ENVIRONMENTAL DIAGNOSTICS INC. 2012 SEWAGE TREATMENT PLANT ANNUAL REPORT Prepared for: FERNIE ALPINE RESORT UTILITIES CORPORATION 1505-17 th Avenue SE Calgary, Alberta T2T 0E2 Prepared by: ENVIRONMENTAL DIAGNOSTICS INC. #140, 5050 – 106 TH Avenue SE Calgary, Alberta T2C 5E9 Tel: (403) 212-3888 Fax: (403) 258-0580 www.environmental-diagnostics.com [email protected] April 2013 Report # W28001
Transcript
Page 1: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

ENVIRONMENTAL

DIAGNOSTICS INC.

2012 SEWAGE TREATMENT PLANT ANNUAL REPORT

Prepared for:

FERNIE ALPINE RESORT UTILITIES CORPORATION

1505-17th Avenue SE Calgary, Alberta

T2T 0E2

Prepared by:

ENVIRONMENTAL DIAGNOSTICS INC. #140, 5050 – 106TH Avenue SE

Calgary, Alberta T2C 5E9 Tel: (403) 212-3888 Fax: (403) 258-0580

www.environmental-diagnostics.com [email protected]

April 2013 Report # W28001

Page 2: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort 2012 Sewage Treatment Plant Annual Report

W28001 April 2013 __________________________________________________________________________________________

TABLE OF CONTENTS

Page No. 1.0 INTRODUCTION 1.1 BACKGROUND 1 2.0 REGISTRATION REQUIREMENTS

2.1 PARAMETERS 2 2.2 REGISTRATION LETTER OPERATING CONDITIONS 2 2.3 REPORTING REQUIREMENTS 3 2.4 SAMPLING FREQUENCY 3

3.0 SEWAGE FLOW RECORDS 5

4.0 SEWAGE FLOW PROJECTION 10

5.0 OVERVIEW OF ELK RIVER SAMPLE RESULTS 12 6.0 OVERVIEW OF INFLUENT TEST RESULTS 14

7.0 OVERVIEW OF EFFLUENT RESULTS 15 7.1 RESULTS ANALYSIS 15 7.2 COMPLIANCE SUMMARY 17 8.0 SLUDGE PRODUCTION AND DISPOSAL 18 9.0 BYPASS EVENTS 19 10.0 PLANT IMPROVEMENTS 20 11.0 PHOSPHOROUS REMOVAL 21 12.0 ASSESSMENT SUMMARY 24 13.0 AUTHORITIZATION AND CLOSING 25

APPENDICES

Table 11 – Fernie Alpine Report Estimated Sewage Generation WWTP REGISTRATION NO: 17139 Laboratory Results

Page 3: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 1 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the wastewater treatment plant at Fernie Alpine Resort (FAR) operated by Fernie Alpine Resort Utilities Corporation (FARUC) is compiled in accordance with the requirements of the Municipal Sewage Regulation (MSR). This report covers the calendar year 2012. Due to the nature of the resort the plant is subjected to a large seasonal swing in utilization with the winter ski period imposing the highest demands. The critical time for sewage flows at the resort is from mid-December to the end of March during the peak ski season. Summer utilization of the treatment works is generally low. FARUC treats its wastewater at a tertiary treatment plant designed to remove BOD5, suspended solids, ammonia, and phosphorous. Wastewater is disinfected with ultraviolet (UV) lamps prior to discharge into the Elk River. Plant effluent quality has been high during the year. There was one sample out of twenty-two which was above the MSR discharge limit for fecal coliforms and there were two samples out of twenty-two for Ortho Phosphorus which were slightly above the MSR discharge limits. FARUC began a monitoring and Clearpac dosing investigation in the winter of 2007 to reduce effluent phosphorous concentrations. The reduction program has shown significant improvement of phosphorus levels in plant effluent. This work will continue until all the total phosphorus concentrations are within discharge limits. Total phosphorus total was within limits in all cases.

Page 4: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 2 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

2.0 REGISTRATION REQUIREMENTS This section describes operating requirements as specified in the Resorts of the Canadian Rockies Inc.’s (RCRI) Registration Letter RE 17139. The registration describes parameters that must be tested for operating conditions, sampling frequency, and sampling locations. 2.1 PARAMETERS

The following parameters are to be monitored:

pH Field Sample

Temperature Field Sample, measured in Celsius

Flow Field Samples, measured as m3 /d

BOD5 Five day biochemical oxygen demand, measured in mg/l

TSS Total suspended solids or non filterable residue, measured in mg/l

NH3 Ammonia concentration, expressed as nitrogen in mg/l

NO3 Nitrate concentration, expressed as nitrogen in mg/l

NO2 Nitrite concentration, expressed as nitrogen in mg/l

Total-P Total phosphorous concentration, measured in mg/l

Ortho-P Orthophosphate concentration, measured in mg/l

Fecal coliform Bacterial concentration, measured as colony forming units per 100ml

Toxicity Bioassay 96 hour toxicity test, recorded as pass or fail

2.2 REGISTRATION LETTER OPERATING CONDITIONS The treatment plant is required to meet the effluent discharge conditions outlined in Table 1.

Table 1 Effluent Limits

Parameter Limit Unit

Flow 1280 m3/d

BOD5 45 mg/l

TSS 45 mg/l

Total-P 1.0 mg/l

Ortho-P 0.5 mg/l

Coliforms* 200 CFU/100ml

Toxicity Bioassay pass n/a

*Limit for recreational waters only, not included in RCRI registration letter

Primary screenings and dewatered sludge are to be disposed of at the Crowsnest Pass/Pincher Creek landfill. Disposal at other sites requires authorization under the Waste Management Act. Operators at the plant are required to be certified in accordance with section 22 of the MSR.

Page 5: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 3 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

2.3 REPORTING REQUIREMENTS

An annual report demonstrating the performance of the facility is to be publicly posted on the Internet within 120 days of the end of the calendar year. The report must include tabulated standards and results for all test samples, interpretation of the results, an indication of the state of compliance of the facility, and the total wastewater flow for the reported period.

