.

• 2008-2009 Preliminary Safety Assessment has been carried. Government Commission was created to support Legal and Regulatory actions in assistance to the State Program. New State Remediation Program was developed (2010-2014) based on more realistic financial requests and SA results. Inventory studies and systematic site specific studies have been started.

• 2010-2011 State Remediation Program to bring PChP U-production legacy site to the ecological safe and sustainable State is launched.”

• 2012 – Need to modify the Strategy for Remediation Actions and Planning. Request for IAEA expert Mission for reviewing

The Main problem -- Lack of Regulatory Requirements for Project Planning and Safety criteria Long-Term Remediation Strategy have to better justified and Approved

Page 5: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Remediation Planning

• Phase 0 (2009). Tailing Inventory and Safety barrier characterisation. Safety Assessment. Monitoring and Surveillance network development

• Phase 1 (2010). Start State Remediation Program Conceptual planning and justification of the strategy and detailed action plan. Design and Action Strategy agreement. Regulatory framework development and administrative actions. Public consideration. International Expertises of the Remediation Action Plans and designs (2011)

• Phase 2 (2011-2015). Implementation of the main set of engineering as a first priority action at territory of PChP (preparatory activity and decontamination of the most contaminated buildings .

• Phase 3 (2016-2020). Preliminary actions on possible removal of the tailing materials from the industrial site to the tailing “D”. Justification and partly relocation of the tailing materials at the surface of tailing “D”.

• Further remedial actions at a later phase have to be focused on the neighbouring areas

• Phase 4. (2021-2025). Stewardship and handover the re-profiled facilities to the basic enterprises and neighbouring areas of the town.

Page 6: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Identification and Characterization of the main hazards

A- tailing “Western” and “Central Yar”; Former U-extraction facilities B – (buildings (№103,

104,120 i 112) in operation of SE “Barrier”, C – in operation of private enterprises FERREXPO LLS; D – in operation of DZMU (Mineral Fertilizer Plant); E – “ Polychimprom”

Page 7: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Inhomogeneous and High gamma-dose rates were identified around the tailing dumps and former Mill and U-extraction facilities

ЦМДПТ, Екомонітор

High gamma dose and 222Rn are the main expose factors at the PChP site

The hot spots with 238U and 226Ra were identified. Gamma-dose rates are in good correspondence with high contamination of some toxic metals in soils

Zn (72,9 -MAC), As (2-20) Fe (21,8), Cu (4,5), Ni (4,2) Cd (2 -MAC)

Gamma-doze varies 0,2 - 10 µSv h-1. At some locations – up to 30 µSv h-1

Page 8: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

The surface cover of the tailing dumps “Zapadnoe”, “ and Central Yar” and storage facility Base C have to be replaced with new

sufficient cover (0,2- 15 µSv h-1)

Page 9: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Rn-222 exhalation (up) and Rn-222 ambient activity concentration in air

Tailing cove is sufficient if Rn-222 exhalation

rate less 1 Bq m2 s-1

Sufficient cover of the tailing is still can not guarantee sufficient remediation effect, because high contamination

of the areas adjacent to the tailing dump site.

Rn-222 exhalation survey 2011

Rn-222 ambient activity concentration in air survey 2011

Page 10: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

New cover still can not guarantee safety condition due remained high contaminated soils at the adjacent area (gamma dose rate 0,5-15 µSv h-1 , which is require to be cleaned-up.

The results of detailed gamma-dose survey were suggested as a basis for clean up planning according End status criteria to be achieved at the industrial site less 0,5 µSv h-1

South-Eastern sector of the PChP site and the tailing “Yugo-Vostoshnoe”, with constructed new cover during 2008-2009

Area with gamma-dose rate more 0,5 µSv h-1

Page 11: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

a) b)

09-4с

09-5с

09-2с

09-3с

09-1с

Tailing Dumps Inventory studies

have been carried out during 2009-2010,

based on drilling and laboratory studies of the tailing materials and existing covers.

