Share this document with a friend
41
US Army Corps of Engineers BUILDING STRONG ® Team of Professionals Making Tomorrow Better Environmental Data Management on FUDSChem for USACE Jacksonville District FUDS Projects Presented by: Javier Cortes, USACE and Allyson Charbonnet, Aerostar SES LLC
Transcript

US Army Corps of Engineers

BUILDING STRONG®

Team of Professionals Making

Tomorrow Better

Environmental Data Management on FUDSChem for

USACE Jacksonville District FUDS Projects

Presented by:

Javier Cortes, USACE

and

Allyson Charbonnet, Aerostar SES LLC

BUILDING STRONG

2 As of: April 16, 2017

POC: A. Charbonnet

Outline

What types of “data” need to be managed

over a FUDS project lifetime?

Challenges of Project Management vs.

Data Management

History and Available Options for Data

Management

USACE Jacksonville District Examples

Observations and Lessons Learned

BUILDING STRONG

3 As of: April 16, 2017

POC: A. Charbonnet

Scoping Sessions/

Define Problem

(historical data)

Develop Project

Schedule

Identify Target

Analytes and

Concentrations

Establish sampling

and analytical

MPCs for PARCC

Define sampling

design and sample

number

Select Laboratory

and Analytical

Methods

Select Sampling

SOPs

Define Data

Validation

Requirements

Collect

Representative

Samples

Shipment, Receipt,

and Storage of

Samples

Sample and QC

Analyses

Laboratory Data

Deliverables

Data

Verification

(Error

Checking)

Data Review

and Validation

Data Usability

Assessment

Reporting,

Archiving,

and Future

Querying

Project Identified

Project Lifetime

BUILDING STRONG

4 As of: April 16, 2017

POC: A. Charbonnet

Scoping Sessions/

Define Problem

(historical data)

Develop Project

Schedule

Identify Target

Analytes and

Concentrations

Establish sampling

and analytical

MPCs for PARCC

Define sampling

design and sample

number

Select Laboratory

and Analytical

Methods

Select Sampling

SOPs

Define Data

Validation

Requirements

Collect

Representative

Samples

Shipment, Receipt,

and Storage of

Samples

Sample and QC

Analyses

Laboratory Data

Deliverables

Data

Verification

(Error

Checking)

Data Review

and Validation

Data Usability

Assessment

Reporting,

Archiving,

and Future

Querying

TPP WP & UFP-QAPP

“Real Work / Data”

Data Validation & Archiving

Project Identified

Project vs. Data Management

AND

BUILDING STRONG

5 As of: April 16, 2017

POC: A. Charbonnet

Project and Data Management Tasks

Technical Project Planning

“Real Work / Data”

Data Validation & Archiving

Work Plan with UFP-QAPP

Real-time

Collaboration

Resource

Management

and Timelines

File Editing &

Management

Review &

Approval

Communication

Time & Budget

Tracking

Data Protection

Company Software and Agency Forms

BUILDING STRONG

6 As of: April 16, 2017

POC: A. Charbonnet

FUDSChem

Required database for FUDS projects

Managed by Environmental Synectics, Inc.

Project and Data Management Tools

available in FUDSChem

► File Management

► Multiple Users

► Sample Planning

► Review and Approvals

► Event Tracking

► Data Validation

► Querying and Report

Generation

► Data Export

► Mapping

► Archiving

BUILDING STRONG

7 As of: April 16, 2017

POC: A. Charbonnet

FUDSChem Dashboard

BUILDING STRONG

8 As of: April 16, 2017

POC: A. Charbonnet

USACE Jacksonville Projects

Former Camp Gordon Johnston Army Military

Reservation Remedial Action Implementation

► Franklin County, Florida (Panhandle)

► Site E, Area 1 – Oil-Stained Sand

► Excavation

► Previously delineated

► Confirmation Samples Required

► Contaminant of Concern: POLs detected by Florida

PRO Method (reported as TRPH)

Demonstrate

Project Planning

BUILDING STRONG

9 As of: April 16, 2017

POC: A. Charbonnet

USACE Jacksonville Projects

Former DeLand Naval Air Station Post Active

Remediation Monitoring (PARM)

► Volusia County, Florida (Central)

► Site 2

► In the vicinity of former underground storage tanks

(2012-2014) three injections of Regenesis Advanced

Oxygen Release Compound

► PARM Samples Required

► Contaminants of Concern:

Demonstrate Data

Submission and

Validation • Benzene

• Ethylbenzene

• Toluene

• Xylene

• 1,2,4-Trimethylbenzene

• 1,3,5-Trimethylbenzene

• Isopropylbenzene

BUILDING STRONG

10 As of: April 16, 2017

POC: A. Charbonnet

Project Planning

Former Camp Gordon Johnston

BUILDING STRONG

11 As of: April 16, 2017

POC: A. Charbonnet

Project Planning Documents

BUILDING STRONG

12 As of: April 16, 2017

POC: A. Charbonnet

Uploading Files

Certify Document

BUILDING STRONG

13 As of: April 16, 2017

POC: A. Charbonnet

Certify File Properties

Lesson Learned

Decide on a naming convention

upfront.