In addition the report must also include the following:

Notification of significant operating events including discharge variances outside given limits,

Recommendations for operational or facility modifications,

Notification of proposed or implemented plant modifications,

Details of proposed or implemented water conservation measures,

A plan indicating existing and proposed developments,

A comparison of projected and actual wastewater flows,

Projected wastewater flows resulting from proposed development compared to the remaining

waste water treatment plant (WWTP) capacity, and

A comparison of water supply and wastewater flows.

As with the previous Annual Reports, this report includes additional information on wasted sludge volumes. 2.4 SAMPLING FREQUENCY The MSR Registration requires RCRI and, as such, the contract operator FARUC, to undertake the environmental testing program outlined in Table 2 below. Elk River testing requires that a minimum of 18 samples annually are taken from each of the upstream, initial dilution zone (IDZ) and downstream river locations, relative to the outfall diffuser. The sampling locations were identified in the April 2001 Environmental Impact Study. A minimum of 12 influent samples are required for BOD5 and TSS. Flow data is to be collected continuously. The intent of the environmental testing procedure outlined in Table 2 is to collect influent and effluent samples during peak demand periods as indicated by resort bookings. To correspond with peak plant loading, river samples are to be collected on the same day as effluent samples. In addition to the program and tests listed above, other in-plant testing is needed to permit operational control of the process.

Page 6: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 4 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

Table 2 Sampling Location/Frequency/Type

Location Parameter

Elk River QTY Influent QTY Effluent QTY

pH WS/G 18 / / M/G, WS/G 25

Temp WS/G 18 / / / /

Flow / / D/C n/a D/C n/a

BOD5 / / M/G 12 M/G, WS/G 25

TSS WS/G 18 M/G 12 M/G, WS/G, D/C 25

NH3-N WS/G 18 / / M/G, WS/G 25

NO3-N WS/G 18 / / M/G, WS/G 25

NO2-N WS/G 18 / / M/G, WS/G 25

Total-P WS/G 18 / / M/G, WS/G 25

Ortho-P WS/G 18 / / M/G, WS/G 25

Fecal Coliform WS/G 18 / / M/G, WS/G 25

Toxicity Bioassay / / / / 3 Y/G 3

Where:

WS/G Weekly seasonal grab sampling, required for three six-week periods during the winter peak, the spring after ice-out, and in the fall when river turbidity and flows are low.

D/C Daily continuous sampling using an on-line instrument and data logger.

M/G Monthly grab sample (not required when weekly seasonal testing is taking place).

3Y/G Three samples per year to correspond with WS/G sampling periods.

Page 7: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 5 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

3.0 SEWAGE FLOW RECORDS This section provides data and analysis regarding plant influent and effluent flows, and compares 2012 data to previous years. Total effluent flow from the WWTP for all of 2012 could not be determined as the flow meter was not working for January, February, and part of August through all of November 2012. The effluent for the remainder of the year was recorded from the effluent weir type flow meter as 62,509 m3 and the average was 335 m3 per day. Please note the following: Flow meter was not working properly for almost 5 months due to two separate incidents

In Jan and Feb there was a delay due to a replacement/upgrade of the existing meter that occurred in the fall of 2011

Between Aug and Nov due to a lightning strike As seen with previous years and in the graph below, it was documented that total effluent is

usually higher than total influent for the plant The data for effluent was incomplete for August 2012; therefore the effluent is less than the

influent as represented in the graph below. Total influent for the year was 99,351 m3 so it is reasonable to assume the total effluent was more

than 99,351 m3 for the year. As the data was incomplete for almost half the year, the daily average was used to calculate the

total estimated flow of effluent Based on the average daily effluent at 335 m3/day and 366 days in 2012; the estimated amount of

effluent would be 122,610 m3 Therefore, it is reasonable to estimate that the total amount of effluent for 2012 would be between

the total maximum effluent for the year would be between 99,351 m3 (total amount of influent) and estimated amount of 122,610 m3 based on daily average. While 122,610 m3 is likely an over estimate, this amount will be the value that will be used throughout the remainder of the report for total effluent.

Available monthly total effluent flow meter records for 2012 are provided in Figure 1 Please note that the results for Jan, Feb, Sept, Oct and Nov are estimated based on the average daily flow.

Figure 1 Effluent and Influent Flow Meter Monthly Flow Totals

0

2000

4000

6000

8000

10000

12000

14000

16000

0 1 2 3 4 5 6 7 8 9 10 11 12 13

Month

Tot

al F

low

[m

3/da

y]

Effluent

Estimated Effluent

Influent

Page 8: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 6 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

The ski resort operates with higher winter and late spring sewage flows than during any other period. The average daily plant flow through January, February and March could not be calculated due to a lack of data; however, it was 479 m³ per day for the same time period in 2011, compared to 412 m3 per day over the same period in 2010. Peak flow for the year reached 811 m³/day on December 29, 2012, which is 23% below the allowable limit of 1,280 m³/day limit. The peak flow is lower than that of 2011 (989 m3/day), 2010 (823 m3/day) and 2009 (1,178 m3/day). The peak flow day occurred during the heavy ski season, which is to be expected. All recorded months showed larger flow effluent than influent. This can be explained by using the potable water to spray the clarifiers to avoid foaming. A summary of sewage flow for years 2003 through 2012 is provided in Table 3 and figures 2 and 3:

Table 3

2003 – 2012 Flow Comparisons

Sewage Flow (m3/day) Year

Total Average Peak Days Over

Limit

2003 137,035 375 1,244 0

2004 151,815 414 1,307 1

2005 125,699 344 1,293 1

2006 127,202 348 1,058 0

2007 144,480 396 1,177 0

2008 135,767 372 873 0

2009 113,336 311 1,178 0

2010 104,815 287 823 0

2011 90,213* (122,275)1 335 9892 0

2012 62,509** ( 122,610)1 335 8112 0 * not including part of Sept and all of Oct, Nov, and Dec 2011

** not including all of Jan, Feb, part of Aug, and all of Sept, Oct, and Nov 2012

1 (data) in brackets – estimate based on daily average 2 the number does not reflect a true peak as all the data were not available during high flow months

2004 to 2010 Higher flows in 2004 were caused by severe infiltration through the collection system. Lower flows in 2005 and 2006 can be also attributed to the fact that a lot of sludge together with water was trucked away from the WWTP itself due to the volumes of sewage the existing plant would not handle without an equalization tank. Through 2008 total and average flow decreased somewhat from 2007, there were no instances where flow exceeded the 1,280m3/day registration limit, compared to one day in each of 2004 and 2005. Peak flow dropped due to full operation of the equalizing tank and collection system improvements to eliminate storm water infiltration. The average flow for 2009 further decreased from 2008 (372 m3/day down to 311 m3/day) and there were no instances where the flow exceeded the 1,280 m3/day. The peak flow increased from 2008 but is comparable to the other years.

