Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant...

Date post: 31-Aug-2018
Category:
Upload: phungtu
View: 214 times
Download: 0 times
Share this document with a friend
49
Transcript
Page 1: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value
Page 2: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value
Page 3: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

CONTENT I

Environmental Impact Assessment (Summary Report)Expandable Polystyrene Plant Project

IRPC Public Company LimitedIRPC industrial Park, Choengnoen Sub-district, Muang Rayong District,

Rayong Province

CONTENT

Content Page

CONTENTFIGURETABLE

IIIIIV

1 Introduction 11.1 Background and Objectives 11.2 Rationale of the Project 31.3 Objectives of EIA Report 51.4 Scope of the Study 5

1.4.1 Study Area 51.4.2 Existing Environmental Baseline Study 51.4.3 Period of Study 5

1.5 Project Plan 7

2. Project Description 7

3. Existing Environmental Baseline 193.1 Physical Resources 19

3.1.1 Topography 193.1.2 Geology and Soil Resources 193.1.3 Weather, Meteorology and Air Quality 193.1.4 Noise 203.1.5 Water resources 20

3.1.5.1 Surface water 203.1.5.2 Groundwater 213.1.5.3 Sea Water 22

3.2 Biological resources 233.2.1 Land resources 23

3.2.1.1 Flora 233.2.1.2 Fauna 23

3.2.2 Marine resources 233.3 Human Use Values 23

3.3.1 Land use 233.3.2 Transportation 233.3.3 Water Use 243.3.4 Drainage and Flood Protection 243.3.5 Electricity 243.3.6 Waste management 24

Page 4: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

CONTENT II

CONTENT (Cont’d-1)

Content Page

3.4 Quality of Life Value 243.4.1 Socio-Economics 243.4.2 Occupational Health and Safety 253.4.3 Public Health 26

4. Public Participation 274.1 Public Participation Activity 274.2 Study Area 274.3 Results of Public Involvement Activities 27

4.3.1 Conclusion of Public Involvement Activities 274.3.2 Conclusion for Comment/Suggestion and Usage for EIA Study and

Environmental Impact Mitigation Measures28

5. Environmental Impact Assessment 385.1 Impacts to Physical Resources 38

5.1.1 Impacts on Topographic Condition/Geological Condition and SoilResource

38

5.1.2 Impact on Air Quality 395.1.3 Impact on Nuisance Odor 395.1.4 Impact to Noise Level 395.1.5 Impact on Surface Water Quality 425.1.6 Impact to Groundwater Quality 435.1.7 Impact to Marine Water Quality 43

5.2 Impacts to Biological Resources 445.2.1 Impact to Terrestrial Biological Resource 445.2.2 Impacts to Aquatic Ecological Resources 44

5.3 Impacts to Human Use Values 455.3.1 Impact to Land Use 455.3.2 Impact to Transportation 455.3.3 Impact to Water Use 465.3.4 Impact to Water Drainage and flood Protection System 465.3.5 Impact to Electric Power Use 475.3.6 Impact to Solid waste and Garbage Management 47

5.4 Impact to Quality of Life Values 485.4.1 Impact to Socio-Economic Condition 485.4.2 Impacts to Occupational Health and Safety 485.4.3 Aesthetic and Tourism Impacts 49

5.5 Major Hazard Assessment 49

6. Health Impact Assessment 496.1 Quantitative Risk Assessment 496.2 Qualitative Risk Assessment 53

7. Environmental Impact Mitigation and Monitoring Measures 537.1 Environmental Impact Mitigation Measures 537.2 Environmental Impact Monitoring Measures 53

Page 5: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

CONTENT III

FIGURE

Figure Page

1.1-1 IRPC Industrial Park and EPS Plant Location 21.2-1 EPS Demand by Region 31.2-2 Market Share of EPS 41.4-1 Study area within 3 and 5 km radius from the plant and the nearby communities 67.1-1 Wastewater Treatment Layout 667.1-2 Complaint Handling Process 727.1-3 Emergency Response Plan 767.1-4 Green Area of the Project 837.2-1 Ambient Air Quality and Noise Level Monitoring Stations in Construction Phase 857.2-2 Ambient Air Quality and Noise Level Monitoring Stations in Operation Phase 887.2-3 Air Quality Monitoring Station from Stack of the Project 907.2-4 Wastewater Quality Monitoring Station 927.2-5 Styrene and Pentane Monitoring Station in the Second Floor of Polymerization

Building95

7.2-6 Respirable Dust Monitoring Station in the Workplace 967.2-7 Noise Level Monitoring Stations 1047.2-8 Socio-Economic Condition Monitoring Area in 5 Km around the Project Location 110

Page 6: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

CONTENT IV

TABLE

Table Page

1.4-1 EIA Study Procedures 71.5-1 Project Plan 72-1 The details of existing operation and the operation after production expansion 8

4.2-1 Study Area for Public Involvement Activity of the Project 284.3-1 Results of Public Involvement Activities of the Project 294.3-2 Number of Participant for the First Public Involvement Meeting Identified by

Stakeholder Group30

4.3-3 Number of Participant for the Second Public Involvement Meeting Identified byStakeholder Group

32

4.3-4 Conclusion of Comment and Suggestion and Usage for EIA Study and EnvironmentalImpact Mitigation Measure Provision

34

5.1-1 Air Quality Assessment from the Existing Project Operation 405.1-2 Air Quality Assessment from the Project Operation after Expanding Production 415.1-3 Result of Odor Impact Assessment from the Existing Project Operation and after

Expanding Production42

5.5-1 Result of Risk Assessment by Using BREEZE Incident Analyst 507.1-1 Environmental Impact Mitigation Measure (Construction Phase) IRPC’s Expandable

Polystyrene Plant Project IRPC Industrial Park, 299 Sukhumvit Road,Choengnoen Sub-District, Muang Rayong District, Rayong Province

54

7.1-2 Environmental Impact Mitigation Measure (Operation Phase) IRPC’s ExpandablePolystyrene Plant Project IRPC Industrial Park, 299 Sukhumvit Road, ChoengnoenSub-District, Muang Rayong District, Rayong Province

60

7.1-3 Air Quality Emission from EPS Plastic Pellet Production Plant Project 637.2-1 Environmental Impact Monitoring Measures (Construction Phase) IRPC’s EPS Plant

Project IRPC Industrial Park 299 Sukhumvit Road, Choengnoen Sub-District,Muang Rayong District, Rayong Province

84

7.2-2 Environmental Impact Monitoring Measures (Operation Phase) IRPC’s EPS PlantProject IRPC Industrial Park 299 Sukhumvit Road, Choengnoen Sub-District,Muang Rayong District, Rayong Province

87

Page 7: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -1-

Environmental Impact Assessment (Summary Report)Expandable Polystyrene Plant Project

IRPC Public Company LimitedIRPC industrial Park, Choengnoen Sub-district, Muang Rayong District,

Rayong Province

1. Introduction

1.1 Background and Objectives

Expandable Polystyrene Plant (EPS) is operated by IRPC Public Company Limited1. The plantis located in IRPC Industrial Park, 299 Sukhumvit Road, Choengnoen sub-district, Muang Rayongdistrict, Rayong province (Figure 1.1-1). The plant was established in 1991 and started producing EPSplastic pellet in 1992 by using SUNPOR technology from Australia. The production capacity is 28,000tons/year or approximately 80 tons/day (number of production days = 350 days/year) (which wasnot mandated to conduct EIA report). The project is categorized in downstream petrochemicalindustry. The initial substance is styrene. The blowing agents (pentane) are added into thepolymerization of styrene. Under the control condition, the plastic is enlarged to Expandablepolystyrene (EPS) form. The properties of EPS plastic pallet include heat/cold protection, waterresistance, impact protection, and light weight. The plant produces two grades of EPS plastic;standard grade and self-extinguishing grade. The differentiations of both grades are quantity ofpentane and treatment agent. Self-extinguishing grade is appropriate for construction work todecrease risk of fire while standard grade is used to produce food containers.

IRPC plans to expand the production capacity from 28,000 ton/year to 53,000 ton/year or151.43 ton/day. Reactor, dryers, chiller, cyclone separator and pulse jet filter, and VOCs TreatmentUnit will be installed in the existing plant. The expansion of plant will enlarge the productioncapacity for more than 100 ton/day. As a result, Environmental Impact Assessment (EIA) report isneeded to conduct in accordance of the Notification of Ministry of Natural Resources andEnvironment Re: defining type, size and procedure for project or activity that need to prepareenvironmental impact assessment report, dated 24 April 2012. IRPC therefore assigns Vision E.Consultants Company Limited (so called “consultant” in this report) to conduct EIA report andsubmit to Office of Natural Resources and Environmental Policy and Planning (ONEP) for approval.

1 EPS Plant Project was formerly operated by Thai ABS Limited before taking over to IRPC Public CompanyLimited on 1 August 2016.

Page 8: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -54-

Table 7.1-1Environmental Impact Mitigation Measure (Construction Phase) IRPC’s Expandable Polystyrene Plant ProjectIRPC Industrial Park, 299 Sukhumvit Road, Choengnoen Sub-District, Muang Rayong District, Rayong Province

Environmental Composition Mitigation Measure Location Period Person in Charge of

1. Air quality 1.1 Construction activities include equipment installation in the existing productionbuilding which paved by concrete. Thus, there is no dust generated from soilopening.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

1.2 Machine and construction equipment must be periodically maintained to controlpollution emission.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

1.3 If dust or construction equipment falls down in the construction site, theconstruction contractor must clean it to prevent dispersion.

