Environmental and Social Monitoring Report January - June, 2018
Kiribati: South Tarawa Sanitation Improvement Sector Project
Prepared by Ministry of Public Works and Utilities, Government of Kiribati for the Asian Development
Bank
This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and
may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of
or reference to a particular territory or geographic area in this document, the Asian Development
Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Government of Kiribati
Ministry of Infrastructure and Sustainable Energy
SafeguardsMonitoringReportJanuary-June2018
SouthTarawaSanitationImprovementSectorProject
July2018
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ExecutiveSummary
5119003|R0|July2018|SMECInternational|i
Document/ReportControlForm
FileLocationName: E>ProjectReports>2018>SASR2018
ProjectName: SouthTarawaSanitationImprovementSectorProject
ProjectNumber: 5119003
RevisionNumber: Rev1
RevisionHistory
Revision# Date Preparedby Reviewedby ApprovedforIssueby
Rev1 16/7/18 PatrickClarke PeterClark PeterClark
IssueRegister
DistributionList DateIssued NumberofCopies
MinistryofInfrastructureandSustainableEnergy/
ADB16/7/18
1xSoftCopy
1xHardCopy
OfficeLibraryKiribati 16/7/18 1xSoftCopy
SMECProjectFile 16/7/18 1xSoftCopy
SMECCompanyDetails
ZaglulKhandkar
20BerryStreetLevel5NorthSydney,Australia,2060
Tel: +61299255571 Fax:
Email: [email protected] Website: www.smec.com
TheinformationwithinthisdocumentisandshallremainthepropertyoftheMinistryofInfrastructure
andSustainableEnergy.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ExecutiveSummary
5119003|R0|July2018|SMECInternational|ii
Contents
1 EXECUTIVESUMMARY..............................................................................................................1
2 ICB01.......................................................................................................................................2
2.1 Status................................................................................................................................2
2.2 SaltWaterWorks..............................................................................................................2
2.2.1 BikenibeuSaltWaterNetwork....................................................................................2
2.2.2 SaltWaterLeaks..........................................................................................................2
2.3 PumpStation1.................................................................................................................3
2.4 SeptageReceivalUnit(SRU).............................................................................................3
2.5 PumpStation5.................................................................................................................4
2.6 EnvironmentalMonitoring...............................................................................................4
2.6.1 OdourComplaint.........................................................................................................4
2.6.2 EnvironmentalComplianceDivision(ECD)Inspections...............................................4
2.7 SocialSafeguards..............................................................................................................6
3 ICB02.......................................................................................................................................7
3.1 Status................................................................................................................................7
3.2 BikenibeuOutfallFloatation.............................................................................................7
3.3 LossofBetioOutfallPipeline............................................................................................7
3.4 EnvironmentalMonitoring...............................................................................................8
3.5 SocialSafeguards..............................................................................................................8
4 ON-SITESANITATIONSUB-PROJECT..........................................................................................9
4.1 Status................................................................................................................................9
4.2 RevisionofSites................................................................................................................9
4.3 EnvironmentalMonitoring...............................................................................................9
4.4 SocialSafeguards............................................................................................................10
APPENDIXA ICB01/02EMPCOMPLIANCEMONITORINGANDAUDIT.....................................11
ICB01January................................................................................................................................12
ICB01February..............................................................................................................................14
ICB01March..................................................................................................................................16
ICB01April.....................................................................................................................................18
ICB01May.....................................................................................................................................20
ICB01June.....................................................................................................................................22
ICB02January................................................................................................................................24
ICB02February..............................................................................................................................28
ICB02March..................................................................................................................................32
ICB02April.....................................................................................................................................36
ICB02May.....................................................................................................................................40
ICB02June.....................................................................................................................................44
APPENDIXB ODOURCOMPLAINT–PS1BIKENIBEU.................................................................49
APPENDIXC APPENDIXC–ECDAUDITLETTER.......................................................................52
Section1–resultof2March2018Audit.......................................................................................53
Section2–Resultof5MayAuditandComplianceNotice............................................................55
APPENDIXD APPENDIXD–PIPELOSSINCIDENTREPORT........................................................59
APPENDIXE OSSPMOU..............................................................................................................64
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ExecutiveSummary
5119003|R0|July2018|SMECInternational|1
1 ExecutiveSummary
TheSouthTarawaSanitationImprovementSectorProject(STSISP)includesrehabilitationofthesalt
water(saltwater)flushedseweragesysteminthethreeurbanareasofBetio,BairikiandBikenibeuin
SouthTarawa,Kiribati.Thefollowingreportdocumentstheenvironmentalactivities,resettlementand
related land issues for theperiodJanuaryto July2018.Thereport isdivided intothreesections to
coverthefollowingprojects:
• ICB01-RehabilitationofthesaltwaterandsewernetworkinBetio,BairikiandBikenibeu,
• ICB02-UpgradingtheoceanoutfallsatBetio,BairikiandBikenibeu,
• OSSP-OnSiteSanitationSub-ProjectspanningfromthevillageofTeaoraereketoBonriki.
TheEngineer continues to conductmonthly auditsof theContractor’soperationswith compliance
observedacrosstheICB01andICB02projects.
WorksprogressedonthefinalremainingtasksundertheICB01Contractwithworkcontinuingonthe
remaining sections of the Bikenibeu Saltwater Network, Septage Receival Unit, Sewer Jetting and
repairsandoutstandingpunchlistitems.ICB02worksincludedinstallationofthethirdandfinalocean
outfallinBetio,andVariationworkstoinstallairvalvesandadditionalconcretemattressesatallthree
locationsofBetio,BairikiandBikenibeu.
SaltwaterleakswereobservedinBetiowiththeleaksisolatedandrepairedbyboththePUBandthe
Contractor. The Environmental Compliance Division within MELAD conducted three separate site
inspectionstoauditcomplianceagainsttheICB01andICB02EnvironmentalLicences.