Page 9: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 7 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

The average flow for 2010 further decreased from 2009 (311 m3/day down to 287 m3/day) and there were no instances where the flow exceeded the 1,280 m3/day. The peak flow decreased from 2009 and is comparable to 2008. 2011 & 2012 The average flow for 2011 has increased slightly from 2010 (287 m3/day) and 2009 (311 m3/day) and there are no instances where the flow exceeded the 1,280 m3/day. The peak flow has increased slightly from 2010; however it is still lower than 2008 and prior. Please note, the average flow was calculated for the data available and may not be representative of the whole year as October, November and December are usually lower flow months. Note that historically from 2004 to 2010 the peak flow occurred systematically in January, February, March and December, which is consistent with the facility operations. Although some data was missing, the values for 2011 were considered “as is”. However, there is more data missing in 2012. In addition, the missing data is among others in January and February, which are historically two out of four highest flows in a year. January is on average the highest month. The average flow for 2012 has was the same as observed in 2011 (335 m3/day) which had increased slightly from 2010 (287 m3/day) and 2009 (311 m3/day). There are no instances where the flow exceeded the registration limit of 1,280 m3/day; however, there is no data for January and February (two out of four peak months in a year). The peak flow of 811 m3/day was recorded in December, which is one of the four peak flow months, and therefore it is reasonable to assume that it would be close to or somewhat above the same number in January or February. Based on the remaining measurements it is unlikely that the peak in January or February would not exceed the registration limit. Please note, the average flow was calculated for the data available and may not be representative of the whole year as January, February, part of August and all of September, October, and November information is not available. This average flow was used to estimate the total yearly effluent flow, which likely represents a reasonable estimate. Daily wastewater flows are strongly correlated to weather and the number of day-users at the resort with the peak ski season having the highest flows. Summer flow results from non-skiing related recreational activities, generally hiking or mountain biking events. The lowest plant flow is experienced in the shoulder season periods (April to June and September to November). The approximately 70 permanent residents in addition to several year-round restaurants providing services to casual visitors ensure that the sewage flows never drop to zero. Figure 2 provides monthly average and peak day sewage flows since 2003.

Page 10: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 8 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

Figure 2 Average and Peak Sewage Flow Comparison Graph*

* Note that the values for 2011 and 2012 may not be representative as some of the effluent flow data for these years are missing

Figure 3 Total Sewage Flow Graph*

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

Year

Sew

age

Flo

w (m

3/day)

Measured Sewage Flow

Estimated Sewage Flow

*please note valuses for 2011 and 2012 were estimated based on the daily average due to a lack of data

0

200

400

600

800

1000

1200

140020

03

2004

2005

2006

2007

2008

2009

2010

2011

2012

Year

Se

wag

e F

low

(m

3/d

ay)

Average Flow

Peak Flow

Average (Missing Data)

Peak (Missing Data)

Page 11: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 9 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

Figure 4 2012 Sewage Effluent Average and Peak Flows by Month

456.8

374.8

223.9

301.3273.7

304.3

409.5

746

639

497

641

454 441

811

0

100

200

300

400

500

600

700

800

900

Tota

l Flo

w (m

3/da

y)

Month

Average Maximum

The Resort’s ongoing program to reduce sewer infiltration is demonstrated by the reduction in return flow to the plant vs. total water usage. In 2007 the total sewage flow was equal to 92% of the total water production; in 2008 this figure decreased to 51% and in 2009, this figure decreased even further to 45%. This year, the total sewage flow was equal to 54% of the total water production, and is consistent with 2010 and 2011. This again is slightly higher than in 2009 but similar to 2008. Water use at the hill is compared to the amount of sewage received at the WWTP in Figure 5.

Figure 5

2012 Water Consumption and Sewage Generation

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Flow

(m3/

day)

Month

Water Consumption Sewage Generation

The impact of rainfall and snowmelt on sewage flow has decreased each year since 2004 as a result of system improvements, the use of water restrictive fixtures and the infiltration reduction program.

Page 12: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 10 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

4.0 SEWAGE FLOW PROJECTION

This section shows projected wastewater flow for 2007 through 2013 based on current development plans and provides an estimate of remaining plant capacity as calculated and tabulated in the 2006 yearly report. Based on unit generation rates provided in the BC Health Act for various lodging types, the estimated highest day wastewater generation for 2011 would have been 1302.3 m3/day. Using the actual peak flow of 811 m3/day, a correction factor of 0.62 was calculated. Averaged correction factor for the last five years (2007, 2008, 2009, 2010, 2011 and 2012) was calculated and multiplied by the future estimated flows to more accurately reflect potential resort sewage generation rates. Please note that this factor may be slightly underestimated as there is no data for two out of the four months with the highest peak. In 2007, 2008, 2009, 2011, and 2012 respectively, the correction factors were 1.20, 0.89, 1.14, 0.65, 0.76, and 0.65 and continue to show that the resort has reduced the impact of both stormwater infiltration and reduced peak flows. Projected daily peak wastewater flows until 2010 by year were provided in table 4 for the Resort’s planned expansions. The highest water generation for 2011, 2012 and 2013 was calculated based on the BC Health Act (refer to Table 11 enclosed at the end of this report). The future flows will be re-evaluated if further expansion occurs. We would recommend continuing the initiative on introducing a stormwater infiltration program, flow restrictive devices, and other water consumption measures. Flow restrictive devices are intended to be utilized in all new construction and the infiltration/ rehabilitation program is expected to be ongoing. The intent is to reduce the amount of per unit sewage generation and to reduce the amount of ground and surface water infiltration into the sewer system. FARUC will monitor sewage flows to determine the efficacy of the program. Even with additional expansion, FARUC may not require an increase to permit discharge above the current limit of 1280 m3/day if the flow restriction measures prove sustainable. Sewage discharge rates will be monitored and an application will be submitted to increase the maximum daily discharge when warranted. Based on 2012 flow data, the plant has an unused capacity of 469 m3/day due to the flow saving measures; however, please note, there was no data available for January, February, part of August and all of September, October, and November for 2012. Since there is no data in 2012 for two out of four months with the highest flow, this number can be slightly overestimated as it reflects the peak for December, which can be slightly lower than a peak for January. This still needs to be closely monitored during 2013 and further considered when adding additional development.

