_______________________________________________________________________________________ Muny Consultants (Pty) Ltd Reg. No. 201802611907. Maxwell Office Park, Building 4, Magwa Crescent, Waterfall City, 2090 [email protected], www.munyconsult.com _______________________________________________________________________________________ Directors: MC Moeketsane
Environmental Management
Programme for the proposed
Upgrading of the Tembisa Extension
25 Bulk Outfall Sewer, Gauteng
Environmental Management
Programme (EMPr)
Authority Reference Number:
Provincial Authority GDARD: (002/1920/E0182)
Project Number:
TSG 0708
Prepared for:
Tangos Consultants (Pty) Ltd
November 2019
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 2
This document has been prepared by Muny Consultants.
Report Type: Draft Environmental Management Programme
Project Name:
Environmental Management Programme for the proposed
Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer,
Gauteng
Project Code: TSG 0708
Name Responsibility Signature Date
Mamane Moeketsane Report Compiler
November 2019
Tinashe Maramba Report Reviewer
November 2019
Tendai Munyoro Project Sponsor
November 2019
This report is provided solely for the purposes set out in it and may not, in whole or in part, be used for any other purpose
without Muny Consultants prior written consent.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 3
Abbreviations and Acronyms
BAR Basic Assessment Report
Bgl Below Ground Level
BID Background Information Document
CEC Cation Exchange Capacity
CoE City of Ekurhuleni
C Plan Conservation Plan
CRR Comments and Response Report
DEA Department of Environmental Affairs
DWS Department of Water and Sanitation (previously Department of Water Affairs)
EA Environmental Authorisation
EAP Environmental Assessment Practitioner
EIA Environmental Impact Assessment
EMP Environmental Management Programme
FEL Front End Loader
GDARD Gauteng Department of Agriculture and Rural Development
GN R. Government Notice Regulation
HIA Heritage Impact Assessment
I&APs Interested and Affected Parties
IBA Important Bird Area
IDP Integrated Development Plan
IWWMP Integrated Water and Waste Management Plan
LDV Light Duty Vehicle
LED Local Economic Development
LHD Load-Haul-Dump
MAE Mean Annual Evaporation
mamsl Metres above mean sea level
MAP Mean Annual Precipitation
NEMA National Environmental Management Act, Act No. 107 of 1998
NEMBA National Environmental Management: Biodiversity Act, Act No. 10 of 2004
NEMWA National Environmental Management: Waste Act, Act No. 59 of 2008
NFEPA National Freshwater Ecosystem Priority Area
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 4
NGO Non-Governmental Organisation
NID Notice of Intent to Develop
NWA National Water Act, Act No. 36 of 1998
PES Present Ecological Status
PHRA-G Provincial Heritage Resources Agency - Gauteng
PPP Public Participation Process
SAHRA South African Heritage Resources Agency
SANS South African National Standards
SSC Species of Special Concern
TOR Terms of Reference
WML Waste Management Licence
Units of Measure
µg/m3 Micro grams per cubic meter
dBA Decibels
Ha Hectare
kV Kilovolt
km Kilometres
m metres
m2 Square metres
m3 Cubic metres
mS/m Millisiemens per Metre
mg/l Milligrams per litre
mm Millimetres
mm/a Millimetres per annum
PPB Parts Per Billion
PPM Parts Per Million
Tph Tonnes Per Hour
Tpm Tonnes Per Month
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 5
Executive Summary
Introduction
An area was identified by the CoE Human Settlement Department and zoned for residential
and recreational development, named Tembisa X25. The development township is situated
approximately 15km from the Kempton Park City Centre, south of Clayville Industrial Area and
the Olifantsfontein Road (R562) and north of the Tembisa Hospital. Tangos Consultants was
appointed by the CoE to investigate the existing sewage infrastructure (Tembisa East Outfall
Sewer) with the view of draining sewer flows from the proposed Tembisa X25 development.
A total of 125 houses were expected to be commissioned by December 2018 as part of phase
1 of the development. The Tembisa X25 development would have a grand total of 3510
Residential 2 (Phase 2) households (middle income housing).
Tembisa East Outfall Sewer is currently draining the north eastern area of Tembisa, the south-
western area of Olifantsfontein and parts of Clayville east. There is evidence of sewage
overflow at certain manholes. The flow loggings conducted on the Tembisa X25 outflow sewer
have confirmed that the overflows are due to insufficient capacity of the sewer. The drainage
system challenges are compounded by the aging infrastructure, high sedimentation of sand
and solids, as well as vandalism of the existing outfalls.
The proposed upgrade of the sewer outfall requires an Environmental Authorisation (hereafter
EA) and a Water Use Licence (hereafter WUL) prior to commencement of construction
activities. The EA application was undertaken in line with the requirements of the National
Environmental Management Act, 1998 (Act No. 107 of 1998) as amended (NEMA) and the
supporting Water Use Licence Application (WULA) in line with the National Water Act, 1998
(Act No. 36 of 1998) (NWA).
Project Applicant
The details of the applicant are detailed in the table below.
Project Applicant: City of Ekurhuleni
Contact Person: Dikeledi Malatji
Telephone Number 011 999 3825
Email Address [email protected]
Physical Address
Water Services Depot
Cnr Vlei Rd & Tenth Rd
Crystal Park, Benoni
1515
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 6
Environmental Consultant
Contact details for the independent EAP are provided in the table below
EAP Company Name: Muny Consultants (Pty) Ltd
EAP: Mamane Moeketsane
Telephone Number 010 005 5770
Email Address [email protected]
Physical Address
Maxwell Office Park
Building 4
Magwa Crescent
Waterfall City
2090
Purpose of this report
The overarching objectives of this Basic Assessment Report (BAR) were to:
■ Identify and assess potential environmental impacts associated with the proposed
Project; and
■ Recommend mitigation and management measures to ensure that the development
was undertaken in such a way as to minimise negative impacts.
