Environmental Monitoring Report This report has been submitted to ADB by the Himachal Pradesh Power Corporation Limited, Shimla and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 41627-043 August 2015 Period: July 2014 September 2014 IND: MFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3 Submitted by Himachal Pradesh Power Corporation Limited, Shimla
Transcript

Environmental Monitoring Report

This report has been submitted to ADB by the Himachal Pradesh Power Corporation Limited, Shimla and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 41627-043 August 2015 Period: July 2014 – September 2014

IND: MFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3

Submitted by

Himachal Pradesh Power Corporation Limited, Shimla

HIMACHAL PRADESH POWER CORPORA Tl ON LTD. (A Sta fe Governmenl Undertaking)

Uttam Bhawan Do ra Lod •e , Below I 03 Tunnel Shimla-171004 HP Ind1a Phone:0177-2658397 Fax:Ol77-2659899

No. HPPCL/ESMU/Sainj HEP/QR/20l5- l,ft6-lt9 To /

Dated: .l.b'- O 7 _ .2 0 JS

Subject:

Madam,

~Tere~~ Kho, Country Director, South Asia Department, India Resident Mission, 4 San Martin Marg, Chanak:yapuri, New Delhi-110021

ASIAN OEVE INRM

OOUNl'RV nu:is;r.TOR·~ OFFIC!

:0 3 AUG 201V rRECEl~1o

Submission of 3{d (w.e.f. 1.07.14 to 30.09.2014) and 4111 (1.10.2014 to 31.12.2014) Quarterly Compliance Status Report on Environment Management Plan alongwith Six Monthly (July-December, 2014) compliance report on Environment Clearance, Forest Ocarancc and Public Hearing - Sainj HEP.

Please find enclosed herewith 3•·d quarterly (w.e.f. l.07. 14 to 30.09.2014)

and 4•h quarterly (l. 10.2014 to 31.12.2014) Compliance Status Report on Environment

Management Plan alongwith Six Monthly (July-December, 2014) compliance rep01t on

Envirorunent Clearance, Forest Clearance and Public Hearing in respect of Saioj HEP.

This is for your information and record please.

Encl: As above

CC: 1. Mr. V. R. Karbar, Team Leader, South Asia Department, Tndia Resident Mission, 4

San Marfin Marg, Chanakyapuri, New Delhi-11002 1 for information, please~

2. Mr. Ralf Starkloff, Senior Safeguard Specialist, South Asia Department, India Resident Mission, 4 San Martin Marg, Chanakyapuri, New Delhi-1 I 0021 for information, please.

3. The General Manager, Sainj HEP, HPPCL, Sarabai (Bhuntar), Distt. Kullu, HP for information please.

'"' ...... -~N uEVl;l 0?MENI B-ANK

A 1.J 't INRM ~

~o ! AUG 2015

RECEIVED - -

HP POWER CORPORATION LTD.

@dJO~c!7'

!Jt])y@)[2@ @[b@@!?al!l@ [P!2@dl&@I? ({il@@ fiWWJ)

Environmental Management Plan Monitoring Report

(Revised Quarter Third (Q3) Report 2014)

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page 1

List of abbreviations and colloquial terms used

ADB Asian Development Bank AY Academic Year Bigha Unit for measw·in_g land (One Bigha = abour 800 sq mtT) Biswa Unit for measuring land (One Biswa = about 40 sq mtr) CA Compensatory Afforestation CAMPA Compensatory Afforestation Management and Planning A2encv CAT Catchment Area Treatment CBO Community Based Onranization CBS Chief Environment Specialist CMO Chief Medical Officer CSR Corporate Social Responsibility DC Deputy Commissioner DFO Divisional Forest Officer DGM Deputy General Manager distt. District DPR Detailed Project Report EIA Environment Impact Assessment EMP Environment Management Plan Go HP Government of Himachal Pradesh Gol Government of India HCC Hindustan Construction Company (Ltd) HOPE High-Density Poly-Ethylene HEP Hydro-Electric Project HFL Highest Flood Level HoP Head of Project HP Himachal Pradesh HPCEDLP Himachal Pradesh Clean Energy Development Investment Programme HPFD Himachal Pradesh Forest Department HPPCL Himachal Pradesh PO\Jo:er Corporation Limited HPPWD Himachal Pradesh Public Works Department HPSEB HimachaJ Pradesh State Electricity Board HPSFDC Himachal Pradesh State Forest Development Corooration

SAlNJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page 2

ITI Industrial Training Institute LADA Local Area Development Agency

LADC Local Area Development Committee LADF Local Area Development Fund LWSS Lift Water Supply Scheme M Meter MoEF Ministry of Environment & Forests MW Megawatt NPV Net Present Value NRRP National Rehabilitation and Resettlement Plan PAA Project Affected Area PAF Project Affected Family Panchavat Lower most tier (at cluster of vi I lage level) of governance in India Parivar Family PAZ Project Affected Zone PCC Project Constrnction Circle PHC Primary Health Centre R&R Resettlement and Rehabilitation RoR Run-of-the-River Rs. Indian Rupees!INR SC Scheduled Caste SDM Sub Divisional Magistrate SE Superintending Engineer SPCB State Pollution Control Board Sq kms Square Kilometer Sq Mtr Square Meter ST Scheduled Tribe

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page3

'· INDEX

S.N. CONTENT PAGE

A Status of Implementation of Environment Management Plan 5-19

B. Annexure

1. EMR-I 20-22

2. EMR - II 23-24

3. FC-I 25-26

4. FC-Il 27-28

5. EC-I 29

6. EMR-III 30-41

7. EMR-IV 42-52

8. EMR-V & EMR-VI 53-55

SAINJ HEP (100 MW)-Enviromnent Monitoring Report No. S-2014/ (Q3) Page4

A. Status of Implementation of Environment Management Plan

The abstract of various provisions in the approved EMP of Sainj HEP along with their implementation status is tabulated below.

Sn Component of EMP

Institutional iresponsibility

Status upto date 30.09.2014

1. Compensatory Afforestation and Biodiversity Conservation Plan

• Afforestation Forest For Compensatory Afforestation (CA) over 96 ha of 96.00 ha Department, land i.e. twice the area of forestland diverted

Director GHNP (47.993 ha) in lieu of diversion of forestland for the Project, Rs 92.50 lacs have been de.posited during Sept., 2009 with Hirnachal Pradesh Forest Department.

• In relocation

situ State Forest of Department/

HPPCL Betula alnoides

The matter has been taken up with forest Department.

• Ex situ conservation measures (seed collection in vitro seed germination and nursery establishment, including setting up of lab. and offices etc and 5 year maintenance)

The matter has been taken up with G.B. Pant Institute of Himalayan Environment & Development, Kullu.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014i (Q3)

Activities done I developments during reporting period (July to Sept ,2014)

No funds have released to this office from competent authority

A comprehensive proposal was received from G.B Pant Institute of Himalyan Enviromnent and Development, Mohal for Ex-situ conservation measures and the work agreement for the ex-situ conservation measures has been signed with the institute

Remarks

DFO, Shamshi has intimated that no fund has been released by CAMPA authority for year 2013-14 so far.

DFO, Shamshi has been again requested to submit a comprehensive proposal on the conservation of Betula Alnoides species. The proposal is still awaited.

Page 5

' Sn Component of

EMP

• Conservation of fauna: restrictions on noise levels during March-June and Oct-Dec shall be followed and this information should be included

• in documents contractors.

tender for

Institutional responsibility

HPPCL/ Contractor

• Conservation HPPCL/ of fauna: labourers Contractor should be made aware of c.onservation, notice boards near labour camps, no fireanllS allowed in the Sainj valley, strict restrictions on laborers to ensure no they do not harvest any productc; from the forests

Status upto date 30.09.2014

The machinery being used for the project work is fully mollified. Regular checks are being made to limit their noise level as per the pennissible limits notified by the manufacturer.

Labours has been made aware of conservation during the celebration of Environment Day, World Water Day etc. Notice board has been placed near labour camp. 3 Nos. check post has been maintained near the project site and l 5 Nos. of Home Guards bas been deployed in these check pots. The main duty of these home guards is to check all illegal activities in the GHNP area.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3)

Activities done I developments during reporting period (July to Sept ,2014) Copy of noise level monitoring report during the reporting period is attached as per Annexure ErvtR-L

Remarks

Noise measured values are within the limits specified by Central Pollution Control Board.

Page 6

; Sn Component of

EMP Institutional

!responsibility Status upto date 30.09.2014 Activities done I developments

during reporting period (July to Sept ,2014)

• Fuel for HPPCL/ laborers should be Contractors

Fuel arrangement (LPG) is being made by the LPG Cylinder has been provided by contractor for its labour and staff free of cost. contractor for its labour and staffs free

provided from plantations or provision should be made for free kerosene/LPG

• Creation and Forest Four No. computers and one no. Vehicle has already provided to Forest Department under this plan. Fifteen No. Home guard has been deployed in Great Himalayan National Park at the project cost during Oct, 2012 to ensure regulatory provisions to protect the existing biodiversity. An expenditure amounting to Rs. 7, 17,450/- has been made so far on the salary of home guards, vehicle and computers under this plan.

funding of a Sainj Valley Conservation Cell; >vhich will monitor and enforce regulatory provisions to protect the existing biodiversity

• Environmental Awareness for

Department, Director GHNP

Support existing

to Prov ided financial support to :-state • Greenson, A social, Environment Tourism &

- government Development Concern organization, Manali Conservation development educational awareness packages, workshops. The project authorities will bring out a monthly publication in local language with progress and future programme.

of agencies during a workshop on Environment protection,

• H.P.Forest Deptt for publication of a Wildlife souvenir.

SAINJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2014/ (Q3)

of cost and an expenditure amounting to Rs. 5, 28,303/- has been made during the reporting quarter nd attached as per Annexure EMR-ll.

An expenditure amounting to Rs. 7, t 7,450/- has been made so far on the salary of home guards, vehicle and computers under this plan.

Remarks

Page7

Sn Component of .EMP

• Anti-poaching measures: one check post to be constructed near the intake and one near 111e powerhouse site. Each check post shall have 3 guards and adequate communication equipment.

Institutional tresponsibility

No poaching certificate

2 Catchment Area Treatment Plan

• Biological Forest measures: Department

o 101 ha afforestation

o l95ha gap plantation

o 1 50 ha pasture development

o 40 ha fuel wood plantation

o 40 ha fodder plantation

o 90 ha social forestry

o 5 new nurseries

Status upto date 30.09.2014

Three no. of check posts are being maintained to regulate movement of forest produce as suggested by Forest Deptt. 15 No. home guard has been deployed at Ropa Complex, Barishisharan and Bah Complex during Oct, 2012 in Great Himalayan National Park at the project cost (FC-1). Bed & Beddings and kitchen utensils have been provided for the home guards. An amount of Rs. 48,07,000/- has been deposited with DFO, Shamshi for maintenance of labour shed, construction of kitchen, toilet bath and water suppiy fitting etc. during August. 2012 for the execution of check posts (FC-I). Emergency light, High Beam torches, Search light has been provided to the forest department for the working of check posts

The fw1ds in phased manner (in five years) are

being released to HP Forest Deptt. (CAMPA

account) for implementing CAT Plan. The total

provision allocated for CAT Plan is Rs 111.54

million (copy of provisions of CAT plan

attached as Annex.ure EMR-N). Following payment has been done in favour of

Forest Deptt:-

S. Amount

N. Deposited

(in Rs.)

Date Remarks

SAINJ HEP (100 MW)-EnvirorunentMonitoring Report No. S-2014/ (Q3)

Activities done I developments during reporting period (.July to Sept ,2014)

Remarks

Utilization certificate amounting to Utilization certificate Rs. 48, 07,000/- has been submitted by DFO, Shamshi attached as per Annexure EMB-"lll:

'<

Page8

' t Sn Component of Institutional Status upto date 30.09.2014 Activities done I developments Remarks

EMP !responsibility during reporting period (July to Sept ,2014)

• Engineering I 5,20, 75,000/ 3/04!2010 Rs. 185.14 lakh for

measures: 0 year and Rs.

o 401 ha contour 335.61 lakh for 1"

bllllding year

o 105 Rmt stepped drain

2 2, 75,86,000/ 30i03/2012 2"" year o 15 check dams

implementation of • Wildlife GHNP will CAT Plan improvement and prepare detailed 3. 2,42,98,000/ 29/03/2013 3"' year development: action plan

implementation of c Survey of fl ora CAT Plan. & fauna in catchment o Incentives -to local communities for fire prevention o Incentives to local communities for wildlife protection o Incent ives to local communities to regulate local and migratory grazers o Habitat improvement in Sainj WLS o Wildlife census Forest o Capacity Department

building of staff and community

SAlNJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page9

•.

Sn Component of Institutional Status upto date 30.09.2014 Activities done I developments Remarks EMP iresponsibility during reporting period (July to

Sept ,2014) o Support for communication o Nursery establishment and maintenance

o Soil & moisture conservation

o Monitoring, evaluation and impact assessment: study o Support for vermin-compost development o Support for intro of LPG for poor household o Socio-economic survey o Ex-situ support for Himalayan Thar breeding/ conservation of GHNP

• Joint Forest Forest Management Department Process, training and awareness

• Silt observatory . Forest Department

• Promotion of eco-tourism. payment

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014j (Q3) Page 10

Sn Component of Institutional Status upto date 30.09.2014 Activities done I developments Remarks EMP responsibility during reporting period (July to

Sept ,2014) for environmental services, monitoring

.., ~ Fisheries Management Plan

• Provision of HPPCL/ Provision of fish ladder has been made in the -fish ladder in the Contractor barrage of Sainj HEP. Some biological data of barrage fish of Sainj river required for fish ladder design,

but the data was not available with the Fisheries Deptt. as intimated by Deputy Director of Fisheries, Patlikulah vi de his office letter No. TFP-5-202-0-1-1989 DATED 21/09/2012. Due to non availability of the biological data the design of fish ladder has been prepared as per IS Code 13877.

• Construction of Fisheries Deptt. Yet to be done additional rearing space for trout -hatchlings at Hamini fann

• Construction of Fisheries Deptt. First installment of Rs 5.0 million has been - Director of fisheries, angling lake at released to HP Fisheries Department during April, Bilaspur bas intimated Nagini 2010 for the construction of angling lake at that an amount of Rs

Nagini. Dy. Director (Fisheries) has intimated that 37,39,500/- has been the estimate is being prepared by IPH. provided to executing

agency for the construction of Dam across river Tirthan.