Table 4

Projected Peak Flows: 2007-2013

2007 2008 2009 2010 2011 2012 2013

Estimated Wastewater Flow (m³/day) 979.2 979.9 1032.4 1261.4 1302.3 1302.3 1302.3

Actual and Corrected (m³/day) 1177 (a) 873 (a) 1178(a) 823 (a) 989 (a) 811 (a) 1146 (b) (a) actual peak flow (b) corrected daily peak flows by the averaged correction faction for 2007, 2008, 2009, 2010,

2011 and 2012 correction factor

Page 13: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 11 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

2007 correction factor of 1177/979.2 = 1.20 2008 “ 873/979.9 = 0.89

2009 “ 1178/1032.4 = 1.14 2010 “ 823/1261.4 = 0.65 2011 “ 989/1302.3 = 0.76 2012 “ 811*/1302.3 = 0.62 AVERAGE = 0.88 * Since only two out of the four months with the historically highest peaks were recorded, this number may be underestimated.

Page 14: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Fernie Alpine Resort Page 12 of 25 2012 Sewage Treatment Plant Annual Report W28001 April 2013

5.0 OVERVIEW OF ELK RIVER SAMPLE RESULTS This section provides data and analysis for the Elk River samples taken during 2012. Table 5 provides a summary record of the Elk River test results for the time period from January 5, 2012 to December 27, 2012. No significant changes were observed in pH, phosphorous or nitrogen concentrations during any of the river sample periods. Elevated TSS were observed downstream on April 26th, however, this corresponds with the elevated results upstream and at the dilution zone. Also, the TSS measured in the effluent on the same day was below detection limits. Elevated coliform counts were observed downstream on April 19th. The results were only slightly elevated in the upstream and dilution zone samples and the corresponding effluent sample had no coliforms detected. Overall, the analyzed concentrations remain constant between the upstream (US) sampling zone and the downstream (DS) sampling zone. The data indicates that the plant’s effluent appears not to have any adverse effect on background nutrient concentrations in the Elk River.

Page 15: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 13 of 25 W28001 April 2013

UP IDZ DN UP IDZ DN UP IDZ DN UP IDZ DN UP IDZ DN UP IDZ DN UP IDZ DN UP IDZ DN

2012-01-05 8.21 8.23 8.24 3.0 5.0 3.0 8 5 2 0.005 0.005 0.005 <0.02 <0.02 <0.02 0.05 0.05 0.05 1.500 1.530 1.500 0.05 0.05 0.052012-01-12 8.20 8.25 8.28 3.0 3.0 3.0 1 1 1 0.005 0.005 0.005 0.005 0.005 0.005 0.05 0.05 0.05 1.390 1.370 1.420 0.05 0.05 0.052012-01-18 - 7.97 8.00 - 3.0 4.0 - 2 1 - 0.005 0.005 - 0.005 0.005 - 0.05 0.05 - 1.290 1.340 - 0.05 0.052012-01-26 7.83 7.93 7.97 3.0 3.0 3.0 1 2 1 0.005 0.005 0.005 0.005 0.005 0.005 0.05 0.05 0.05 1.520 1.590 1.530 0.05 0.05 0.052012-02-02 7.64 7.79 7.87 3.0 3.0 3.0 8 4 4 0.005 0.005 0.005 0.005 0.0200 0.0060 0.05 0.05 0.07 1.540 1.550 1.560 0.05 0.05 0.052012-03-29 8.21 8.22 8.23 6.0 4.0 3.0 13 13 11 0.005 0.005 0.005 0.005 0.005 0.005 0.05 <0.25 <0.25 1.08 1.03 1.09 0.05 0.05 0.052012-04-04 8.26 8.29 8.30 11.0 3.0 8.0 7 9 12 0.005 0.005 0.005 0.005 0.005 0.005 0.05 0.05 0.05 1.05 1.06 1.09 0.05 0.05 0.052012-04-12 8.19 8.21 8.24 8.0 11.0 9.0 9 19 16 0.006 0.007 0.005 0.020 0.032 <0.025 <0.25 0.05 0.05 0.90 0.91 0.99 0.05 0.05 0.052012-04-19 8.38 8.38 8.42 10.0 8.0 10.0 15 17 68 0.005 0.005 0.005 0.0344 0.0157 0.0191 0.05 0.05 0.05 1.20 1.15 1.19 0.05 0.05 0.052012-04-26 8.10 8.11 8.12 52.0 86.0 92.0 10 30 24 0.0115 0.0096 0.0110 0.0794 0.1160 0.1260 0.05 0.06 0.06 0.525 0.746 0.937 0.05 0.05 0.052012-05-03 8.29 8.30 8.27 12.5 7.0 13.0 3 7 6 0.0053 0.005 0.005 0.0077 0.0070 0.0090 0.05 0.05 0.05 1.160 1.180 1.210 0.05 0.05 0.052012-10-18 8.28 8.29 8.30 4.0 4.0 4.0 1 1 2 0.005 0.005 0.005 0.005 0.005 0.005 0.05 0.05 0.05 1.45 1.45 1.46 0.05 0.05 0.052012-10-24 8.23 8.22 8.24 4.0 4.0 4.0 5 1 1 0.005 0.005 0.005 0.0069 0.0063 0.0066 0.07 0.05 0.05 1.46 1.47 1.50 0.05 0.05 0.052012-11-01 8.11 8.12 8.13 11.0 8.0 9.0 12 9 7 0.005 0.005 0.005 0.0191 0.0122 0.0141 0.05 0.05 0.05 0.721 0.782 0.795 0.05 0.05 0.052012-11-07 8.01 8.01 8.01 6.0 5.0 4.0 25 18 14 0.005 0.005 0.005 0.0164 0.0150 0.0200 0.05 0.05 0.05 0.798 0.798 0.799 0.05 0.05 0.052012-11-15 8.18 8.19 8.21 4.0 4.0 4.0 1 1 1 0.005 0.005 0.005 0.0059 0.0065 0.0055 0.05 0.05 0.05 1.300 1.310 1.300 0.05 0.05 0.052012-11-22 8.23 8.23 8.24 4.0 4.0 4.0 2 1 1 0.005 0.005 0.005 0.0126 0.0113 0.0112 0.05 0.05 0.05 1.160 1.110 1.130 0.05 0.05 0.052012-12-27 8.06 8.09 8.11 4.0 4.0 4.0 1 2 1 0.005 0.005 0.005 0.0082 0.0108 0.0074 0.05 0.05 0.05 1.310 1.470 1.330 0.05 0.05 0.05