This report also provides the status quo of the biophysical and socio-economic environment
of the project area through specialist studies undertaken. Furthermore, an Environmental
Management Programme (EMP) was developed to mitigate and manage environmental
impacts associated with each project activity.
Project Overview
An area was identified by the CoE Human Settlement Department and zoned for residential
and recreational development, named Tembisa X25. Tembisa X25 township is situated
approximately 15km north of Kempton Park city centre, south of Clayville industrial area and
the Olifantsfontein road (R562), east of Winnie Mandela Park and north of the Tembisa
Hospital. It is approximately 2km west of the R21 Highway which links Pretoria and OR Tambo
International Airport. The site bisects Reverend RTJ Namane Road on the east and shares a
boundary with Tembisa Hospital.
Tangos Consultants were appointed by the CoE to investigate the existing sewer infrastructure
(Tembisa east outfall sewer) with view of draining sewer flows from the proposed Tembisa
X25 development. The Outfall Sewer drains sewage from sewer lateral pipes branching from
the eastern side of Tembisa, Clayville industrial, Clayville east and several Clayville extensions
on the northern side of Clayville.
A new township development – Tembisa X25 – is currently under construction; the sewer
lateral pipes from Tembisa X25 are to be connected to the Outfall Sewer.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 7
The proposed development would drain sewerage into the existing outfall sewer which starts
upstream of RTJ Namane Road within the Moriting sub-township of Tembisa and traverses
through the development site for the proposed township, through Clayville industrial and
across several ERF stands in the northern part of Clayville all the way into the Olifantsfontein
Waste Water Treatment Works (WWTW). The scope of work considered in this PDR only
starts downstream of RTJ Namane Road (next to Moriting Primary school) and ends across
S-view road (before the pipe bridge)
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 8
1 Details of the EAP
Muny Consultants has been appointed by Tangos Consultants as the independent
Environmental Assessment Practitioner (EAP) to conduct the Basic Assessment (BA) process
according to the NEMA and EIA Regulations, 2014 (as amended), as well as the required
Public Participation Process (PPP). As part of the BA process, an EMPr has to be formulated
to comply with Section 19 (1) (a) of the EIA Regulations, 2014 (as amended). The details of
the EAP undertaking the EMPr are supplied in Table 1.
Table 1 : Details of the EAP
EAP Company Name: Muny Consultants (Pty) Ltd
EAP: Mamane Moeketsane
Telephone Number 010 005 5770
Email Address [email protected]
Physical Address
Maxwell Office Park
Building 4
Magwa Crescent
Waterfall City
2090
1.1 Expertise of the EAP
1.1.1 The Qualifications of the EAP
Mamane is a Senior Environmental Consultant Muny Consultants. She holds a BSc (Hons)
in Environmental and Water Sciences from the University of the Western Cape. Mamane has
over five (5) years of relevant experience in the field of Environmental Management. Her key
area of expertise lies in undertaking environmental permitting applications and the planning
and management thereof. Mamane has a working knowledge of the South African regulatory
guidelines and has been involved in various regulatory processes.
1.1.2 Summary of the EAP’s Past Experience
During her time at Muny Consultant Mamane has been responsible for the compilation of EIAs,
EMPs and Basic Assessment Reports (BARs), as required by South African legislation.
Further to this, Mamane has been involved in Performance Assessments, Legal Compliance
and Water Use License Audits. She has extensive experience with the ISO 14001
Environmental Management System (EMS) as well as worked as an Environmental Officer on
various developments. Please refer to Mamane Moeketsane’s CV attached as Appendix A.
2 Project Applicant
The details of the Applicant are provided in Table 2 below:
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 9
Table 2: Details of the Applicant
Project Applicant: City of Ekurhuleni
Contact Person: Dikeledi Malatjie
Telephone Number 011 999 3825
Email Address [email protected]
Physical Address
Water Services Depot
Cnr Vlei Rd & Tenth Rd
Crystal Park, Benoni
1515
3 Description of the aspects of the activity
The National Environmental Management Act, 1998 (Act No. 107 of 1998) as amended
(NEMA) provides the environmental legal framework for South Africa. The listed activities that
require environmental authorisation have been outlined in the EIA Regulations 2014 (as
amended).
■ Regulation GN R. 327 – Listing Notice 1 (as amended): This listing notice provides a
list of various activities which require environmental authorisation and must follow the
Basic Assessment process as described in Regulation 19 and Regulation 20 of the
NEMA EIA Regulations; and
■ Regulation GN R. 324 – Listing Notice 3 (as amended): This notice provides a list of
various environmental activities which have been identified by provincial governmental
bodies. The undertaking of such activities within the stipulated provincial boundaries
will require environmental authorisation and the Basic Assessment process as
described in Regulation 19 and Regulation 20 of the NEMA EIA Regulations.
3.1 Listed and Specified Activities
The proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer requires an
environmental authorisation prior to the commencement of construction works. This
application aims to obtain environmental authorisation for the proposed project in City of
Ekurhuleni. The following Listed Activities as shown in Table 3 will be triggered by the
proposed project.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng TSG 0708
Muny Consultants (Pty) Ltd 10
Table 3: Listed and Specified Activities
Listing Notice and Activity Listed Activity and trigger as per the project description Aerial extent
GNR 327, 7 April 2017 (Listing Notice 1):
Activity 12
The development of
(i) dams or weirs, where the dam or weir, including infrastructure and water surface area, exceeds 100 square metres; or
(ii) infrastructure or structures with a physical footprint of 100 square metres or more;
where such development occurs:
(a) within a watercourse;
(b) in front of a development setback; or
(c) if no development setback exists, within 32 metres of a watercourse, measured from the edge of a watercourse;
GNR 327, 7 April 2017 (Listing Notice 1):
Activity 19
The infilling or depositing of any material of more than 10 cubic metres into, or the dredging, excavation, removal or moving of soil, sand, shells, shell grit, pebbles or rock of more than 10 cubic metres from
(i) a watercourse;
but excluding where such infilling, depositing, dredging, excavation, removal or moving—
(a) will occur behind a development setback;
(b) is for maintenance purposes undertaken in accordance with a maintenance management plan;
(c) falls within the ambit of activity 21 in this Notice, in which case that activity applies;
(d) occurs within existing ports or harbours that will not increase the development footprint of the port or harbour; or
(e) where such development is related to the development of a port or harbour, in which case activity 26 in Listing Notice 2 of 2014 applies.