4 Public Health Delivery System

• Construction of HPPCL/ Provision of Rs. SO· lacs has been kept for frequent health checkups are being Medical examination one Dispensary, Contractor construction of Hospital at Sainj (Rs. 25 lakh carried out during the reporting of the labourers have including staffing, under LADF & Rs. 25 lakh under R&R Plan) period. been carried out at the hospital equipment Scheme submitted to GoHP by Health time of new joining

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page 11

Sn Component of EMP

and supplies

• A first-aid post at each of the major construction sites (two in total), including staffing, equipment and supplies

•Two ambulances

Institutional irespoosibility

Contractor

Contractor

5 Environmental Contractor Management in Labor Camps

• Provision of Contractor heating (chapter does not have clear measures; please describe what source of heating is used)

Status upto date 30.09.2014

Department, outcome awruted. Payment will be relea<;ed after approval by Govt. of Himachal Pradesh. HPPCL is maintaining a dispensary. One No. Doctor and one No. Pharmacists are posted in the dispensary. Health checkups are carried out by the Doctor posted in the dispensary during various camps organized in the project area.

Two no. First aid posts have been constructed by the contractor near Barrage and Power House sites.

Two numbers of full Equipped Ambulances provided at Project Site used for bettennent of Workmen and Local Villagers.

The labour camp has been constructed at Jangla near Adit - II by the contractor.

The contractor has provided heating arrangements to the labourers. Heaters and coal was provided for the heating during the winter.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3)

Activities done I developments during reporting period (July to Sept ,2014)

Presently four numbers of Pharmacists are being deployed in two posts in day and Night Shifts. An amount of Rs. 3, 95,815/- ha<; been spent on the medical staff (salary of medical staff) and amount of Rs. 43.917 /- on medicine in the reporting quarter by the contractor. Annexure is attached as per EMR-II The detail of expenditure on Ambulance d1ivers, hired ambulance, fuel Cost and maintenance cost to the Ambulances from Jul to Sept, 2014 is attached as EMR-11.

Remarks

and then as and when required. Medical examinations of some labourers are being attached herewith as Annexure (EMR-II). Records are being maintained by the contractor.

Page 12

Sn Component of EMP

Institutional responsibility

• Provision water supply

of Contractor

• Sanitation and Contractor sewage facilities: please describe current status per camp. and the periodic monitoring results of the quality of effluent from the oxidation ditches. to ensure that the sewage from the labor camps does not pollute the river water (measure pH, BOD, COD, TSS and TDS as per EMP chapter 14).

• Solid waste management: o Report progress on the location, construction and use of the designated landfill site according to international good practice. o Report progress

Contractors/ HPPCL

Status upto date 30.09.2014 Activities done I developments during reporting period (July to Sept ,2014)

The contractor has provided water purifiers in all An expenditure of Rs. 23,226/- has messes. been done by the contractor to provide

drinking water facility to the labourers during the reporting quaner.

Community toilets have been provided and in the labor camp and septic tank has been provided for the sewage from the toilets. Waste Water, Drinking Water, Ambient Air Quality, Noise Levels were being monitored periodically at the Project Site by the External party and records being maintained.

Wastage has been carried out by contractor own vehicle. The process of Composting has been established by the contractor. The bio- degradable waste from labour camp has been disposed off in four composting pits and later it is being used as Fertilizers to plants.

All the parmneters were monitored which is under control and the reports are being maintained. An expenditure of Rs.109, 755/- has been done by the contractor for the construction of new septic tank maintenance of septic tank in the labour camp during the repotting period.

SAINJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2014i (Q3)

Remarks

Page 13

Sn Component of EMP

6

on the disposal of biodegradable waste: preferably through the use of composting pits. Disposal of biodegradable waste at the muck disposal sites, as mentioned in the EMP, should be discouraged). o Commissioning and use of a waste collection truck

Muck Management Plan

Dt: max. quantity to be dumped = 116864 cum D2: max. quantity to be dumped =

113226 cum

D3: max. quantity to be dumped =

Institutional responsibility

Contractor/ HPPCL

Status upto date 30.09.2014 Activities done I developments during reporting period (July to Sept ,2014)

The Muck dumping sites are being Proper monitoring and inspection is preparediconsrructed as per nonns of H.P. State being carried out by HPPCL and HP Pollution Control Board for dumping. Presently State Pollution Control Board. muck is being dumped in five dumping sites only Annexure is attached as per EMR-"'St and protection ·works has been provided at these dumping sites.

76.24 % dumped to date; Retaining wall has been Dl: No muck dumped this period provided to the dumping site all along the river.

43.72% ·dumped to date; Retaining wall has been provided to the dumping site all along the Kartaul Nallah. A stone crusher has been set up at this site.

This site is not being used so far.

D2: 3925 Cum muck dumped this period

SAINJ HEP (100 MW)-Environment Monitoring Repon No. S-2014/ (Q3)

Remarks

Page 14

Sn Component of Institutional Status upto date 30.09.2014 Activities done I developments Remarks EMP responsibility during reporting period (.July to

Sept ,2014) 41439 cum

D4: max. quantity 39.95% muck dumped so far. A stone crusher D4: No muck dumped this period. to be dumped = (20TPH) has been set up at this site and crushing 231306 cum of muck from site no. 7 is being carried out.

D5: max. quantity 20.32% muck dumped so far; proper protection is 05: 17634 Cum muck dumped this to be dumped = being provided to this dumping site. period 507035 cum

D6: max. quantity This site is not being used so far. -to be dumped = 42323 cum

07: max. quantity 100% muck dumped Proper protection lias Muck is being used in the crusher. to be dumped ;:: already provided to this dumping site. 42323 cum

7. Restoration and Landscaping of Construction Sites

•Use & HPPCL/ Quarry site is not being used so far. restoration of Contractor -quarry sites

• Beautification HPPCL Beautification of the barrage site, power house of the barrage site, complex and the colony area will be done after -power house constmction works. complex and the colony area

8. Environmental Management in Proposed road length reduced due to change in road alignment. HPPCL was completed Road Construction. 9. l 3 km length of and remaining road has been completed by HCC Ltd .. 4 No. bridges (

Steel bridge at Suind, Steel bridge at Sambha, RCC bridge at Kartaul khad, RCC bridge at Kotlt.1 Nallah) and ~ No. highway traffic twmels has·atso been constructed to avoid the cutting of trees.

• 4 km: 517 m Cutti.ng road from Neuli to Barrage has been Maintenance of road is being carried wide road from completed. Breast wall and retaining walls has out by HCC Ltd. Neuli to Barrage been provided wherever required. Drainage

sysrem has been provided to the entire road

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3) Page 15

'-. ' ;

Sn Component of Institutional Status upto date 30.09.2014 EMP responsibility

length.

• 0.5 km: 517 m -wide road to Desanding basin and intake

• 2 km: 517 m Cutting of road from Sambha to Adit-I has been wide road from completed. Sambha to deflushing tunnel & HRT adit-J at Kartaul nallah

• 7 km: 5/7 m Cutting of 4.15 km road from MAT to junction, wide road from 0.86 km from junction to Adit-II and 0.67 km Suind to bottom of from junction to common Adit to top & bottom of surge shaft surge shaft has been completed. Common adit

• 2.5 km: 5/7 m wi II be used for construction of surge shaft so the

wide road from road length is reduced. Breast wall and retaining

bottom of the walls has been provided wherever required.

surge shaft to top of surge shaft

• 1.5 km: 7/10 Cutting of 0.400 km road from Suind to MAT and m wide road from tail race has been completed. Breast wall and Suind to MAT and retaining walls has been provided wherever tail race required

• 2 km: 517 m Quany site is not being used so far no road wide road from construction for quarry sites had been carried out. quarry sites, dumping areas & colony etc.

• 8 km: Widening HPPWD/HPPCL Rs. 1 Crore as advance was released to H.PPWD of existing road on 08.04.2009 & Utilization Certificate

SAlNJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3)

Activities done I developments Remarks during reporting period (July to Sept ,2014)

Maintenance of road is being carried out by HCC Ltd.

------------do---------

-------------do-------------

-----------do-----------.

The work is in progress.

Page 16

Sn Component of EMP

9

from Suind to Neuli (from 2.75/5m to 5/7m)

Greenbelt Development Plan: 40 ha. Around reservoir area. This includes nursery advance plantation

creation, works,

and maintenance

Institutional responsibility

Status upto date 30.09.2014

amounting to Rs. 92.84 lacs up to Dec., 11 received from HPPWD. Due to local agitation a meeting with H.PPWD held on 28.02.2012 and it was agreed that balance work from Suind to Neuli shall be done by HPPCL after taking over site from HPPWD. Revised utilization certificate amounting to Rs. 81 .82 lacs up to May, 2012 has been received from HPPWD. Secretary, PWD has accorded his consent for handing over of road from Suind to Neuli road to HPPCL. The balance work of improvement of road has been taken up by HPPCL work is in progress.

forest /HPPCL

Deptt. The project contractor has implanted 1000 plants on both banks of the Sainj River.

10 Control of Air Contractors, Ambient air sampling is being carried out by Environment Engineer, H.P. State Pollution Control Board, Kullu once in every three months at the major construction sites and analysis report is being submitted.

Pollution (for /HPPCL monitoring requirements see chapter 14 of EMP: once every season at major construction sites, SPM, RPM, S02 and NOx):

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014/ (Q3)

Activities done I developments during reporting period (July to Sept ,2014)

Plantation is also being carried at the batching plant and crushing plant

Monitoring for the 3rd quarter of 2014 has been carried out by Startech Labs, Hyderabad in the month of Sept and the report is attached as Annexure EMR-lU.

At all the lucations the level of the ajr, water aand noise quality parameters have been observed to· be within the limits as per CPCB nonns.

Remarks

Green belt around the periphery reservoir rim will be developed through Forest Department.

Page 17

Sn Component of EMP

11

12

Control emissions equipment, vehicles generators;

of of

and

Dust control: sprinkling, covering stockpile, effective traffic management

Measures for Noise Control: see chapter 11. Monitoring as per EMP chapter 14: once every three months, at the major construction sites.

Water Pollution Control

Institutional responsibility

Contractors I HPPCL

Contractors/ HPPCL

Status upto date 30.09.2014

Every vehicle is being checked for pollution under control certificate regularly.

~ Sprinkling of water is being done regularly along the PWD roads

~ Effective traffic management is being maintained at site.

? Truck hauling soil, sand & other loose material 1s being maintained at least two feet of free board .

.»- Maintenance of construction equipment is being carried out regularly.

? Provision of ear plug /ear muff has been made to the labourers.

};- Noise level monitoring is being carried out by H.P. State Pollution Control Board once in every three months at the m11:jor construction sites.

The sedimentation/ settling tanks have been provided for the batching plant near Power House, Adit - J and Adit-3, in all the tunnels and also for vehicle washing ramps. Regular monitoring of water quality is being done by HP SPCB. Annexure is attached as EMR-IV.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2014i (Q3)

Activities done I developments during reporting period (.July to Sept ,2014)

Monitoring for the 3 rd quarter of 2014 has been carried out by Startech Labs, Hyderabad in the month of Sept and the report is attached as Annexure (EMR-I).

During the reporting period regular cleaning and maintenance of these settling tanks has been carried out. An amount of Rs. 35,000/- has been spent during the reporting period for construction/ maintenance of these tanks.

Remarks

Page 18

Sn Component of Institutional Status upto date 30.09.2014 Activities done I developments Remarks EMP l'esponsibility during reporting period (July to

Sept ,2014) 13 Environmental H.P. Pollution ~ An amount of Rs. 3.05 lacs, 5 lacs and 5.24 Quarter ly monitoring of air, water

Monitoring Control Board lacs was released in the year 20 l 0-11 , 2011-12 quality and noise level is being carried Programme: and 2012-13 respectively to HP State Pollution out by H .P. State Pollution Control • Water quality Control Board under Environmental Board, Kullu. Monitoring for the 3rd

• Air quality and Monitoring Plan. quarter of 2014-15 has been carried

meteorology ~ An amount of Rs. 15 lacs have been deposited out in the month of sept, 2014 and the

•Noise with Environment Department, Go HP for report is attached as Annexure Eiv1R-EMP monitoring during March, 2012. V&VL

• Soil erosion and Yet to be done -siltation

•Ecology Yet to be done -

• Incidence of Yet to be done -water-related diseases

~ Land use Yet to be done -loattern

SAINJ HEP (lOO MW)-EnvirorunentMonitoring Report No. S-2014/ (Q3) Page 19

___ , STArrn·c~i • l\H~ PVT (Tl> :" r ~ :r• !..-'1.~ n _ 1 ~" .. ~h'. r• H '·• ~ i t.>!J., Qpu !.! J\!1"' !i Jr (.;\,,)!\jO ~/a<'.ttrl>l',lt,;;;i

~<vvm;V• t(! '"'"' O!>(J A I • •Ni.)JI•. T<-l • ·» <!IJ·:"~(}~ I \l<ifl .'.'.P,1-l <;~~' 4'J:.: l '•O~.: £- ·1l\d: I: ;41;)fft,il·,~ltt1()("(\.'•~ · - 1 :~ ~/\, t (If))

; r:J . 1.. . r:cn _-Ai'·: (~· ; 1. .. " '

JEST REPOF:n

Hindustan Conslruct :on Company ltd .. DI

:. cs v llage 6 pos:-S.J· . t' oJ Re .... <.!r~r 1 eh ·Ba•11ara Ct <:.l "' 1 11

REF No

NOlSc LEVEL MONITORING

S.Na Day

lo.cation Levels in

Leq (dBA)

. 3

14 1 ~ p I

75 d8fl.

I Samphng is carried out as por St<!nd,;rd nHtlllodi

Equiprnc-nt Detnils Ma~ e -: r SI ·e._• c_l(:~;.:; Mode t· .. , £ • " ? i •

Monitored by • t...

Rumarks Cornpfre~

'• Che-ck.~d By. I~ '

'II

EMR- 1

STARTE(;H LABS • l•I f

2~W Sep. 20 14

Ti me

• 1 25 prt.