- Construction site andtransportation route

- Over constructionphase

- IRPC Public CompanyLimited

2. Water quality 2.1 Sufficient and sanitarian toilets must be provided to the workers. - Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.2 Wastewater from workers must be treated in the septic tank before collecting inthe Effluent Pond 4 (capacity = 12,000 m3) before discharging to Kon Puek Canal.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.3 It is prohibited to discharge contaminated water into the drain pipe.Contaminated water must be collected in the container with lid pending fordisposal by licensed waste management company. Wastewater fromconstruction activity must be treated in the primary wastewater treatment unitbefore discharging to the central wastewater treatment unit 1 (WWT-1) of IRPCIndustrial Park.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.4 Throwing garbage to drain pipe is prohibited. - Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.5 The construction contractor must remove equipment in construction site and onthe road to prevent falling into the drain pipe.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.6 Water used in the construction phase must be supplied by water work of IRPCIndustrial Park.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

2.7 In case that IRPC industrial Park cannot supply water in construction phase, theConstruction contractor must procure water from external sources.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

Page 9: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -55-

Table 7.1-1 (cont’d-1)

Environmental Composition Mitigation Measure Location Period Person in Charge of

3. Noise 3.1 Construction and installation that generate loud noise during 19.00-07.00 mustbe avoided.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

3.2 Machine/ equipment that generate no greater than 85 dB(A) of noise at 1 mdistance must be selected. The equipment must be inspected to reduce noise. Ifmachine/equipment generate noise level for more than 85 dB(A), noise barriermust be installed.

Machine/ equipmentused in construction site

- Over constructionphase

- IRPC Public CompanyLimited

3.3 The Construction contractor must provide personal protective equipment such as earplugs and ear muffs to the workers who work in the noisy area (more than85 dB(A)).

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

3.4 The warning sign must be installed in the area that noise level is greater than 85dB(A). Working period in this area is not more than 8 hours/day. Rotation systemmust be applied to allocate workers to work in other areas.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

4. Waste management 4.1 Recycled waste must be collected in the close container pending for selling tolicensed buyer.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

4.2 Waste management staffs must be assigned. Waste containers with lids must besufficiently provided. Local waste management company must be contacted todispose waste.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

4.3 Burning of construction equipment or waste is prohibited in the constructionsite.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

4.4 Name and telephone number of construction contractor must be attached withthe equipment transportation vehicles in order to inform about complaintchannel.

- Equipmenttransportation vehicle

- Over constructionphase

- IRPC Public CompanyLimited

5. Transportation (cont’d) 5.1 The Construction contractor must provide training to the drivers. The driversmust seriously follow the traffic regulations.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

5.2 The Construction contractor must plan to transport the equipment. If possible,road with high traffic density i.e. highway no.3 in front of Rayong municipalitymust be avoided. Transportation during rush hours (07.30-8.30 hr and 16.30-17.30 hr) must be avoided as well to minimize the impact to the communities.

- Transportation route - Over constructionphase

- IRPC Public CompanyLimited

5.3 Speed limit in the community area must follow the law. Speed limit in theconstruction site must be set up at 30 km/hr. Speed limit sign must be installedand obviously seen in the production area.

Production area andtransportation route

- Over constructionphase

- IRPC Public CompanyLimited

5.4 Loading of truck must follow the law to prevent road damages. - Transportation route - Over constructionphase

- IRPC Public CompanyLimited

Page 10: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -56-

Table 7.1-1 (cont’d-2)

Environmental Composition Mitigation Measure Location Period Person in Charge of

5. Transportation (cont’d) 5.5 The equipment transportation truck must be covered to prevent falling and dustdispersion.

- Construction site andtransportation route

- Over constructionphase

- IRPC Public CompanyLimited

5.6 Vehicle Engine must be monitored to control pollution emission. Safetyinspection must be conducted every time before use.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

5.7 Name and telephone number of construction contractor must be attached withthe equipment and worker’s transportation vehicles in order to inform aboutcomplaint channel.

- Equipment and worker’stransportation vehicle

- Over constructionphase

- IRPC Public CompanyLimited

5.8 Equipment transportation trucks must be covered by canvas over transportationroute in order to prevent falling and accident.

- Construction siteand transportation route

- Over constructionphase

- IRPC Public CompanyLimited

5.9 The staff must be assigned to facilitate traffic at the entrance-exit of productionarea to prevent accident.

- Production area - Over constructionphase

- IRPC Public CompanyLimited

6. Socio-economic 6.1 The EIA Monitoring Committee of IRPC Industrial Park which includinggovernment officers, experts, community representatives must be informedabout construction schedule and construction plan.

- EIA MonitoringCommittee of IRPCIndustrial Park

- Before constructionphase

- IRPC Public CompanyLimited

6.2 The managers and workers of nearby must be informed before construction. - Nearby factories in IRPCIndustrial Park

- Before constructionphase

- IRPC Public CompanyLimited

6.3 Local employment must be considered as the first priority. Job vacancy must beannounced to the communities.

- Communities in the studyarea

- Over constructionphase

- IRPC Public CompanyLimited

6.4 At least 2 channels must be provided to handle with complaints. The complainercan contact Emergency Control Center (ECC) 24 hours at 0 3880 2560 and 1800800 008. Complaint can be sent via post or via company staffs. The complainthandling channels must be informed to the communities.

- Construction siteand communities in thevicinity

- Over constructionphase

- IRPC Public CompanyLimited

6.5 Complaint handling process must be followed to deal with complaints. If it isproved that complaint was caused by the project, corrective action must beimmediately taken. Mitigation measures must be addressed to prevent the sameproblem in the future. The solution to complaint must be reported to thecomplainer and the project manager.

- Construction siteand communities in thevicinity

- Over constructionphase

- IRPC Public CompanyLimited

6.6 The criminal behavior of construction workers must be controlled. Regulationand punishment must be addressed. The procedures to contact local authoritymust be prepared.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

6.7 The Construction contractor must seriously follow occupational health and safetypolicy of IRPC.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

Page 11: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -57-

Table 7.1-1 (cont’d-3)

Environmental Composition Mitigation Measure Location Period Person in Charge of

7. Occupational Health andSafety

7.1 Occupational Health and Safety must be one criteria of Construction contractorselection.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.2 Occupational and safety ACT B.E.2554 and ministerial regulation re: occupationalhealth and safety in construction work must be seriously followed.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.3 The Construction contractor must seriously follow occupational health and safetyagreement in the contract.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.4 Standardized Personal Protective Equipment (PPE) i.e. helmet, boots, glassesmust be provided to the workers who work in the risky area. PPE training mustbe provided.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.5 The construction workers must be informed about occupational health and safetyregulation and the instruction for PPE use.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.6 Construction design and equipment selection must be done in accordance of thestandard and law.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.7 First aid equipment must be prepared. The procedures for nearby hospital contactmust be set up to prepare for serious injury response.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.8 The Construction contractor must provide appropriate construction suit to theworkers.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.9 Daily meeting must be set up every morning before working to ensure mutualunderstanding and to acknowledge about the problems of working.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.10 Occupational health and safety specialist must be assigned to inspect safety ofworkers.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.11 Warning sign must be installed in construction site, helmet area, non-smokingarea.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.12 Safety Data Sheet (SDS) and suggestions in the document must be informed tothe construction workers.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.13 Breaking period must be set up. Waste containers must be sufficiently provided tothe workers.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.14 Emergency response plan for fire and chemical leak must be addressed andinformed to workers. Related agencies must be contacted.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

Page 12: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -58-

Table 7.1-1 (cont’d-4)

Environmental Composition Mitigation Measure Location Period Person in Charge of

7. Occupational Health andSafety (cont’d)

7.15 The regulation of these following works must be set up for the safety of work;1) Electricity appliance use2) Construction work3) Crane use4) Forklift5) High Pressure Jet Gun6) Radiography7) Cold Work8) Hot Work9) Confined Space Work10) Welding work11) Blasting12) Vehicle use

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.16 Accident including cause, cost of damage, and solutions must be recorded andreported.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.17 Compensation must be paid to workers and local people who affected from theconstruction activity.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.18 There is no camp site. The construction contractor must indicate the assemblepoint to pick up workers to the project area.

- Assemble point - Over constructionphase

- IRPC Public CompanyLimited

7.19 These following regulations must be addressed;1) Workers must show ID card to the security guard when entering/ leaving the

area.2) The visitor must exchange ID card at the security guard.3) Visitor who does not receive permission is not allowed to enter the area.4) Gambling is prohibited.5) Selling alcohol and drug is prohibited.6) Weapon and explosion are not allowed in the construction site.7) Having quarrel is prohibited.8) Demolishing cannot be done unless the permission is received.9) All workers must keep the area clean.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.20 The Construction contractor must demolish all construction works andequipment when the construction is finished.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

7.21 Warning system must be set up at construction site and safety zone. Warningsystem must be informed to construction workers and staffs.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

Page 13: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -59-

Table 7.1-1 (cont’d-5)

Environmental Composition Mitigation Measure Location Period Person in Charge of

8. Major Hazard 8.1 The Construction contractor must seriously follow company regulation includingwork permit and contractor control.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

8.2 Flash protection must be installed in the vehicles that will enter the productionarea.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

8.3 Vehicle and person without permit are not allowed to enter the construction site. - Construction site - Over constructionphase

- IRPC Public CompanyLimited

8.4 The fire extinguisher must be sufficiently installed. - Construction site - Over constructionphase

- IRPC Public CompanyLimited

8.5 The Construction contractor must contact the project and ECC to prepare foremergency response in case of fire or chemical leak.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

9. Health 9.1 The Construction contractor must provide training to the workers on health,disease prevention, preferable behavior, and negative effects of drugs.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

9.2 The Construction contractor must follow Worker Law re: annual physical healthcheck and Workers' Health Surveillance.

- Construction site - Over constructionphase

- IRPC Public CompanyLimited

9.3 Baseline data of workers’ health must be collected. - Construction site - Over constructionphase

- IRPC Public CompanyLimited

9.4 Data of workers must be submitted to the local public health office. - Local public health office - Before construction - IRPC Public CompanyLimited