GNR 324, 7 April 2017 (Listing Notice 3):
Activity12
The clearance of an area of 300 square metres or more of indigenous vegetation except where such clearance of indigenous vegetation is required for maintenance purposes undertaken in accordance with a maintenance management plan.
c. Gauteng
i. Within any critically endangered or endangered ecosystem listed in terms of section 52 of the NEMBA or prior to the publication of such a list, within an area that has been identified as critically endangered in the National Spatial Biodiversity Assessment 2004;
ii. Within Critical Biodiversity Areas or Ecological Support Areas identified in the Gauteng Conservation Plan or bioregional plans; or
GNR 324, 7 April 2017 (Listing Notice 3):
Activity14
The development
of—(xii) infrastructure or structures with a physical footprint of 10 square metres or more;] where such development occurs—
(a) within a watercourse; and
(c) if no development setback has been adopted, within 32 metres of a watercourse, measured from the edge of a watercourse;
c. Gauteng
iii. Gauteng Protected Area Expansion Priority Areas;
iv. Sites identified as Critical Biodiversity Areas (CBAs) or Ecological Support Areas (ESAs) in the Gauteng Conservation Plan or in bioregional plans;
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 11
3.2 Description of the Activities to be undertaken
3.2.1 Project Overview
Tangos Consultants were appointed by the CoE to investigate the existing sewer infrastructure
(Tembisa east outfall sewer) with view of draining sewer flows from the proposed Tembisa
X25 development. The Outfall Sewer drains sewage from sewer lateral pipes branching from
the eastern side of Tembisa, Clayville industrial, Clayville east and several Clayville extensions
on the northern side of Clayville.
Tembisa East Outfall Sewer is currently draining the north eastern area of Tembisa, the south-
western area of Olifantsfontein and parts of Clayville east. There is evidence of sewage
overflow at certain manholes. The flow loggings conducted on the Tembisa X25 outflow sewer
have confirmed that the overflows are due to insufficient capacity of the sewer. The drainage
system challenges are compounded by the aging infrastructure, high sedimentation of sand
and solids, as well as vandalism of the existing outfalls.
The recommended scope of works includes the construction and testing of a 6.5km Concrete
Bulk Outfall Sewer Pipeline ranging between 525mm and 1200mm in diameter. The works will
also include the construction of concrete pipe support columns, across streams, construction
of junction boxes, installation of manholes, road crossings and river/stream crossings.
Figure 1: Image of an overflowing manhole along the Tembisa X25 sewer pipeline
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 12
Figure 2: Image of pollution in a tributary of the Kaalspruit River
3.3 Specialist Studies
It should be noted that the following specialist studies have been undertaken for the proposed
project:
■ Biodiversity Impact Assessment;
■ Wetland Delineation and Impact Assessment;
■ Surface Water Impact Assessment
4 Composite Map
The composite plan for the project area, indicating biodiversity sensitive areas, heritage
resources, watercourse buffers, is depicted in Figure 3 below.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 13
Figure 3: Composite Map
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 14
5 Description of Impact Management Objectives including
Management Statements
The EMPR seeks to achieve a required end state and describes how activities that have, or
could have, an adverse impact on the environment will be mitigated, controlled and monitored.
The EMPR will address the environmental impacts during the construction and operational
phases of the proposed project. Due regard must be given to environmental protection during
the entire project; various environmental recommendations are made to achieve overall
environmental protection. These recommendations are aimed at ensuring that the contractor
maintains adequate control over the proposed project to:
■ Minimise the extent of an impact during the life of the proposed project;
■ Ensure appropriate restoration of areas affected by the proposed project; and
■ Prevent long term environmental degradation.
5.1 Volumes and Rate of Water Use required for the Operation
It is unknown at this stage as to the volume of water required for the proposed constructions.
5.2 Has a Water Use Licence has been applied for
Water use authorisation has been sought from the Department of Water and Sanitation (DWS)
for the triggered water uses under Section 21 and Government Notice 509 of the NWA.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 15
6 Impacts to be Mitigated in their Respective Phases and Impact Management Outcomes
The proposed mitigation measures and its compliance with the relevant standards are presented in Table 4 below.
Table 4: Impacts to be mitigated and Objectives
Activity and Identified
Impact
Aspect
Affected Environmental Objective Phase Mitigation Measures Responsibility
Time period for
implementation
Pre-Construction Phase
Appointment of
Contractors
Non-compliance to the
EMPr and conditions set
out in the EA and WUA
All aspects of
the
environment
To ensure that the EMPr and
EA conditions are
enforceable under the
general terms and
conditions of the contracts
Pre-
Construction
The EMPr and EA document must be included as part of tender documentation for all contractor
appointments;
All appointed contractors must sign an undertaking to ensure that environmental documents (EMPr,
EA and WUA conditions) will be implemented all phases of the project.
Applicant
Contractor
Pre-
Construction
Pipeline route and
design
The location of pipeline
infrastructure within
delineated water
resource areas and
within regulated areas of
watercourses as defined
in the NWA
Flora;
Wetlands;
Surface
Water;
Noise
pollution;
Traffic
To ensure stability of the
pipeline and operational
efficiency
To prevent and minimise
impacts to identified
freshwater features in
proximity of the pipeline and
those that the pipeline
crosses
Pre-
Construction
Ensure that as far as possible all infrastructures result in the least disturbance to delineated water
resource features present;
Ensure that sound environmental management is in place during the planning phase e.g. ensure that
all site documentation to be drafted including method statements are approved by the ECO;
Ensure that during the planning phase stormwater control measures such as the construction of
berms to prevent gully formation, siltation of freshwater resources as well as contamination of surface
water resources are implemented. This must be prioritised in areas where the pipeline crosses a
watercourse;
Ensure that the design of the pipeline infrastructure is environmentally and structurally sound and all
possible precautions are taken to prevent possible bulk water spillages into surface water resources;
All landowners and neighbours must be made aware of the commencement of construction activities;
A complaints register must be prepared and neighbours / landowners must be made aware of the
process to lodge any complaints or issues;
A traffic management plan must be formulated to ensure that traffic impacts have minimal effect on
users;
All necessary transportation permits should be applied for at this stage and obtained from the relevant
authorities, including permits for abnormal loads if relevant. Oversee development of permits required
by contractors.