Ni-grit

Levels in Leo (d8A)

t:

70 dBA

Approved La1Jo1ulory by M.:iEF. OHSAS 18001 and ISO 9001 'Nf"b::; '.•.: I t f · ·

• • ·-.i

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 20

STARTl.:CH I.ABS PVT. JJ'D. ~-· Fk>o1 G.~r~ (:f\df\,!Jf--f~~. ti Nr1 1 -~)~ ·::­Op~· St /lr-r>.r; Jr C<J1;f,~;w, M~cJ·11.;\~utJ., tf'{r'r,:;r~l)aCl !J()O ry,~ A)> :NDil. ffl! • 9' 4 () 23(>4 t $0{1, Z.,().t 1 90~> 40? I ~.(j"J,) E·Ui~'~ c:oa!;ry~l:r~s:.ilrtu,,:t~-';).!}~ r;()tr

f o, 1.:, 1 na 1w ;;;,1 • .i ;1, c. '

TE~TBJ;PORT

ru i1, o

S.No

Hindustan Construction Company Ltd

Vll:age & pos1-Sa•n; Teri -B~H1Jara. Dis;.(; !~:::

NOISE lEVEL MONITORING

Day Locat io n

Levels in Time Leq (dBAI

.. i

. -•t.

Nl!ar O.G Set (320KV./;j Lc·9 No. AOSOOSOQ

Near D.G Sel (180KVA) t..og No· ~,0500SIJB

Ne-ar Kartah Crwshing PJar.t

Near Ad1t·1 Crushing Pl.;nt

CPCB limits

..

1 I

11

. '

(. 11 1 12 ! •

15 ~J t 7? 0

... ! .:,.' t.

35 air- 73 i

. .m 7 ~ 2

6 7 i)

15 clBA

Sampliog Is carrfed out as per Standard methods

Equipment Details r.• 1 •.

Monitored by

Remarks

(/ Odr.; ~.

Compli~ ~

-· '

·, &:; ,, E .. · t..

STARTECH LABS

15'" Sep. 2014

2 P' Sep. 2014

29!" StW 20:4

Night

Time

t0.50 pm

10 55 pm

i 1 05 pm

11 i 5 pm

i I ?.O pm

levels in teq (dSAJ

"$7.3

G6 4

67 9

67 i

58 3

70 dBA

I Checked 0y: , \ 1 • Authori.ted by: ef

Approved Laboratory by MoEF, OHSAS 16001 and ISO 9001 ., I • • ' T 1

Sain; HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 21

1 • .,m~ ot the IM<1US''1

TEST REPORT

ll iodustao Constrnd? on co 111 p_~!!J'.. Lt~ . ~

Vil!age & pos1-S<w11

SlARTECH LAB~

Teti -Banjarn, Oi~H-l<udw p Date or Rcrcrt:ng

NOISE lfVEL MON!TORING

Oay Locatton

Levels In Time Leq {dBA)

') '-

, v

4

t;

Near 0 G.Set {82.S;<V,\1 log No 1\050CJS26

Near D G Set ~500!\VA: L08 tJ 0 . .A.0500501

:4i•ar D G Set P20t'~\l.A.; Leg No f..C:iCW.223

~~·~,"lr D G Set (50DKVAJ ~og N<: A050U389

Nea< D G Set (50CKVA) : og No r~0500541

N~ar D G Set i500KV.41 l'-~9 No A050C403 '

CPCB Limits

·O am

I 0111 ~

·1!.l an

l ,:; t" _< ,,,, ~~~

i r ii'I ~,, ·1rn

75 d6A

Sampling is carried out as per SI<> r..dMd methods

I Equipment rietaiis I.' . , r ,,

'.icide N

71 ~.

c.

~3 ['

73 3

.. ') ; .) i

73 9

Monitored by

Remarks

- ., • C: ~ • ~ u I .

Complies

Time

·c 'Opm

'I) i5 pn

10 20 j.l'll

·c 30 pm

Nigflr

J Levels fn Leq (dBAj

65 9

GO 0

68.4

70 dBA

_., Checked By

/ '') Authotizvd by: (''" -., ... )-~.

,., -

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3} Page 22

SAlNJ HE PROJECT

HCC LTD

Sr. ~o. .Jol· I~ ,\u~-14

Nos. of lab&ltr en2a~fd I ·~:11 ).~;

LPG C ylir.ter 'l4 165

lotal .{ :~ :•1 1g4~01i

fa~~rd11nre (in Rs,\

~t ~fl, Jd l~ Ang-H - ---

I '.\lo. ~r paticn! 1isi1ed lfaprn~a~ l~bl I '~'J

I £lptodilu rt im rnediciae

I :,rn 1633~ I (1.11 Rs.)

£xp«ndirure c:i mclfual ~!aff ~9046 I 13ci~~5 I (in Rs.)

~

Ambulance Drlvm lm~nth lo)~ I :wr

ll'isl!), I Hired ,\n;bulmt 11mn11h 11 i!<i I : .1Xl() \~ I f'u£1 cost 2nd maintenance cosr for ih.e Amhul.anu ( nwn:b \\'i5t ), Detailed sheet attached. Two Ambulance

Sq>-14

5r

l~I

; "81}63

~p-U

:262

ito'lJ6

:M:~

bi&% I I

\\~

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3)

EMR-11

fol.lll

1789

JOO

~1830J

fotal I

I I

3997

~3'17

mm l

206815 I

2400ll

Page 23

- T0500343 (Am1>ul.111cu I 01 J 111y 1.i to. Sopt 1014

Monti\ I-ISO Qty.~~ .. Oil f ~parus Cost Coolant 0';';°1 s"'i«J;.op111r Cost l4-lul 25 -

14-Au11 4a I ----..__ 14_...!:f 1'1 i ~Cost 13715 08 J -

A Tolill Cost ( .S ) 32652 00

T05003G7 (Ambulance) 01 July 14 te> Snpt 2014

11.11.11 ~Ito

Mooth HSOQtyttr repair

E~I Spares Cost Coat J'1 Jul Z8

_ 14-Aug ns -14-~ 0 r- 52100

,_ -HSO Cost 5442

8 Total Cost ( S) 17128 (10

!A ~2652 8 17128 Total Cost 49780

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 24

M ' '

From

To

Slr.

I Oft'Sl DcpJ1ttllc"•l. I If'

Divi:-.i.m.11 h1rc~1 t lfficcr <JHNP. Sh~m,!11

Deputy Ut'llt'Hll ,'v1<111,1gt)t. Srunj Hydro l 'kc1ri•· Prnie.::r UPPCL. So1.>1•a , Bhtonkr)

lltili'.l':ttion (\•rtifi•·a1e or Sl'inj HEP for the yc::u 2014-!5.

Plca"c rcr~r ,,, yl•ur u!ticc 1c\cphnnic rna.-:.'k!~e dated 16.3.2015 on the

1mqjcct cited above.

2, Jn this ''(•1m<:1;(11111 it i~ rotimatcdthat the u1iliz.e1tion ccrtific.ate of Sainj

HEP for the year 2014-1 5 cucl'>"'-'J herewith for infommtion Md further neccssnry

Action please.

Encl: As .above.

'111-:·. (}. ~ (tJj I\'

, ( l. .,/ < \

'l't"1n1 fo1thfully.

~~-~ Ill\ iswrt:JI I nH

• GI lNr Shamshi

~.'j 'i-c:. A ~~(C "') k<n .,.., o..~J.

l-Hii:.t \ C,r.; ·-i~" '1 ;, f~ - ~ I I'-<

. ... i .. --• '°"" r •

~·-., .... .t

1 Officer.

Sainj HEP (lOOMW)-Bnvironmental Monitoring Report No.S-2014/ (Q3)

EMR-.m:

' .... • •• J .

Page 25

FOl{:\1<11t1 111 /\llO'tl.lnltlC \II

SI. rl,~ttcr '- o. and

HNo. I :~" <;!!NI'

Endst.No. 2'.'33 da1e<.i 29.9.'.:0l·I

Amount. (R\.in lakh}

41'.ll7.000.00

48,07 .11011 Coll

Name of Schcmt":-.CAT l'luo of Saiuj ~ HEP

I •. ,·1111 ,.< that Rs. 48.07,000/- (Rr. . Fony t•1ghl lal' seven thous; 111d only ) or grant-in­.th• sa111.;ti(Hl~ Jurini; t!ic )ca; 2v!4·:::. '" fove>ur of Divisional J~orest Officer Orcu1 Himalayan N.-t onal l)ark ~hamshi • Distt. KuUu under this Minist:ry/Departm~nt I etter No. given in the margin and a sum uf Rs. nil 00 3l'C()Unt or tlll..~pcnt. balance of the pr~vir.ms year a surn of Rs 48,07.0110,1- has b<..-en utilized for the

I purp,,~ for which JI was ~culctioned the j j current financial ~~HI _ __J

:.!~ Cettifit;O u ! i1 .• • ... '"";is!1 .... ,! :::y:._.:! !1'··t :.\· •;n•1ffiti()n~ on whh~h tht." ~rnnb·lll·:ml wa .... Silncr1· 11~ t lr.1h !>~'l'll duh· tulfilkd und that J have cxcrci~ed the f\,lhl\\lllt! <:hecks to sec 1'1 •Ii\ 1 •Ill\ ~ \.t' .1crw1ll} 11t1li,. .... ll l1•r th,· purposes for which it \\.:J..' s·u cticmcd. Kinds o d1.:d:s ~.:r~1 ,·d.-

a I 00% d1~king by the Fore~t Guard. Deputy fUm~er.

!:-. 50 % For~st l{ange Offici::r

c. f(aJ)(.!c;m cll<'cking ACF.

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3)

,9lli'H9Wfor.o". Of"~ Gl-ifvP Shamshl

D<'sign~tion ............... .

Page 26

(

·, EMR-W.

Provision under Catchment Areu Treatment Plan for Saillj HEP

Abstract of cost for Catchment Area Treatment Plan for Saini HEP (100 MW)

S.N. Activity Unit Rate (in

Phy Financial (Rs.

Rupees) in Lakh) I WORKS

A Biological Measures

1 Afforestation ha 79000 101 79.79 2 Gap Plantation ha 59600 195 116.22 3 Pasture Development ha 11800 150 17.70 4 Fuelwood Plantation ha 59600 40 23.84

5 Fodder (Silvioasture) ha 59600 40 23.84 6 Social Forestry ha 59600 90 53.64

7 Establishment of New Nurseries No. 200000 5 10.00 i Sub-Total (1) Biological Measures . . 621 325.03

B EnQinerrinQ Measures

1 Contour Bundino ha 25000 401 100.25

2 Steooed drain Rmt 25000 105 0

26.25

3 Check dams No. 200000 15 30.00 iii Su-total (2) Enqineerinq Measures - - - 156.50

c Wildlife Improvement & Development - 194.00 D JFM, Training, Awareness LIS - . 20.00 E Slit Observatory - 40.00 iii Sub-Total (3) Works (A to EJ 735.53

F Departmental Charges(@ 17.5 % - - - 128.71 iv Total Works (IJ Component (4) - . - 864.24

II SERVICES

G Eco-Tourism(@ 1 % of iv - . - 8.64

H Payment of Environmental ServicesA us - - 60.00 r Eco-task force (Physical 100 ha min.) Ha. - - 150.00

v Total cost of (II) Services - - - 218.64

vi Total of Works+ Services (1+11) 1082.88

J Monitoring & Evaluation (a) 3 % of vi - - - 32.48

Grand Total (A-J) - . - ·1115.36-

Rupees in Crores 11.154

Rates are inclusive of Maintenance for 5 years

Payment of Environmental Services" = To be paid to communities for conservation bel1aviour related to silt load as monitored

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 27

Year-wise Phvsical and Financial Tar£ et for Catchment Area Treatment Plan Sainj Hvdroelectric Proiect (100 MWl Financial Total Phy.

s. Activity Outlay for Unit Outlay for OYr 1 Yr 2Yr 3Yr 5 Yr Remarks N. tho CAT CAT Plan 4 Yr Total Plan Period Period

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy An Phy Fin ! WORKS A Biological Measures 1 Afforestation 79.79 ha 101 11 8.69 30 23.7 30 23.7 30 23.7 0 0 0 0 101 79.79 Rate of work to b• applied 2 Gap Plantation 116.22 ha 195 15 8.94 60 35.76 60 35.75 60 35.76 0 0 0 (j 195 116.22 in field while exeeuttng 3 Pasture Development 17.70 ha 150 10 1.16 60 7.08 60 7.08 20 2.J6 0 0 0 0 150 17.7 works shall be as per 4 Fuelwood Plantation 23.84 ha 40 10 5.96 10 5.96 10 5.96 10 5.96 0 0 0 0 40 23.84

notified norms excluding maintenance and 5 Fodder {Silvipasturel 23.&4 ha 40 10 5.96 10 S.96 10 5.96 10 5.96 0 0 0 0 40 23.84 department.I charges.

6 Social Forestry 53.64 ha 90 15 8.94 25 14.9 25 14.9 25 14.9 0 0 0 0 90 53.64 Maintenance as per norms notified a~ to be

Establishment of New segregated by Executing 7 Nurseries 10.00 No. 5 5 10 0 0 0 0 0 0 0 D 0 0 5 10 Aa<lncv

Sub-Total (1) Blo/oglcal ii Measuru 325.03 . 1121 76 49.81 195 93.36 195 155 88.64 . . . . 621 325.03 B Engineering Measures Rate of worl< to be applil!d 1 Contour Bonding 100.25 ha 401 101 25.3 100 25 100 25 100 25.00 0 0 0 0 401 100.25 in field shall be as given 2 Stepped drain 26.2.5 Rmt 105 15 3.75 45 11.25 25 6.25 20 5.00 0 0 0 D ~05 26.25 in abstract of cos1s

3 Check dams 30 No. 15 2 4 8 16 l 6 excluding departmental

2 4.00 0 0 0 0 15 30.00 charou Su-total (2) Engineering

m Measures 156.50 . . 33.0 . 52.25 37.25 3'.00 . . 156.50 Wildlife Improvement & . 67.90 48.50 48.50 29.10 . c Development 194 . 194.00 Raf-Table No.6

0 JFM. Tralnlno. Awareness 20 us 7.00 . 5,00 5,00 . 3.00 20.00

E Silt Observatorv <W.O . 40.0 . 40.00 Ill Sub-Total n1 Worlcs fA to El 735.53 . . 11!i7.51 . 239.11 . 11U.11 . 154..7' . . 735.53

Departmental Charges @ F 17.5% 128.71 27.57 . 41.81 32.22 . 27.08 . . 128.71

Iv Total Worb In Comoononl f41 864.24 185.14 . 280.95 216.33 . 181.82 . . 864.24 II SERVICES . G Eco-Tourism fSJ 1 % of iv 8.64 . . 2.16 . 2.16 2.16 2.16 . 8.64

Payment or Environmental 15.DO 15.00 15.00 15.00 H Services" 60.00 us . 60.00

I Eco-task force 150.00 Ha. . 37.50 37.50 37.50 37.50 . 150.00 Phy. 100 ha min. v Total CO$! of 1111 Servicn 218.64 . 54.66 54.66 54.66 54.66 218.64 vi Total o f Wotks • Services 11+111 1082.88 . . 185.14 335.61 . 270.99 . 2J6.4S 54.66 1082.88

Monitoring & Evaluation@! 3 'ii 4.87 6.50 9.74 1 1.3

J of vi 32.48 . . 7 32.48 11.3

Grand Total IA.JI 1115.36 . 185.14 . 335.61 . 275.66 242.98 . 64.40 7 . 1115.36 Phy• Physical; Fin.= Financial

Financial Amount= Total is inclusive of Maintenance for S yea.-.. including on Soil & Moisture Conservation Works Rates to be applied each Year= as por notified norms for executing the works This Phasino is malnl• for i>hvaical works oh&Slno and roleuc of monev bv the User Ao.,ncv. Since financial amount each year includes maintenance, the break uo to be dona bv Executino Aaencv.