Contract award andworks commenced on the Onsite Sanitation Sub-Project during the reporting
periodwith10of the34 toiletscaptured in thesuccessfulbid.Groundwatersampling tubeswere
installedduringMayandJuneallowingbaselinegroundwatersamplingtocommence.Avariationis
being prepared to replace three of the sites with more appropriate sites due to unforeseen
circumstancesincludinginabilitytocontactlandownersandlackofareaavailableforconstruction.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB01
5119003|R0|July2018|SMECInternational|2
2 ICB01
2.1 StatusThe ICB 01 Contract involves the rehabilitation of three separate sewer networks in the areas of
Bikenibeu,BairikiandBetio.Theworksrequirethecleaningofpreviouslyinstalledsewerinfrastructure
inadditiontomajoroverhaulofexistingsewerpumpstationsandthesaltwaterflushingnetwork.
ThesewernetworksinallthreelocationshavebeenrehabilitatedandhandedovertoPUBforongoing
operation, with the additional saltwater network system in Bikenibeu being the only remaining
saltwaternetworkrequiringenergisingandhandover.
2.2 SaltWaterWorksIntakePumpStationsarecompleteandcommissionedinBairikiandBetio.HandoveroftheBikenibeu
pumpstationhasbeendelayedduetoapumpcorrosionissue.Replacementpumpsarecurrentlybeing
procuredwithfinalinspectionsandhandoverscheduledforJuly.
2.2.1 BikenibeuSaltWaterNetwork
Extensivecomponentsof thesaltwaternetwork lieunder recently sealed roads in the furthermost
regionsofeastandwestBikenibeu,withrestorationrequiringaconsiderableamountofcutandrepairs
tothesealedmainroad.TheContractorsubmittedanalternativedesigntooffersaltwaterservicesto
the communities in Bikenibeu without the need for road cuts. This alternative approach involves
installingthebypasslinesusedundertheICB02Contractintrenchesalongtheroadside.
The alternate works were approved under Variation 36.7. Installation of new saltwater taps at
residentialpropertiesandtoiletblocks iscomplete.1,500of the2,000metresof the160ODmain
backbonepipeline is installedwith the final500metres scheduled for installationduringearly July
2018.
AsdetailedintheQ22017report,undertheHighwayActaroadreserveexistsadjacenttoroadsunder
theKRRP.Localresidentconsultationalsooccurredpriortoapprovaloftheworkstoensureallqueries
raisedbylocalresidentswereaddressed.
Due to the use of flexible pipelinematerial, there is no requirement for the removal of trees or
permanentstructuresduringtheinstallation.LocalresidentswereconsultedbytheContractor’sonsite
personnel as the works progressed. Residents were asked to indicate their preferred location for
installationofthetap,withcaretakentoinstallthetapandisolationvalveinalocationawayfrom
trafficableareas.
SMECwillimplementafollowuproundofresidentconsultationstotheareaofinstallationinorderto
reinforcetheintendeduseofthesaltwatersystem,andtoinformresidentsoftheprocessofreporting
toPUBanyissueswiththeconditionofthesystemonceitbecomesoperational.
2.2.2 SaltWaterLeaks
Additionalsaltwaterleakswerereportedoverthereportingperiod,primarilyintheBetioRegion.The
EngineerisawareofsixseparatesaltwaterleaksoccurringinBetiobetweenJanuaryandJuly2018,
withall leaksoccurringunderoradjacenttothepavementinstalledundertheKRRP.Thesaltwater
networks inBetioandBairikiwerehandedovertotheEmployer inAugust2017.Allsaltwater lines
werepressuretestedat1.5timesoperationpressure,withinspectionrecordsshowingworkinBetio
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB01
5119003|R0|July2018|SMECInternational|3
was completed in late 2015. These failures occurred within the defect liability period, with PUB
inspectioncrewsadvisedtoreportifthelinefailureswereduetocontractorfaultordefect.
Table 1 below summarises all reported leaks during the reporting period, with indication of the
apparentcauseoftheleak.
Table1.SaltWaterLeaksRegister
Date Area Location LikelyorObservedCause Comments
4/02/2018 Betio BTH5 ExistingFailedtappingRepairedbythe
Contractor
8/03/2018 Betio BTH21 Pipecrown-longitudinalfailure RepairedbyPUB
16/03/2018 Betio BTH20 ExistingCorrodedConnectorNipple RepairedbyPUB
6/04/2018 Betio BTH67 ExistingLeakingTappingBand RepairedbyPUB
6/04/2018 Betio-Graveyard BTH19 ExistingCorrodedpipeclamp RepairedbyPUB
4/05/2018 Betio-Graveyard BTH20 Tappingbandfailure RepairedbyPUB
As indicatedabove,the leaksappeartobeoccurring ina localisedarea;beingtheoceansidemain
roadoftheBetioregion.Itisunderstoodthatthisroadissubjecttofrequentusebyheavyvehicles
withthisofferingoneexplanationforthereoccurringissue.Itisalsopossiblethatthepipematerial
maybe faulty, andPUBhasoffered toprovidea lengthof failedpipe for theEngineer to conduct
materialtestingtodeterminetheconditionofthematerialandensureitisfitforuse.
As detailed in the previous safeguards report, a leak occurring in November 2017 led to a
compensationclaimfordamagestogardenandhouseholdwellcontamination.Theincidentoccurred
oninfrastructurepreviouslyenergised,testedandhandedovertoPUB.TheContractorwasnotifiedof
theleakandproceededtorepairthefault.NoreportwasissuedtotheEngineerwiththecauseofthe
leakleftundefined.Duetothelackofinformationaroundtheincident,thecompensationclaimwas
settledwiththeclaimantbytheContractor,withthematternowconsideredclosed.