Additional drilling and Assessment have to be continued in 2012

Page 12: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

In some locations an existing cover are damaged due to creaking unacceptable steep slopes, and animals effects

Скважина № 09153

0

2

4

6

8

10

12

0 500 1000 1500 2000 2500 3000 3500мкР/ч

м

МЭД гамма излученияГоризонты отбора проб

Скважина № 09-2ц

0

2

4

6

8

10

12

14

16

18

0 1000 2000 3000 4000 5000 6000 7000 8000

мкР/ч

м

МЭД гамма излучения

Горизонты отбора проб

The technical Surveillance program and drilling of the tailing bodies have to be continued in frame of State Remediation Program Phase 1

Page 13: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

y=-0.078*(x-6.70)^ 2+2.24 R=0.65y=-0.178*(x-6.74)^ 2+4.89 R=0.82y=-0.196*(x-4.89)^ 2+4.05 R=0.96

0.00

1.00

2.00

3.00

4.00

5.00

6.00

2 3 4 5 6 7 8 9 10

pН водної витяжки

Log(

Kd)

Log(Kd(U-238))

Log(Kd(Th-230))

Log(Kd(Ra-226))

Log(Kd(Pb-210))

Tailing Central Yar has worst geochemical conditions at

the site for U-leaching, from the tails (рН 2.8-4.0)

Experimental studies of Kd for radionuclides in the tailing materials allows to reduce uncertainties for the long-term radionuclide groundwater transport predictions from the tailing dump site

Log (Kd) as versus of pH in the pore water

Page 14: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

The main radiological hazards at the Uranium production legacy sites

In some cases gamma dose rate are 101 -103 µSv h-1, surface beta particle fluxes are 101 -103 Bq cm-2 , U in dust dispersed at the floor up to 102 g / m2

Challenges. A large number of the high contaminated buildings and equipment remained at the PChP Legacy

Site have to be removed and decontaminated

Page 15: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

• Gamma-dose rate survey over the UPLS (ones 2-5 years);

• Rn-222 exhalation on the tailing covers ( seasonally)

• Rn-222 ambient concentration survey at the Legacy sites territory and in the most contaminated premises and houses at the adjacent areas (seasonally) by installing track detectors

• The samples from surface waters (seasonally) and in the groundwater (ones a year) have to taken for analyses of its radioactive and chemical contamination

• Aerosols to be taken at the defined locations and during remediation

• In the defined cases the water, soils, aerosol and biological samples have to be analyzed for 238U - 234U - 230Th - 226Ra - 210Po - 210Pb, 230Th

• The typical set of toxic metals have to be also monitored : Pb, Co, Cd, Mn, Cu, Ni, Fe, Zn, As, V, Cr

Basic meteorological and hydrological parameters have to be measured

The typical Monitoring program for PChP Legacy Site is elaborated according to IAEA Recommendation

SRS-27(2002) and SRS-64 (2010)

Page 16: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Analytical capacity of the Reference laboratory UHMI includes

High efficient gamma, alpha and LLC spectrometry devices as well as basic

radiochemical and environment sample preparation facilities

Page 17: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Training and fellowship in Ukrainian Hydrometeorological Institute Department of Environment Radiation Monitoring

Methods of environmental

samples measurement

Gamma –spectroscopy

• 4 HPGe Semiconductor Detectors Type - GEM, GWL, GMX –

ORTEC, BE5030 - CANBERRA Measurement - 234Th (238U), 235U

,234U, 226Ra, 228Ra ,210Pb, 228Th , 40K, 137Cs, 241Am and ets.

• NaI(Tl) scintillation detector Measurement - 40K, 137Cs, 60Co

and ets.