# Samples 17 18 18 17 18 18 17 18 18 17 18 18 17 18 18 17 18 18 17 18 18 17 18 18Average 8.14 8.16 8.18 8.7 9.4 10.2 7 8 10 0.01 0.01 0.01 0.02 0.02 0.02 0.051 0.050 0.052 1.18 1.21 1.23 0.05 0.05 0.05

Maximum 8.38 8.38 8.42 52.0 86.0 92.0 25 30 68 0.01 0.01 0.01 0.08 0.12 0.13 0.070 0.058 0.074 1.54 1.59 1.56 0.05 0.05 0.05Minimum 7.64 7.79 7.87 3.0 3.0 3.0 1.0 1.0 1.0 0.01 0.01 0.01 0.01 0.01 0.01 0.050 0.050 0.050 0.53 0.75 0.80 0.05 0.05 0.05

Table 52012 Elk River Sample Results

Note: Shaded squares show tests reported at less than the stated value, for calculations these are listed as to equal to the value stated, eg. <0.05 is now 0.05

Sample DatepH TSS Coliform N-NO2Ortho-P Total P mg/L NH3 N-NO3

UP – Upstream IDZ – Initial Dilution Zone DN – Downstream

Page 16: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 14 of 25 W28001 April 2013

6.0 OVERVIEW OF INFLUENT TEST RESULTS This section provides data and analysis for the plant influent (raw sewage) samples taken during 2012. Table 6 provides a summary record of the influent test results for the period January 5, 2012 to December 27, 2012.

Table 6 2012 Influent Results

Flow Temp pH TSS BOD CODm3/d C mg/L mg/L mg/L

2012-01-05 517 3.0 7.80 288 348 5702012-01-12 206 -10.0 7.88 105 162 3662012-01-18 233 -26.0 8.06 107 408 4102012-01-26 133 -5.0 7.50 305 313 6362012-02-02 215 -3.0 7.53 112 254 4912012-03-29 620 2.0 7.85 156 115 3752012-04-04 374 3.0 8.03 220 64.9 2442012-04-12 481 4.0 7.56 75 67.6 1152012-04-19 1014 0.0 7.94 40 33.4 932012-04-26 229 8.0 8.03 186 127 1502012-05-03 184 3.0 7.91 49 49.6 1032012-06-13 103 10.0 7.90 41.3 41.7 892012-07-26 193 22.0 7.52 86 132 3322012-08-16 209 10.0 7.97 88 63.1 2202012-09-12 210 8.0 7.84 88 39.9 982012-10-18 107 0.0 7.99 23 17.1 452012-10-24 191 -1.0 7.97 19 21.8 492012-11-01 916 6.0 7.71 32 35.2 622012-11-07 190 5.0 7.85 104 41.8 572012-11-15 185 1.0 8.08 41 8.6 612012-11-22 421 -10.0 7.88 64 30.3 762012-12-27 329 -16.0 7.57 72.5 295 551# Samples 22 22 22 22 22Average 321 0.5 7.84 96 111 220High 1014 22.0 8.08 305 408 636Low 103 -26.0 7.50 19 9 45

2012 Influent Results SummaryDate

22

A total of 22 BOD and TSS samples were analyzed. Inlet BOD ranged from 8.6 mg/l to 408 mg/L with an average of 220 mg/L. The average influent sewage strength was measured at 108 mg/L in 2011, 142 mg/L in 2010, 143 mg/L in 2009 and 488 mg/l in 2007. Since a typical waste water BOD is in the range of 250 mg/l, it is assumed that the average BOD is well below the expected level. This can be caused by infiltration, leaking flow fixtures and so on. For that reason the flow saving measures effort should continue.

Page 17: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 15 of 25 W28001 April 2013

7.0 OVERVIEW OF EFFLUENT RESULTS This section provides data and analysis for the effluent (treated) samples and plant flows for 2012. A total of 388 effluent samples were collected and analyzed. Effluent samples were collected on the same dates as influent samples to permit an evaluation of plant performance. Table 7 summarizes the laboratory effluent test results for 2012.