Engineer
Contractor
ECO
Pre-
Construction
Phase
Establishment of the
Construction site
camp
Disturbance to the
environment and
contamination of water
resources
Flora;
Soil & Land
Capability;
Freshwater
features;
Groundwater
To control the temporary
storage of waste and
hazardous material;
To ensure that the storage of
waste and hazardous
material does not result in
pollution of the environment
Pre-
Construction
The construction site camp should preferably be located in an already disturbed area
During the planning of the construction site camp layout, ensure that the site layout makes provision
for a storage area for hazardous material. This storage area must be concreted, bunded, covered,
labelled and well ventilated;
The waste skip that will contain hazardous waste will be kept within a bunded area;
An emergency spillage response plan and spill kits should be in place and accessible to the
responsible monitoring team. The Material Safety Data Sheets (MSDS) for all hazardous substances
shall be kept on site during construction for reference at any time in terms of handling, storage and
disposal of materials;
If the contractor will repair or maintain vehicles at the site camp, the site camp layout plan must make
provision for a bunded maintenance area;
The location of the laydown area, hazardous material storage, waste area including hazardous waste
and ablution facilities should not be located within sensitive areas.
Contractor
ECO
Pre-
Construction
Phase
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 16
Activity and Identified
Impact
Aspect
Affected Environmental Objective Phase Mitigation Measures Responsibility
Time period for
implementation
Construction Phase
Construction site
access
Disturbance to
indigenous vegetation
and soil compaction and
erosion caused by
vehicles and heavy
machineries
Flora;
Soil & Land
Capability
To avoid soil compaction
and erosion;
To avoid disturbance to
indigenous vegetation
Construction
Clearly mark the site access points and routes to be used by construction vehicles;
Site access map must be provided to all drivers. The drivers must be instructed to use access points
and route as highlighted on the site access map;
Access to site must be gained through use of existing roads;
The contractor must use the existing tracks that run along the pipeline servitude for access;
The areas that were disturbed e.g. areas used for parking, must be ripped and reseeded during
rehabilitation.
Construction vehicles and machinery repairs must only take place a designated workshop area at the
construction camp;
Contractor
ECO
Site supervisor
Construction
phase
Construction site
setup
Disturbance to
indigenous vegetation
and potential
contamination of water
resources
Flora;
Soil & Land
Capability;
Freshwater
features;
Groundwater
To avoid destruction of
vegetation;
To prevent contamination of
surface and groundwater
Construction
Ensure that all equipment e.g. generator, waste bins, spill kit and hazardous material are kept outside
freshwater resources including wetlands. A buffer zone of at least 15m from the outer edge of the
wetland must be maintained when setting up on site;
Ensure that the area to be designated as parking area is outside of water resources. If possible,
choose an already disturbed area. A buffer zone of 15m from the outer edge of a wetland must be
maintained.
Stockpiling of the pipes to be installed must be limited to only what is required and only be stored in
designated areas to avoid any unnecessary impact to drainage lines. No pipes or any materials shall
be stored within 100m from the watercourse.
Ensure that stationery vehicles have a drip tray placed underneath;
All hazardous material including oil and paint should be kept within a drip tray while on site and away
from fresh water features;
An emergency spillage response plan and spill kits should be in place and accessible to the
responsible monitoring team. The Material Safety Data Sheets (MSDS) for all hazardous substances
shall be kept on site during construction for reference at any time in terms of handling, storage and
disposal of materials.
Contractor
ECO
Construction
phase
Vegetation clearing
Removal of the natural
vegetation and
Disturbance to animals
on site
Fauna;
Flora
To prevent the spread of
alien invasive plant species;
To minimise the negative
impact on faunal species
found on site
Construction
Clearing of vegetation must be kept within a 10 m servitude during the construction phase;
Areas designated for vegetation clearing should be identified and visibly marked off;
Ensure that vegetation clearing and indiscriminate vehicle driving does not occur outside of the
demarcated areas;
A suitable Alien and Invasive Plants control programme must be put in place so as to prevent any
encroachment as a result of disturbance to the surrounding terrestrial zones;
Existing access roads must be utilised to gain access to the servitude.
Exposed areas should be rehabilitated with indigenous plants to the project area as soon as
construction is finished.
Do not disturb nests, breeding sites or young ones (especially around the wetlands that the pipeline
with run at a tangent to).
Do not attempt to kill or capture snakes unless directly threatening the safety of employees;
Dogs or other pets are not allowed to the worksite as they are threats to the natural wild animal;
A low speed limit should be enforced on site to reduce wild animal-vehicle collisions;
No animals should be intentionally killed and poaching and hunting should not be permitted on the
site;
Severe contractual fines must be imposed and immediate dismissal on any contract employee who
is found attempting to snare or otherwise harm remaining faunal species.
Contractor
ECO
Construction
phase
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 17
Activity and Identified
Impact
Aspect
Affected Environmental Objective Phase Mitigation Measures Responsibility
Time period for
implementation
The ECO must conduct regular site inspections of removing any snares or traps that have been
erected.
Employees and contractors should be made aware of the presence of, and rules regarding, flora and
fauna through suitable induction training and on-site signage.