Page 14: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -60-

Table 7.1-2Environmental Impact Mitigation Measure (Operation Phase) IRPC’s Expandable Polystyrene Plant Project

IRPC Industrial Park, 299 Sukhumvit Road, Choengnoen Sub-District, Muang Rayong District, Rayong Province

Environmental Composition Mitigation Measure Location Period Person in Charge of

1. General measure 1.1 IRPC Public Company Limited must follow mitigation and monitoring measuresaddressed in the EIA Report of Expandable Polystyrene Plant Project, located inIRPC industrial Park, 299 Sukhumvit Road, Choengnoen sub-district, MuangRayong district, Rayong province, conducted by Vision E. consultants CompanyLimited and approved by the Expert Review Committee.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.2 If the monitoring result indicates any problem, IRPC Public Company Limited mustsolve the problem immediately. Mitigation and monitoring measures must beseriously followed.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.3 If there is any emergency that may affect environmental quality, IRPC PublicCompany Limited must inform Rayong Natural Resources an Environment Office,Department of Industrial Works, Rayong Provincial Industry Office immediately tosolve the problem.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.4 IRPC Public Company Limited must submit monitoring report every 6 months toRayong Natural Resources an Environment Office, Department of IndustrialWorks, Rayong Provincial Industry Office, and ONEP.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.5 Any changes in project details, mitigation and monitoring measures must beapproved by the permitting authority as follows;1) If the permitting authority considers that changes are better than or equal to

the existing mitigation measures, the permitting authority can register forthose changes and submit the record to ONEP for information.

2) If the permitting authority considers that changes may affect the maincontent in EIA report, the additional reports must be submitted to ONEP forapproval. When the permitting authority gives permission to that change,ONEP must be informed.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.6 HAZOP study for worst case scenario must be concluded. P&ID and comparisonto other units of the project must be clarified.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.7 Third Party must monitor the implementation of mitigation measures and monitoringmeasures. The permitting authority must be notified at least 2 weeks prior to themonitoring.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.8 When the project has operated into the steady state and the monitoring resultfinds that air pollution emission is less than the value in this report, IRPC PublicCompany Limited must use the monitoring result to be control value and informONEP.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.9 When the air monitoring result is close to standard of ambient air quality, theproject must cooperate with related agencies to reduce the pollution.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 15: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -61-

Table 7.1-2 (cont’d-1)

Environmental Composition Mitigation Measure Location Period Person in Charge of

1. General measure (cont’d) 1.10 If air quality monitoring result is increasing but still under the control value, theproject must investigate to find out the cause and monitor the situation toprepare for response. The details of this investigation must be addressed in themonitoring report.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.11 If air quality monitoring result is more than control value, the project mustinvestigate the cause, solve problem, and repeat monitoring to confirmeffectiveness of corrective action. Preventive measures must be addressed toavoid the same problem.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.12 The activities around air monitoring station during monitoring period must bereported.

- Air monitoring station - Over operation phase - IRPC Public CompanyLimited

1.13 Rayong Provincial Industry Office must be informed before shutdown/turnaround and pre-start up.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.14 The incident/ accident from the same type of industry in Thailand and in foreigncountries must be reviewed and reported in monitoring report once a year.Mitigation measures of this project must be revised in according to this review.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.15 Health of worker must be checked and collected in database. Annual physicalhealth check-up must be conducted. Health of workers who work in the riskyarea must be checked by the occupational physician. The relationship betweenhealth check-up result and period of work must be defined to monitor healththreat.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.16 Health information of workers and contractors must be recorded (only monthlycontractors who work in the factory every day, contactors duringshutdown/turnaround is not included). 30 years data-based after terminationexcept these following cases;1) In case that workers or contractors work with this project for less than 1

year, the health check-up result must be delivered to them.2) In case that the project will go out of the business, health data base must be

delivered to the new employer. If there is no new employer, the projectmust notify workers and contractors about their rights to request for healthcheck-up result at least 3 months before termination.

- Project area - Over operation phase - IRPC Public CompanyLimited

1.17 The criteria for laboratory selection must be set up. Third party who has beencontracted to monitor environmental quality must be controlled to ensurereliability of data. Supplier management must be followed to show transparencyand corporate governance of the project.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 16: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -62-

Table 7.1-2 (cont’d-2)

Environmental Composition Mitigation Measure Location Period Person in Charge of

2. Air quality 2.1 The project does not use chemical substance that identified in ambient VOCs (9types) and VOCs in the watch list (19 types).

- Project area - Over operation phase - IRPC Public CompanyLimited

2.2 IRPC Industrial Park allocate emission for this project including oxide nitrogen0.039 gram/second and Particulate Matter 0.024 gram/second as follows;

Emission yearEMISSION RATE (g/s)

SO2 NOX ParticulateRemaining emission rate 2013 101.9553 7.5342 4.0781EPS Emission 2016 0 0.0390 0.024Remaining emission rate 2016 101.9553 7.4952 4.0541

- Project area - Over operation phase - IRPC Public CompanyLimited

2.3 Air emission must be controlled as follows; (Table 7.1-3)1) VOCs Treatment Unit Stack

- Styrene ≤20 ppm and 0.1678 gram/second- Pentane ≤ 300 ppm and 1.774 gram/second- Oxide nitrogen ≤ 10.6 ppm and 0.039 gram/second

2) 03K002 : Vent 03T001A/B (Holding Tank)- Styrene ≤ 0.378 ppm and 0.00058 gram/second- Pentane ≤ 185.22 ppm and 0.198 gram/second

3) 04K001 : Vent 04D001A/B (Holding Tank)- Styrene ≤ 0.567 ppm and 0.00135 gram/second- Pentane ≤ 266.49 ppm and 0.440 gram/second

4) 07K001 : Vent 04N003A/B (Centrifuge)- Pentane ≤ 674.73 ppm and 0.554 gram/second

5) 05F002/07F004 : Vent in Flash Dryer System- Pentane ≤ 86.94 ppm and 0.601 gram/second- TSP ≤ 10.4 mg/m3 and 0.024 gram/second

6) 10U001-M01 : Vent in Predryer, Dryer tank- Pentane ≤ 514.08 ppm and 1.751 gram/second

- Stack - Over operation phase - IRPC Public CompanyLimited

Page 17: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -63-

Table 7.1-3Air Quality Emission from EPS Plastic Pellet Production Plant Project

SourceCoordinate Height of vent

(m) Vent diameter (m Temperature(°K) Speed (m/s) Flow rate 1/

(m3/s)

ConcentrationEmission rate (g/s)

ppm mg/Nm3

X Y Styrene Pentane NOx TSP Styrene Pentane NOx TSP

VOCs Treatment Unit Stack 750261 1400251 43.75 0.80 473.15 6.22 1.97 20 300 10.6 - 0.16780 1.774 0.039 -

03K002 : Vent 03T001A/B (Holding Tank) 750223 1400249 22.5 0.18 312 15.89 0.362 0.378 185.22 - - 0.00058 0.198 - -

04K001 : Vent 04D001A/B (Holding Tank) 750221 1400256 22.8 0.29 306 9.51 0.560 0.567 266.49 - - 0.00135 0.440 - -

07K001 : Vent 04N003A/B (Centrifuge) 750235 1400256 26.0 0.22 310 7.60 0.278 - 674.73 - - - 0.554 - -

05F002 / 07F004 : Vent in Flash Dryer 750262 1400266 32.2 0.50 321 13.94 2.342 - 86.94 - 10.4 - 0.601 - 0.024

10U001-M01 : Vent in Predryer, Dryer 750265 1400259 46.6 0.36 309 12.57 1.154 - 514.08 - - - 1.751 - -Standard 23.482/ 999.713/ - 4004/ - - - -

Source : IRPC Public Company Limited, 2016Remark : 1/ Flow rate and concentration at 25๐C, 1 atm, dry Basis) Excess air conditionStandard: 2/ New Air Emission Standards for Industries in Singapore

3/ Air Industrial Standards for Organic Substances (TCVN 5940), 19954/ Notification of Ministry of Industry re: Industrial Emission Air Quality Standard B.E.2549

Page 18: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -64-

Table 7.1-2 (cont’d-3)

Environmental Composition Mitigation Measure Location Period Person in Charge of

2. Air quality (cont’d) 2.4 When the monitoring result indicates that pollution emission is close to thecontrol value, the project must reduce production capacity or adjust theoperation to decrease the emission. If the project cannot reduce emission rate,the operation must be temporary stopped until the problem is solved. Theproject must submit the report and monitoring result after corrective action toIRPC Industrial Park within 3 days.

- Production unit - Over operation phase - IRPC Public CompanyLimited

2.5 Log Sheet of VOCs Treatment Unit must be recorded every 2 hours. - VOCs Treatment Unit - Over operation phase - IRPC Public CompanyLimited

2.6 The specialist must be hired to maintain VOCs Treatment Unit in accordance ofpreventive maintenance.

- Project area - Over operation phase - IRPC Public CompanyLimited

2.7 The automatic valve system must be used. The inspection plan of automatic valvemust be set up to control the effectiveness of system.

- Production unit - Over operation phase - IRPC Public CompanyLimited

2.8 The reserved equipment such as seal, joint, valve must be prepared in ready-to-usecondition.

- Project area - Over operation phase - IRPC Public CompanyLimited

2.9 VOCs Inventory of the project must be conducted in accordance of Departmentof Industry’s guideline. The leakage assessment must be done within one yearafter operation. Then, the related laws must be followed.