2.3 PumpStation1PS1ateachofthethreeseweredsystemsiscompletewiththefinalfootprintoftheinstallationsbeing
determined.SurveyshavebeenconductedatallsiteswithdocumentationforwardedtoMISE.MISE
has determined compensation amounts and provided information and instruction to Lands
ManagementDivision(LMD)toproceedwithofferingpaymenttothepersonsidentifiedbytheLMD
asowners.TheEngineerunderstandsthatpaymentforlandoccupiedbyPumpStation1inBikenibeu
isyettobereleased.
2.4 SeptageReceivalUnit(SRU)WorkstoinstalltheSRUareongoingwiththeunitremaininguncommissionedatthetimeofwriting.
TheunitlieswithinthefootprintofthePumpStation1inBetiowhichliesonGovernmentLeaseLand.
InitialtestingwasconductedwiththeeffluentflowingsuccessfullyfromthePUBvacuumtrucktothe
unit.
DuetothecommonoccurrenceofconcreteseptictanksinTarawa,smallstonesorconcretechipsare
foundwithintheeffluentremovedfromtheseptictank.Thesestonesarecapturedbetweenthescrew
oftheSRUandthesideoftheunitchambercausingexcessivescrapingandpotentialdamagetothe
unit.TheContractoriscurrentlymanufacturingascreeningdeviceusingPVC,tobeinstalledattheSRU
inlettoseparateanysmallstonesorhardobjectsfromtheseptictankeffluentpriortoentryintothe
machine.Thisadditionwillnotrequireworksoutsideoftheexistingfootprint.Testingofthisscreening
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB01
5119003|R0|July2018|SMECInternational|4
unitwilloccurpriortocommissioning,handoverandtrainingofthePUBwastewaterstaffinoperation
oftheSRU.InstallationofthescreeningunitandtestingisscheduledtooccurinJuly2018.
2.5 PumpStation5TheContractordemobilisedfromthepreviouslycontroversialsiteinthefirstweekofOctoberafter
completingallworks.TheexistingPumpstationwasdemolishedandreplacedwithamanhole.The
school sewer line was cleaned and inspected to ensure correct operation. There were no further
altercationsbetweentheresidents,ContractororPolice.
2.6 EnvironmentalMonitoringMonthlyenvironmentalmonitoringoftheContractor’sworkcontinuedinthefirsthalfof2018witha
totalof12auditsbeingconductedbytheSafeguardsOfficer.TheAuditsareavailableinAppendix1.
Issueswereminor,includingContractor’sstaffnotcorrectlywearingPPE.
2.6.1 OdourComplaint
The Engineer attended ameetingwith local residents at PS1 Bikenibeu on 19 February 2018. The
meetingwasheldinresponsetoanodourcomplaintmadetotheEngineerduringaprevioussitevisit.
DocumentationrelatingtothiscomplaintandinterviewareincludedinAppendixB.
The complaintwasassociatedwithexcessiveodourbeingobservedadjacent to theoutfall screen,
especiallywhenthePUBwerecleaningthescreenwiththerakeandvacuumtruck.Theresidentstated
thatthepresenceofodourhadimprovedsincetheprojectbegantoupgradetheinfrastructure,but
theodourwasstillanissueforthefamily.Itisnotedthatthefamilyhasconstructedadwellingdirectly
adjacenttotheoutfallscreensincethepreviousreportingperiod.
Odourhasbeenidentifiedasapotential issuesincetheproject’sinceptionwithpossiblemitigation
optionsincludinginstallationofextracoversontheoutfallscreenandtechniquestoreducetheodour
emittedbythevacuumtruckduringcleanout,includingminimisingspillageandalwayscontainingraw
effluentaftercleanout.
2.6.2 EnvironmentalComplianceDivision(ECD)Inspections
Forsimplicity, ICB01and ICB02willbeconsideredtogether in thissectionof thereport.TheECD
withintheMinistryofEnvironment,LandsandAgriculturalDevelopment(MELAD)conductedtwosite
inspectionsduringthereportingperiod.Thefirst inspectionoccurredon2March2018.Thereport
compiledinresponsetotheauditisdetailedinAppendixC,Section1.TheconcernsraisedbyECDwere
addressedbytheContractor:extrainspectionswereconductedtoensurecorrectuseofPPE;ensuring
fuelwasstoredcorrectly;andconfirmationthatdebrisattheBetioPS1sitewasnotderivedfromeither
theICB01orICB02Project.
The secondECD inspectionoccurredon2Mayat TemakinPoint, Betio. ECD issueda letter to the
ContractoradvisingthattheECDbelievedtheContractorhadbreachedtheEnvironmental licences
underICB01andICB02.ThisletterisprovidedinAppendixC.
ECD has communicated their concerns to the Contractor andMISE regarding a number of issues
(AppendixC,Section2).ECD’sprimaryconcernsforboththeICB01andICB02worksarenotedinthe
followingextractfromtheNoticeofCompliance.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB01
5119003|R0|July2018|SMECInternational|5
Thefollowingnotesprovideanupdateonthestatusofthefiveconcernslistedabove.Atthetimeof
writing:
Item(i)
LMDhasissuedanapprovallettertotheLicenceholdergrantingapprovalforuseoftheTemakinPoint
sitefortemporarystorageofprojectmaterialsandplantsduringtheprojectimplementationstage.
Item(ii)
TheLicencestatesthattheLicenceholder,nottheContractor,mustsubmitthereports.Discussions
areongoing todetermine responsibilities.TheContractor states that these requirementswerenot
includedintheContractwithMISE.TheBEIAstatesthisistheresponsibilityofPUBandECD.ECDhas
statedthatresponsibilitylieswiththeContractorduringtheConstructionphase.Thereisnodiscussion
inthecontractthatwouldsupportthisstatement.
Item(iii)
Asabove
Item(iv)
TheContractor’smonthlyreportshavebeenforwardedtoECDforreview.