Vegetation clearing
Increased soil erosion,
increase in silt loads
and sedimentation
Soil & Land
Capability;
Freshwater
features
To prevent unnecessary loss
of soil;
To prevent siltation of water
resources
Construction
A storm water management plan must be compiled for the construction and operational phase of the
pipeline. The stormwater design for the bulk water pipeline must:
Reduce / prevent siltation, erosion and water pollution;
Avoid concentration of storm water runoff and allow for sheet flow;
Following construction, rehabilitation of disturbed areas is required; especially next to the drainage
lines the pipeline crosses.
Avoid areas with sensitive soils, steep slopes during rain or windy season.
During the construction phase, berms should be installed to prevent gully formation and siltation of
the freshwater resources. The following points should serve to guide the placement of berms. The
material for the construction of the berms must be sourced legally by the contractor appointed to
construct the pipeline:
Where the track has slope of less than 2%, berms every 50 m should be installed;
Where the track slopes between 2% and 10%, berms every 25 m should be installed;
Where the track slopes between 10%-15%, berms every 20 m should be installed; and
Where the track has slope greater than 15%, berms every 10 m should be installed.
Cutting/clearing of the herbaceous layer within the wetland areas along the linear development should
be avoided so as to retain soil stability provided by the grass root structures;
Ensure that all activities impacting on the wetland features are managed according to the relevant
DWS Licensing regulations (where applicable).
Contractor
ECO
Construction
phase
Excavation and soil
stockpiling
Increased soil erosion
Soil & Land
Capability;
Freshwater
features
To prevent unnecessary loss
of soil;
To prevent siltation of water
resources
Construction
A storm water management plan must be compiled for the construction and operational phase of the
pipeline. The stormwater design for the bulk water pipeline must:
Reduce / prevent siltation, erosion and water pollution;
Avoid concentration of storm water runoff and allow for sheet flow;
Do not stockpile soil for more than four (4) months;
Earth works e.g. excavation, must be prioritised during the dry winter season;
The speed limit on site should be kept at 20kmph to minimise dust generation;
Install stormwater control measures e.g. berms around stockpiled soil to minimise the impact of
surface water runoff.
Contractor
ECO
Construction
phase
Waste generation
Pollution due to
concrete, sewage, oil
and fuel spills.
Soil & Land
Capability;
Freshwater
features;
Groundwater
To control the temporary
storage of waste and
hazardous material;
To ensure that the storage of
waste and hazardous
material does not result in
pollution of the environment
Construction
Ensure that all stationery vehicles have a drip tray underneath;
Ensure that there is always a spill kit available;
Should a spill occur, ensure that it is cleaned up immediately and the contaminated soil is stored as
hazardous waste;
Proper ablution facilities on site must be provided. These facilities must be cleaned and emptied
regularly
The sewage must be collected by a registered contractor and nust be disposed of at a registered
waste water treatment works. Proof of disposal must be kept on site.
Use a plastic sheeting while pouring concrete on site. This is to ensure that the concrete does not
spill on bare soil and it facilitates a quick and easy clean up;
Ensure regular monitoring of the pipeline to ensure that there are no leaks;
Contractor
ECO
Construction
phase
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 18
Activity and Identified
Impact
Aspect
Affected Environmental Objective Phase Mitigation Measures Responsibility
Time period for
implementation
Hazardous material must be kept within a drip tray while on site and stored within a bund area at the
construction site camp.
All spills must be reported to the ECO;
No vehicles or machineries may be maintained/repaired on site. This must be done at a workshop
area within a bund wall;
Proper Standard Operating Procedures in place regulating refuelling and other potential polluting
activities.
Waste generation
Mishandling of
construction waste
Soil & Land
Capability;
Freshwater
features;
Groundwater
To ensure that waste
management in
implemented correctly on
site
Construction
Sanitation services must be provided for construction personnel whereby at least one portable toilet
will be provided for fifteen (15) employees. These facilities must be cleaned and emptied regularly;
The sewage must be collected by a registered contractor and must be disposed of at a registered
waste water treatment works. Proof of disposal must be kept on site;
All construction employees and visitors must undergo an environmental induction by ECO. The ECO
must clearly highlight the management of waste on site;
The construction waste generated on site must be separated into their waste streams i.e. general
waste, construction rubble, hazardous waste, scrap metal and other construction waste;
All bins and skips must be clearly labelled to indicate the waste stream;
The waste skip containing hazardous waste must be kept within a concreted, bunded area;
Use a licensed waste contractor for the collection of waste generated on site. The collected waste
must be disposed off at a registered/authorised landfill site and proof of disposal must be kept;
The ECO should keep all records of waste generated and disposed off. A waste register must be part
of these records.
Building rubble must be re-used where possible;
Do not bury wastes on-site;
Burning of waste is not allowed.
Contractor
ECO
Construction
phase
Installation of the
pipeline
Contamination of the
freshwater features
and groundwater;
Loss of wetland
Features Habitat and
Ecological Structure
Changes to
Ecological and Socio-
Cultural Services
Provision
Loss of hydrological
function and sediment
balance
Wetlands;
Surface
Water
Groundwater
To prevent the
contamination of wetlands,
surface water and
groundwater
Construction
The wetland areas which will be affected by the bulk water pipeline construction must be kept to a
minimum;
The disturbed freshwater features need to be rehabilitated immediately after construction;
Soil stockpiles should be kept outside of the 15m buffer from the outer edge of delineated wetlands;
All hazardous materials such as oil, paint and other chemicals must be used outside of the 15m buffer
zone;
Use plastic sheeting under equipment when preparing concrete on site. Ensure that the preparation
of the said concrete takes place outside of the 15m buffer zone from the outer edge of a delineated
wetland;
Use a plastic sheeting while pouring concrete on site. This is to ensure that the concrete does not
spill on bare soil and it facilitates a quick and easy clean up;
Spilled concrete should be cleaned up immediately;
Employees and contractors must be trained on the correct handling of spillages and precautionary
measures to be implemented to minimise potential spillages;
Contractor
ECO
Construction
phase
Post Construction Phase
Decommissioning the
Construction site
camp
All aspects of
the
environment
To prevent further
disturbance of the
environment
To ensure that no material or
structures are left behind
Post
Construction
Ensure that waste is collected from storage areas for off-site disposal at a registered landfill site;
Ensure that all office containers that were used are removed off site;
Ensure that any fence that was erected for the purpose of the site camp is removed;
Ensure that any rubble waste generated through decommissioning of the site camp is removed off
site and if it cannot be reused, it must be disposed off-site at a registered landfill site;
Contractor
ECO
Immediately
after
construction
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 19
Activity and Identified
Impact
Aspect
Affected Environmental Objective Phase Mitigation Measures Responsibility
Time period for
implementation
Increased
environmental
degradation
Ensure that the area that was used as the site camp is rehabilitated through ripping (at least 300mm
deep) and re-vegetation;
Ensure that an indigenous grass seed mix is used for revegetating disturbed areas.