- Project area - Within one year afteroperation

- IRPC Public CompanyLimited

2.10 The project must cooperate with Pollution Control Department to monitor andcontrol VOCs.

- Project area - Over operation phase - IRPC Public CompanyLimited

2.11 Air pollution supervisor must be hired in accordance of the notification ofMinistry of Industry.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 19: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -65-

Table 7.1-2 (cont’d-4)

Environmental Composition Mitigation Measure Location Period Person in Charge of

3. Water quality 3.1 Measures for wastewater treatment (Figure7.1-1) include;1) Wastewater from polymerization unit (demineralized water and water for

pallet washing) = approximately 230 m3/day2) Wastewater from machine washing = approximately 31 m3/day3) Contaminated rain water (from pallet tank, pentane tank, and chilled water

tank) = approximately 11.85 m3/15 minutes

Wastewater from the above sources must be collected in Wastewater Pit 1which include Rapid Mixing Tank, Slow Mixing Tank, Sedimentation Tank, SludgeMixing Tank and Gravity Thickener Tank. After that, treated water must becollected in the Wastewater Pit 2 before transferring to WWT-1 of IRPC IndustrialPark Pit 2. If quality of effluent exceeds the standard, it will be re-treated again.

4) Wastewater from office building (approximately 3.2 m3/day) must be treatedby septic tank before discharging to rainwater drainage. Wastewater must becollected in the Effluent Pond 4 or WWT-1.

- Project area - Over operation phase - IRPC Public CompanyLimited

3.2 Non-contaminated rain water must be discharged to the Effluent Pond 4 (12,000m3) before sending to Klong Kon Puek canal.

Project area - Over operation phase - IRPC Public CompanyLimited

3.3 Hydrocarbon detection pond (86.4 m3) must be prepared to detect leakedhydrocarbon on concrete paved area. This pond will prevent hydrocarboncontamination to rainwater in drainage pipe. There are three partition sheets andsluice gate valve to prevent leakage to drain pipe. Contaminated water in thehydrocarbon pond must be disposed by licensed waste management contractor.

- Project area - Over operation phase - IRPC Public CompanyLimited

3.4 The quality of wastewater must be controlled as follows before transferring toWWT-1 of IRPC Industrial Park;- SS ≤ 3,000 ppm- COD ≤ 3,000 ppm- Oil & Grease ≤ 20 ppm

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 20: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -66-

CentralUtilities

Office Building

Polymerization Unit

WWT-1

Tap water Use in office building 4.0 (4.0) Wastewater3.2 (3.2)

Wastewater frompolymerization unit 122 (230)

Steam 17 (32)

Demineralized water 92 (174)

Condensates 17 (32) Cont

amin

ated

rain

wat

er11

.85

(11.

85)

Primary WastewaterTreatment Unit

Pallet washing 30 (56)

Septic Tank

Wastewater149.85 (272.85)

Chilled WaterUnit

input (close system)

output (close system)Chilled water105 (105)*

effluent 3.2(3.2)

Wastewater Treatment LayoutFigure 7.1-1

Remark : monitoring station at Effluent Pond 4; monitoring parameters = SS, BOD, pH, TKN and Oil & Grease, monitor once a monthmonitoring station at WWT-1; monitoring parameters = SS, COD and Oil and Grease, monitor once a monthEffluent from office building will be transported to aerobic system and to effluent pond 4 or WWT-1

Machine cleaning 16 (31)

Chilled water output 6,250 (8,060)

Chilled water input 6,250 (8,060)

Air Coolerof VOCs treatment unit

Water cooling input 0 (3,744)

Water cooling output 0 (3,744)

Remarkpresent (after expansion)unit : m3/day--- non-continue* m3/year

Effluent Pond 4(12,000 m3)

Kon Puek

non-contaminatedrain water

aerobic system

Page 21: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -67-

Table 7.1-2 (cont’d-5)

Environmental Composition Mitigation Measure Location Period Person in Charge of

3. Water quality (cont’d) 3.5 Quality of wastewater must be monitored before transferring to WWT-1.Monitoring parameters include SS, COD, Oil & Grease.

- Primary wastewatertreatment unit

- Over operation phase - IRPC Public CompanyLimited

3.6 If the monitoring result of wastewater quality does not meet internal controlrange of IRPC Industrial Zone, these procedures must be followed;1) If SS or COD is higher than internal control range, WWT-1 will consider the

capacity of COD loading that indicates at 1,050 kg/day.2) If IRPC Industrial Park considers that WWT-1 cannot receive wastewater

from the project, WWT-1 staff will notify the project to stop transferringwastewater to central facility.

3) The project will immediately stop transferring wastewater to WWT-1 andinvestigate for problem of primary wastewater treatment unit.

4) The corrective action must be taken in accordance of the cause. Thetransparency of water in Wastewater Pit 2 (WWP2) must be monitored. Ifwater is not transparent, filter press will be checked whether it is torn ornot. If the filter press is torn, the operation must be stopped until the newone is replaced. If water in WWP-2 is turbid, water must be reversed toWastewater Pit 1 to repeat treatment until water is clear.

5) Before transferring wastewater to WWT-1 again, WWT-1 staff must benoticed in order to monitor wastewater quality again.

6) If wastewater quality still exceeds the internal control range, the productionprocess in the downstream of polymerization unit must be reduced todecrease quantity of wastewater. Wastewater must be treated by wastemanagement contractor that obtains the license from the Department ofIndustry.

- Primary wastewatertreatment unit

- Over operation phase - IRPC Public CompanyLimited

3.7 Wastewater treatment supervisor must be assigned in accordance of thenotification of Ministry of Industry.

- Project area - Over operation phase - IRPC Public CompanyLimited

3.8 The staff must be assigned to inspect and to maintain the primary wastewatertreatment unit in accordance of the maintenance plan.

- Primary wastewatertreatment unit

- Over operation phase - IRPC Public CompanyLimited

Page 22: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -68-

Table 7.1-2 (cont’d-6)

Environmental Composition Mitigation Measure Location Period Person in Charge of

4. Solid waste 4.1 Non-hazardous solid wastes include;- Contaminated container

The project will generate contaminated containers for approximately 53.0ton/year such as used plastic bag, used jumbo bag, plastic gallon, paper box.Contaminated containers must be collected in the sieve and moved to thepending area before sending to dispose by licensed waste managementcontractor.

- Filter bagThe project will generate filter bag for 0.2 ton/year. Used filter bags must becollected in the jumbo bag pending for disposal by licensed wastemanagement contractor.

- Garbage from office buildingThe garbage from office building is approximately 17.08 ton/year. Garbagemust be collected in the container with lid; pending for disposal by licensedwaste management contractor.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.2 Hazardous waste- Paper with polymer

The project will generate oil and chemical contaminated waste forapproximately 5.7 ton/year. Contaminated waste will be collected in the tank(capacity = 1,000 liters) under the roof and surrounded by the dike. Oil andchemical contaminated waste must be managed by the contractor whoobtains the license from government agency.

- Additive Paper BagThe project will generate used additive paper bag for approximately 5.1ton/year. Used additive paper bags will be collected in the jumbo bag andmoved to the storage area that covered by roof and dike. Used additive paperbags must be managed by the contractor who obtains the license fromgovernment agency.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.3 The waste storage area must be covered by the roof and surrounded by the diketo prevent contamination to the outside environment. Waste must be stored inthe container with lid; pending for disposal by licensed waste managementcontractor.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.4 Global Positioning System (GPS) must be installed in the waste transportationtruck to control the contractor. Telephone number must be clearly attached onthe truck as a channel for complaint.

- Transportation route - Over operation phase - IRPC Public CompanyLimited

Page 23: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -69-

Table 7.1-2 (cont’d-7)

Environmental Composition Mitigation Measure Location Period Person in Charge of

4. Solid waste (cont’d) 4.5 Solid waste management must be conducted in accordance of the notification ofMinistry of Industry re: Solid Waste Management B.E.2548. Waste managementmust be done by contractor who obtains the license from government agency.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.6 Manifest Form must be submitted to the Department of Industry. The copy mustbe collected at least 1 year for retrospective check.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.7 Summary report of waste by type must be conducted. The ratio of recyclingwaste must be also addressed in the report.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.8 3R principle must be applied. - Project area - Over operation phase - IRPC Public CompanyLimited

4.9 Industrial waste management supervisor must be assigned in accordance of thenotification of Ministry of Industry.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.10 Waste separation activity must be promoted to reuse some materials such aspaper and steel to reduce quantity of waste.

- Project area - Over operation phase - IRPC Public CompanyLimited

4.11 The waste management contractor must be audited to ensure that wastemanagement is conducted in accordance of the regulation and academicprinciple.

- Waste managementcontractor

- Over operation phase - IRPC Public CompanyLimited

5. Noise 5.1 Control room must be set up to prevent loud noise. - Project area - Over operation phase - IRPC Public CompanyLimited

5.2 Hearing protective equipment such as ear plugs and ear muffs must besufficiently provided. Hearing protective equipment wearing zone must be set up.Warning sign must be installed in the area that noise level exceeds 85 dB(A).The workers must wear PPEs when entering to the area.

- Project area - Over operation phase - IRPC Public CompanyLimited

5.3 Noise level must be controlled at 85 dB(A) at 1 meter distant from machine.Noise reduction methods such as installation of material or lids must be applied.If noise level still exceeds than 85 dB(A), warning sign must be installed. TimeWeighted Average (TWA) must be set up in accordance of the related laws suchas the notification of Ministry of Industry re: Safety Measures for WorkingEnvironment in the Factory and the ministerial regulation re: ManagementStandard for Occupational Health and Safety in light and noise B.E.2549.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 24: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -70-

Table 7.1-2 (cont’d-8)

Environmental Composition Mitigation Measure Location Period Person in Charge of

5. Noise (cont’d) 5.4 Hearing protective equipment wearing Zone (i.e. Ear Muffs, Ear Plug) must bedefined. Warning sign must be installed in the area that noise level is greater than85dB(A). The workers must wear hearing protective equipment before enteringto the noisy area.

- Project area - Over operation phase - IRPC Public CompanyLimited

5.5 Machine/ equipment must be maintained in accordance of the maintenance planand preventive measures to reduce noise level.