Item(v)
Themonthlyreportsreferencedaboveincludeacomplaintregisteranddetailsofanyenvironmental
damage.
TheEngineercontinuestoconductmonthlyauditsoftheContractoragainsttheapprovedContractor’s
EnvironmentalManagementPlan. Compliance is generally goodwithno findingsof significance to
report.ThesereportshavebeenforwardedtotheEnvironmentalOfficeratMELAD.Themonthlyaudits
forJanuarytoJunearepresentedinAppendixA.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB01
5119003|R0|July2018|SMECInternational|6
2.7 SocialSafeguardsAllbutthreepumpstationswithin ICB01are locatedonGovernmentLeaseLand.Thethreepump
stations of interest, Pump Stations 1, 5 and 6, are all located in Bikenibeu. Surveys have been
conductedatPS1withdocumentationassociatedwithcompensationratesforwardedtotheLMDfor
processing.AsdiscussedinSection2.5ofthisreport,worksatthenewPS5anddecommissioningof
the existing PS5 are complete. Three separate persons have claimed ownership of the PS6 land.
Negotiationscommencedin2012withthepersonsofquestionwitharesolutionoccurringearlierin
theproject.Atpresent,landoraccessissuesarenotimpedingprojectcompletion.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB02
5119003|R0|July2018|SMECInternational|7
3 ICB02
3.1 StatusAll constructionworksunder the initialContractBOQarenowcomplete.Remainingworks include
installationof additionalmattresseson theedgeof the intertidal reefs inorder tomitigate riskof
outfalllinefloatation.A400metrelongstringofoutfallpipelinebecamedetachedfromtheintertidal
reefandwaslostfromBetioon31January.ThePipelinewasmooredparalleltotheexistingtrench
awaitinginstallation,whenitwasseparatedfromthemooringsandcarriedawaywiththelargetidal
movements. The replacementpipelinewasprocuredand is now installed.However this eventhas
causedadelaytoprojectcompletion.
3.2 BikenibeuOutfallFloatationMeasurestoaddresspotentialoutfallpipelinefloatationincidentshavebeenapprovedandprocured.
Airvalveshavebeeninstalledatallthreelocationsatlocalhighspotsontheoutfallalignment.Four
separate air valves have been installed in Betio due to the 800 metre section of near horizontal
intertidalreefalignment.Nofurtherfloatationobservationshavebeenreportedsincetheinstallation
oftheairvalvesand30metresofadditionalconcretemattressesateachsite.
All rectificationworks tookplaceonoradjacent to the intertidal reef leading to limited social and
environmental impact. In order to settle the floating Bikenibeu pipeline, a 6mmpenetrationwas
drilled in the crown of the pipe at the transition zone from intertidal zone to deep water. This
penetrationresultedintheintroductionofasmallamountofsewageeffluenttobedischargedatthe
intertidalreef.Thepenetrationwasrequiredtoensureairreleaseoccurredduringtheprocurement
andinstallationofspecialtyairvalves.
3.3 LossofBetioOutfallPipelineAnincidentreportwasissuedtotheEngineerandEmployeron2February2018,advisingoftheloss
ofthelengthofpipe.AtthetimetheContractorwascontinuingin-scopeworkstoinstalltheremainder
oftheBetiooutfallpipelineafterextensivedelayswhentidalpatternsonlyallowedaccesstothereef
forapproximatelyfourdayspermonth.
TheexistingtrenchwasclearedtowardstheendofJanuaryanda400-metrelongstringof315mm
diameterHDPEpipewasmooredparalleltothetrenchawaitinginstallationduringthemorninglow
tideof1February2018.
Whenthepipestringwasdiscoveredtobemissing,localboatswereusedtosearchtheimmediate
areawhilepilotsofAirKiribatiwererequestedtoprovidelocationofthepipeifsightedfromtheair.
Howeverthepipestringwasunabletobelocated.
The incident reportdetailing theactionsand further informationaround thedisappearanceof the
pipelineisavailableinAppendixDofthisreport.
Unfortunately,theeventhadasignificantimpactonthecompletiondateoftheprojectandintroduced
alargemarinehazardintotheimmediatearea.Therearealsopotentialfutureclaimsforrecoveryof
thepipelineifitisdiscovered.
Theincidentwasdeterminedtobeanun-compensableevent,andtheContractorhasabsorbedthe
costofprocuringareplacementpipeline.ThiswasprocuredbytheContractorandInstallationwas
completedinJune2018.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-ICB02
5119003|R0|July2018|SMECInternational|8
3.4 EnvironmentalMonitoringSMECundertook routinemonthly audits of the JV, as noted inAppendix 1. Themajority ofworks
undertakenoccurredontheintertidalreef,usinga20tonneexcavatorequippedwithrubbertracksin
ordertominimiseimpactonthereef.Therearetwonoteworthydeficienciesinthereportingperiod
includingthecontinuedreleaseofsewageatthereefedge,andconcern,recentlyraised,overthelack
ofapprovaldocumentationfromtheLMDforuseofthePS1siteforstorageofequipment.
3.5 SocialSafeguardsWorks during the reporting period occurred primarily at the Betio PS1 site. The area used for
constructionisGovernmentLeaseLandwithnorequirementfortheresettlementoflocalresidents.
WorkstoinstalltheBairikioutfallrequireaccesstotheLDSchurchinWestBairiki.TheContractorwas
instructedtoalignthepipeastocauseminimaldamagetotreesandexistingseawall.Worksinvolved
trenchingthroughthechurchyardandinstallationofanewoutfall lineundertheexistingseawall.