Table 7 2012 Effluent Results

Flow Temp pH TSS COD BOD Coliforms P-OP04 Total P NH3-N NO3-N NO2-N

m3/d C mg/L mg/L mg/L cfu/100ml mg/L mg/L mg/L mg/L mg/L

2012-01-05 - 3.0 7.82 3.0 15 2 1 0.583 0.638 0.05 38.2 0.052012-01-12 - -10.0 7.71 3.0 15 2 1 0.133 0.125 0.05 27.0 0.252012-01-18 - -26.0 7.80 4.0 11 2 2 0.347 0.338 0.05 28.5 0.252012-01-26 - -5.0 7.48 3.0 12 2 1 0.189 0.143 0.05 28.3 0.052012-02-02 - -3.0 7.87 3.0 14 2 1 0.370 0.450 0.05 25.8 0.052012-03-29 702 2.0 7.73 3.0 11 2 1 0.208 0.002 0.05 20.3 0.052012-04-04 464 3.0 8.01 3.0 12 2 1 0.032 0.056 0.05 14.2 0.052012-04-12 555 4.0 7.89 3.0 10.0 2 1 0.053 0.050 0.25 11.2 0.052012-04-19 383 0.0 8.12 6.0 10.0 2 1 0.144 0.169 0.05 4.7 0.052012-04-26 283 8.0 8.01 3.0 10.0 2 2 0.015 0.026 0.061 7.6 0.052012-05-03 242 3.0 7.91 3.0 10.0 2 1 0.017 0.029 0.05 6.1 0.052012-06-13 146 10.0 8.04 4.0 10.0 2 1 0.013 0.012 0.05 10.7 0.052012-07-26 220 22.0 7.94 4.0 10.0 2 1 0.099 0.092 0.05 19.2 0.052012-08-16 - 10.0 8.27 4.0 10.0 2 1 0.326 0.518 0.05 20.4 0.052012-09-12 - 8.0 7.95 4.0 10.0 2 1 0.271 0.355 0.05 18.7 0.052012-10-18 - 0.0 7.97 4.0 10.0 2 1 0.134 0.144 0.05 9.1 0.052012-10-24 - -1.0 8.03 4.0 10.0 2 1 0.116 0.125 0.05 9.8 0.052012-11-01 - 6.0 8.02 4.0 10.0 2 1 0.071 0.080 0.05 3.5 0.052012-11-07 - 5.0 8.10 4.0 10.0 2 1 0.082 0.123 0.05 7.4 0.052012-11-15 - 1.0 8.04 4.0 10.0 2 1 0.078 0.081 0.05 12.9 0.052012-11-22 - -10.0 7.99 7.5 10.0 2.4 2700 0.092 0.485 0.05 5.1 0.052012-12-27 472 -16.0 7.52 4.0 15.0 2 32 0.597 0.749 0.05 17.9 0.05

# Samples 9 22 22 22 22 22 22 22 22 22 22 22Average 385 1 8 4 11 2 125 0.180 0.218 0.060 16 0.07High 702 22 8 8 15 2 2700 0.597 0.749 0.250 38 0.25Low 146 -26 7 3 10 2 1 0.013 0.002 0.050 4 0.05Limit 1280 N/A N/A 45 N/A 45 200 0.5 1 N/A N/A N/A# Over Limit 0 N/A N/A 0 0 0 1 2 0 N/A N/A N/A

Date

2012 Effluent Results Summary

Notes: 1. Shaded squares show tests reported at less than the stated value, for calculations these are listed as

equal to the value stated, ie. <0.05 is assumed to be 0.05 2. Geometric mean is used for coliform results

7.1 RESULTS ANALYSIS The average BOD in the effluent was <2.0 mg/L. This is the same as for 2011, 2010, 2009 and 2008. TSS samples averaged 2.8 mg/L with a maximum concentration of 7.5 mg/L occurring in November. The plant provides excellent BOD5 and TSS treatment with average removals of 100% and 95.8%, respectively.

Page 18: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 16 of 25 W28001 April 2013

Due to the relatively low levels of TSS, UV disinfection was able to effectively control the amount of coliform concentration found in the effluent. In general, the UV disinfection was able to keep the coliform levels well below the acceptable limits for recreational waters with the exception on November 22, 2012, where the fecal coliforms were measured at 2700 cfu/100 mL and exceeded the MSR discharge limits. A new UV unit was installed in 2011. Although the Elk River samples show coliforms in the downstream samples higher than those of the upstream samples, the results are low and do not correspond with the elevated coliform result on November 22nd and indicated no measurable impact of the effluent discharge on the river. Effluent ammonia concentrations are consistently low. Effluent data shows the plant is effectively oxidizing ammonia nitrogen and that there is no evidence of elevated ammonia levels in the Elk River as a result of discharge from the treatment plant. As was the case in previous years the bioassay toxicity tests show that plant effluent is non-toxic. The results of these tests are shown below in table 8.

Table 8

Toxicity Test Results

Sample Date Result

2012/01/25 Pass 2012/05/15 Pass 2012/12/03 Pass

Two samples out of twenty-two for ortho-phosphorus were slightly above MSR discharge limits (0.583 and 0.597 mg/L vs limit of 0.5 mg/L). Total phosphorus was below the MSR discharge limits for all tests. A phosphorus reduction strategy, as outlined in Section 11, was started in the winter of 2007 to address the removal of soluble phosphorus from the effluent stream. The plant has sufficient infrastructure to remove precipitated nutrients and no additional treatment processes are required. Phosphorus in the plant effluent has no discernable impact on background nutrient levels in the Elk River, with upstream and downstream concentrations being virtually identical. A 2001 report by Highwood Environmental indicated that phosphorus releases would have a negligible impact on aquatic life in the Elk River. FARUC completed plant modifications for phosphorous removal.

Page 19: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 17 of 25 W28001 April 2013

7.2 COMPLIANCE SUMMARY

Table 9 summarizes the number of days that samples exceeded MSR effluent requirements.

Table 9 2012 MSR Parameter Compliance

Parameter Unit MSR Limit

No. of Samples

Average Value

Max. Value

Samples Over Limit

Flow m3/day 1280 365 335 811 0

BOD5 mg/l 45 22 <2 2.4 0

TSS mg/l 45 388 2.4 7.5 0

Total Phosphorous mg/l 1 22 0.22 0.75 0

Ortho Phosphate mg/l 0.5 22 0.180 0.597 2

Fecal Coliforms* cfu/100ml 200 22 125 2700 1

96 hr LC50 Bioassay / Non-toxic 3 / / 0

* Limit for recreational waters only, not included in FAR registration letter The high fecal coliforms on November 22, 2012 were measured at 2700 cfu/100 mL and exceeded the MSR discharge limits. Although the Elk River samples show coliforms in the downstream samples higher than those of the upstream samples, the results are low and do not correspond with the elevated coliform result on November 22nd and indicated no measurable impact of the effluent discharge on the river. The source of the elevated coliforms is unknown and based on the fact it was one time event, it was likely due to an error or contaminated sample.