- Project area - Over operation phase - IRPC Public CompanyLimited

5.6 Noise contour map must be conducted to address loud area every 3 years or afterchange of production which may affect noise level in the project area.

- Project area - Over operation phase - IRPC Public CompanyLimited

5.7 Hearing Conservation Program must be set up in accordance of the law. Theacademic principle must be applied to prevent hearing loud noise for too long.For examples, the period of working in the noisy area must be reduced. Workingday and workers must be rotated. Hearing safety procedures training must betrained and revised at least once a year.

- Project area - Over operation phase - IRPC Public CompanyLimited

6. Transportation 6.1 Forklift driver must be trained about safety measures. Retraining must be doneevery 5 years. Forklift condition i.e. breaking system must be inspected inaccordance of the user’s guide.

- Project area - Over operation phase - IRPC Public CompanyLimited

6.2 The vehicles of the project must be maintained by the distance that indicated inthe user’s guide of each type of vehicle.

- Project area - Over operation phase - IRPC Public CompanyLimited

6.3 Transportation during rush hours (07.30-08.30 hr and 16.30-17.30 hr) must beavoided.

- Over Transportationroute

- Over operation phase - IRPC Public CompanyLimited

6.4 The transportation route that passes through the community i.e. highway no.3 infront of Rayong municipality as well as other routes that may cause trafficproblem must be avoided to minimize the traffic impact.

- Highway no.3 in frontof Rayong municipalityand othertransportation routesthat may cause trafficproblem

- Over operation phase - IRPC Public CompanyLimited

6.5 The hazardous chemical transportation contractor must install Global PositioningSystem (GPS) and speed limit control in the vehicle.

- Project area - Over operation phase - IRPC Public CompanyLimited

6.6 Loading of chemical substances on the truck must be controlled in accordance ofthe law.

- Over transportationroute

- Over operation phase - IRPC Public CompanyLimited

6.7 Sign and symbol such as traffic sign, enter-exit sign to production area, and speedlimit sign must be installed.

- Project area and insideIRPC Industrial Park

- Over operation phase - IRPC Public CompanyLimited

6.8 The training of transportation procedure, emergency response, and otherregulations must be provided to the drivers. The driver must follow trafficregulations seriously.

- Over transportationroute

- Over operation phase - IRPC Public CompanyLimited

Page 25: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -71-

Table 7.1-2 (cont’d-9)

Environmental Composition Mitigation Measure Location Period Person in Charge of

6. Transportation (cont’d) 6.9 The speed of chemical substance transportation vehicles and workers’ vehiclesin the IRPC Industrial Park must be limited in accordance of IRPC’s regulation.The speed limit inside IRPC Industrial Park is not more than 30 km/hr. Speedlimit sign must be installed in the project area and inside IRPC Industrial Park.Speed of vehicles in the community must be limited in accordance of the law.Traffic regulations must be seriously followed.

- Project area and insideIRPC industrial zone

- Over operation phase - IRPC Public CompanyLimited

6.10 Warning sign, type and quantity of chemical substance, emergency responsepractice, SDS, and contact number of transportation contractor and IRPC mustbe attached on the chemical transportation vehicle to provide a channel forcomplaint.

- Chemical loading truck - Over operation phase - IRPC Public CompanyLimited

6.11 Practice guideline, safety measure, and emergency response in transportationworks must be provided.

- Over transportationroute

- Over operation phase - IRPC Public CompanyLimited

7. Socio-Economics 7.1 Qualified local people must be considered as the first priority for employment toenhance good attitude to the project and to reduce conflict with the community.The communities must be informed about job vacancies every time.

- Communities in thestudy area

- Over operation phase - IRPC Public CompanyLimited

7.2 The activities such as knowledge activity, community business promotion, qualityof life policy and career development that related to the factory must beconducted with communities in the vicinity.

- Communities in thestudy area

- Over operation phase - IRPC Public CompanyLimited

7.3 Social activities such as students’ scholarship and heath check-up must beconducted in accordance of the CSR plan.

- Communities in thestudy area

- Over operation phase - IRPC Public CompanyLimited

7.4 Local academic institutions must be supported to improve quality of teaching.Community activities must be supported appropriately such as religion activity,cultural activity, and environmental activity to strengthen good relationship withcommunity leaders and local administration organizations.

- Academic institutes inthe study area

- Over operation phase - IRPC Public CompanyLimited

7.5 The community representatives must have opportunity to visit the factory atleast once a year or by request to study environmental management.

- Project area - Over operation phase - IRPC Public CompanyLimited

7.6 Complaint handling process for internal and external complainer must be set up.Emergency Control Center (ECC) can be contacted for 24 hours via telephone(0 3880 2560, 1800 800 008), post, fax, or direct contact. These complaintchannels must be disseminated to the communities (complaint handling processis shown in Figure 7.1-2).

- Project area andcommunities in thestudy area

- Over operation phase - IRPC Public CompanyLimited

Page 26: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -72-

Start

Complainer submit complaint via ECC(Tel 0 3880 2560), 1800 800 008)

ECC immediately notifies target factory and on callteam to investigate in the field within 1 hour

1. Target factory immediately investigate the process.2. On Call team visits the complainer and investigates the problem

within 1 hour.

Is there the impact?

1. Team On calls ECC to notify the target factory to take correctiveaction immediately.

2. Target factory investigate production process. If the problem isfound, the corrective action must be taken within 1 hour.

1. Target factory informs result of corrective action to on call teamvia EEC to notify the complainer immediately.

2. On Call team inform the complainer in the field within 7 days.3. If the corrective action is on process, on call team will report the

progress to the complainer every 7 days.

ECC immediately notifies related person

(SMS to notify Executives)

Record and summary the result within 15days

Remark :ECC = Emergency Control Center)* report the complainer back within 1 hour** target plant must address additional measures to prevent

repeating of problem

End of process**

Yes*

Complaint Handling ProcessFigure 7.1-2

No*

Person in Charge of Procedure

Complainer, ECC

ECC, target factory,

On Call Team, Executives

ECC, target plant,On Call Team

ECC, Target Plant,On Call Team

ECC, target plant,On Call Team

ECC, target plant,On Call Team

ECC, target plant,On Call Team, Executive

ECC

Complaint form

Telephone, SMS, Walky Talky,General Call Intercom

Telephone, SMS, Walky Talky,General Call Intercom

Telephone, SMS, Walky Talky,General Call Intercom

Telephone, SMS, Walky Talky,General Call Intercom

Telephone, SMS, Walky Talky,General Call Intercom

form

within 1 hour

Page 27: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -73-

Table 7.1-2 (cont’d-10)

Environmental Composition Mitigation Measure Location Period Person in Charge of

8. Occupational health andsafety

General measure8.1 Occupational health and safety committee must be assigned to responsible for

these following tasks;- address safety policy- address occupational health and safety regulation- supervise occupational health and safety works in accordance of the plan- investigate cause of problem

- Project area - Over operation phase - IRPC Public CompanyLimited

8.2 Occupational health and safety laws such as Occupational Health and Safety andWorking Environment ACT B.E.2554 must be followed.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.3 Full time occupational health and safety supervisor must be hired. - Project area - Over operation phase - IRPC Public CompanyLimited

8.4 Major hazard and risk assessment report as well as the monitoring report must besubmitted to the Ministry of Industry in accordance of Section 4, clause 32 ofOccupational Health and Safety and Working Environment ACT B.E.2554. Whenthe details of operation in the law section 4 clause 32 is clearly defined, theprocedures in the law must be followed.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.5 Environmental and occupational health and safety policy must be addressed andacknowledged.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.6 The annual occupational health and safety plan must be conducted and revisedevery year.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.7 The communication channels with works such as PR board, magazine, andelectronic media must be set up to provide information on occupational healthand safety.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.8 The safety promotion activities such as safety week and safety culture projectmust be conducted.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.9 The personal preventive equipment such as helmet, boots, gloves, and dust maskmust be sufficiently provided to the workers. Safety procedure must be seriouslyfollowed.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.10 The following trainings must be provided to the workers;1) Safety in production process2) Safety in chemical work, noise work, and hot work3) PPE use4) Fire extinguish and fire extinguishing equipment use5) First aid6) Emergency response

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 28: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -74-

Table 7.1-2 (cont’d-11)

Environmental Composition Mitigation Measure Location Period Person in Charge of

8. Occupational health andsafety (cont’d)

8.11 The personal preventive equipment must be inspected and repaired/changedregularly.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.12 Tools, engine and machine must be inspected and maintained by the period thatdefined in the user guide.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.13 The fire extinguishing system and equipment installation must be designed inaccordance of the international standard as follows;- 14 gas detectors at polymerization unit, coating unit, and packaging unit.

Lower Explosive Limit (LEL) of Methane must be used to monitor leakage.Warning is divided into 2 levels. When gas detector warns at 20%LEL, thestaff will use portable gas detector to investigate the cause. When gasdetector warns at 40%LEL, the project will prepare for evacuation. Shiftsupervisor will investigate the cause of problem.

- 319 sprinklers at polymerization unit and packaging unit- 29 warning equipment at polymerization unit, water separation unit, size

separation unit, dryer, coating unit and packaging unit- 22 smoke detectors at water separation unit, electricity control room, foam

tank room, production control room, production cabinet room, and chemicalpreparation room

- 42 heat detectors at polymerization unit- 13 Wall Hydrants at polymerization unit, water separation unit, size

separation unit, dryer, coating unit and packaging unit- 5 Foam Hydrants at polymerization unit and water separation unit- 22 Emergency Stop Push Bottoms at polymerization unit, water separation

unit, size separation unit, dryer, coating unit and packaging unit- 39 portable dry chemicals (12 kg) at polymerization unit, water

separation unit, primary wastewater treatment unit, size separation unit,dryer, coating unit, packaging unit, control room, and VOCs Treatment Unit

- Carbon dioxide Fire extinguisher (50 kg) must be installed in one point athydrocarbon detection pond.