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) PageSg

-~

MONTHLY STATEMPli Of r.IUCKIOEBRIS D·SPOSAL TO BE SUB!M'TED :o HP SPC8 by Sa1n1 HEP!100MVI! NMJe & Addtc" ti ~ca:. So~ HydrO Ekcrric P~JJttt t!P"CL, S111b1/, Dis rt Kulw rH.P) MONTH FOR rt'HJCHSTAT81EHT IS MWTTED: ·Stpfi>t:ier,Wl4

'

Sr. , I G:asummta4 1 Ou.lmia0!• .. ~111:h~br l~Wllllor!ltles•tllttr.i! ~rltt 1 ~~!11 llo PrqtctCo.,.; r.-.ai:eyQ/ 's«Wd !l•'!ilm 109"';:t$,Glii.rJ!fd i\lbJd f~ d..rrollligt!'::I rtfditm;.r'i l

CT1r.t~1oi. I I . s11r1neu.,,

2 "'...i•!S<l\41!

3 ~S114t; 3W'O!:>!'!rl

~ '!iud P.ace Tur_tief

;irhl 1UISl

I

I~

I zms I 13000 m5 lit~&:at~

r 'i} 53~~ 61 537S5 €1 I O t 11 Kl121J

I ~111 I 1~$4 I 1~'14 SSEJ

~-j ioifii )!O I l.'O m I &'315 I 991~ llSJS l~~st.au ~f~u;_l_&~f~-:--!--1'-----l----+~-'--_... _ _._ __ ~~5~~ S :i.irQ" Si~• t~ 5112C tQSI 21! I 810

S'J' .... .,

.\C1t!o HRT[J.2) 0

\"15 ii.,.: i: \llret1r111 :'ii) I 0 I [' ~r.:--:--J.2_1 _-+--.,,,.,.,.-';----+1---i-- ;stil la

FD~ 117~ 0 I . 0

• s. s. ei.w. I 1ao ' c ~ I c l I jFl!l-5

5&lai mr'WI j ~.~

~4'11$«o~W

231300

rotai I 57tt1o mz msg,. 1 ms 1 ms90.a7 • nu1ur 1 uun 1

~Gt~ailJa.~·ts.

Saaif f+~~ E~ f'rqea.

Hl'PCl ~~i (S~~

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 29

EMRW

STARTECU l.A.H~ PV"I. I .Tf> ;i·. J"IOQI $•.11i Ct .l'nlw r- H No • !.M • Or,~ St A1">~ .1' C: .lit'\ll- M:>•.lma;,iuu:, Jiy<for.01.111'.1 :,()(; f..t,f. A r•. 11"01A. T"'' • 3: .tJ.~;,,~·)4 P't:· )\'> );'~~)4\ !*''.)~, 40:.n~..,.t1q~;

F. .nm1? qi,...~! l~fi.o-~ ~!.-)""<):;hi.ti Ju c.:.-n.1 /(}I N<i 7 ,..pq.A;-. '/(J;,.s l\.r \,,

Sll\RTECH LABS (,, ,,,~·~ ~ ' \

I;.$_LREP..QRT

r:anHJ ')f the ll'd ..:s•ry

H 1n tJUsta fl Co nstrucllon Compnny ltd Da:o of So1·1pltn!} 16'"· Sep. 2014

age "' , c ~ ' r., Teh .£3:;1. Ha • •">!-1'.u, l HI

Dat~ of R!!c:e1p: 21' Sep. 21.14

D.it& o! R~;...o·t ng ~ff· Sep. 2L>14

REF I (\

Time uf mcinHor•oo 09 40 '"'

/Jinr) !>peed 3 3 Kms / hr

Arnb1~'1t Al• Temp

.. ' , ·-"40.l'

AMBIENT A'R QUALITY·· NEAR SUIND NEAR HPCL OFFICE ROAO SIDE

S.No Param~tE>rs Limits Ruulta

f'lM; •. J.tgtm1 60 •() l:

Pr.1, >l (l!t"I' 100 oO fl

Sut .. hur 01oi.:1der. (S1.;, .Q 80 1; 2

4 N1:ro9er. Di(lx1<:fe'. {NO j L.;9tn1 BO 1, 0

C.:irbon r.1 .r'l0:>.1<:113 ':v 1 • ., ,n 4.0 ·~ii

l<,'1H:'•Ofl«! {NH J) L1 J rn 400 ")•

Sampling and Analyois earned out as per IS : 5182

Equipments ootai15· J,!.., •.<: ~ r

r.; o '• c R ,_ ~ £111 \' ::J Equipm~ntt Detail& MMe E~,;.t~r,r1

M · fo \(.. J.AS 12' :.1on1tored by './• G nr;cr -l:r ~ Eltccul>ve

Mr R i;u - En.· i=ie!·;: t,s5t

Remarl<s Compl <!S

,.\

1:1.otc Radc11 Gai; Analysis ·~ uono only in B~t>::i Atcmlc A~s arc:h C"ntcr nt r• 1.1mb<1i

.·.~· Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 · .• ·.I[

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3)

••• II

Page 30

· - "' ~1-AKIT.Ctl l.'\H~ P\FI. t.Tn 7 .. fr.c.x· S-'AR C:.J)t~ r"'1!K~' '• ICN,... I '.A 1

(Ji JP :'' An'<':s. tr C.-;,~ !~~ .,tv M1< ·1 ,,,,~ ; t·; ~'Yt1~ 1.'.1t•1td :,: .. ~: •1:->tt A p 1"'.il i:A

Tt'l ,1i1 4'.J ~·:!(}.¢1~1 1.3V'Cll:N:1 <t0<' 1',(,'H £. ff\At'. QUl"~i~y·.~:1'~,toth~ch~Wt u :.i n .

' n L No • <Hf{./lf'ii'0•14 Ai ·G J

1' STARTECH LABS

N.-n·c> ..,f PH;

lndus•ry U1ndus1nn Co : ruc tion Company Li d

Vil!agr: & rir1~;! :,:i«: 1e h -8ar::-i 1 >" !)•(,' !' .: ! , , h P

'f11J1e of tnon ifOfHl~ 1C 15 a';1 • t

.Jat.:- 01 $amt1I r.~ 11·~ Se~. 2014

Wff\d speed 3 3 Km s / nr 'line d·tf>C!iCJn ~outh east 1:1 NorH· .-1cs!

24 2"C

AMBIENT AIR QUALITY - NEl\R BARRAGE AREA

t S.No. Pnrnmoters T Limits -

1 ?M, ~ 11!Jlft' 1 60

Rotults

1 . 2 ,/

2 t'M1 ~. ~1 g1m l 100

~ v 5ulp'HH 010;1..d.,s 1 ~ ~. so { Ni:rogc r: O·oio('t>S. it;C· 1. ·} 80

s Car!:Jon Mo• ;xiJ: • r4 t··, v J ,,, f 4.0

£ Amm()oia tNH:i) pg:m~ 400 26

Sampling and Analysi~ carri(;Cf c;it as p11r IS : 5182

f'qu pm&nts Dctads

Equipments. Ootails

fAonitorca by

Remarks Complr •·s

; • \ / I • , -, J ~ Chc-c!led by .A1,itl1 oriso.-l by:

. !'l_~t~:. R;odo r. Gas Ana1y s1s ·~.;!~/\(] e n ! , In B~LI At(l m !C Res~arch Center il l r.• umu11

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 t.'i!bs · \': ·... I rt·~ <,1a•·t't'nt1b ~ .. ~ 'c.c·•,

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 31

~

STAHiECH LABS PVT. I.TD :r' floor, $Mi' Clmrnb~·1~ H N!• 1 U•.'< Opp :-.i Arn•\<. Jr Coi!egi; Macti''"iJ•;<.t,; Hyt1f."!i<:i,uJ ~'(J Of.i-0, A~ tNDlA Tft~ 4 9t 1}.(1.~'~f,.:& ~~IX ~301119(;~ 40~~WJ..:.:

C: .. tT•<':.I~ tt~t1Jt~y~¢. "br,~.r1...tt ,;f~l~i~~ (;(.)!\ ~

:.'! l .r.;~.~ .1 .•Of! :A_f"ilOV4··A~ G l STARTECH LABS

Nt;im(; of !M rnuus: y

TEST R~PORT

Hindustan Construction Company Lttl .

I Vt:fagn & vO' ~ ';, ~: · r,, ren.-8ar.1~r..1 ::;,:',! ~ .a:i<J i-1 p

::!TL !:ttS Ill I

...

Wind spt:>ed 3 3 l\m~ 1 f f Wrnct d:rect 011 . Sou!ii east to P..otth west

Ambient Air Temp: 2J 2~c

AMBIENT AIR QUALITY • r~EAR ADlT·3 TUNNEL

S.No. P.aramE>ters limih Result& ~

j PM,}, i'9im~· 60 1 ~ 'l !:) '

'.> 1 PM,., µ9:m' 100 57

3 Sulphur Dic,;idr:s {$()_, I J 80 15 0

' ,, Nitro9~n Dio,d(if!s {NG,) '!i 80 19 2

'5 Carbon Monoxide i CC: il} n· 4.0 till

Ammonia (NH··). p.g '!· -400 25

Sampling and Anal;·~it carried cut ilS per IS; S182

Equipments D~tails: Mi}!\~ .f,€ • c \'irt.rn men1

Equipmonts Oota!I& ~.' I ! ~;u RCS 9CCO

Monitorca b7•

Remarks Compl;cs

-~r ' c ' _,}; f"t ---

A1,1tho risc~ t:Y: ~~~~~~~~--

• , \ Chec:ked by

Approved Lnboratcry by MoEF. OHSAS 18001 and tSO 9001

Sainj HEP {lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 32

STAIH Ef'H l AB~ PVT. Lr£ l 2" r!!)Ut !>Mf-\ <:;.n.,,11.f.>o•,; H N<> ! '..>P.'. •

Opr,; $, Allt<-S .J, CCllO'i-)Q, MllrJw••m''''" Hy<'.t!'>':lPUCl ~!ti~•. A !•. INOIA T~I • f!'1 4!i :>'.l~!~;ti 2~11'>4l9!)-!, 'l{1l'l'xB·'< I: ffi"loi QtJUliiy :~1J:1tl,fr.tise;hltlb!; ~Orr> STARTECli LABS I LJ l No URH.N>i;>(/()4•111 m !

r Name or the lr1thn1 ..,

Ad<:ress

fEST REPOJl!.

Hindustan Con$truction Compan; Ltd

V1U.age & pos:·S;:;:n; Teti ·B<illjlHi< Di!>' Kull;; Hp

' . . Time ci monitoring: 08.45 arr: - CB 4'i MP

Wind ~p~(:d. 3.3 Kr,1s ; hr

AMBIENl AIR OUA!.ITY - NEAR ADIT·2 TUNNEL

S.No Parameters

t Limits.

I PMt ~. Jlg1m1 6fl

t Pl\h~ ,,g:m~ 100

3 Sulphur DioJrn:lcs (SO:· ;19 ·r-r:> 80 ,,

Nitro9e·; Dio;w:l~~ ,~,(../. ; . i:g·'!\ 1 BO

~ CMbM Morrox:ide > ("'t(<: ·. \ ... \J s ;1;;''n' 4,0

{j Ammonr;i {Ni-b}. H~!r1· 400

Sampling and Analysi:s carried out u per IS: 5181

Eqoiprr.!llr:ts ·oiiiaffs:

Equipments Details

Monitored by

R~marks

, I

Con1 pl 1cs

~st>. · E riv E ~~:.;1rn ¥c 4 •• \ '

- I Result!>

18 9

10 s

13.3

1 !i 5

Nit

21

• r' 4t

~<Lt~: Radon Gu Analy&ll; is :101;~ only ir. B.:iba Aturnic Ri!-searcti.Ceot~r a! f.hJrnbJ~

Approved Laboratory by MoEf, OHSAS 18001 and ISO 90tl1 Web!'.ite; .-. ,,.,. • • • ·.,~ !ilt,,~ ;:;~·-~' f:: -r: :,ii~ '.Q'!"hil!.'J .. .9@~19.c)g_<;t\I.~~~ ~'!'. ~~ · ~J. · .:i ~a.A .. ~!XD

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 33

I

STARTECH LABS P\11. Ll'D. "/!" Fl\)o(. SM.fl CPl.'tm0¢«i, H.Nc • 1 5&'1, ~ St. AT>n"f> Jr. Cotteg41. Mad11Ut9uda ti,nr·nt .. ~. 11,P NOIA l1•I •ll " . o;sH ' 4lh/1~11

E-mrui· <1Ull•1ty(li.>Smrtechlans.co•J1 * STARTECH LABS I O.L.No 1,RR1APi20IJ4!Al.JG I

\Bml.' of II c lndus:rt

REF llo

TEST REPORT

lflndust.1n Con$truchon Compar.; L d

Vllla9e & post-Sa1111. leh.-Ban;ara. Dist-Ku!:u, HP

t STUEH$il21005'14

Data oi Sampling 1611' Sep, 2014

Oale of Receipt 21•1 S&p 2D14

Date of Reporting 291~ Sep. 2014

0 Jtallr,m 24hrs

RFN; ••/

Time of monitoring: lt> rn ani - 10.10 ani

Wind speed 3 3 Kms i hr Wind direction : South easr ta North west

Ambcnt Air Temp. 24 S'C

AMBIENT AIR QUALITY - NEAR AOIT·1 TUllNEl •

IS.No. j_ Poramettu

// I PMu. µg/m3

2 P'.11~. µg/ml

_C_ li~its j:,/ao

4

5

6

Sulphur Dioxides {S02: M'rr.;

Nllrogcn Dioxide& tf.\0,1 JlQ m ·

Carbon Monoxide (CO}, 1 ~g1rni

Ammonia (NH1). 1ig:m ~

1o&

BO

$0

4.9

4-00

SampHng end Anillysls carried out a.s per IS : 5182

Equipments Details·

E.quipmcntt Details

Monitored by

I Remarks

Checked b!