Monitor rehabilitated areas until 80% coverage has been achieved
Rehabilitation
Inadequate
establishment of
vegetation after
rehabilitation
Flora,
Wetland
ecology
To ensure that all disturbed
areas are rehabilitated and
good vegetative cover has
been established
Post
Construction
Implement the agreed schedule of alien invasive plant species;
Re-seed all areas that failed to establish a good vegetative cover within three-months after initial re-
seeding;
Upon completion of construction and rehabilitation, the ECO must assess and approve the adequacy
of the rehabilitation;
The ECO must ensure that adequate levels of rehabilitation have been undertaken to allow re-
establishment of vegetation;
Rehabilitation works should be monitored until 80% of vegetation has been established.
Contractor
ECO As agreed
Final monitoring
report
All aspects of
the
environment
To report of the state of the
environment
Post
Construction
The ECO must undertake the final inspection of the site and sign off that the EMPr, EA and WUA
conditions have been complied with or identify areas of non-compliance. The final report must be
submitted to GDARD
ECO End of the
project
Waste disposal
Pollution of the
environment
Soil;
Freshwater
features
To prevent pollution Post
Construction
All construction waste that has not been disposed must be removed from site and disposed off at a
registered landfill site. The proof of disposal must be submitted to the ECO. Contractor
End of the
project
Operations and
Maintenance of the
pipeline in close
proximity of a wetland
Wetland;
Surface
water
To minimise degradation of
wetlands and freshwater
features
Operational
It is recommended that the pipeline be audited routinely and adjust maintenance schedule
accordingly;
It is recommended that the managing authority of the pipeline must test the integrity of the pipeline at
least once every five years or more often should there be a sign or reports of a leak;
Should a blockage occur, precautionary measures must be implemented to prevent the pollution of
the freshwater features during repair, including the placement of sheeting around the area being
maintained.
Maintenance
team Continuous
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 20
7 Rehabilitation Mitigation Measures
The following rehabilitation mitigation measures must be implemented where the pipeline has
been installed. These measures have been listed below
■ Erosion berms should be installed on roadways and downstream of stockpiles to
prevent gully formation and siltation of the freshwater resources. The following points
should serve to guide the placement of erosion berms. The material for the
construction of the berms must be sourced legally by the contractor appointed to
construct the pipeline:
Where the track has slope of less than 2%, berms every 50 m should be installed;
Where the track slopes between 2% and 10%, berms every 25 m should be
installed;
Where the track slopes between 10%-15%, berms every 20 m should be
installed; and
Where the track has slope greater than 15%, berms every 10 m should be
installed.
■ Contractors must only clear bushes and trees larger than 1 m. The remaining
vegetation must be stripped with the topsoil to conserve as much of the nutrient cycle,
organic matter and seed bank as possible.
■ Active rehabilitation, shaping, and re-vegetation of disturbed areas must be
undertaken immediately after construction;
■ The wetland areas present will be affected, disturbance must be minimised and
suitably rehabilitated;
■ All erosion noted within the construction footprint should be remedied immediately and
included as part of an ongoing rehabilitation plan;
■ Soils which were compacted as a result of construction activities should be
ripped/scarified (<300 mm) and profiled;
■ A suitable AIP control programme must be put in place so as to prevent any
encroachment as a result of disturbance to the surrounding terrestrial zones;
■ Soil removed for the pipeline construction should be stockpiled and utilised as backfill
once each section of pipeline has been constructed. Topsoil and subsoil should be
stored separately;
■ The area must be shaped in such a way so as to follow the contours of the surrounding
landscape and ensure that the site is free draining;
■ Areas where vegetation is cleared (either for the pipeline where vegetation is present
or for the laydown area), should be rehabilitated with a suitable indigenous vegetation
cover once construction has been completed;
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 21
■ Prevent access of people/machinery/vehicles/grazing animals on newly rehabilitated
land to allow regeneration of vegetation and to reduce erosion.
■ Refuelling of vehicles should take place in contained/ bunded areas.
■ Rehabilitation to be monitored bi-annually for the first year after completion of the
construction phase.
8 Financial Provision
This section is considered to be not applicable
8.1 Determination of the amount of Financial Provision
This section is considered to be not applicable
8.1.1 Describe the Closure Objectives and the extent to which they have been
aligned to the Baseline Environment described under the Regulation
This section is considered to be not applicable
8.1.2 Confirm specifically that the Environmental Objectives in relation to
Closure have been consulted with Landowner and Interested and
Affected Parties
This section is considered to be not applicable
8.1.3 Provide a Rehabilitation Plan that describes and shows the scale and
aerial extent of the Main Mining Activities, including the Anticipated
Mining Area at the time of Closure
This section is considered to be not applicable
8.1.4 Explain why it can be confirmed that the rehabilitation plan is
compatible with the Closure Objectives
This section is considered to be not applicable
8.1.5 Calculate and state the quantum of the Financial Provision required to
manage and Rehabilitate the Environment in accordance with the
applicable guideline
This section is considered to be not applicable
8.1.6 Confirm that the Financial Provision will be provided as determined
This section is considered to be not applicable
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 22
9 Monitoring Compliance with and Performance Assessment
The applicant will be responsible for ensuring compliance with the EMP as well as the
implementation of all monitoring and mitigation measures. The recommended monitoring for
the identified impacts is detailed below. The applicant will keep a record of all environmental
monitoring taken on site. A summary of the environmental monitoring to be undertaken is
included in Table 5 below.