- Carbon dioxide Fire extinguisher (6 kg) must be installed in 11 points atpolymerization unit, control room, control storage room, lift, packagingroom, and electricity control room.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 29: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -75-

Table 7.1-2 (cont’d-12)

Environmental Composition Mitigation Measure Location Period Person in Charge of

8. Occupational health andsafety (cont’d)

8.14 Reserved water for fire extinguishing of IRPC Industrial is used in this project asfollows;- 4 water tanks (capacity 25,000 m3) with 6 water pumps: 2 sets of 9 m3/hr

pump, 1 set of 280 m3/hr pump, 1 set of 680 m3/hr pump and 1 set of 680m3/hr diesel water pump.

- Water tank at WH 40 (capacity 1,050 m3) with 1 set of 300 m3/hr water pump.- Sea water with 6 water pumps (pumping rate of each pump 459 m3/hr).

- IRPC industrial zone - Over operation phase - IRPC Public CompanyLimited

Emergency response plan8.15 Emergency response plan for fire and chemical leak must be set up. Level of

emergency is divided into 4 levels as follows; Level 1: the emergency including properties of IRPC and chain companies

can be controlled by on-site emergency response team and someequipment from central unit.

Level 2: the on-scene commander considers that emergency includingproperties of IRPC and chain companies cannot be controlled by on-siteemergency response team. The central emergency response team and fullequipment are needed.

Level 3: the on-scene commander considers that emergency includingproperties of IRPC and chain companies cannot be controlled by IRPCemergency response team and the chain companies. Assistance fromlocal/district/provincial government agencies and other private companiesi.e. PTT Groups, EMAG are needed.

Level 4 (national/ international level): the on-scene commander considersthat emergency including properties of IRPC and chain companies cannotbe controlled by IRPC emergency response team and the chain companies.Assistance national/international agencies are needed.

The emergency response layout is shown in Figure 7.2-3. The emergencyresponse level 1 and 2 must be practiced at least once a year. Theemergency response practice for level 3 and 4 depends on the willingnessof government and related agencies.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 30: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -76-

INTERFACE

Emergency Response PlanFigure 7.1-3

RESPONSIBILITY

On scene Commander(OC)

On scene Commander(OC)

Related Agencies inIRPC’s EmergencyResponse Plan Level 2

On scene Commander (OC)

On scene Commander (OC)

Related Agencies; IRPC Level 4and Rayong Province Level 3, 4

Related Agencies inIRPC’s EmergencyResponse Plan Level 1

Related Agencies; IRPC Level 3and Rayong Province Level 1, 2

On scene Commander (OC)

Related Agencies

Start

Fire/ Explosion Case

Fire CaseLevel 1

Fire CaseLevel 2

Fire CaseLevel 3

Normal Situation

Normal Situation

Normal Situation

Fire Case Level 4

INTERFACE

Control in accordance of emergencyplan, On station, Inform governmentoffice/communities/ other companies

Control in accordance of emergencyplan, On station, Inform governmentoffice/communities/ other companies

Control in accordance of emergencyplan, On station, Inform government

office/communities/ other companies

Control in accordance of emergencyplan, On station, Inform governmentoffice/communities/ other companies

Normal Situation

NotifyCommunity Plan

Normal Situation

Meeting

End

Remediation

No

no

No No

No

No

Yes

Yes

Yes

Yes

Inform

Inform

Inform

Inform

No

yes

Yes

yes

Note : To inform

Page 31: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -77-

Table 7.1-2 (cont’d-13)

Environmental Composition Mitigation Measure Location Period Person in Charge of

8. Occupational health andsafety (cont’d)

Communication in emergency situation8.16 The communication plan within IRPC Industrial Park as well as local government

agencies and nearby factories must be set up.- Project area - Over operation phase - IRPC Public Company

Limited8.17 The community leaders must be informed about emergency. The community

leaders will contact the president of sub-district administrative organization ordistrict officer or the governor to consider about the need of communityevacuation. The magnitude of emergency and wind direction must be used forconsideration. If the community leaders decide to follow community evacuationplan, the community plan will be followed.

- Project area andcommunities in thevicinity

- Over operation phase - IRPC Public CompanyLimited

8.18 Channels to inform communities about the emergency include;1) The community leaders near the area must be contacted by phone to inform

about the emergency. The company must ask the community leaders toinform local people via village radio.

2) SMS message must be sent to inform community leaders, relatedgovernment agencies, and networks.

3) Broadcasting car must be used to inform about the emergency to thevicinities.

- Project area andcommunities in thevicinity

- Over operation phase - IRPC Public CompanyLimited

Measures after emergency8.19 The recovery plan and emergency report must be conducted to prevent

repeated problems. The committee must be set up to investigate cause ofemergency.

- Project area - Over operation phase - IRPC Public CompanyLimited

8.20 Compensation measures are as follows;1) Reserve fund must be allocated to compensate money for first aid.2) Life and property insurance must be provided to the workers as well as

affected person. The compensation rate is considered by degree ofdamages.

- Project area andcommunities in thevicinity

- Over operation phase - IRPC Public CompanyLimited

Page 32: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -78-

Table 7.1-2 (cont’d-14)

Environmental Composition Mitigation Measure Location Period Person in Charge of

9. Major Hazard General measure9.1 Preventive maintenance must be conducted to investigate and to control

effectiveness of equipment.- Project area - Over operation phase - IRPC Public Company

Limited9.2 Safety Data Sheet (SDS) must be provided in the working area. - Project area - Over operation phase - IRPC Public Company

Limited9.3 The workers must be trained to ensure their understanding on safety

procedures before working.- Project area - Over operation phase - IRPC Public Company

Limited9.4 Risk assessment for production process must be conducted. Risk assessment

report must be submitted to the Department of Industry every 5 years.- Project area - Over operation phase - IRPC Public Company

Limited8.6 Risk assessment for production unit/ additional equipment must be conducted by

the specialist during detail design. The assessment report must be submitted tothe permitting authority for approval before start-up.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.5 Chemical leak response plan must be set up. - Project area - Over operation phase - IRPC Public CompanyLimited

9.6 Emergency Shower and Eye Wash must be inspected in accordance of the plan. - Project area - Over operation phase - IRPC Public CompanyLimited

9.7 The equipment such as gas detector and emergency warning must be calibrated. - Project area - Over operation phase - IRPC Public CompanyLimited

9.8 Work permit system must be applied for;1) Hot Work2) Cold Work3) Confined Space Entry4) Hazardous Waste Transportation5) Vehicle Entry to Battery Limit

- Project area - Over operation phase - IRPC Public CompanyLimited

9.9 Person in charge of and emergency response plan must be prepared. Evacuationplan must be set up to reduce magnitude of accident.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.10 Chemical and fire response training must be recorded in the system. - Project area - Over operation phase - IRPC Public CompanyLimited

9.11 Emergency response plan in Thai language must be provided. The plan mustcover fire, gas leak, and chemical leak.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 33: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -79-

Table 7.1-2 (cont’d-15)

Environmental Composition Mitigation Measure Location Period Person in Charge of

9. Major Hazard (cont’d) Safety measure of production process9.12 If the project cannot control the temperature at 90๐C, these procedures must be

followed;1) TCP must be added to maintain polymer in the suspended form.2) If polystyrene cannot be controlled to suspended form, PVA must be added

to reverse polystyrene in the suspended form.3) If polystyrene and water is still separated, CaCO3 must be added to restrain

polymerization reaction. The temperature in reactor must be reduced from90QC to 35๐C to solidify polystyrene by using cooling water and chilledwater.

4) Nitrogen purge will be used to transfer VOCs to the VOCs treatment unit.Solid polystyrene will be cut by water pressure (more than 1,000 bar gage)and sold as low grade product.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.13 If there is a power outage at 120๐C, the temperature in reactor must be reducedto 35๐C by using cooling water and chilled water. Poly-styrene will be solidifiedin the reactor. Nitrogen purge will be used to transfer VOCs to the VOCstreatment unit.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.14 Temperature and fiber must be calibrated. The joint must be cleaned inaccordance of the plan.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.15 Work instruction must be followed in case of normal operation and emergency. - Project area - Over operation phase - IRPC Public CompanyLimited

9.16 The conditions such as pressure, temperature, and level of substance in thereactor must be recorded in the DCS system to show the tendency in variousconditions.

- Project area - Over operation phase - IRPC Public CompanyLimited

9.17 Safety equipment such as pressure safety valve, emergency valve, and isolatingvalve must be regularly inspected to ensure the readiness of use.

- Project area - Over operation phase - IRPC Public CompanyLimited

Safety measure of transmission pipeline9.18 The layout of pipe must be designed appropriately. Pipe structure must be able

to support expansion and shrinkage due to temperature change and weight ofpipe.

- Project areaAnd transmissionpipeline

- Over operation phase - IRPC Public CompanyLimited

9.19 Corrosion preventive measures such as Non-metallic Coating and MetallicCoating must be addressed in accordance of Standard Code ASME Section IX.