'.'a1t.c- ~i.:ro \/iroom1H.I l,~vCl!l N>J R:JS SOGO Ma~.!' E .clect1

A S 1.27

Complies

E:rocufive

.-, •-.; ( ~ --~'~ ..

~uihoriscd by:

R~sulls

1:.. 7

68.,

12.7

16 9

Nil

~J!te: Radon Gu An11l1$ls la dono only In Bat11 Atotnlc P ~c:irch Ctnt•r at Mumhl.

Approved Laboratory by MoEF, OHSAS 18001 and IS09001 Website:~ • .. •. •n :· • E'·m:,i' t_t"'1"J~~bJ!Q.@'?.! 1 a ... ~rn. s:a-1

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S·2014/ (Q3) Page 34

___, s ·rARTl-CH L~B~ PVT. J.fi) ?' ~-(){1t SMfi O>;;r:,tmr" I I r~r.. ' !".ti • Opp 8t An··., l> ( .!'.i:Jki/t: lll'J';"1111iip·.,d., Hyd11<ao.:i.:1 ~;;i· .. ()!jJ_; A.F' INf;lA fr;t ·~~ 4U :) ~i;.~ 1~_t{) ~'3{.>~t:~)~l ·~"\'"Fr~~'·· E (nh•I Qw•·:" ... ~l,•• i&\,.:tl~t.,t. cun1 STAHTECH LABS , D !. N1J I rm•A.•' ?0fl4·Al (,,

:.arr.e of th<! 11 ~fosr•

Mdr~ss

TES_i REPORT

Hindustan Con:;truction I c ()OJ.<.} I Ltd

V 11a9c & n~s~-S<i • 1 Tel"l -Baniarci. tJ • t'J·lu. HP

STL'EHS .. 21t- -:i 1.:

Date o' Rec e1pt 21'' Sep, l!O 14

Dati: rt R1q:-crtm9 2~r· Sep 2014

\'Ji<Ht speeo 3 3 Kms . hr ·.vmrl d.rt.'C l•Ofl Sou:h eas.t to Nor\11 west

AMBIENT AIR QUA Lil Y - NcAR AOIT-1 CRUSHER PLANT

S.Uo Param~:c rs Um its Rosu Its

600 34(\

Sulphu l O:lld s so

80 17 4

Sampling an{f Analysis carried out <1s per IS: 5182

Equ1pm1u.'lts Details : • ' l' ,l '"" °"',r,il\Ot(i- t •,I s

Equipments O~taiis

MonltC)red by

Remark.$ Compn~s

Cfieck~d by

Approved Laboratory by rv~oEF, OHSAS 18001 and ISO 9001

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 35

•I

.,

... ... .... ~TART I CH LAH~ P\' l l'l I>

7 f I·~~ .• ~ .• W!t t~~.~.:rl!ft~«~ t<; t-..i, i 1 !, ' . "' Opp \:)I /\1,,,..,·, Jr. <,;QHti';.Jf,! •Aud.!1dQ· <..

- Hyt~\.!'-~""'d '·\l()l,l~O. Ar• 1 ... r1~, ,....; ,,,, • ,. ~· • ;. .. ~ ~~-1() ~ ,.,.:13()~ ..... u ,1 ...

r rt 1l'' 'ld.al lv ~ ......... 'trtf1.t.,J1·~:L•!;, c.t>r:-

;;;:. . : , , Nr ! I/lo' A/'i/()(l.l /I, ; . ' STARTl:CH LABS

"\ -

... ... .... -.....

.. ...,

r~a 1 t..: ol ruo I dustry

fffF No

Hi"du st ;Jn Cc r, i.rruet10•1 C omr I.Id

v11 d:J'"' r \ • ~ .... ~ " 1 !~/1 Bj1 •',! n:..! ~.1,.;ll~. f<?

or 1 o T irrte of nr.mtonno r.·1 ,;,, .\ j s • cd 1 J , · '. •icJ d1 I On SQJ!r ca~! to Nor:ll .. esl

AMSIENl AIR Oi.JALlTY - NEAR KARfAH CRUSHING PLANT

5.No. Parametets

Susrenle 1 .... 600

60

3 80

1 Sampling and Analys is t:<Hr1e d out u pef IS; 5182

J Lquipments Oet:111

C::qulpment& Details

Monitored by

Rflmarks

Chai;:ked b 1

,.1; Ci, 1C''"llV•t

!.~ .Jf'\! ~.v f~!)~, ~C1tCr.

i/r!rf E::::vfPcl· 1.1u !.,1 1,0 .1-.1~s ~2T

\·, ~·:,.:~ GJnesh -f:.i/ E~•~" .. utlVtl' \1! lo.(a~,l ·E~" Frt:ld Asst

• I'

Ru ult$

388

tJ 2

15 9

N~a! Radon Gas Ana!yr,1<.. •~ ;!on<r on11 Jn S;ib.:i Atomr<: RtHlllCtl Ct!nter ot Mumb:ii

Approved laboratory by MoEF, OHSAS 18001 and ISO 9001 /i12bS!'e • v-. "\L · .. l'- 1

• J .· 'u·• ... ... :;;,... h' '"- ""'' .> • ~.,. 3 c. •"'!.

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 36

STAHTLCH l AB~ PVr. nn

" SU\RTECB LABS

RH ll o

' .

I~.~ T REP.QB.I

liindust.J n C o nst r :.ict i on Comp;rny Ltd .

VrJl ag~ S pos · -$.1 · 7e 11 -Brrnpra {. ~ · ·'\- u Hf:

STl E S 1.i 1 •

l" ~'.) d't .. r . '

Da te of Pcpo1 :1ng

1~«>! 1 or; Z4t r:;

I t I~ f

Wrrid direcl:on So;n n ~ as1 to t,ont: we$t

AMBIENT AIR QUALITY - NEAR KARTAH ROAD SIPE SCHOOL

S.No Parnm'!tc rs

i limih

Pth ~. 11•). mi (j 0

P'A10. H91'11' 100

I Sulphur Dioxdus iSG:, i ia:i· n· ·. 80

Ni!rogen OitHid<-s iJ.C. 1 119 I'! 60

C::irbon •.fonoxl'le ; ;; c; ~ .. ·~ 4.0

A'l~lll{' 'I '1 ·~~Hi, 11P 400

I Samplin9 and Analysis cam" u out as per IS . 5162

Equipment$ 011ta1ls :

Eqoipments Details

Monitored by

Remarks

Checked by

• r

Co!llp !i (•s

' ~ -.~! Au I h 0 rn1 e d _ _!>-'y'-;--

Ruutts

13 .,

~9 e 11 3

1'5 0

N•J

2.:

t'.J.?ttL Radon G1s A11alys1s ;$ d o·1c cnf: in Baba AtQmic Rese rch Cl)ntl'r at Mlrmba1

Approv~d lnbo1ato:-1 by MoEF. OHSAS 18001 and ISO 9G0f ·r • 1 1 r· 1ta1 .ccm · •

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 37

1 I

(

TEST REPORT

Nome o! th• lodus1ry

Hindustan Con•truct1on

1 Company Ltd., Dale of Samplmg 151" Sep. 2014

V1llagf:' & • est ·,.~ .,1 Date of Receipt 21"1 S~p 2014

Add1ess Teh -banJ<''•l D1-,1-Ku11.1 1-1 P Oate ot Reporting 2£1tn Sop. 2014

REF No. 1 STLJEHS112•002-14

T4me of monitoring · 09 35 .Jf'"I 0£- 35 am OuraUon · 24nrs

Wtnd ~oP.ed 3 3 Kms I h W1od cirect1on .Soutti eai.\ to North Y1Ht

Arnbtenf Air Temp· 22.PC

AMBIENT AIR QUALITY - NEA~ POWER HOUSE - NEAR MAT TUNNEL

S.No. Paramet ct rs Limits

1 PM2 =.. µ.g/rn1 60

2 PM· . •lg,m~ 100

3 Sulpt11Jr Dioxides (SO,. !·!1 mJ 80

4 Nitrogen D.ox1de:; !iO, 1 ' g ,,,1 80

5 Carbort Monoxide (CO). µy/ml 4.(>

6 Ammooia (NHa) ~Lg r,• 400

Sampling and .Analysl$ c:nru:d out as per IS : 5112 Eq:.upmcn:s O•talls:

Equipmet1t1 Det.iUa

Mon1tor1Jd by

Remarks

Checked hy

f/(jf.,e- v t>l'll

Model No. RDS 9000, Make Ecote ch •I.ode' t..o M,S 1 n Mr • 1v;i Ganesh Env I •ocu11ve '"1• fl o -Env Fielu A s·

Comp!ie1

, t (\

~uthoriscd by·

Rea11ltt

/13.6

(\'~

14.2

18 1

Nil

21

li!2!£! Radon Gas Anal~~is ·~ done ooty lri Saba Atomic Rcse::ireh C11ntc1 at Mumbai.

Approved L<tborotory by MoEF, OHSAS 18001 and ISO 9001 f r•n1 r ~ t .:>ii Cl 1 ~· CO'l"I '

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 38

STARTECH LABS

TEST REPORT

Name of ti ;---i Hindustan Construction lndustr Company Ltd

i Ai:ldress \Village & pcst-Sa1n1

Tetl.-Baniar~. Q.s1 r,u!lu, H P

I REF No l STL.EHS '2100i ,14

cs 20 am

I Date of Sampling

Date of Receipt

Date o1 R~pot ting

Ouratior. · 24hrs

15'~ Sep. 2014·1 • i1~1 Seg. 2014

29'~ Sep. 2014

\Time of monitoring · 09 '20 am ·

l Wind speed: 3.2 Kms I hr

Ambient Air Temp 22.3•c

I Wind di(ection South east to North west

AMBIENT AIR QUALITY - NEAR MAIN OFFICE

S.No. Parameters Limits

PMu, µglm ·~ 60

2 I PM10, 1.1.gtrn 3 100

3 Sulphur Dioxides (SO,; ~lgfmJ 60

4 ~ Nitrogen OioXidos ( N~,", ,,grm' 80

s I 4.0 Carbon Monor.1de ~1_,1,; 1 pg;rr,l

6 Ammoni u (NH1). py• ·n 400

Sampling and Analysis carried out as per IS: 5182

Equipments Details:

Equipments Details

I Monitored b')'

Mare Aero Vironment Mociel No. RDD 9000 , M o ~.e: Ecotech lv"orJel No: AAS 127 Mr Siva Ganesh -Env Executive ~~· Ra J -E.n\/ F eld Asst

Rosults

12.3

58

10.6

17.8

Nil

22

Complies l Remarks ~---.-z..---~~~~-t

(70.. ;>-nib . Authorised by: I

, Checked by (\

r ,t:!Q!!.; Radon Gas Anatysi1' is cJonc only in Baba Atomic Research C-entcr al· Mumbai

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 Website. VN{!' ~"~-'1~;_!L~ < ._. ' : ·'lied r;~1~2lt1u [email protected];?ch!ab§. t:OQl. sl~1ri~f.hlabs@g'l'~JLf.Q!!l

Sainj HEP (lOOMW)-Environmenta l Monitoring Report No.S-2014/ (Q3) Page 39

,.......,

STARTECH LAru; PVl. L1D. ~r Anor, SMA C:n;vnM«s H No l SS; • Opp .. St Artn·a Jr. ColJego Matt1ttilQUOO t+iOoratmd. SOOOSO, A.P. INOl.A T4'1 t~·~0.?304HJOO, 2304100!:\ '4021'~ c:.maH qv;t1~Gtart~abs.oom . * STARTECH LABS f D L No J 'AA!AP!l'004i.4J. i G I

Address

REF No

TEST REPORI

flfndustan Co:1slrutllon CompJny Ltd.,

V1!1ag0 & post·Sa1?:1. Teti -eaoiara D st· •,u·ru l'i P

STllEHSll2rD 11 14

(WAd'iV St:R , I

Date of Sampling 18!11 Sup, 20U

Oat~ of R.,ce1pt 2t•t Sep, 2014

Oare of Reporting 29·~ Sep, 2014

OuraH011 24nrs -une cf mon:tonng 10 05 aP~ - '0 Q!i; ••

W1110 speeo 3.3 Kms I hr IJ lnd direct100 . South east to North wesl

Amt11enl Air Temp

AM81ENT AIR QUALITY - NEAR WORKStfOP/STORES (KART AH)

I S.NQ. Parameters llmlts

1 PM. ,, 1'9 m eo 2 PM10, ~1g/m3 100

Sulphur 01oiodH (SC: >'g n•' 80

.4 Nitrogen Dlo1tides (t~O.;). 11g !l"' 80

Carbon Monoxide (CO; Ptl"'' • 4.0

Ammonia (NH3), µg1mJ .. 00

Sampling and Analysis carrifld out as per IS : 5182

Equ1pmtnt1 DCl3llS

Equipment• Details

'.ion i tor~d by

Ch('c;.cd by

Make AP.ro V1ronme111 Model Ne ROS 9000, Ma~.e t::osech ~.b:!u: '>lo AAS 12i

Mr

Ct>mplies

esh Env c•c ull~e v Frel<J A st

,.-., Q;: ..... ~ I

A1Jthorlscd by:

Results

13 9

63

15 0

17.6

NH

24

Not•: Radon Gu An•f)'Jt$ i!5 done 0111~ 1n B•ba Atomic Rcscilrch Contor at Mumtu1i.