WorkswerecompletedwithnoconcernsraisedbyLDSpersonnelwiththeEngineerconductingpost
constructioninspectionstoensurepropertywasleftinasgoodorbetterconditionthatitwasfound.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-On-SiteSanitationSub-Project
5119003|R0|July2018|SMECInternational|9
4 On-SiteSanitationSub-Project
4.1 StatusTheconstructionContractfor10ofthe34toiletswasawardedtoHiTekConstructionsinApril2018
withsitelayoutsandengagementwiththelocalresidentsoccurringshortlythereafter.Potentialsites
hadbeenspecifiedwhentheprojectwasoriginallyapproved.The10sitesincludedintheHi-Tekbid
were locatedbetweenEitaandTeaoraereke inSouthTarawa.Local inspectionssoonrevealedthat
constructionwasnotsuitableatanumberoftheproposedlocationsandasaresultthreealternative
sites were approved. Water sampling equipment arrived in Tarawa in June with baseline water
sampling ongoing. Materials for construction are currently being procured internationally with
constructionanticipatedtobegininJuly2018.
4.2 RevisionofSitesPostContractawardsiteinspectionsidentifiedissuesrelatedtoseveralproposedareasofconstruction
thatwerenotpreviouslynotedintheSeptember2017inspections.
ANT4was visited in April but no landowner could be located. Neighbours advised that the family
currently resided in New Zealand and had not returned in previous months. No information was
availableregardingthereturndateoftheresidents,noranycontactdetails.Furtherinspectionledto
theremovalofthesiteduetorestrictedaccess,littleroomforconstructionandtheinabilitytoconfirm
landownerapprovalandcooperation.
TEA5 was visited by the Contractor representative and SMEC Community Engagement staff to
determineapprovalforconstructionandconfirmasuitablesitelayout.TEA5requirestheinstallation
oftwoseparatesepticsystems,onasiteinitiallyproposedonthelagoonsidebehindthefishmarket
in Teaoraereke. the local landowner was unable to be located and several families occupy the
restrictedspace.Theproposedconstructionsitehadincurrederosionwithaseawallandgravesites
impedingconstructionactivities.Anyexcavationsofthesitewouldleadtopotentialcollapseofthe
seawallandtheareawasdeterminedtobeunabletoaccommodateasingleinstallation.
VisittotheTEA6siterevealedacontainerandgravesitelocatedattheproposedareaofconstruction.
Project team members were advised that the landowner was not currently on Tarawa and that
residentsdidnothaveauthoritytoapproveuseofthelandandremovalofthegrave.
Sitesthatwerenolongersuitableforconstructionwerereplacedbysitespreviouslyidentifiedinthe
initialprojectsurveysduringprojectinception.ThenewproposedsitesareEIT1,EIT4andBN4.Inorder
toincludethenewsites,acontractvariationiscurrentlybeingfinalisedtoaccommodatethechanges.
4.3 EnvironmentalMonitoringThe contractor has installed three groundwatermonitoring tubes at eachof theeight sites. These
monitoringpointswillbeorientedtoallowsamplestobetakenfromthelocationofafuturesoakaway
fieldand inclosevicinity to thehouseholdwell.Thepurposeof thewater sampling is toascertain
existingwaterqualityatthatlocation,andmonitoranyimpacttheprojectmayhaveonthelocalarea
intermsofwatercontamination.EquipmenttoconductthisexercisewasincludedinSMECV013and
hasarrivedinTarawaatthetimeofwriting.Watersamplingwillcontinuethroughoutthelifeofthe
projectwithMISEandPUBtoundertakefuturemonitoringtodetermineanyimpactoftheinstalled
sanitationinfrastructure.
EquipmentpurchasedbytheconsultantunderV013willbeusedtoquantifyandtestthefollowing:
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-On-SiteSanitationSub-Project
5119003|R0|July2018|SMECInternational|10
• Salinity(g/L)
• pH
• AmmoniaNH3-N(mg/L)
• NitrateNO4-N(mg/L)
• TotalOrtho-Phosphate(mg/L)
• FaecalColiformandE.colipresence.
TestswillbeconductedforaperiodofuptothreeyearspostconstructionbyMISE,withtheinstallation
tobedecommissionedifgroundwatercontaminationisidentified.Initialsamplingwillbecompleted
priortocommissioningofthesystemsandabackgroundreportongroundwaterqualityidentifiedby
thesamplingwillbesubmittedtotheEmployerandADB.Thisreportwillsetoutafuturemonitoring
scheduletobeadoptedbytheteamsresponsibleformonitoringoftheproject.
TheKiribatiMinistryofHealthconductongoingwatersamplingofthePUBgroundwater inBonriki,
includingbiologicaltestingsimilartothatrequiredunderOSSP.AnalysisforFaecalColiformandE.Coli
requiresanincubatorandasuitabledeviceisavailableatNaverere.SMEChasconsultedwiththeChief
ofLaboratoryServicesatNavereretorequestassistancebyallowingtheir incubatortobeusedfor
theseanalyses.Laboratorystaffhaveofferedtheirexpertiseandequipmenttotheprojectteamanda
trainingday isplanned toensurecorrectwater collectionand testingmethodologiesare followed.
Chemicaltestingdoesnotrequirelaboratoryequipmentandwillbeconductedonsiteorinoffice.
MembersofPUB,MISEandMoHhavebeeninvitedtoparticipateinthewatersamplingactivitiesin
order toprovideappropriate training in theuseof theequipmentand finaliseaprocedure for the
requiredfuturesampling.AllequipmentwillbehandedovertotheEmployerattheendofthebaseline
watersamplingperiod,andGoKwillberesponsibleforongoingmonitoring.
The OSSP BEIA also includes measures to mitigate negative environmental impact including pre-
constructionconsultationwithlocalresidentsonhowtooperateandmaintaintheinstallation.
4.4 SocialSafeguardsFollowup visits to the sites included in theprojectwere conducted inApril to confirm site access
arrangementsandtoinformthelocalresidentoftheupcomingworks.SMECcommunityengagement
staff attended to translate and offer advice to the local residents and facilitate the signing of a
MemorandumofUnderstanding (MOU).ThisMOUwasapprovedforusebytheWaterUnitwithin
MISEandasignedexampleisprovidedinAppendixD.