- Project areaAnd transmissionpipeline

- Over operation phase - IRPC Public CompanyLimited

9.20 Safety measures in emergency system separation must be addressed. - Project areaAnd transmissionpipeline

- Over operation phase - IRPC Public CompanyLimited

Page 34: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -80-

Table 7.1-2 (cont’d-16)

Environmental Composition Mitigation Measure Location Period Person in Charge of

9. Major Hazard (cont’d) 9.21 Preventive maintenance plan for raw material and nitrogen pipe must beaddressed.

- Project areaAnd transmissionpipeline

- Over operation phase - IRPC Public CompanyLimited

9.22 The inspection plan for external inspection, thickness inspection and CUIinspection must be set up.1) The frequency of external inspection and thickness inspection is as follows;

Type of Circuit1/ External Inspection Thickness Measurement

Class 1 5 Years 5 Years or ½ Remaining Life

Class 2 5 Years 10 Years or ½ Remaining Life

Class 3 10 Years 10 Years or ½ Remaining Life

Class 4 10 Years 10 Years or ½ Remaining Life

Injection Point By Class 3 YearsRemark: 1/ Class 1 : Dangerous substance pipe (immediately damage safety, environment, and property) such as

combustible substance, brittle fracture substance, H2S, Anhydrous HCl, HF, as well as pipeline thatlaying in the community or source of water

Class 2 : Other pipes not identified in Class 1 and Class 3; process pipeline i.e. H2, Fuel Gas, CNG

Class 3 : Combustible substance but does not evaporate when leakage or the substance that located at fararea i.e. hydrocarbon pipe, product pipe from tank to pH tank outside production unit

Class 4 : Infrastructure pipe i.e. water pipeline, wind pipeline, nitrogen pipeline, vapor pipeline andincombustible substance pipe.

2) The insulated pipe must be randomly inspected. The frequency of inspectiondepends on the following plan;

Strategy1/Carbon Steel Stainless Steel

InitialInspection

NextInspection

Initial Inspection Next Inspection

0, 1 1 Year(s) 3 Year(s) 1 Year(s) 5 Year(s)

2 3 Year(s) 5 Year(s) 3 Year(s) 8 Year(s)

3, 4 5 Year(s) 10 Year(s)Remark 1/ insulated pipe inspection plan is divided into 5 levels;

- Level 0 the highest risk (100% ) - the duration between initial inspection and the next inspection is shortage.- Level 1 high risk (50 %)- Level 2 medium risk (33 )- Level 3 Low risk (25 %)- Level 4 the lowest risk (10% ) - the duration between initial inspection and the next inspection is longest.

3) Thickness must be inspected by Ultrasonic Thickness Measurement (UTM).The frequency of measurement depends on class of chemical substances.The actual wall thickness is used to calculate corrosion rate and remaininglife. Calculation result must be considered to indicate inspection plan.

- Project area andtransmission pipeline

- Over operation phase - IRPC Public CompanyLimited

Page 35: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -81-

Table 7.1-2 (cont’d-17)

Environmental Composition Mitigation Measure Location Period Person in Charge of

10. Measure forshutdown/turnaroundand pre-start up

10.1 Measure for shutdown/turnaround1) The communities and local agencies must be informed via PR board before

shutdown/turnaround

- Communities in studyarea

- Shutdown/turnaround- IRPC Public Company

Limited2) Safety inspection measures during shutdown/turnaround must be done every

day by maintenance department, safety department, and the workers. Resultof inspection must be recorded.

- Project area - Shutdown/turnaround - IRPC Public CompanyLimited

3) Work permit system must be set up before operation. - Project area - Shutdown/turnaround - IRPC Public CompanyLimited

4) Personal protective equipment such as ear plugs, ear muffs, helmet, gloves, andmask must be provided to the workers who work in the risky area.

- Project area - Shutdown/turnaround - IRPC Public CompanyLimited

5) Work instruction and occupational health and safety training must be providedto the workers.

- Project area - Shutdown/turnaround - IRPC Public CompanyLimited

6) Job safety analysis of high-risk works in shutdown/ turnaround phase must beprepared.

- Project area - Shutdown/turnaround - IRPC Public CompanyLimited

7) After shutdown/turnaround, the contractor must clean the area to preventoccupational health and safety impact.

- Project area - Shutdown/turnaround - IRPC Public CompanyLimited

10.2 Measure for pre-start up phase1) Training must be provided to the workers before start-up. - Project area - Pre start up - IRPC Public Company

Limited2) Unrelated person is not allowed to enter the production area. - Project area - Shutdown/turnaround - IRPC Public Company

Limited3) Before plant start-up, the area and production unit must be inspected in

accordance of Pre-Start up Safety Review (PSSR) Checklist.- Project area - Shutdown/turnaround - IRPC Public Company

Limited11. Health 11.1 The company must support the environmental and health activities as well as

monitor health of local people.- Communities in the

study area- Over operation phase - IRPC Public Company

Limited11.2 Health of new worker must be checked. Annual physical health check-up must be

conducted. Health of workers who work in the risky area must be checked by theoccupational physician. The relationship between health check-up result andperiod of work must be defined to monitor health threat.

- Project area - Over operation phase - IRPC Public CompanyLimited

11.3 In case that the occupational physician finds tendency of sickness, the companymust investigate cause of this abnormal condition and review workingprocedures. Rotation of person in charge of must be considered to preventrepeated mistake.

- Project area - Over operation phase - IRPC Public CompanyLimited

11.4 Workers’ health record must be collected as a baseline for occupational healthmonitoring.

- Project area - Over operation phase - IRPC Public CompanyLimited

11.5 The local public health office must be appropriately supported when there is arequest.

Local public healthoffice

- Over operation phase - IRPC Public CompanyLimited

Page 36: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -82-

Table 7.1-2 (cont’d-18)

Environmental Composition Mitigation Measure Location Period Person in Charge of

11. Health (cont’d) 11.6 The activities of local public health office must be appropriately supported suchas financial support, knowledge support to health volunteers.

- Local public healthoffice

- Over operation phase - IRPC Public CompanyLimited

11.7 MSDS must be submitted to the local public health offices i.e. Rayong PublicHealth Office.

- Project area - Over operation phase - IRPC Public CompanyLimited

11.8 Number of workers and MSDS must be submitted to the local public healthoffices.

- Local public healthoffice

- Over operation phase - IRPC Public CompanyLimited

11.9 The main public health office for workers must be identified to reduce densityof community public health office.

- Project area - Over operation phase - IRPC Public CompanyLimited

11.10 Criteria of health service office and laboratory must be set up. For goodcorporate governance, the supplier management process must be followed toassess quality of health office.

- Project area - Over operation phase - IRPC Public CompanyLimited

12. Aesthetic 12.1 The space of green area must be 616 m3 or 9.76 percent of the project area(6,313 m3) (Figure 7.1-4). The maintenance of green area must be conducted.

- Project area - Over operation phase - IRPC Public CompanyLimited

Page 37: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -83-

Figure 7.1-4 Green Area of the Project

Plant NorthTrue North

Green area 616 m3 or 9.76 percent of total project area (6,313 m3)

Symbol

Additional green area after theexpansion

Boundary of project area

Page 38: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -84-

Table 7.2-1Environmental Impact Monitoring Measures (Construction Phase) IRPC’s EPS Plant Project

IRPC Industrial Park 299 Sukhumvit Road, Choengnoen Sub-District, Muang Rayong District, Rayong Province

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

1. Ambient air quality - Total suspended particulate (TSP) 24hours

- Particle matter less than 10 microns(PM10)

- Wind speed and wind direction

- US.EPA 802 gravimetric method orother methods followingdetermination of government agencies

- US.EPA 076 CFR gravimetric method orother methods followingdetermination of government agencies

- Cup anemometer and anodizedaluminum vane or other methodsfollowing determination ofgovernment agencies

- Monitor 2 stations (Figure7.2-1) including1. Wat Pluak Kate school2. Royal irrigation office of

Rayong

- Monitor 1 time for7 days consecutively inequipment/machineinstallation phase

- IRPC Public CompanyLimited

2. Noise - Average noise level in 24 hours (Leq 24hr)

- Background noise (L90)- Maximum noise level (Lmax)

- IEC 60804 or IEC 61672 or othermethods following determination ofgovernment agencies

- Monitor 2 stations (Figure7.2-1) including1. Wat Pluak Kate school2. Nuen Pudsa temple

- Monitor 1 time for7 days consecutively inequipment/machineinstallation phase

- IRPC Public CompanyLimited

3. Transportation - Record traffic accident and complaintfrom communities , solution andprevention for recurrence

- Prepare a report - Construction site andtransportation route

- Over construction phase - IRPC Public CompanyLimited

Page 39: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA Report Expandable Polystyrene Plant Project 

Summary Report                                                                                                                                                                                                       ‐85‐ 

Figure 7.2‐1 Ambient Air Quality and Noise Level Monitoring Stations in Construction Phase

Page 40: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -86-

Table 7.2-1 (cont’d-1)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

4. OccupationalHealth and Safety

- Provide summary report of accident inconstruction phase for IRPC including Cause of accident or abnormal event Number of injured people Severity and damage/loss Solution/recommendation

- Prepare a report - Construction site - Report every accidentevent over constructionphase

- IRPC Public CompanyLimited

Page 41: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -87-

Table 7.2-2Environmental Impact Monitoring Measures (Operation Phase) IRPC’s EPS Plant Project

IRPC Industrial Park 299 Sukhumvit Road, Choengnoen Sub-District, Muang Rayong District, Rayong Province

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

1. Air quality1.1 Ambient air quality

(includes all activitiesaround monitoringstation)

- Average styrene in 24 hours

- Average pentane in 24 hours

- Nitrogen dioxide (NO2)

- Wind speed and wind direction

- US.EPA. Compendium MethodTO-14/TO-15 or other methodsfollowing determination ofgovernment agencies

- US.EPA. Compendium MethodTO-14/TO-15 or other methodsfollowing determination ofgovernment agencies

- Chemiluminescence Method orother methods followingdetermination of governmentagencies

- Cup Anemometer and AnodizedAluminum vane or othermethods followingdetermination of governmentagencies

- Monitor 2 stations (Figure 7.2-2)including1. Wat Pluak Kate school2. Royal irrigation office of

Rayong

- Monitor styreneand pentane once amonth for 24 hours

- Monitor nitrogendioxide twice a yearfor 7 daysconsecutively at thesame time of airquality monitoringfrom stack

- Monitor windspeed and winddirection at thesame time withambient air quality

- IRPC Public CompanyLimited

Page 42: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA Report Expandable Polystyrene Plant Project 