Approved Laboratory b-y MoEF. OHSAS 18001 and ISO 9001 • t I , b~

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page40

Sl'AHTFCH 1.AOS PVT f.TIJ :r r·ic)l",r ~.· .... u .. • ... ', ... .1."'t:r"'# '1 N~, 1 -•-!:.. , oop ""·' A11J1' 1 < , 1

1t ,1• ""·A·!· ·.::*··-· ~ ~di·• l! .ar: !.,(" J~ I'. P l~~l'<A Toi • !col ~OlJV-ll\)•)O :?J<;ll'l'O'.; 4021W!J4 E: ·m~~ <l~-tJ•t'(".>&~ll':ochfiil>ti CO"'

,'·

STARTECH LABS Io 1 no : 111, Al' ;•co-t '•t .;

r-sar .. c ol thf: .ndustry

Address

TEST REPORT

Hindustan Construe.lion Company Ltd.

Village & posr-Sa.·1,. fJat(' er Pf.:c..:ipt

REi No

j. The. · Ba'1jora :.i.,.· · "'' ·' HP I Da!• ol r•port1ng

~/EHS:t:~!C:;:: !4 , i·me of Sm11plrng

STACK MON!i ORING REPORT

DCliJ IS

Fuoi llseo

Control Equ1prnenl

Art·~nl 0

1; rp, cc Stac~. 1 emp r G

Nil

159

S·ack D1,ir"lele1 rr.

C's Area m:

Flow Characteristics

.• :-._ ·y 111/'i

Emissions Details

Partu:;ilate- matter. n1g/Nm}

Su;priur di:JXHJIJ rng/Nrn:t

Ol<"dt•s ol N1'r<1g(~"l lll{l/Nm) i CPCB Standi1td5 1 . .~

Sampling and Analysis carried out ;i~ p~r IS:t125S

Equipment Details

Monitored by

A<:,.C vrrrnm. ·- · · Mooe! No sr~\ '.:\,1

Mr Rajat»"'"1a Lr"t Ln:;;111(~1 Mt Siva G:ir•est· En~ l,;t1c,Jlrv~

11 , r r

21"'' Sep 2014

29'" Sep, 2014

1 ·40 pm

0.15 o o,;·7

11 f 1

510

115

eoo

At1 'J1il.;es a·i:· """' .\· lh rn 'II h•11ds 'l'3 ;>er CPCB Mo(r '"v"ns aod 1'..s per : ~' ~ '€ .' 1~,.; ied

-~ ' Checked by ______ _.,J .... }_·_·1~

Approved Laboratory by MoEF, OHSAS 18001 3f\d ISO 9001 "'"~"' 11 \'.ti.'. la eh ~·~r_ £.:-,, .~~·xi· 1r~~'" ·) :-;'.,iic.:1"1.,!:. ..P.!;]!!! COi

Sainj HEP (tOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 41

STARTt.'.( H I .t\B~ PVT. I.TU. ?.'"' flc.<it SMrt Ct•,, .. ;!.J~1 H No ! !.ill'.' Opp St ,'\rin~ Jr t'••• ' 'i!' V"1<11•1'Jc;11:1;; 1-iy(ll:r•ar.,· tl • !A• thv A 1• '"' ":IA

EMR-IV

Tt>i . 9• 4!J 2:1n4 ' "~"°- :".IM'90C' <1t:i7< r.r< "-''­~-•"a,1 '~ 1~i1t ( ..... ~ .. t'l.l,, •. t'''J .. _ "~err.

i () i.. h~ J ;,,., I&· ... ·· r,, • .., r,j t, , STARTECH LABS

Name ot 1;·t!

ln~u~!r ,

RLF ~,

Hindustan Construct!or1 Company .l.td .

Vrllag~ & pc~'f·.,'' : ·t~h Ban~ata : <~~ t·I;; u. ~i P

uatf.: of Snmp••c g

21" Sep. 2014

291" Sep. 2014

"WASTE WATER - VEHICLE WASHING RAl.iP - SEDIMENTATION TANK - KARTAH WORKSHOP

~---~-

S.No. Parameters Metho ds As per APPC01CPCB Results limits

,}1 ~\:;; 'i'j 4~.0B 5.5·9.0 7 3C i. !°"O~ul S~ViPC•'ded Sof1d:; (rr~! _ i APHA 2540D 200 162

3 011 & GreJ!;e •rrgt .. ) APH/.. 5~206 10 j B . Ct11::111 ca! Ox~gcfi Demand \,•,g .. ; APriA ~1/')(18 i~o 130

.. 5 f).c.1c"J•tar Oxy-g~~n Clerna.1d :' d:;r

,\PHA 5 i; ca 30 JO at 27"C (mg!l)

0 ·1 c;..1al Ro.:s1dlh1i Cti•onn<:· (Jn'.,;·-·' /, ~; rl/l.. ~ ~11.?G8 1.0 ~4 ii

I Sample analysis done as per APHA

Remarks: An3fysed as per given sample

,· i Checked b)

Approved Laboratory by MoEF. OHSAS 18001 and ISO 9001 Website t:.v.w ~li!r.~~t.'l.a,b~~Qf1} E·miJ.1 'i!.'1·1~)( Mf~~!:!.'lf.:'"tJ!,:ibs <,..:1n: ..J_ !!!?-l~ ~:C~!.r ·

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 42

STARTECH I.AB'> PV1. l.TI> 7' f°>oc1 SI'."!• ;.;1,·,tn1Jcn H Ne. \ 'vi (l!'~ ~· A<:r•· ;:. t..: tt '4P t-.1J(1u-~'.~~.J •. ~

Hy1for .b;.i:J ~·).' ''' ( 1 I· I' INU:A I lf;li • ~l 4fl·?.'.,., .•. )\1() .'304 l~;',, 41;~ 1 'ol'""

E i'fhll• tJ11iJ!ttY''"~l<100U•l11b·5 CO<••

f .n 1 N<. 1 ~;~ M; Joo.: .o.i ·<3 !

,.; STARTECH LAB~

Name o! ttrn 1ndus;ry

Address

A. I

TEST REPORT

Hindustan Construe lion Company Ltd ..

Vdag~ ,\ pv$l-Sa1·1· le!1.·8d 111.;rn r; s· "u ,1 HI;

S H.iEHS/12103 :' ·..:

U;.le of Sarnp11r1g

r Dain o! Rece1p!

D,1!£> of Report ng

1a·~ Sep, 20 1 4

21 sl Sep, 2014

WASTE WATER - FROM SEDlMENTATION TANK - BATCHfNG Pl.ANT - BARRAGE

As per APPCBICPCB Result5 Limits

Parameters Methods S.N-0.

FH ,\PHA 4!i0GB 5.5·9.0 7.35

2 Total Susper,doo Sof,d~ (m~ l - .\Ph/, 25400 2.00 1 i'O

.,j 0 1:. Gsu;;ic;e (mgfl } ,, V H .; 5 5 2 ~18 10 2.8

4 Cht:rn1c:a! Oxy,ge .• t."lcmard \' .:, ., ;,pliA 52LOi3 25D 116

30 28

1.0 Nil

5 la" og cal o, roen Dou.ax · l•Pf'ik 521UB a• n·c Jm,illl)

G r o:a· ReskJoal Cmonnc (m:JiL) /\PH/, 4 :i0(18

Sarnple analysis don<t as per APHA

Remarks; Analysad as per gllten :::i~1p!e

~eked L;

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 t.~t3;t~ VIW\'.Sl~t~-vf.!:: _ _ _.";""!s , ilii:?_;~~:~ .. ..>

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 43

/'

STAHTl:Ctl l.AUS PVT. I.TD <'~ r• . .,,, SM11 <,t:;o•·>tie•. I• Nv I './!. ! OJ.JR ~\ Al , t.. ... 1,•t-\'lt", f.t~d~Jin.-.. • 1 ~" HVdO'f\b';tC: ~·.1' ... ">f,,() J, i' i~f,,11/~ fo( • !1 t -40 ,· l1•4 ":t{I<; ; .l(M l !~lJ'. ./HJ/J !>i'J& ~ E. ·<n,~11 qo,3J'! .. · ' ~,.fA~~1:1 hi, lJ..J LCHl

! Ot. N.,; 1 pf, A; X o,f ''" (,

Namf: of U1e 'ndush

Hindustan ConstrucHon Company Ltd ..

-.. STARTECH LABS

I r

2')s.c Sep, 2014 • 11 p

Date of Reporting 29 11 • Sep, 2'014

REF N:J

WASTE WATER - FROM SEOIMErHATION TANK - TUNNEL WASTE WATER - ADlT-1

S.No.

'"I L

3

.!

6

Parameters

:11~m1cal O~ygen Dem.m·J :n ,

I U!olcgicdl Ox·,gcr Cetrkn"l 1 I .1 di .J • C (mg. ...

Sample analysis done as per APHA

Methods

: .• ~y,; 45006

!,J:JtJt.. 2~41J0

..;:::11-1r, ss;os

APH.:.. 51208

;. PH . .\ :;21 ()[3

J.Pt-JA 4&D08

Remarks: Ant:1lysc-d as per give>n s<iPiple

.'.et

As per APPCBJCPCB limits

5.5-9.0

200

10

250

30

1.0

7 . -,I -Authorized by

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3)

Results

---, ; 02

t 22

2.2

?S

26

Nil

Page 44

..,, .. STARTf.Cf i I.Ah~ PVT. LTD.

t ti N I\

°* START _Cl·I LAH~

Name r.i l lht: tndustry

Address

REF No

CIA.,. ff

I~~TREPORI

Hindustan Construction Company Ltd.,

Vlllage & post·Sa:n1. Teh.-Banjare, D1s:-Ku; ru . HP

STLIE:H S/121035! 1-!

Oate cf Sampltng

Dn·e of Receipt

Dato of Rr-i10· 1 ng

18'M Sep, 2014

21 •1 Sep, 2014

2911• Sep, 2014

WASTE WATER - FROM SEDIMENTATION TANK- BATCHING PLANT- MAT

As per APPCBJCPCS S.tfo Pa ti meters Methods .l.Jmltt Resuftl

pH APHA 45008 5.5·9.0 6.94

Total Suspended Solids (mg1t l AP~iA 25400 200 13 ~

3 o. . Grease tmg/L) APHA 55208 10 2.0 4 Chemical Oiygen .Demand (mgt>...) APHA 52208 250 106.4

5 Biolcgical 01111en Oen an ! ' at2i•c rng!L) APHA 52108 30 20

6 Tota Rosid.ml Ch ounc (n L APHA 450(,8 1.0 Nil

Sample analy-sis don1t aa per APHA

Remarkt; Analysed 8$ per giv&n SilmpJe

Samole Collected by

• L J I ( u _.. . I, (,..,~,.-.,~ -

Authorized by Checked by

Approved Lauorntory by f.1oEF OHSAS 18001 and ISO 9001 1t~'ebslt-a. •NIW c.tar;nch aus om E· I

Sainj HEP (100MW)·Environmental Monitoring Report No.S-2014/ (Q3) Page 45

~ (

STARTECH t.AB!::i PVT. LTD • ~,<~('I !)t.~~~ (, •• : 11 1."t-l ... •f P.11J- ! !;.& I

( J;1i·, S1 Anff::. J• l:,:~• ··-.:1::·~ tlt:\dJ~tlQ 1. 1(!·. t ><ydr.<ut.o,1u ~r.x: ·,;.,: ,t I' INOi.J\ TAI i fl' t ' ; 1i u 1 ... .._ ~ J.,.~ · ''fi~-· -"J: '•».Ji ?o

( ma,J f:ttJ<\f,ry-ll'~! •1tor •1;;n;h c~J'~t

f 0. L Ni; I H"! AP .l\J•)..;!,41 u i

i t

ST-\PTECH LABS

Na "le 1::. 1 !t ~ lndu~•t 1

Hindustan Cons lrutt1on Company Ltd ..

'J1ilage & post- Sa. ·,~ Teti ·oarjcP C;l, c ~ · ~-, ·:,, •'

I • . ol>\ ol' ' I·

Oa!e of Receipt

l Hi'~ St.p, 2014 1 21~1 S~p. 2014

2&·:0 Se;:i 20 H

WASTE WATER - FROM SEDIMENTATION TANK - BATCHING PLANT - AOIT ·1

As per APPCB/CPCa f Results I Umlu

S.No. Parameters Methods

pH I .-'Hf, .:5 )00 5.5-9.0 7,.26 ., ~ T o'.a: Suspenoc.-'J Sotds (mg ... ;.nHl'.\25.!..;D 200 128

3 e: .~ G•e;;se (mgiL) A:-FA ':io::·~n 10 I 4

~ Chem.ca. OxygeP I)e1;1..,r.r1 \noJ 1 r A '"'HA 512,!8 250 96 3

30 r c 5 P . .ioe ca Oxyger 0f:m" :J ~

,:.}- '•J.'\ ~!!OB <J~ 27'JC (mg L)

6 Tct,i; Residual Cr crno:: (n g _ 1 A:-:H A 450CB 1.0 N1:

S3mple ana lys i.s dont- as per APHA

Sanip:e (01 e..:red by

Cheded D~ ,· 1 '.J

). t ;fr...?

Aut horized b/

Approved Laboralory hy r.1oEr. OH SAS 18001 and fSO 9001 · E· ' .... : ·..: ~i£·~-- .J.l_'.ab-; !-0.!.!f, S.\il ~- · i~;smji am

Saini HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 46

\

SlAfffECH LAU& PVI. U D. ;'!'""1 Fk.JC1' S~1f< C,rtd!il~l'h'~ ti ft'O 3 -~ ,· OIJl' S: t.r:q;; - C· i!1~·1<.• l>.~.:;."!in;•~uu., 1-iyour.'lt>lVi ~ IJ!:\l ,, f' •NO!A t£~1 , Cf~ 4!l·;nr.14 !~•. :>:io.1t905 4c,:;;-:•·1tY~.-.