TheMOUspellsoutresponsibilitiesofallpartiesincludingrequirementsoftheresidentstoreporton
specificusagebehavioursoftheusersandaitalsoprovidesadviceonseekingassistanceifanissue
withthesystemisidentified.MISErepresentativesrecommendedthattheMOUbesignedbytheland
ownerwiththeinclusionofalocalpriestandmemberofparliamentinordertofurtherformalisethe
agreements. TheMOU for all of the eight locations has now been signed by land owners or the
respectivelocalelders.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|11
AppendixA ICB01/02EMPCompliance
MonitoringandAudit
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|12
ICB01JanuaryICB:01 EnvironmentMonitoringandAuditing DateofInspection:
26February2018
Site:Records–InterviewwithMichael
SimmonsinBikenibeuMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
WastesandfromBairikisaltwatermain
weredumpedatNanikaidumping
ground.
Approximately3truckloadswere
disposed.
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|13
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:
26February2018
Site:Records–InterviewwithMichael
SimmonsinBikenibeuMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Allmachineryisworkingwell
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nopollution.
Lessthan100litresofdieselarekeptin
cans.
Buttweldingofsaltwatermainpipesis
undertakenonsite.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|14
ICB01FebruaryICB:01 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
SimmonsMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
2workerswerenotwearingsafetyboots
Theconcernedworkerswereremindedto
wearsafetybootsatalltimes
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposedofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wastesareshippedoutoftheKiribatiat
thecompletionoftheproject.
Nil
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
OnelandownerinBikenibeudoesnotwant
tohavethesaltwaterdistributionpiperun
acrosshislandtoservethehousebehind
hisproperty
TheContractordiscontinuedthework,
informedtheaffectedpersonoftheissue
andadvicetoseekassistancefromthe
Government
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstructionactivities
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
Allmachineryisworkingwell
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|15
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
SimmonsMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
contractortocorrectproblemwithin2
days.
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissionsfrom
thedrillingrigsandvehicles
Nopollution.
Lessthan100litresofdieselarekeptin
cans.
2.7
Removedtreesandvegetationalongsewer
linetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|16
ICB01MarchICB:01 EnvironmentMonitoringandAuditing DateofInspection:14April2018 Site:Records–InterviewwithMichael
Simmons
Monitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Twotruckloadsofsandfromcleaningthe
sewermainatBairikiBetioandBikenibeu
weredisposedatNanikai
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|17
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:14April2018 Site:Records–InterviewwithMichael
Simmons
Monitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Allmachineryisworkingwell.the
Contractorhasaroutinemaintenance
schedule.
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nopollution.
Lessthan100litresofdieselarekeptin
cansonsites
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|18
ICB01AprilICB:01 EnvironmentMonitoringandAuditing DateofInspection:28thNovember2017 Site:Records–InterviewwithMichael
SimmonsMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensure all staff are wearing appropriate
PPE. JSEAs for work tasks have been
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspection to ensure that non-hazardous
materials are collected and dispose of in
the landfill, and hazardousmaterials are
storedsafely.
Inspection to ensure that all hazardous
wasteareshippedoutoftheKiribatiatthe
completionoftheproject.
Fourtruckloadsofsandfromcleaningthe
sewer main at Bairiki and Betio were
disposedatNanikai
2.2
Accidentaldamagetoproperty
2.2
Visual inspection of project sites, and
records of grievance made and actions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noise nuisance from construction
activities.
2.4
Asaboveandconductasetof interviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|19
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:28thNovember2017 Site:Records–InterviewwithMichael
SimmonsMonitoring–Bikenibeu
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaust emissions and black smoke
excessive
2.5
As above and check for maintenance
records,ageofequipmentandoperation
within specifications and instruct
contractor to correct problem within 2
days.
Allmachineryisroutinelymaintainedand
working.
2.6
Pollutionfromchemicalsandfuels
2.6
Regular inspection of sites for pollution
from storageof hazardousmaterials and
likelyleakagesandexhaustemissionsfrom
thedrillingrigsandvehicles
Nopollution.
About20litresofdieselarekeptincanson
sites
2.7
Removed trees and vegetation along
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
or local consultation agreed to another
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Have available full record of monthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|20
ICB01MayICB:01 EnvironmentMonitoringandAuditing DateofInspection:14thDecember2017 Site:Records–InterviewwithMichaelSimmons
Monitoring–Bikenibeu15December2017
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Fourtruckloadsofsandweredisposed
atNanikai
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|21
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:14thDecember2017 Site:Records–InterviewwithMichaelSimmons
Monitoring–Bikenibeu15December2017
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Allmachineryisroutinelymaintained
andworking
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nofuelsarestoredonsite.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|22
ICB01JuneICB:01 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–July2018
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Nil
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|23
ICB:01 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–July2018
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Allmachineryisroutinelymaintainedand
working
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nofuelsarestoredonsite.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|24
ICB02JanuaryICB:02 EnvironmentMonitoringandAuditing DateofInspection:17February2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Nil
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Reportofmissingsmallfishingboatin
whichtheContractorworkerswere
blamed
theContractorhastalkedwithpeople
concerned
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|25
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:17February2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Allmachineryisoperatingwell
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nil.Lessthan100litresofdieseliskeptin
cans
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Noremovaloftreeshastakenplace
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
Workdone
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|26
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:17February2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied
TrenchingforBetiohasstarted.
Asectionofanoutfallpipewasgone
missingovernightafteritwasleftonthe
reefflatovernight.
Trenchingspoilwereseenatthe
trenchingsiteatBetioreefflat
TobetakenoutoncetheBetiooutfall
completes
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Buttweldingtoconnectthepipeswas
carriedoutattheoutfallsite.
