Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Date post: 20-May-2015
Category:
Upload: dscrivenyoung
View: 1,478 times
Download: 0 times
Share this document with a friend
Description:
Presented to Environmental Law Committee of Chicago Bar Association Young Lawyers Section on March 24, 2011
Popular Tags:
18
Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases Dave Scriven-Young Peckar & Abramson, P.C. 208 S. LaSalle Street Suite 1356 Chicago, IL 60604 (312) 239-9722 dscriven- [email protected]
Transcript
Page 1: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Environmental Issues in Land Development:

Legal Requirements and Recent Enforcement Cases

Dave Scriven-YoungPeckar & Abramson, P.C.208 S. LaSalle StreetSuite 1356Chicago, IL 60604(312) [email protected]

Page 2: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Legal Requirements: Why Comply?

• Civil Penalties

• Criminal Penalties (fines and/or jail time)

• Superfund Liability

• Citizen Lawsuits

• Project Delays

• Injured Workers

Page 3: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Storm Water Runoff • Construction activities that disturb one or more acres of land

 • Obtain Clean Water Act permit coverage for discharge of

storm water runoff from the construction site 

o General permits issued through National Pollutant Discharge Elimination System (NPDES) program

 • Develop and implement Storm Water Pollution Prevention

Plan 

o Describes physical characteristics of the site, lists potential sources of pollutants, and identifies erosion prevention, sediment control, and storm water management practices to be implemented

Page 4: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Discharges to Waters of the United States

Clean Water Act Section 404 permits needed for discharge of • Dredged material (i.e., excavated materials from waters of

the United States) • Fill material (i.e., material that replaces an aquatic area with

dry land or changes the bottom elevation of a water body)

Page 5: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Solid and Hazardous Wastes

• Spent cleaners (e.g., organic solvents)

 • Used oil

 • Wastes that contain

ignitable and corrosive materials

• Paints, including lead-based paints

 • Paint thinners

 • Polychlorinated biphenol

wastes (e.g., fluorescent light ballasts, transformers)

 • Wastes that contain

certain toxic pollutants

Page 6: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Solid and Hazardous Wastes

Resource Conservation and Recovery Act (RCRA) imposes requirements for managing, treating, and disposing of hazardous wastes.  For example: • RCRA specifies the time hazardous wastes can be stored at

a site.  If the storage time is exceeded, a RCRA permit is required.

 • The generator is responsible for ensuring that a tranporter is

a registered hazardous waste transporter and that the hazardous waste is delivered to a RCRA-permitted treatment or disposal facility.

Page 7: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Solid and Hazardous Wastes

Renovation, Repair and Painting (RRP) Rule • Contractors performing renovation, repair and painting

projects that disturb lead-based paint in homes, child care facilities, and schools built before 1978 must be certified and must follow specific work practices to prevent lead contamination.

Page 8: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Solid and Hazardous Wastes

Residential Property Renovation Rule • Requires persons who renovate "target housing" (built prior

to 1978) to provide a lead hazard information pamphlet to the owner and occupant prior to the renovation.

Page 9: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Solid and Hazardous Wastes

Storage tanks (above ground or underground tanks) for petroleum products, such as gas or diesel fuel • Environmental requirements under RCRA and other statutes

dictate how you store, label, and dispose of these materials, and plan for spill prevention.

  

Page 10: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Spill Reporting

Emergency Planning and Community Right-to-Know Act (EPCRA) contains emergency planning and reporting requirements. • If more than the reportable quantity of a hazardous chemical

is spilled or released, the spill or release must be reported to the proper authorities.

 • Material safety data sheets (MSDS) for all materials

containing hazardous chemicals must be maintained onsite.

Page 11: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Asbestos

National Emission Standard for Hazardous Air Pollutants (NESHAP) for asbestos, established under the Clean Air Act • Submit written notice of intent to renovate or demolish 10

working days prior to starting any construction activities.  Notifications must include the scheduled starting and completion dates of the work, the location of the site, the names of operators or asbestos removal contractors, methods of removal and the amount of asbestos, and whether the operation is a demolition or a renovation.

Page 12: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Asbestos

• Asbestos NESHAP mandates zero visible air emissions from construction activities: Specific work practices include sufficiently wet any asbestos-containing materials to prevent release of fibers prior to, during, and after renovation/demolition activities and until disposal.

Page 13: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Other Considerations

• National Environmental Policy Act (e.g., Environmental Impact Statements)

 • National Historic

Preservation Act

• Endangered Species Act

Page 14: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Enforcement

Improper removal and disposal of asbestos • Russell Coco (construction supervisor) pled guilty in U.S.

District Court for the Southern District of Iowa to one count of conspiracy to violate the Clean Air Act and one count of failing to remove all regulated asbestos-containing material before commencement of the renovation project.

 • Coco agreed to face up to one year in prison and a fine up

to $250,000.

Page 15: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Enforcement

Clean Water Act • Highway Construction Company agrees to pay $60,000 civil

penalty for performing unpermitted fill activities that impacted a section of a nearby stream and three acres of adjacent wetlands.

 • EPA assesses $15,000 penalty against Sharp Homes-

Hunter's Ridge Development.  Construction on land being developed for homes allegedly caused discharges of storm water through sewers, surface runoff and discharge pipes to a tributary to the Illinois River.

Page 16: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Enforcement

Clean Water Act • Beazer Homes USA, Inc. agrees to pay $925,000 civil

penalty to resolve violations at construction sites in 21 states.   Beazer will also implement a company-wide stormwater program to improve compliance with storm water runoff requirements.

Page 17: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Enforcement

Residential Property Renovation Rule • US EPA files against Hanson's Window and Construction,

Inc. 542-count complaint requesting $784,380 in civil penalties. 

Page 18: Environmental Issues in Land Development: Legal Requirements and Recent Enforcement Cases

Thank You!