Site Name, Document Type, Date

Synectics uses: Document Type,

Document Coverage (ex. SDG, site,

location)

Data Validation Report, SDG 1234

Chain of Custody, 012345A

Well Construction Diagram, MW-01

Groundwater Sampling Log, MW-01

UFP QAPP, Camp Gordon Johnston

BUILDING STRONG

14 As of: April 16, 2017

POC: A. Charbonnet

Checking File Status

BUILDING STRONG

15 As of: April 16, 2017

POC: A. Charbonnet

Library Searches

BUILDING STRONG

16 As of: April 16, 2017

POC: A. Charbonnet

Creating Location Definition

BUILDING STRONG

17 As of: April 16, 2017

POC: A. Charbonnet

Former Camp Gordon Johnston

BUILDING STRONG

18 As of: April 16, 2017

POC: A. Charbonnet

Camp Gordon Johnston LDIs

BUILDING STRONG

19 As of: April 16, 2017

POC: A. Charbonnet

Screen and Certify

BUILDING STRONG

20 As of: April 16, 2017

POC: A. Charbonnet

Site Location Crossreference

Lesson Learned:

Easy to forget - essential

BUILDING STRONG

21 As of: April 16, 2017

POC: A. Charbonnet

Event Planning

BUILDING STRONG

22 As of: April 16, 2017

POC: A. Charbonnet

Add Test Methods

BUILDING STRONG

23 As of: April 16, 2017

POC: A. Charbonnet

Assign Field Samples

BUILDING STRONG

24 As of: April 16, 2017

POC: A. Charbonnet

Generate Chain of Custody

BUILDING STRONG

25 As of: April 16, 2017

POC: A. Charbonnet

Generate Chain of Custody

Reports Tab

Environmental Data

Option

Select Chain of

Custody Report

Export in preferred

format

BUILDING STRONG

26 As of: April 16, 2017

POC: A. Charbonnet

Data Submission and Review

Former DeLand Naval Air Station

BUILDING STRONG

27 As of: April 16, 2017

POC: A. Charbonnet

Environmental Measurement

Lessons Learned:

Be consistent with Test Type

BUILDING STRONG

28 As of: April 16, 2017

POC: A. Charbonnet

Event Tracking Report

BUILDING STRONG

29 As of: April 16, 2017

POC: A. Charbonnet

Event Tracking Report

Lesson Learned:

Use a different ID for your

sample than LOCID.

Each sampling event must

have a unique sample ID.

ie. 2-ZMW-12-20161025

BUILDING STRONG

30 As of: April 16, 2017

POC: A. Charbonnet

Laboratory Data

BUILDING STRONG

31 As of: April 16, 2017

POC: A. Charbonnet

Laboratory Data

BUILDING STRONG

32 As of: April 16, 2017

POC: A. Charbonnet

Automated Data Review

BUILDING STRONG

33 As of: April 16, 2017

POC: A. Charbonnet

Sample Qualification

BUILDING STRONG

34 As of: April 16, 2017

POC: A. Charbonnet

Project Chemist Data Validation

Using Tools - Select –

Data Review Checklist

Complete Checklist

Generate ADR Detail

Report including Checklist

BUILDING STRONG

35 As of: April 16, 2017

POC: A. Charbonnet

Event Tracking Report

BUILDING STRONG

36 As of: April 16, 2017

POC: A. Charbonnet

Finalizing Data Validation

Submit Data Validation Report for Approval to USACE Chemist

BUILDING STRONG

37 As of: April 16, 2017

POC: A. Charbonnet

USACE Chemist Approves

BUILDING STRONG

38 As of: April 16, 2017

POC: A. Charbonnet

Event Tracking Report

BUILDING STRONG

39 As of: April 16, 2017

POC: A. Charbonnet

Export Final Validated Data

BUILDING STRONG

40 As of: April 16, 2017

POC: A. Charbonnet

Lessons Learned

Contractor Learnings

FUDSChem preplanning greatly benefited efficiency of and

confidence in field work

Event planning identified gaps in sampling points as originally

planned

Ease of Automated Data Review with upload directly by lab resulted

in faster chemist validation time

Anticipate the initial investment of time and resources into learning

the system will result in higher quality data and future cost savings

USACE Jacksonville Learnings

Efficiency is gained by having all records in one location

Paperless reviews and approvals made easy via word wide web

Complete seamless package archived automatically for future

reference or legal litigation

BUILDING STRONG

41 As of: April 16, 2017

POC: A. Charbonnet

THANK YOU!

Questions? Comments.

Javier Cortes

U.S. Army Corps of Engineers, Jacksonville District

Jacksonville, FL 32207

[email protected]

904-232-1896

Allyson Charbonnet, Ph.D.

11181 St. Johns Industrial Pkwy N.

Jacksonville, FL 32246

[email protected]

904-565-2820


Recommended