Page 20: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 18 of 25 W28001 April 2013

8.0 SLUDGE PRODUCTION AND DISPOSAL This section provides data regarding the disposal of bio-solids (sludge) from the treatment facility in 2012. Operation of the 200 m3 aerated sludge digester allowed the plant to bag and landfill all of its bio-solids without resorting to vacuum truck services. All solids were transported to the Crowsnest/Pincher Creek landfill site. Hauling data for bagged solids are in Table 10.

Table 10 2012 Bagged Solids Data

Month Vol.

Bagged (m³)

January 206

February 173.4

March 154.5

April 65.5

May 43.3

June 72.3

July 104.4

August 105.5

September 111.5

October 117

November 97.3

December 144.2

Total 1394.9

The aerated sludge digester has allowed the operators to store liquid sludge during peak winter weekend periods and bag at the less active midweek times, avoiding the need for emergency vacuum truck services. Sludge bag data indicates the winter season is most active for the plant.

Page 21: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 19 of 25 W28001 April 2013

9.0 BYPASS EVENTS

This section provides information about bypass events in 2012

Bypass events result in elevated effluent suspended solids concentrations which decrease the effectiveness of the UV disinfection system; an increase in TSS results in a simultaneous increase in coliform counts. While soluble BOD is removed though the aeration basins, the overflow of TSS also results in an increase in BOD readings due to the presence of biological floc.

There were no bypass events in 2012.

Page 22: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 20 of 25 W28001 April 2013

10.0 PLANT IMPROVEMENTS

There were no significant plant improvements for 2012. RCR is currently looking at the elimination of the potable water to spray down clarifiers and they are pricing/investigating replacing the bagger with a centrifuge. The continuous strive for the improvements of the Waste Water Treatment System by RCR will continue along with minimization of the potable water use ie clear well water will be used to spray down the clarifiers instead of potable water.

Page 23: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 21 of 25 W28001 April 2013

11.0 PHOSPHORUS REMOVAL

This section describes the phosphorus monitoring and removal strategy being implemented to bring the plant into compliance with effluent limits. In the winter of 2007, the plant increased chemical dosing with Clearpac to reduce effluent phosphorus concentrations. By late January 2008 sample results showed marked improvement with both ortho and total phosphorus concentrations falling below discharge requirements. The increased application of Clearpac in 2008, while effective, has been operationally costly; the relationship between chemical dose and nutrient removal will be adjusted for best efficiency. The monitoring and removal program continued in the summer of 2008 with the plant evaluating additional removal strategies, including:

Implementation of sampling procedures to measure total phosphorus concentrations at the following locations; auger monster (raw sewage), clarifier supernatant, RBC overflow, mix tank liquor, sand filter filtrate, filter backwash, sludge digester supernatant, and effluent,

Evaluation of precipitant dose on effluent phosphorous levels at the current chemical addition point (clarifier overflow),

Evaluation of changing the precipitant dose location, and Evaluation of alternative chemicals.

The plant will continually monitor and optimize coagulant dosages for improved phosphorus removal. In 2009 upgrades to the phosphorus injections points and mixing tanks began. In the spring of 2011 the final stage of this improvement will be completed with the installation of a rapid mixer and flocculation system and the relocation of the UV system. This will result in the better usage of tertiary filtration. Longer runs, less backwash water, better phosphorus removal and better effluent quality will be accomplished. 2010 data show further improvement in phosphorus concentrations with only three exceedances for ortho-phosphorus (all results for total phosphorus were below the limits) with only a 15% exceedance compared to 2008 results with 50% exceedance and to 2009 with only a 18% exceedance. 2011 data showed further improvement in phosphorus concentrations with only one exceedances for each total phosphorus and ortho-phosphorus, both on July 14, 2011. The exceedances for ortho-phosphorus was only 4% and for total phosphorus was only 13% above the limit with is less than those of previous years. The 2012 data showed was similar results to that of 2011. Two samples exceeded the limit both for ortho-phosphorus. The exceedance was 14 % on Jan. 5th and 16% on Dec. 27th. It is anticipated that the program will continue to show improvement to plan effluent quality in 2013. Below are some graphs showing the general decrease in phosphorus levels since 2007.

Page 24: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 22 of 25 W28001 April 2013

Figure 6 Total Phosphorus Levels 2007-2012

0

0.5

1

1.5

2

2.5

3

3.5

2007 2008 2009 2010 2011 2012

mg

/L

Year

Average High Low

Figure 7 Ortho Phosphorus Levels 2007-2012

0

0.5

1

1.5

2

2.5

2007 2008 2009 2010 2011 2012

mg

/L

Year

Average High Low

Page 25: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 23 of 25 W28001 April 2013

Figure 8 Days over Limit 2007-2012

0

2

4

6

8

10

12

14

2007 2008 2009 2010 2011 2012

Year

Total Phosphorus Ortho Phosphorus

Page 26: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

2012 Sewage Treatment Plant Annual Report Page 24 of 25 W28001 April 2013

12.0 ASSESSMENT SUMMARY

The plant has produced high quality effluent with BOD5 normally below the regulated limit of 45 mg/l and for all but one instance, less than 2 mg/l. TSS averaged approximately 2.8 mg/l with no instances of violating MSR limits. Coliform and ammonia results indicate that the plant functioned well again in 2012. Phosphorus reduction appears to be consistent with 2011 results with only two samples exceeding the limit; both were for ortho-phosphorus. The exceedance was 14 % on Jan. 5th and 16% on Dec. 27th. In 2011, exceedances of 4% for total phosphorus and 13% for ortho-phosphorus were observed compared to 50% for 2008 and 18% for 2009, and 15% in 2010. The phosphorous monitoring and reduction plan outlined in section 11 have made a significant impact in reducing phosphorous in the effluent. There has been no measurable impact of phosphorous releases from the plant on Elk River background nutrient concentrations. Operation of the sludge digester has eliminated the need for emergency liquid sludge hauling. All sludge was bagged and disposed of at the approved landfill site. Major new residential or hotel developments are not anticipated until 2013 at the earliest, though the resort is expected to see moderate growth over the next year with a projected peak flow that may reach the rated capacity of the plant in a near future. The discharge flow limit may need to be raised to account for the proposed growth though the effect of the infiltration reduction program has reduced peak flows and may continue to reduce average flows. FARUC will continue to monitor flow and assess the need for any registration amendment. In summary, the activated sludge treatment process functioned well in 2012 with only, although significantly improved, phosphorus concerns outstanding. A program was installed in the summer of 2007 to address effluent phosphorous concentrations and will continue until positive results are consistently achieved. Please note that it is essential to have good reliable data and as such, we strongly recommend that effluent flow (especially during peak months such as Jan, Feb, Mar and December) is measured and the flow meters carefully checked and maintained.