9.1 Monitoring of Impact Management Actions
A monitoring programme is essential as a management tool to detect negative impacts as they
arise and to ensure that the necessary mitigation measures as indicated in Table 4 above are
implemented. The monitoring programmes have been discussed below.
The identified impacts that require monitoring programmes includes the following:
■ Site clearing and establishment:
Removal of vegetation and alien invasive species; and
Soil erosion.
■ Construction
Soil erosion; and
Stormwater generated.
Heritage resources;
Hydrocarbon spillages; and
Domestic waste (including sewage);
Reasonable measures will be taken to prevent the disturbance of wetlands; this includes:
■ Implementation of storm water management to prevent erosion and siltation
■ Prevention of hydrocarbon spillages.
9.2 Monitoring and Reporting Frequency
The monitoring and reporting frequency is discussed in Table 5 below.
9.3 Responsible Persons
9.3.1 The Applicant
The Applicant remains ultimately responsible for ensuring that the development is
implemented according to the requirements of the EMPr. Although the CoE appoints specific
role players to perform functions on their behalf, this responsibility is delegated. The
Municipality is responsible for ensuring that sufficient resources (time, financial, human,
equipment, etc.) are available to the other key personnel (e.g. the ECO, CLO and Contractor)
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 23
to efficiently perform their tasks in terms of the EMPR. The Municipality is further liable for
restoring the environment in the event of negligence leading to damage to the environment.
9.3.2 The Contractor
The contractor, as the Municipality’s agent on site, is bound to the EMPR and EA conditions
through its contract with the Ekurhuleni Municipality, and is responsible for ensuring that it
adheres to all the conditions of the EMPR. The contractor must be thoroughly familiarised
with the EMPR requirements before coming onto site and must request clarification on any
aspect of these documents, should they be unclear. The contractor must ensure they have
provided sufficient budget for complying with all EMPR conditions at the tender stage.
The contractor must comply with all orders (whether verbal or written) given by the ECO,
project manager or site engineer in terms of the EMPR.
9.3.3 The Environmental Control Officer (ECO)
The Environmental Control Officer (ECO) is appointed by the Project Manager as an
independent monitor of the implementation of the EMPR and to monitor project compliance.
The ECO must form part of the project team and be involved in all aspects of project planning
that can influence environmental conditions on the site. The ECO must attend relevant project
meetings, conduct inspections to assess compliance with the EMPR and be responsible for
providing feedback on potential environmental problems associated with the development. In
addition, the ECO is responsible for:
■ Liaison with relevant authorities;
■ Liaison with contractors regarding environmental management;
■ Undertaking routine monitoring and identifying a competent person/institution to be
responsible for specialist monitoring, if necessary; and
■ The ECO has the right to enter the site and undertake monitoring and auditing at any
time, subject to compliance with health and safety requirements applicable to the site
(e.g. wearing of safety boots and protective head gear).
■ The ECO will be responsible for liaising with the Gauteng Department of Agriculture
and Rural Development (GDARD). The ECO must submit monthly environmental
reports and quarterly audit reports to the authorities.
9.3.4 Contractor Environmental Officer (EO)
The contractor must appoint an Environmental Officer (EO) to assist with day-to-day
monitoring of the construction activities. Any issues raised by the ECO will be routed to the
EO for the contractors’ attention and subsequently, the EO liaise with the main contractor for
his or her attention. The EO shall be permanently on site during the construction phase to
ensure daily environmental compliance with the EMPR and should ideally be a senior and
respected member of the construction crew.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 24
9.4 Time period for Implementing Impact Management Actions
Table 5 provides the time period for implementing impact management actions.
9.5 Mechanism for Monitoring Compliance
Table 5 sets out the method of monitoring, the implementation of the impact management
actions, the frequency of monitoring the implementation of the impact management actions,
an indication of the persons who will be responsible for the implementation of the impact
management actions, the time periods within which the impact management actions must be
implemented and the mechanism for monitoring compliance with the identified impact
management actions.
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 25
Table 5: Monitoring and Management of Environmental Impacts
Source Activity
Impacts requiring
monitoring
programmes
Functional requirements for monitoring Roles and responsibilities (For the
execution of the monitoring programmes)
Monitoring and reporting frequency
and time periods for implementing
impact management actions
All activities
throughout the
project
Removal of vegetation
and alien invasive
species
Compile and Implement alien plant monitoring to prevent the establishment of alien invasive
plant species and only the necessary vegetation required for the construction of the pipeline
will be cleared
Alien invasive species monitoring utilising
the AIP should be undertaken by an
independent Environmental Control Officer
(ECO)
Bi-annually for the first year after
completion of the construction phase
Soil erosion
All topsoil removed will be stored in a stockpile and protected from erosion for use during
rehabilitation. Daily site inspection will be undertaken by the Environmental Officer to ensure
that all soil erosion mitigation measures are in place and implemented adequately.
Environmental Officer
Environmental Control Officer (ECO) Daily
Soil contamination
through oil leaks Heavy machinery and vehicles must be maintained and serviced regularly.
Environmental Officer
Environmental Control Officer (ECO) As and when required
Soil compaction Use existing tracks that run along the pipeline to access the pipeline servitude. The ECO
must monitor that there are no multiple tracks created during construction Environmental Control Officer (ECO) Daily
Use of hydrocarbons
Daily inspections of machinery must be undertaken and drip trays will be placed under the
machinery to collect any hydrocarbon leaks and spillages in the event it is required. Should
spillages occur, the soil must be cleared and treated utilising bioremediation techniques.
Should the soil not be adequately treated on site, the soil must be removed from the site and
disposed of at a licenced waste handling facility.