Summary Report                                                                                                                                                                                                       ‐88‐ 

Ambient Air Quality and Noise Level Monitoring Stations in Operation Phase Figure7.2‐2

Page 43: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -89-

Table 7.2-2 (cont’d-1)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

1.2 Air quality fromstack

- Styrene - US.EPA. Method 18 or othermethods followingdetermination of governmentagencies

- Monitor at 3 stacks including(Figure 7.2-3)1. VOCs Treatment Unit2. 03K002 : Vent 03T001A/B

(Holding Tank)3. 04K001 : Vent 04D001A/B

(Holding Tank)

- Monitor twicea year

- IRPC Public CompanyLimited

- Pentane (Pentane) - US.EPA. Method 18 or othermethods followingdetermination of governmentagencies

- Monitor at 6 stacks including(Figure 7.2-3)1. VOCs Treatment Unit2. 03K002 : Vent 03T001A/B

(Holding Tank)3. 04K001 : Vent 04D001A/B

(Holding Tank)4. 07K001 : Vent 04N003A/B

(Centrifuge)5. 05F002/07F004 : Vent, Flash

Dryer6. 10U001-M01 : Vent, Predryer,

Dryer

- Monitor twicea year

- IRPC Public CompanyLimited

- Nitrogen Oxide (NOx) - US.EPA. Method 7 or othermethods followingdetermination of governmentagencies

- Monitor 2 stations (Figure 7.2-3)including1. VOCs Treatment Unit

- Monitor twicea year

- IRPC Public CompanyLimited

- Total suspended particulate (TSP)in 24 hours

- US.EPA. Method 5 or othermethods followingdetermination of governmentagencies

- Monitor 2 stations (Figure 7.2-3)including1. 05F002/07F004 : Vent, Flash

Dryer

- Monitor twicea year

- IRPC Public CompanyLimited

Page 44: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -91-

Table 7.2-2 (cont’d-2)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

2. Water quality2.1 Effluent water after

treatment by SATs- Suspended solid (SS)

- BOD

- pH- Oil & Grease

- TKN

- Dried at 103-105 oC othermethods followingdetermination of governmentagencies

- Azide Modification othermethods followingdetermination of governmentagencies

- Electrometric Method- Soxhlet Extraction other

methods followingdetermination of governmentagencies

- Kjeldahl Nitrogen other methodsfollowing determination ofgovernment agencies

- Outlet of effluent water drainagesystem after treatment by onsitewastewater treatment unit(Figure 7.2-4)

- Monitor oncea month

- IRPC Public CompanyLimited

2.2 Effluent water aftertreatment byPretreatmentwastewater unit

- Suspended solid (SS)

- COD

- pH

- Oil & Grease

(Effluent quality value of the project must referfollowing Wastewater Specification ofwastewater treatment center 1 of IRPCindustrial zone)

- Dried at 103-105 oC or othermethods followingdetermination of governmentagencies

- Potassium Dichromate Digestionor other methods followingdetermination of governmentagencies

- Electrometric Method or othermethods followingdetermination of governmentagencies

- Soxhlet Extraction or othermethods followingdetermination of governmentagencies

- Effluent outlet of the projectbefore being drained to centralwastewater treatment 1 of IRPCIndustrial Park (Figure 7.2-4)

- Monitor oncea month

- IRPC Public CompanyLimited

Page 45: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -93-

Table 7.2-2 (cont’d-3)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

2.3 Water quality inhydrocarbon pit

- pH

- Temperature

- BOD

- COD

- Suspended solid (SS)

- Oil & Grease

- Styrene

- Total organic carbon

- Electrometric Method or othermethods following determination ofgovernment agencies

- Thermometer or other methodsfollowing determination ofgovernment agencies

- Azide Modification Method or othermethods following determination ofgovernment agencies

- Potassium Dichromate Digestion orother methods followingdetermination of government agencies

- Dried at 103-105 oC or other methodsfollowing determination ofgovernment agencies

- Soxhlet Extraction or other methodsfollowing determination ofgovernment agencies

- Purge and Trap Capillary-Column GasChromatography/Mass SpectrometricMethod or other methods followingdetermination of government agencies

- TOC Analyzer or other methodsfollowing determination ofgovernment agencies

- Hydrocarbon pit (Figure7.2-4)

- In case ofhydrocarbonleakage

- IRPC Public CompanyLimited

Page 46: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -94-

Table 7.2-2 (cont’d-4)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

3. Noise level - Average noise level in 24 hours (Leq 24 hr)- Background noise (L90)- Maximum noise level (Lmax)

- IEC 651 or IEC 804 or othermethods followingdetermination of governmentagencies

- Monitor 2 stations (Figure 7.2-2)including1. Wat Pluak Kate school2. Nuen Pudsa temple

- Twice a year for 7days consecutively

- IRPC Public CompanyLimited

4. Solid Waste - Identifying proportion and type of recycling solidwaste to whole solid waste

- Prepare a report - Project area - Every month andreport the resultevery 6 months

- IRPC Public CompanyLimited

- Providing summary report in each solidwaste types including type, volume,collection, transportation, disposal from theoperation of the project. Also, the copy oflicense for solid waste disposal must beattached in the report

- Prepare a report - Project area - Every month andreport the resultevery 6 months

- IRPC Public CompanyLimited

5. Occupational healthand safety

5.1 Workplace Air quality - Styrene

- Pentane

- NIOSH1501 or other methodsfollowing determination ofgovernment agencies

- NIOSH1500 or other methodsfollowing determination ofgovernment agencies

- Monitor 2 stations (Figure 7.2-5)including1. Reactor 12. Reactor 23. Reactor 34. Reactor 45. Reactor 5

- Four times/year - IRPC Public CompanyLimited

- Respirable dust - NIOSH0600 or other methodsfollowing determination ofgovernment agencies

- Monitor 7 stations including(Figure 7.2-6)1. First floor of product building2. Third floor of product building3. Fifth floor of product building4. Sixth floor of product building5. Operator room, second floor

of polymerization building6. Material weighting room,

second floor ofpolymerization building

7. Material weighting room,fourth floor of product building

- Four times/year - IRPC Public CompanyLimited

Page 47: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -103-

Table 7.2-2 (cont’d-5)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

5.2 Noise Level - Provide noise contour to determine loud noisearea

- IEC 651 or IEC 804 or othermethods followingdetermination of governmentagencies

- Project area - Provide noisecontour map every 3years or in case ofproduction processchange, causing noiselevel change in theproject area

- IRPC Public CompanyLimited

- Average noise level in working period (TWA) andmaximum noise level

- IEC 651 or IEC 804 or othermethods followingdetermination of governmentagencies

- Four stations in productionarea include: (Figure 7.2-7)1) First floor of

polymerization building2) Second floor of

polymerization building3) First floor of product

building4) Fourth floor of product

building

- Four times/year formonitoring. The resultmust be comparedwith the standard,noise exposure of stafffollowingregulation ofMinistry of Labor aboutOccupational Health,Safety andEnvironment inWorking Area aboutHeat, Light and NoiseB.E.2549

- IRPC Public CompanyLimited

- Noise dose - Noise Dosimeter or othermethods followingdetermination of governmentagencies

- Sapling examine staffs in loudnoise area

- Four times/year - IRPC Public CompanyLimited

- Octave band - Frequency Analyzer or othermethods followingdetermination of governmentagencies

- Four stations in productionarea include: (Figure 7.2-7)1) First floor of

polymerization building2) Second floor of

polymerization building3) First floor of product

building4) Fourth floor of product

building

- Four times/year - IRPC Public CompanyLimited

Page 48: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -108-

Table 7.2-2 (cont’d-6)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

5.3 Health Checkup Health checkup for new staff before working- Physical fitness- X-ray lungs

- Examined by doctor - New staff - Before working - IRPC Public CompanyLimited

Annual health checkup for staffs- Physical fitness- X-ray lungs- Complete blood count (CBC)- Liver function (GOT and SGPT)- Renal function examination

- Examined by doctor - All staffs - Once a year - IRPC Public CompanyLimited

Health checkup from health risk- Audiography- Examine derivative styrene in urine

- Examined by OccupationalPhysician

- All staffs - Once a year - IRPC Public CompanyLimited

5.4 Record Accidentaland Illness of Staffs

- Record accident including cause, loss,solution and recurrence method

- Prepare a report - Project area - Record everymonth andreport theresult every6 months

- IRPC Public CompanyLimited

- Record illness of staffs - Prepare a report - Project area - Record everymonth andreport theresult every6 months

- IRPC Public CompanyLimited

6. Transportation - Record traffic accident, mitigation measuresand recurrence method

- Prepare a report - Project area - Record everymonth andreport theresult every6 months

- IRPC Public CompanyLimited

Page 49: Environmental Impact Assessment (Summary Report) EPS.pdf · EIA Report Expandable Polystyrene Plant Project CONTENT II CONTENT (Cont’d-1) Content Page 3.4 Quality of Life Value

EIA ReportExpandable Polystyrene Plant Project

Summary Report -109-

Table 7.2-2 (cont’d-7)

EnvironmentalComposition Monitoring Parameter Analytical Method/Measure Monitoring Station Frequency Person in Charge of

7. Socio-economiccondition

- Recording complaint of the project andmake a summary report including complaint,solution and measure to prevent recurrence

- Prepare a report - Project area - Once a year - IRPC Public CompanyLimited

- Surveying socio-economic conditionincluding socio-economic change, householdproblem and demand, attitudes of localpeople, community leader, representativesof related government agencies andbusiness owner around the project location.The socio-economic monitoring area shouldbe the same of environmental monitoringstation. Also, community satisfaction indexmust be monitored

- Survey and sample size must beconducted following method andstatistics

- The areas are in 5 km around theproject location and the areas ofenvironmental monitoringactivities (Figure 7.2-8)

- Once a year - IRPC Public CompanyLimited


Recommended