E rr:\~t f.l!lnh!y•.•·.·~,ra"~(! t..t 1ll:)...~. 1..{;rr~

/ li : Nt, r HI~ _,:; • (if.I.I Al {, t

TEST REPORT

N <HiH: 0 f Ill c ln!lus·1y

Hindustan Cons!ruc!ton Comf?ar.y lid

Atldres • Vil•aqe & post-~'" :11

Teh -9nn;ar(:• '..:: .• Lr~ .. r' p

;tAr STABTECH LABS

1€'" Sep. 2014

21& Sep, 2014

29'" Ser, 2014

WASTE WATER - FROM WORKERS CAMP/OFFICERS CAMP - AOIT·1

S No Parameters Methods As per APPCS/CPCB Results lirnits

vi M'HA 45008 5.5·9.0 7 15 YI

" fot<:il Suspended So:i:ls (rng'L.1 APHA n~oo 200 106

3 01 & Grease tl"lg/~ ~ :.PH/'. ~·!:208 10 1 0

4 , Cti~rnical Oxygen Oemanj 1m:: ·: · . .:.PHL.. 527.0& 250 BiJ

30 22

1.0 t-! 11

5 I 8>0k·,1•'•' Oxy9e., iJema .. ct '' 1 •;' "°;J-I/.., ~2108 .;t27°C {mgl)

6 icta: Residual Chfciin.: (P!Qfl) f, PHA 45006

Sample analysis done as per APhA

Remarks: An;)lys·ed as per given sairqlle

S.n r. 11' Ceo .ect~d by

Chocked by ,,· i I J J

·' l Au t h<>ri?ed by --- ___________ _..

Aµprovcd Laboratory Ly MoEF. OHSAS 18001 at1d ISO 900i 'tte~s·:€ \' :. ··· ::1tl<1bc; r ,.. f -r: t , ::-• •• 1 ~~

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 47

Sl'ARTf.CH I.AUS PVJ. D T>. ?""" ftF""')f SMfi Ctt;<i.fl J.H·I', H Nt~ 1 ~ / OPll M Ar'H!>c J• (., J»t:t;· M3'C.l<1:<KJi.,:rn f-t)'t1<1* t~~;):1 ..!)(,' l t ,.\ J' tr'Jf L/<.

1ef ~ g· ,4o~~~:i.l11i1 1 .. r .• ~J :''\. 1.i1~J~} .-,,, l~Jti ... ;

E ·f0~1I qu;~li:y(l.!l.»\;:<T!• · rhl.ll>~ r om

( D l N-. ! !RR Jl.P.?<104 Al (, ! STARl'ECH LABS

Name of Pie !ndusfr1

Address

Hindustan Construction ~Ott)pany Ltd_ 1

Village & post-S<J.·;;

l:a1e of Samplir;;

t\~tP cl Receipt

I 18'" Sep, 1014

21tt Seµ, 2014 Teh -Oar11ara. D1':.t .'..,J ,, HP

D'1tc ot Reporting

REF llo

WASTE WATER .. FROM OFFICER MESS SAINJ

S.No. Parameters Methods As per APPCB/CPCB

2

3

5

Cfm111icci! O)(ygc·n Oerl"Md (mgi'L.J

Bioiog:cal Oxygen Oc111J'l<j 3 ~1~, . .. 7 C mall)

Sample analysis done as po r APt1A

A· · ' A 2540!)

,!.p: •• ; ~5200'

:i21 0

Remarks; Analysed as per given sample

3ample Ct leered by

Checked by

limlt.s

5.S.9.0

200

10

250

30

1.0

• f"_.., -

Approved Laboratory by MoEF. OHSAS 18001 and IS090M 1.\'c;.!..s1' ... 1·.·.· ·'· '•' )~ r '-11 E·"' · r " ·~-· u?.f~.::•'1· rh hi':_~~n· 11 •'•l '-:s ...__

Sainj HEP (100MW)-Environmenta l Monitoring Report No.S-2014/ (Q3)

R~ults

6.89

54

, 6

62.4

16

Nil

Page 48

I'

STARTl·C'H I.AtlS PVT I Tl>. ;i•" f'loor. ~Mfl C• ''"" ,,,, H llt<. ' 5~ i Orp Sr Ar.1111 l• C:,:;.-!:t•: p,la·:J111n\t•i'li< 1-if'dl·"1t)F>\~ ""' t!'>~' f, p 1•1[)Jf. fo1 ttll ~(~ ."'.!..r11~~Y..r L J'.A1'it)~. 40,"S(I t·l

f ·"111i' quahtyu••''l-l"lf"l'ft 1t:'. Cftll'

f l) L No Hi/ I .'" • )t.}1111 Ai 1,i I

'" STARTECH LAB~

rName of the lndLisrry

Address

REF No·

Hindustnn Construc:tioo Comp:iny ltd.

vti;ag~ & r··-'s:-~- 31::} TE'~h -Bo:liBr ~1 C :-r< Ji:u HP

Dar,, nf Saripl1ng

Date of Re~e:p:

Oatc of Reporting

181" Sep. 2014

/1f1 Si?p 2014

29tt Sep, 2014

. . l ORIN KING WATER QUALITY - KART AH AREA - STORE/WORKSHOP {BOREWELL-3)

Parameter

Co1o' (Hazen un Is

Odor

iaste T vttmNy iN'TLi}

pH

Total Hardn~ss as CaCO: {1",:·l}

ICO'I as Fe (mg/L}

Chlorides as Cl {mgfL)

1 Res1duai free chlorine {mg/L)

01ss.:;lved ::c!ids ,l"'lg.L)

C:i c1•J"1 a~ Ca err.gr ... ) rl.agne.sium as r.~g (m9r.)

Ctrp~r as Cu {mg 1L)

1 4 ~/a'l:1,,rcsr: as l.~n (nlg t;

15 l Sulphates as so, (mgll J 16 N:lrate <is NOJ imgtl)

17 ~1i.:crn1e il$ F (rPgli.,

I Checked by · ,.\

Methods Deslrabi& limits

I .As Per IS 10500

5

Agreeable

AgreHbte APHA 21303 5 ----··•PHA 45008

t.PHA 2340C ~-APHA 35008

/,Pl~A 45008

/\PH .A 4 5008

APht\ ~S40C

.!1F r·•, ·~5008

.r.Pt~ ,, :i~rnoe

• ;.; f• t. · G \3

~PHA 4$0QE

/.fHf\ 4~·UOB

6.5-8.5

JOO 0.3

250

0.2

500

75

30

0.05

o. 1

200

45 1.0

Authorized by:

Results

Agreeable

0-4

6.98

55 2 Nil

26.3

Nil

216

· 19.4

5 2 Nol [)erected

t,01 Cetec!cd

tO.~

2 4

Nd

' ~ Approved l aboratory by MoEF, OHSAS 18001 and ISO 9001

\.~/eti:~-t~ )\'IN!. ~lats [ .~- . -~ _''_ -~· "'~: ,, =- ...:_ cv:

Sainj HEP (100MW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 49

STARH:.C H .I: ABS PVl. I JD. ~ F•t'·O~ SMR. -... t.;;'" L•f}f:O, ~i t•lj) • 'ii' : Ortr,. S? t..r,r ,~ ;t t> ~ Ji t~~.,r1•r.,,~, 1~:

H;d<.Hllt'i~d s~·u ,J~ L p 1~ ... UIJ\ r~1 .,.ffj 40.::.'·.,~: .. ?~::.:~ .~1(;.C1~r-~~) 4!·(·1~)'J'.n

£ rr•ad t:1un.~t~v:;i:;';:~~·-:,~~ :11.Jl. :l elJ•"' I D.L .fw"!; r :t:lf1 ·/10.. ~·:.n.: ,;i~ ·~' J

Hindustan C:::instruct1on Compa11, LI •.

SlAHTECH l.ABS

fame or the lnduslry

Address 1,,11:.;ige & ~' ... ·<.:.-ri 02~e or RecQ101 2' s: Sr.;i. 2014 Teh -8ar);a·:-. ~ .. H·"'; 1 :.: f1 P I

Daw ct RN;wun J '2Sl1' Sep, 2014

REF No

DRINKING WATER QUALITY • WORKCRS CAMP/OFFICERS CAMP/ADIT·1 SITE {90REWELL ·2)

'S No. Parameter

Ce>io; {Ha1on 1Jr:.;s l

t. Qj r

3 Tti'i!i::'

4 fort c.:7 tMTU}

5 :tti

;o

12

13

14

'6

'U)P US J:e 11119·l)

Ch!cf:'.les a!> Cl (mgtlJ

Rcsi;.:ual lfe;c: c~1lor1rw (rn~i'L ·

01ssc1..,ed solid"" (mg/I.)

C;:i;c1ur1 11s Ca (rng!q

lh'.:!'W"tl!m as :.1;: (mg1:.1

C;;p;:::r i:!S C1.. n:g l)

S r ' • JS SOc rn{l

r. ·rrqf: as 1•03 (mg L

17 FitJor1d•.: 0~; r \mg!:.:

I Check~d i:>y ,, J l .

I .

Methods

,\='dA .: 1 :(!8

I HA • }I! ::

!,l'>lit, 3~0·)8

,'..rlri,4 <:•%8

t-P•lf, 45(J08

/d~H}\ 2S40C

,.pu, l50'.18

B B

. / °'r. B • II t t. E

Desirabf e Limits A'!> Pi>r IS 10500

5 Agrceab!e

Agruab!e

5

6.5·8.5 300

0.3

250

0.2

500

75 30

0.05

!) 1

200

45 1.0

Results

Ag'ei:able

Agreeatii~

D 4

I 33

it8

134 2

NH 302 46 4

i 2 4

N': Detected

28 0

., ) I c L Authorized by: <t~,,.,.,b_ i.__::

Approved laboratory by MoEF, OHSAS 18001 and ISO 9001 /,_L .... t.: !!t.'I, ~-~~t=t.:;;.:t =

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 50

,, STAHTLCU LABS

N:ime of the lndugtry

I Address

REF Ho:

TE§LR.EPORT

Hindustan Ccnst ruction Company .. •

V·Hagi:> & ;; (~'.: "~) , :r,;. Tet; -Bar·p:a Ck»· ''';iiu

sn EHS

D~ite o! Rcce1p•

Oa•e of Rr.ovtmg

J r I

DRJNKlNG WA TER QUA LITY OFFICERS CAMP - SAINJ (BOREWElL·1l

S.No. Paramet~r

Colf/1 (Hazen units)

2 OC:i'

J T tt

4 T :..rb<i.\v (NTU:

6 pH

r, Tota ti,Jrcn.ess a~ CaCO. 1r" -

7 ir(rn a:; Fe {rng/L)

9

Cllunaos ;1s (;! lmg1_,

R .. .,. 'JD' 1.rA ;r nc

10 D.sso ·Jen solids (mgtl )

! l ~: i.m a. ~- ,mg ...

