APPENDIX D
ENVIRONMENTAL AUTHORISATION
ENVIRONMENTAL AUTHORISATION
A Basic Assessment Report has been submitted to the Department of Environmental Affairs for consideration with an
application for Environmental Authorisation (EA). Should the Department issue a positive decision, the EA will be
included in this section prior to the Rehabilitation Plan being implemented. No construction may occur without an EA.
Please note that the work proposed within the Enkangala Wetland and Doornrandjies A21C-03 was Authorised in
2017 and 2018 respectively and the EA is included herein.