Page 18: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

UMF-2000V - 0.5 L,

Tracer 232U - 0.135 BqТ=12000 s

238 U

, 419

8 kе

V

234 U

, 477

3 ke

V

232 U

, 532

0 ke

V

0

10

20

30

40

175 225 275 325Channel

Cou

nts

СЕА-01V - 0.5 L,

Tracer 232U - 0.135 BqТ=15000 s

238 U

, 415

1 ke

V

234 U

, 472

1 ke

V

232 U

, 526

4 ke

V

232 U

, 532

0 ke

V

234 U

, 477

3 ke

V

238 U

, 419

8 ke

V23

5 U, 4

398

keV

0

5

10

15

600 700 800 900Channel

Cou

nts

Simplified methods for U-Th series radionuclides determination in waters (UMF-2000, and LLC) are put in use at the Barrier Lab.

UHMI Lab. Becomes an international training centre. During recent 4 years

Tajikistan 4 people trained, Kyrgyzstan 6, Azerbaijan 2, Georgia 2, Ukraine 2

Page 19: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Regular participation in IAEA PT Inter-comparison exercise for all Labs can significantly improve quality of analytical measurement

UUMI and Marzeev Inst. Labs is a partners of IAEA PT programs since 2005

Barrier Lab. Is measured all samples delivered in frame of RER/3/010 ICE

Page 20: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site
Page 21: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

There are 4 different laboratories are involved for Monitoring Program Implementation. All of them are annually take part in the

inter-laboratories comparison exercise as part of established Site specific Monitoring Programs at PChP site and surrounding areas

Грунт хвостосховищ ПХЗ

y = 1,059xR2 = 0,9143

0

2

4

6

8

10

12

0 2 4 6 8 10 12

U-238 Alpha, Бк/гр

U-2

38 G

amm

a, Б

к/гр

Аналіз результатів визначення U (238+234) (Z-критерій)

-9

-6

-3

0

3

6

9

SSM STUK 5 2 9 10 3 1

проба № 1проба № 2проба № 3

Аналіз результатів визначення Ra-226 (Z-критерій)

-9

-6

-3

0

3

6

9

SSM STUK 5 2 9 10 1

проба № 1

проба № 2

проба № 3

2010-2011

UHMI Internal QA/QC procedures, when U-238 in the tailing materials was measured by two different methods (Alpha and Gamma Spectrometry)

Ra-226 in the water samples. Z-score,

7 labs (UHMI Lab is 1)

U (234+238) in the water samples. Z-score, 8 labs

Page 22: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

01.01

.2007

01.04

.2007

01.07

.2007

01.10

.2007

01.01

.2008

01.04

.2008

01.07

.2008

01.10

.2008

01.01

.2009

01.04

.2009

01.07

.2009

01.10

.2009

01.01

.2010

01.04

.2010

01.07

.2010

01.10

.2010

01.01

.2011

0,1

1

10

100

F 1/F 0 U-238 Ra-226 Pb-210

01.01.

2007

01.04.

2007

01.07.

2007

01.10.

2007

01.01.

2008

01.04.

2008

01.07.

2008

01.10.

2008

01.01.

2009

01.04.

2009

01.07.

2009

01.10.

2009

01.01.

2010

01.04.

2010

01.07.

2010

01.10.

2010

01.01.

2011

0,1

1

10

100

F 2/F 0

U-238 Ra-226 Pb-210

AEROSOL CONTAMINATION

IMPACT Relative values of U-238, Ra-226, Pb-210 in aerosol fallout at two different places A -South-eastern tailing

B – near building 103 Former U-extraction Facility in comparison to aerosol fallout contamination at the Dneprodzershinsk (meteorol. station) at the distance 10 km from the legacy site. Highest contamination

in summer period

A

B

Page 23: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Gross-alpha activities in surface water

Dnieper upstream of legacy site

Konoplyanka river inlet to the Dnieper

Dnieper downstream of legacy site

Page 24: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Tailings (gamma-dose expose, Rn )

Aerosol fallout and Inhalation

Groundwater transport module was developed and applied for long-term dose assessment via water pathways

Assessment applied for the contaminated buildings and settlement

Agriculture lands and irrigation

Adapted for all former U facilities and territory of PChP UPLS Inter-active matrix easy in use ( LEGO) Open system for development and improvement and function extension Large Library for model parameters and simple screening models Module for statistic and Probability functions analyses Dose and Risk assessment modules to be extended for Chemo toxic risks Generation of Reports