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution
2
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
3.3
Inadequateworkersanitationfacilities
provided
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties
PublicsanitationfacilityatBetioisbeing
used.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|27
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:17February2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|28
ICB02FebruaryICB:02 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Nil
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|29
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Allmachineryisoperatingwell.
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nil.Lessthan100litresofdieseliskeptin
cans.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Noremovaloftreeshastakenplace
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
Workdone
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|30
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied.
Nil
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Nil
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution
2
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
3.3
Inadequateworkersanitationfacilities
provided
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties
PublicsanitationfacilityatBetioisbeing
used.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|31
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26March2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses.
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational.
However,itwasnotedthatairvalves
havenotbeeninstalledonthedefected
outfallpipesatBikenibeu.Sewagejetting
outoftheholethatwasdrilledtolet
trappedairescaped,isvisibleduringlow
tideswhenthesewageisbeing
discharged.Theholeislocatedatthereef
edge.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|32
ICB02MarchICB:02 EnvironmentMonitoringandAuditing DateofInspection:18April2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil.Noworkswereundertakenduringthe
monthofMarch
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Nil
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|33
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:18April2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Allmachineryisoperatingwell.
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nil
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
Workdone
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|34
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:18April2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied
Nil
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Nil
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution.
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|35
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:18April2018 Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.3
Inadequateworkersanitationfacilities
provided
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties
PublicsanitationfacilityatBetio
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational.
Airvalveshavenotbeeninstalledonthe
defectedoutfallpipes.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|36
ICB02AprilICB:02 EnvironmentMonitoringandAuditing DateofInspection:26May Site:Records–InterviewwithMichael
Simmons.Monitoring–Betio,Bairiki&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Dredgedspoil(bouldersandstones)
occupythelengthofthedredgedtrench
Toberemovedwhentheoutfallpipeline
iscompleted
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|37
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26May Site:Records–InterviewwithMichael
Simmons.Monitoring–Betio,Bairiki&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Allmachineryisoperatingwell
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nil.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
Workdone
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|38
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26May Site:Records–InterviewwithMichael
Simmons.Monitoring–Betio,Bairiki&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied
Trenchingisdonealongthedesigned
route
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Nil
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|39
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:26May Site:Records–InterviewwithMichael
Simmons.Monitoring–Betio,Bairiki&Betio
Outfalls
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.3
Inadequateworkersanitationfacilities
provided
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties
PublicsanitationfacilityatBetio
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational
hopefullybyPUB
Airtrappedintheoutfallpipesbeyond
thereefsurfzonehasbeencausing
problemswiththeoutfall.Holeswere
drilledtoreleasetrappedairbutalsoraw
sewageplumes
AirvalvehasbeeninstalledatBairikibut
notatBikenibeu.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|40
ICB02MayICB:02 EnvironmentMonitoringandAuditing DateofInspection: 18May Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu,Betioand
BairikiOutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Dredgedspoil(bouldersandstones)
occupythelengthofthedredgedtrench
Toleavethedredgedbouldersandstones
aloneasadvisedbytheEnvironment.
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|41
ICB:02 EnvironmentMonitoringandAuditing DateofInspection: 18May Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu,Betioand
BairikiOutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablish
impactsandactionstakenbycontractor
Nil
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Allmachineryisoperatingwell
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Nil.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
Workdone
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|42
ICB:02 EnvironmentMonitoringandAuditing DateofInspection: 18May Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu,Betioand
BairikiOutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied.
Trenchingisdonealongthedesigned
route
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Nil
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution.
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|43
ICB:02 EnvironmentMonitoringandAuditing DateofInspection: 18May Site:Records–InterviewwithMichael
Simmons.Monitoring–Bikenibeu,Betioand
BairikiOutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.3
Inadequateworkersanitationfacilities
provided.
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties.
PublicsanitationfacilityatBetio
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses.
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational
hopefullybyPUB
Airtrappedintheoutfallpipesbeyond
thereefsurfzonehasbeencausing
problemswiththeoutfall.Holeswere
drilledtoreleasetrappedairbutalsoraw
sewageplumes.
AirvalvehasbeeninstalledatBairiki
outfall.Installationofairvalvesat
BikenibeuandBetiooutfallstofollow
soon.
1airvalveistobeinstalledatBikenibeu
outfall,1atBairikiand4atBetio.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|44
ICB02JuneICB:02 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithGregHalls
Monitoring–Betiooutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
1.3
Occupationalhealthandsafetymeasures
1.3
Ensureallstaffarewearingappropriate
PPE.JSEAsforworktaskshavebeen
completedandsigned.
Nil
2.1
Generationofconstructionwaste
2.1
Inspectiontoensurethatnon-hazardous
materialsarecollectedanddisposeofin
thelandfill,andhazardousmaterialsare
storedsafely.
Inspectiontoensurethatallhazardous
wasteareshippedoutoftheKiribatiat
thecompletionoftheproject.
Dredgedspoil(bouldersandstones)
occupythelengthofthedredgedtrench
Tobereusedasweightalongtheoutfall
pipe
2.2
Accidentaldamagetoproperty
2.2
Visualinspectionofprojectsites,and
recordsofgrievancemadeandactions
taken
Nil
2.3
Accidentaldamagetoutilities
2.3
Asabove.
Nil
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|45
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithGregHalls
Monitoring–Betiooutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.4
Noisenuisancefromconstruction
activities.
2.4
Asaboveandconductasetofinterviews
withclosestresidentstoestablishimpacts
andactionstakenbycontractor
Nil
2.5
Exhaustemissionsandblacksmoke
excessive
2.5
Asaboveandcheckformaintenance
records,ageofequipmentandoperation
withinspecificationsandinstruct
contractortocorrectproblemwithin2
days.
Nil.Thebidexcavatorhashydraulichose
problem.