Environmental Officer
Environmental Control Officer (ECO) Daily
Ablution facilities
The contents of the chemical toilets must be emptied on a regular basis, at least twice on a
weekly basis, to prevent sewage spillages. The sewage must be collected by a registered
contractor and must be disposed of at a registered waste water treatment works. Proof of
disposal must be kept on site.
Environmental Officer
Environmental Control Officer (ECO) Weekly
Waste management
Clearly marked bins will be placed at each active site to collect the domestic or hazardous
waste generated during construction and will be disposed of at a registered waste handling
facility.
Environmental Officer
Environmental Control Officer (ECO) Weekly
Traffic Management
Controls over driver training, vehicle maintenance, speed restrictions, appropriate road safety
signage, and vehicle loading and maintenance measures must be strictly adhered to. Flagman
should be used were appropriate.
Environmental Officer
Environmental Control Officer (ECO) Daily
Noise Management
Mechanical equipment with lower sound power levels should be selected to ensure that the
permissible occupation noise rating limit of 75 dBA is not exceeded. Construction workers and
personnel should wear hearing protection when required. Vehicles and machines will be
properly serviced and well maintained and a grievance procedure will be established whereby
complaints are recorded and responded to.
Environmental Officer
Environmental Control Officer (ECO) Daily
Audit Reporting
Auditing against the
construction conditions
outlined within the
approved EMP and EA
(EMP Performance
Assessment)
To determine compliance to EMP conditions. Environmental Officer
Environmental Control Officer (ECO)
Daily monitoring by Internal
Environmental Officer during
construction
Monthly monitoring by external ECO
during construction phase
Tangos Consultants (Pty) Ltd
Environmental Management Programme for the proposed Upgrading of the Tembisa Extension 25 Bulk Outfall Sewer, Gauteng
TSG 0708
Muny Consultants (Pty) Ltd 26
Source Activity
Impacts requiring
monitoring
programmes
Functional requirements for monitoring Roles and responsibilities (For the
execution of the monitoring programmes)
Monitoring and reporting frequency
and time periods for implementing
impact management actions
Rehabilitation Rehabilitation of
disturbed areas Review of rehabilitation after each pipeline section has been rehabilitated must be done.
Environmental Officer
Environmental Control Officer (ECO) After completion of each pipeline section
Muny Consultants (Pty) Ltd 27
10 Indicate the Frequency of the Submission of the Performance
Assessment / Environmental Audit Report
Monitoring to be undertaken during the construction phase of the pipeline must be completed
daily by the internal Environmental Officer appointed and by an external independent ECO.
The reports must be submitted to the GDARD on a monthly basis.
11 Environmental Awareness Plan
11.1 Manner in which the applicant intends to inform his or her
employees of any environmental risk which may result from their
work
The purpose of an Environmental Awareness Plan is to outline the methodology that will be
used to inform the operating personnel of any environmental risks which may result from their
work and the manner in which the risks must be dealt with to avoid contamination or the
degradation of the environment. The environmental awareness plan ensures that training
needs are identified and appropriate training is provided.
The objective of this Environmental Awareness Plan is to:
■ Inform employees and contractors of any environmental risks which may result from
their work; and
■ Inform employees and contractors of the manner in which the identified possible risks
must be dealt with to prevent degradation of the environment.
In general, the purpose of implementing an Environmental Awareness Plan is to optimise the
awareness of those partaking in the mining and related activities which have the potential to
impact negatively on the environment and in doing so, promote sustainable development.
The awareness training of employees, supervisors, sub-contractors and contractors will
ensure that co-operation in terms of environmental management will occur. This will contribute
to the successful implementation of the conditions set out in the EMP and EA, and thus to the
environmental sustainability of the project. In addition, it will ensure the success of the
proposed project regarding compliance with legislation and avoid possible future liabilities and
legal action due to a lack of environmental awareness.
11.1.1 Specific Environmental Training
Environmental Awareness Training will be undertaken to make employees and contractors
aware of the following:
■ The importance of conforming with the environmental policy and procedures and with
the requirements of the EMP;
■ The significant social and environmental impacts of their work activities and the
environmental benefits of improved personal performance;
Muny Consultants (Pty) Ltd 28
■ Their roles and responsibilities in achieving conformance with the environmental policy
and procedures and with the requirements of the environmental management system;
■ The potential consequences of departure from specified operating procedures; and
■ Possible archaeological finds action steps for mitigation measures, surface collections,
excavations and communication routes to follow in the case of a discovery.
11.2 Manner in which risks will be dealt with in order to avoid pollution
or the degradation of the environment
■ A detailed environmental incident management plan or spill clean-up program must be
compiled prior to construction;
■ All employees must undergo an environmental induction prior to accessing site. The
spill clean-up plan must be included in the environmental induction to ensure that all
employees and visitors can implement the program should a spill occur.
■ All refuelling should occur within a concreted, bunded area;
■ No refuelling of vehicles must be done on site;
■ All stationery vehicles must have a drip tray underneath;
■ All teams must have a spill kit and a hazardous waste bin (clearly marked) to ensure
that they will be able to implement the spill clean-up program
■ All spills must be reported to the ECO and must be cleaned up immediately
Further to this, management shall establish and maintain procedures for the internal
communication between the various levels and functions of the organisation, and receiving,
documenting and responding to relevant communication from external I&APs. The applicant
shall consider processes for external communication on its significant environmental aspects
and record its decision. Environmental risks will be dealt with through training and
communication to ensure minimal degradation of the environment.
12 Specific Information required by the Competent Authority
No request for specific information has been requested for this proposed project by GDARD
to date.
Muny Consultants (Pty) Ltd 29
13 Undertaking
The EAP herewith confirms: -
■ the correctness of the information provided in the reports
■ the inclusion of comments and inputs from stakeholders and I&APs ;
■ the inclusion of inputs and recommendations from the specialist reports where
relevant; and
■ the acceptability of the project in relation to the finding of the assessment and level of
mitigation proposed.
Signature of the Environmental
Assessment Practitioner:
Name of Company Muny Consultants (Pty) Ltd
Date