ECOLEGO modeling tool for Radionuclide transport and Dose assessment has been provided for RER/3/010 project partners and is currently in use for SA and EIA at PChP site

Page 25: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Effective dose rate at the different location of the PChP Legacy Site (ECOLEGO modeling tool application)

mSv per hour

0,00E+00

5,00E-03

1,00E-02

1,50E-02

2,00E-02

2,50E-02

3,00E-02

3,50E-02

4,00E-02

Build

ing

103,

insi

deBu

ildin

g 10

3, o

utsi

deBu

ildin

g 10

6, in

side

Taili

ng "

Zapa

dnoe

"Bu

ildin

g 11

2, in

side

Taili

ng "

Cent

raln

y Ya

r"Se

dim

enta

tion

pond

s

Taili

ng "

Yugo

-Vos

toch

noe"

Loca

l "ho

t spo

ts"

Taili

ng "

Dnep

rovs

koe"

Noth

ern

part

of th

e s i

teTa

iling

" Laz

o"

Taili

ng "

Suha

chev

skoe

-1"

Stor

age

yard

"Ba

The High potential Radiological Risks for workers at this territory required Strict Regulatory Control and IAEA Consulting on Remediation Strategy Development

Page 26: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Comparison of the potential dose rates between PChP site and similar UP Legacy sites in Tajikistan and Uzbekistan.

The highest potential doses are expected for workers in the buildings former U- extraction facilities

Page 27: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

0

20

40

60

80

100

120

140

160

180

200

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000

time, y

U, B

q/L

base casewaste removalsoil cover

U concentration in the aquiferat site boundaryfor different scenarios

U-activity concentration in the aquifer at the groundwater inlet site for the different scenarios

Preliminary Assessment of the Cover effect for the Tailing dump Dnieprovskoe based on the Groundwater Pollution simulation with

ECOLEGO Groundwater Module (by D. Bugai)

Page 28: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Main constrains and needs for further development (1) • The Legal and Regulatory framework should be

significantly develop and provide clear safety criteria and regulatory requirements in support and implementation Remedial Actions. Licensing instruments have to be harmonized with EC and best international practice making Monitoring Programs as Decision Making Instrument more efficient

• QA/QC programs have become normal regular practice for all participants of the Site specific Monitoring Programs

• Monitoring and radiation control devices, specially for Inhalation and Rn-222, working in the contaminated buildings and tailing sites has to be provided for site operator workers

• Site specific Monitoring program has to be developed and optimized. Ecotoxicological studies regarding toxic metal in soils, water and aerosol, have to be extended. Specific monitoring studies are required for Most contaminated buildings.

Page 29: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Experimental site specific studies have to be developed such as lysimeters, AMAD and aerosol re-suspension parameters, solubility of tailing materials and erosion and hydraulic conductivity site specific factors

• There are many State and Private organization are still in operation at the PChP UPLS, they have to be involved for implementation the State Remediation Program. Site characterization and Assessment have to cover also territories and facilities operated by Private companies at the territory

• Technical capacity of the involved laboratories and in particular SE “Barrier” should be significantly improved

• Participation in the internationally organized training , and fellowship programs are important component of the Monitoring Programs sustainable development and optimization and all period of the remediation process

Main constrains and needs for further development (2)

Page 30: Environment Monitoring and Site Characterization Relative ... Documents/Meetings… · Environment Monitoring and Site Characterization Relative to Pridneprovsky Uranium Legacy Site

Thank you very much for sharing DOE and RSLS

Unique Experience

Спасибо

Acknowledgement Ministry of Energy and Coal Industry of Ukraine (Financing of the State Program)

State Nuclear Regulatory Inspectorate of Ukraine (Regulatory support)

State Enterprise “ Barrier” (Technical support and field activities)

IAEA UA/0923 (Equipment and experience gained for Reference labs)

IAEA R)ER/3/010 (Experience and knowledge)

[email protected]


Recommended