Page 27: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 28: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Flow* 2011 2012 2013(l/unid/day) Units Generation (m3/day) Generation (m3/day) Generation (m3/day)

Griz Inn 1136 45 51.1 51.1 51.1Wolf's Den 318 42 13.4 13.4 13.4Cornerstone 1136 26 29.5 29.5 29.5Timberline Condos 1022 58 59.3 59.3 59.3Polar Peaks (4-Plex Units) 1136 24 27.3 27.3 27.3Timberline Single Family & B&B 1363 51 69.5 69.5 69.5

Subtotal 246 250.1 250.1 250.1

Flow* 2011 2012 2013(l/unid/day) Units Generation (m3/day) Generation (m3/day) Generation (m3/day)

Timberline Infills 1022 141 144.1 144.1 144.1Timberline Single Family 1363 2 2.7 2.7 2.7Timberline Infills 1022 106 108.3 108.3 108.3Timberlanding Multifamily 1022 45 59.97 59.97 59.97Timberlanding Single Family 1363 32.5 42.92 42.92 42.92Highline Infil 1022 26 26.6 26.6 26.6

Subtotal 352.5 384.59 384.59 384.59

Flow* 2011 2012 2013(l/unid/day) Units Generation (m3/day) Generation (m3/day) Generation (m3/day)

Single Family 1363 49 66.8 66.8 66.8Duplexes 1363 10 13.6 13.6 13.6Parcel 31-Condotel 318 61 19.4 19.4 19.4Parcel 32-Duplex 1363 16 21.8 21.8 21.8Parcel 36-Hotel 318 101 32.1 32.1 32.1Parcel 37-Townhouses 1363 8 10.9 10.9 10.9Parcel 38-Townhouses 1363 23 31.3 31.3 31.3Parcel 3-Condominium 1363 12 16.4 16.4 16.4Parcel 8-Condominium 1363 42 57.2 57.2 57.2

Subtotal 322 269.5 269.5 269.5

Flow* Population 2011 2012 2013(l/unid/day) (each) Generation (m3/day) Generation (m3/day) Generation (m3/day)

Skiers 36 700 252 252 252

Subtotal 700 252 252 252

Flow* Area 2011 2012 2012(l/unid/day) (m2) Generation (m3/day) Generation (m3/day) Generation (m3/day)

Lizard Creek - Dining 97 54.7 5.3 5.3 5.3Lizard Creek - Bar 145 40.4 5.9 5.9 5.9Kelseys - Dining 97 204.4 19.8 19.8 19.8Kelseys - Bar 145 65 9.4 9.4 9.4Daylodge - Dining 97 358.6 34.8 34.8 34.8Daylodge - Bar 145 260.7 37.8 37.8 37.8Mean Bean 97 26.8 2.6 2.6 2.6Gabrielles 97 133.8 13 13 13Powder House Inn 97 232.2 22.5 22.5 22.5Bears Den 97 62.4 6.1 6.1 6.1

Subtotal 1439 157.2 157.2 157.2

1302.3 1302.3 1302.3989 (actual) 811***(actual) 1146 (projected)

*Estimated Wastewater flows from BC Health Act, Sewage Disposal Regulation

**Based on 2005 flow for peak day flows

*** Note that the number does not reflect a true peak as all the data were not available during high flow months

Table 11 - Fernie Alpine Resort Estimated Sewage Generation (m3/day)

Daily Wastewater Flow (m3/day)*Corrected Daily Peak Flow Projections**

Existing Development

Infill Units

Highline Subdivision

Day Users

Dining Facilites/Bars

April 2013 W28001

Page 29: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 30: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 31: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 32: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 33: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 34: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 35: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 36: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 37: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 38: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 39: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 40: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 41: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 42: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 43: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 44: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 45: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 46: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 47: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 48: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 49: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 50: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 51: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 52: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 53: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 54: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 55: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 56: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 57: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 58: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 59: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 60: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 61: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 62: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 63: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 64: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 65: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 66: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 67: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 68: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 69: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 70: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 71: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 72: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 73: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 74: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 75: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 76: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 77: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 78: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 79: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 80: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 81: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 82: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 83: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 84: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 85: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 86: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 87: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 88: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 89: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 90: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 91: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 92: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 93: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 94: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 95: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 96: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 97: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 98: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 99: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 100: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 101: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 102: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 103: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 104: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 105: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 106: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 107: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 108: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 109: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 110: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 111: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 112: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 113: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 114: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 115: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 116: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 117: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 118: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 119: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 120: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 121: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 122: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 123: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 124: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 125: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 126: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 127: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 128: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 129: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 130: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 131: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 132: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 133: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 134: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 135: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 136: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 137: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 138: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 139: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 140: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 141: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 142: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 143: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 144: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 145: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 146: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 147: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 148: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 149: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 150: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 151: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 152: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 153: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 154: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 155: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 156: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 157: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 158: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 159: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 160: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 161: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 162: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 163: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 164: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 165: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 166: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 167: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 168: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 169: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 170: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 171: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 172: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 173: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 174: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 175: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 176: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 177: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 178: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 179: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 180: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 181: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 182: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 183: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 184: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the
Page 185: ENVIRONMENTAL DIAGNOSTICS INC. - Fernie Alpine Resort2012 Sewage Treatment Plant Annual Report W28001 April 2013 1.0 INTRODUCTION 1.1 BACKGROUND The following annual report for the

Recommended