AwaitingsparepartsfromAustralia
2.6
Pollutionfromchemicalsandfuels
2.6
Regularinspectionofsitesforpollution
fromstorageofhazardousmaterialsand
likelyleakagesandexhaustemissions
fromthedrillingrigsandvehicles
Lessthan20litresoffueliskeptin
containeronsite.
2.7
Removedtreesandvegetationalong
sewerlinetrenchesnotreplanted
2.7
Confirmthatrevegetationhastakenplace
orlocalconsultationagreedtoanother
approachtomitigatelosses
Nil
2.8
Failuretoprepareandsubmitmonitoring
checklistreports
2.8
Haveavailablefullrecordofmonthly
monitoringchecklistreports
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|46
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithGregHalls
Monitoring–Betiooutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
2.9
Damagetoand/orlossofcoral
Thereplacementoftheoldoutfallpipes
couldimpactlivecoralinthedirectpath
ofthepipelinetrenches.Toaddressthisa
detailedmarinesurveywascompleted
andexistenceofallcoralspeciesmapped.
Basedonthissurveyatotalof5-7m2of
coralcouldbeimpacted.Theuseofan
experiencedmarineecologisttohelp
locatetheoutfallwhennearcoralsandto
leadtherelocationofcoralheadswill
minimizefurthertheminorimpactofthis
work.
Deploymentofweighttoweighdownthe
outfallpipeswerecarriedoutatthe
BikenibeuandBairikioutfalls.Workis
restrictedtotheareaoverthepipesto
minimisecoraldamage.
3.0
PoorTrenchingworkareacontrols
Contractorwillberequiredtomarkwork
areacorridorswithanchoredbuoys(14m
constructionwidth),ensurethatrubber
tracked,lightweightexcavatorisused;
andoptionalapproachtopipeline
replacementbereviewedandthebest
approachapplied.
Trenchingisdonealongthedesigned
route
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|47
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithGregHalls
Monitoring–Betiooutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.1
Pollutinganchorfabricationandbatch
plantoperations
Runofffromanystagingareafabrication
siteswillneedtobedivertedtoa
detentionareatoreducetheamountof
sedimentreachingthesea.Ifalocal
fabricationandbatchplantisused,the
contractorwillneedtoprovidean
inspectioncertificate,signifyingthat
operationsareincompliancewithall
Kiribatiregulations.Thecontractorwillbe
responsibleforassistingthelocal
providertobecomemore
environmentallycompliant
Nil
3.2
Diffuserunitnotsuitedforsite
conditions,leadingtopotentialeffluent
pollution
2
Priortothediffuserbeingattachedto
eachpipeline,itwillbeinspectedand
certifiedasbeingadequateforthis
specificapplication
Alldiffusershavebeendeployed.
DiffusersatBikenibeuandBairikiare
connectedandoperational.Betiodiffuser
isyettobeconnectedtothemainoutfall.
3.3
Inadequateworkersanitationfacilities
provided
Contractorwillberequiredtomake
arrangementsforworkerstouse
public/privatetoilefacilitiesortoprovide
portabletoiletssuchasporta-potties
PublicsanitationfacilityatBetio
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixA
5119003|R0|July2018|SMECInternational|48
ICB:02 EnvironmentMonitoringandAuditing DateofInspection:3July2018 Site:Records–InterviewwithGregHalls
Monitoring–Betiooutfall
EnvironmentalIssue MonitoringDetail Issues Actionstaken
3.5
Effluentplumereachingshoreand
causingGIandothermicrobialandviral
sicknesses
Plumemonitoringatthreediffusersites
tobeimplementsstartingonyearone–
asdefinedintheIEESection7.3.2.
Monitoringshouldbeconductedduring
normalandspringtideconditions,once
every3monthsatthethreediffusersites.
Parameterstobemonitoredshouldbe
currentspeedanddirectionat3depths
andatthesametimepH,TSS,turbidity,
salinity,totalphosphorus,Nitrate(NO3)
andatfourlocations,i.e.twoupstream
(25mand50m)andtwodownstream(25
and50m)ofthediffuserimmediately
overthediffuser,20mdownstream,and
50mdownstreamand100mdownstream.
Priortothestartofsamplingatracer
shouldbeintroducedintothewastewater
streamtoestablishthegeneral
movementoftheplume.
Monitoringtocommencewhenthe
diffusersareconnectedandoperational
hopefullybyPUB
Airtrappedintheoutfallpipesbeyond
thereefsurfzonehasbeencausing
problemswiththeoutfall.Holeswere
drilledtoreleasetrappedairbutalsoraw
sewageplumes.
AirvalvehasbeeninstalledatBairikiand
Betiooutfalls.Installationofanairvalve
atBikenibeutofollowsoon.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixB
5119003|R0|July2018|SMECInternational|49
AppendixB OdourComplaint–PS1
Bikenibeu
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixB
5119003|R0|July2018|SMECInternational|50
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixB
5119003|R0|July2018|SMECInternational|51
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|52
AppendixC AppendixC–ECDAuditLetter
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|53
Section1–Resultof2March2018Audit.
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|54
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|55
Section2–Resultof5MayAuditandComplianceNotice
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|56
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|57
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixC
5119003|R0|July2018|SMECInternational|58
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixD
5119003|R0|July2018|SMECInternational|59
AppendixD AppendixD–PipeLossIncident
Report
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixD
5119003|R0|July2018|SMECInternational|60
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixD
5119003|R0|July2018|SMECInternational|61
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixD
5119003|R0|July2018|SMECInternational|62
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixD
5119003|R0|July2018|SMECInternational|63
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|64
AppendixE OSSPMOU
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|65
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|66
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|67
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|68
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|69
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|70
SouthTarawaSanitationImprovementSectorProject-SafeguardsMonitoringReport
SafeguardsMonitoringReport-AppendixE
5119003|R0|July2018|SMECInternational|71