12 •.1 ay•·s:~rn a•. Mg 'rrJ l

13 (. ,,,. a~ C,1 (mo L}

i4 f,1 .r iares.., as ¥n (n..: t.I

Checked by .. -

g

Methods Onifablo limits As Per IS 10500 I

~~~~~~~--M'HA z· 20C

I· ::irlA 45.)08

A;,H.A 45:)08

1, &f5 E . 11,.. .::, 8

0

5

Agreeable

Agreeable

5 6.5·8 .5

300

0.3 250 1).2

soo 75

30

0.05

0 1

200 45 1.0

Authoriad by

a t ! ., Approved LaboratNy by MoEF, OHSAS 18001 and ISO 9001

Saini HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3)

Res ulls

Agreeabie

Agreeab e

0 3

7 25

88 I ! II

32.6

Nd

202

2~ 3

Nol De:eo:-!ed

t.o' De:~de.J

J l

Page 51

l Name of the Industry

Address

TEST REPORT

Hindustan Constr1.1ct1on Comp 1•) Ltd

V 0 llaye ~, ~- ,~_:[ ,;J•L:

STAHl r:cH LABS l It It

18:11 Sep. 20 · ~ t

21'' Bep._ 2014 fo~1 ·B • q 1S!·KJ lu I 7> Dale c' Reporting zgi· Sep. 21)1 .:

FN• DRINKING WATER QU t.UTY - BARRAGE VILLAGE NIHARNI

I S.No Paramet~ r

Co!}.; (Ha;:et: Jn.ts)

l Oct~r

'<l' .. 1t•

, T,,;-L1 •·'~ ii'<1'.'I ..

5 pH ,. ':i rota: :iardnt:ss ::s. CnC ~J "t lror. as Fe (mg/L)

8 ':::n1or1tJes as Cl ~mgJL)

9 ~e>•duaf '·er cnicri

10 D1~:,(,iVJ.'d sonds (rng. ( )

11 c ii t· d ,) a~ Ca (I' I ~i .I:._ j

12 t: '') r '· r.; ~ / r:i u is I,~ :J { r."1) '· ,~ Coµ~''·" as Cu 1mglL.1 •4 ~.la~g::int'S.:> -~ Ow •,1n \(fl g '1 .•

iS s,;;_,tiaies. as so~ (mgfL.

i~ Nit· :i't: as ~w~ (Pl9 'LI

F :J as F

I ;J, ) '

Methods

/. 0 HA ;-'140C

M1 HA J:.JOH

APH·• :r:ooa w .' ·~ 5008

"PHA 2!l•:OC

l ·, 3:.008

! P>iA ~':iOOB

Desirable Limits As Per IS 10500

5

Agreeable

Agreeable

5

6.5·8.5

30Cl

0.3

250 0.2

500

n 30

0.05

0,1

2()0

45

1.0

Results

t-11:

Ag r ~~ea ~de

t~greeable

Nrl

7.06 58 1,z.1

2'J tJ

N,I

12'1 . .. }

2.4

Nri! O~!e cte:J

r-l"; D~'.t.<..•ej

10:

j 2

- -~--1

Authorized by: 'i.~-.. ,.,71 )Le,("::::__ • Checked oy n

Approved Laborat~ry by MaEF. OHSAS 18001 arid ISO 9001

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 52

"· Nu

l,

1.

3.

...

s.

G.

1,

EMR·V

II.I'.~ IA 1 l. l'OU.li !'ION CONTl{()l l~OAIW Rer,if>n~i Oflkl' lllMllOA Shopping Compl.,~. Hll1l No·S, Kullu, Oistt·Kullu,

Plfl·llSJOl (H.P) Phone: 01902-223149 W~b~ite:http://hppcbnlc.in e-m•il.rohppcb•kullu·np@n1~.in

No PC!l/YL:!ltJ/M/:. s.i1n1 h~P/flA uv1r /}(}] ! 10

1 h~ .... ;t'11r#r tti ( J\dn1lf, .. I

t.,11. c.., "': ~f\.riro n~r"t' ~!..

H"PCL. ~_.,,lbili jBhu11IPt;.

OiW ·l\ullU·l 7S1?6 (H.I':

I

~:;b An.1lysis R~port and bill for the'"'~'~''' of W::u.~r s.tmples fMJ> of 21'" '.1tr-2014-1S. ~I

:.• Jo. • • ~ ... • .-. th. ;i•C•''" '''''' '"' ···•• 1;,· ; Rt'f1ort No . 9381>-&1, 9390-')4 dat<?d lS.J 1.2014 of the !~mph:> js) Of ,,,.y-\lt:!f:1 <lt.'!f .. •.'.'tfhH··~~ Ot yovr ;;..·~.tl-1.'l ! ' .,, ~:11;'1,1 C· ,:~':'"."!f•O i')I'! J().0!1.2014. nlf.\ ton1pa1 •. t(Nl~ ':iCiJtP(Ht.·nt ·.nuW!rtg

i•;t( . l:Y'1•'~f· ~·: Wi th h'•'\uit ~, l~ :Y't,.f1(1( •r':l·il r.•'."• ·~: ~;1:' )\;,:

~.H'l'11)1in,~ flo•nt S.~•-·p(){( r.1ar~mi!tttr

"'o p•1 00 coo 110!:.' Remark~

tu\./trnl /II n.f,/;) t"'~/1) r .. ,,m Natura! \'\l',lt~T )1 j(, 7 4~ 1.11 () 6.0 '1 0 As P"'t wdter quillity cf"lterl~: thi~

So111 t c• at Ror»• cl,is~ /\ It ,., ~u1\Jl>l1< for drinkina r t1,'1~UHP·

without rorwe.it1<111,ll trcdtment but Jlt"r d1v1ft:ctr;in

kdt•i.11 ' i; h ., ·\S ptr " ' au~l•tv er 'J, this conrtro1>

•I: dJ>:. u. It ;., !.:.:i:tabfe for outr.oor borth1:1d f t:il)r\y l\(!;I i l~,r '·U II 1 KM ll/S C1f .r 'll' I l~ "'> A~ P"r w.rter qu~lity ('1t[l•r11. lhi~ conllm» outll•t c.' .. ~s A. II " S\litablc for drinl<ins v.;thc>ut

-~·,1'!·~ • .-t'~!.' Hlotl ttP,'llJrr"'r~\ I tJt ,dtec 1t1 •nlt-ctiou R ~··"·· .\t •)l 1 I !; • r <\s µer Wdlt'r QL!~lity rr1i.1!th1; th1; CtHlllfn\') 0•11cr.1on tl<A~S A. ll j~ suitable fo• drinkin15 witnout Struc rurl1 Sitt~ r.on11entl:>n<'.ll tr11atm~ot but ,1fter dt,1nl••ttln1 Katrol NilH&r:, ,, ,.,~ 1 !<>: ·) " f.; A>. l)f'{ WfU('f qU~lity <.rll~fh) th·~ cor.t1rm!i l)I<; l,-,tJ~1.: c-L.!s-.. A II ,, 'urtablt· for cJr•nktr.g WolhC>Ut colo•, t-d t-1 <.O<"V?nt fcH''l-ll tt~,,it1ne1,1 bu' .)tt\.'' di:..1r"a l!t: ttO•t

''\.'"'.! ~tJ r:~l At n 78 (,, • J \lo As ~e: v..·,ltli.r qu31itv rnt<•r•,1. th" 1 1nfirm:1 Mt.St la \iut,~R<·) t.'t ~~ ;-~ A It IS >•1llabl<> ,,,, drinking witl1out

e.•.''W\•Pr1t1011 .. •' l'f~.:nrnent but JIH~r d1:.1nle:ctton f' v\•r "·'"" >~ .. ' I , PtH y.,,"Jtt?r q11.ili1y t: ~1rt•r1,1 lh11 Cf)~ t·rn•1..;. •"'!H.:lt:I'~ .)"~ ot ~, .... , f.. II :s S\Jitolblc to< dririfini; .v1thu1.11 ~Jrr .. ~·· \Ji convettho,l:i' \r~Jlrncnl but h , d1:~inf1!c\1or1

SiU (s) No.l<U5.l2.20l.-'l O<lted-23.ll.2llH, <Jrn<>unung R~.4040.!IO r,,. :,cco:.mr of s,1inpl,. •e~l<ng tn.11gi,s c1f thi! at;(',.e 1nent1or.11d s;unpt~ (s) l~/ illf' .11\,l ~·11<los"(J ~(!1t>w:tti Ym• oflt r<1c::>t'~!ed to <HrJfllJC' the payni1'1Jt ;ic;,in~t the ill>\lv<~ r<?fcrwd blll ln thl' form of l)<'!ll ~nrl llr;1ft ir: iavor 1)f The As~i~tM • !:n~lronmental Englne(!r, H.P.S.PCS,

Region ll Office, HfMUOA, Shoppin& C0<11plc~, H;1ll No-S, Kuitu, Oi$U.-Kullu, :":1·175101 (H.P) within Orl\I n•ooth End· \i'\

Copy 10:

,. v '~-w .... , .. -Sh,u •• 1

f\.ss.i$t.t.nt fn~lfOOtnentJI !:nf!wc•:~

H "S•·<•: f'>cllut•on Control ~oafd. «u1>11

Pli No 0 i '10.~-V.3 p~> . •), .. . ·-··

lh1~ r ... 1 •• 1•;b~-< ~1·r.11•t.Hv ~ ~ ... t,n.) l·~)lli,.i\i-',.l( \.·,...,...trc noard. Sh:;1;'. '.I ~v;tt•t L:'t rivo• -01 1 ... 1(1-::) '.fl'Or~l'G~·,

'._l,.... ..- ,-

:· .·,,:·'\~l ~ Y.4.l <!'t1"~' ~,· ;\(r;~:"'i \··.:~i ;ts.,i· i .: 1'<1UO!'lo>•·::ltd: l r1~··1H·~·r

, "1• Fi.;,11 ~<.·n~ .- \.-~ ·.J.t1,'o.... !~\1~'.;

'-J~ ~)!•It, ;1-':.1·

Sainj HEP (lOOMW)-Environmental Monitoring Report No.S-2014/ (Q3) Page 53

- /

H.P., STA:l'l·~ POLI l no., ( .'ONTROI. BOAHn (, J_ (" /,. ({, II.. IJ I/./: I 1 >I 11 \ t \I \.I) I I' \ (

l-.:.111·11 lo:.

~ ( .. 11 ·d lo

·'· :):th , t H, , ." 'l" : ... Q_J'"rllfil• 1>.:lail

·'' '"''·

-.

· ' I • !/( JJ/.\ 11: I/ .1 \'/)/•If.I•

1'110"1 \(J: 11/Wr'._'(ilo)/~I

\\11111 '-1 \II< \ltt'\llt!._IH\'<. 10 1'0111

11- .1.1 211: ~

I I

[11•

., ~

Sainj HEP (lOOMWJ-Environmental Monitoring Report No.S-2014/ (Q3)

EMR·VI

Page 54

Cor!l.Qarntive St.Hemen~ of Ambient Alr2em_plcs Sam~ling Point Report No P.ir:1mP.ter Prescribed Result (24 Remarks

Sr. No. Limit Hrs) Uc/m3

(24 Hrt) ue/m3

1 la lb 2

Ne,1rAdit -I A·~f><f0-1692 RSPM 100 44.66 Wit/11n limit Within limit With•r> Lomit

Within limit Wit'i•n limit Wilh•n Limit

Will 1n limit Within Lio:it W 1th1n Limit W1th111 lunit

Ni'iH A.ol•t -1 A 36~'l0 '\t><>.Z SO..' BO E\Dl

Ne<J• ,td1t -I

Dl:'l '>•t.' Nt•ar Adit-111 n1m ~ : .. ~e.i< Adt-11•

O'•n' '>•( • Near Adi~ !II

1 "\~/. 'J,, .>f" •I' I >ltr~ t

1 l\.~,1. 11, of l'r IJC" Srte l IJ 'f !> t_, 1 l(M D/ s MAT from P <>w• t Site

•tel 1 KM O/~ MAT Ir .;'Ill\ I' It '<;itl?

4h 111\.iOt-MATfrom I' 1 I Sit<?

!>. Powt>r I l<·11~e S1tf'

"> P·•<11 •c. Hnuse Site ">b Pcwr 1 tlrn1~e Silt;

<\·36')() 369i

A ~t·•ll h'l'>

A

" A ~t)~"- ti"'\

A~~, ... I

A·373Z- )7.~4

,, f 1

\ 4""> i""t ~J~l

NOx

'~" N' "12 ~.l)x

xSl'M

~02

Nh fl":>PM

502

HSPM

S02 MO~

BO 100

()

HO Wu

f~O

•o 100

80

;()()

P.O

RO

11.77

GS.66 BOL

15 S2

f:lDL W11h1n 11mit

Within Lun1t

73 O Within l1n1it

SOL Wrth n lm1lt 7_13 Within Limit

.L.i ...... ., .L .. Assistant C n11111fr1,.1e111al Eng•l\E'E!r

H P State Pollution Control Soard, Kull11 Ph Mn 01902-223149

,~, -

Sainj HEP (100MW)-Envinmmental Monitoring Report No.S-2014/ (Q3} Page 55

2. J;"'orest Clearance.

Forest Clearance rccejved vide order F.No.8-93/2008-fC Govf of India, Mini:'itry Of Environment &

Forests (FC Division) Paryavaran Bhawan, CGO Compkx, Lodhi Road New Delhi 110 003 dat~d 26'h Oct,

2009 from Sr. Assist.ant Inspector General ofFtirests.

Compliance sratus for rhe conditions included in I.his clearnncc letll~r is given below. 1\rea is given in ha

(hectares) and amount in Indian Rupees (Rs.). Th~ unit used is Lakh/lac (One lakh is equal to One hundred

thollsand or 0. JO million) and C.rore (one crore is t~gual to I 0 million or I 00 lakh).

S.N. Measures/ stipulations Compliance Status

1 l .egal status of I.he diverted forest land shall HPPC!, will not seek changes in t.he legal status

remain unchanged.

2 The Compensatory Afforestation (CA) will be For Compensatory Affon:~station (CA) over 96 ha -

raised 1111d mainte1ined by the StMc Foresl. land t.c. twice lhe area of forestland diverted

Depa_rtm~nt al the project cost. (47.993 11a) in lieu of diversion of forestland for

the Proj0c1, Rs ~~.b50 lacs haH~ been deposited

during Sept., 2009 wilh Himachal Pradesh Forest

lkpartmenl.

3 The User Agency shall furnish an underlaking HPPCL will pay the udditional NPV as per the

to pay the additional NPV, if so delcrmined, as final decision of Hon 'hie Supreme C\iurt ofln(fai

per the final decision of Hon 'bl~ Supreme and an undertaking Lo this cffoct has been

Court of India. submitt(.:d to Fore::;t Deptt.

4 The User Agcn1;y shall implement all the The Muck RehabilitAtlon P1Ai1 is being

con<litio11s of the Muck Relrnbilitation Plan implemented with due diligence. The

under the supervision of Slutc Forest Dept.t. At engineering mc1rnures are being executed by

the project cost. HPPCI , concurrent to tlK muck dumping.

11.owcvcr, the biological measures will be taken

on completion of muck dumping, with assistance

and guidance of HP Forest Departm~nt. After

stabilization, all the muck dumping site.<; located

on fore8t land shall be hanckd over back to HP

Fllrest Department.

SAINJ HEP ( 100 MW) Fnvironmcut Moniloring Repott No. S·2014/4 Page 21

5 i) The user agency shall ensure thal muck do1.:s Proper Protection .tuethods arc provided to avoid

j not roll down 01e slopes. All such areas where the roJJing down of muck whenever required.

muck has rolled down the slopes shall be

rehabilitated at IJ1e cosl of user agency and

uuder the supervision of Stat'e forest

department.

ii) Construction of check dams, retention/toe Retaining walls have been constructed to avoid

walls to arrest :;tiding down of the excavated sliding down of c11.ca vated material along the

material along the conlNtr. slopes.

iii) The dumping area of muck disposal shall The dumping sites have been protected as per

bt.: stahilized and re-clai1rn:<l and plantatiou of norms of Stale polluLimt control board. Mor<'over

suitable specie8 slrnll he carried oul over stabilization, reclamation and plar1tation etc. will

dumping areas at I.he cost of user agency under be done after complet.i.011 of excavation work.

supervisiou of Slate ForesL Department.

Stabilization and reclamation of such dumping

~iles shall be completed as soon as the

e.xcavation work is over, before the closer of

the project.

6 The entire re~ervoir area shall be dt.:clared as a The entire reservoir area will be got declared as a

Reserved fore.st under Indian forest Acl, 1927. Reserved Forest under Indian Forest Act,, 1927

However, regulated fishing shall be ullowed. by State Gtwt. with regulated ffahing rights a.lier

commissioning of the project.

7 Green hclt of adequate width shall be raised by Green belt of adequate width will be rni8cd by

the user agency around the reservoir at. the cost

of project.

the HPPCI . around the re~ervoir as per the

availability of suitable area in commltation with

forest Department at the cost of project

However, plantation near project appurten'1nce

is being carried out by the contractor

3 Tlic User Agency shall fac.;ilitate a study on the The ma1.1<.:r was taken up with (LB. Pant Institute

impact of this project on the GHNP in general of H imalayan Rt.-s<',arch & Development, a

and flora & fauna of the local area in particular govemn1t:nt institute at Mohal. Kuitu, HP for

by a reputed institution like Wildl ife Institute carrying out the study on the impact of this

of India (W 11) or Bombay Na turn I History project on the Gl.lNP m general and flora &

Society (BNHP) or Indian lnst.itutc of fauna of the local area in parti1,;uJar. The institute

Sciences (US) clc. has agret>,<l to carry out' the study & submitted

SAJNJ HEP (100 .MW)-Enviro11111e11t Monitoring Rt:pl>1t No. S-2014/4 Page 22

TOf{. The work lrns been awarded to the

in.stilutc. Interim reports tor the 2nd year of study

& utilization certificate have been submiU.ed by

the institute during April. 2014.

9 The user agency will lake all measure to HPPCL will take all measure to contain the

contain the subs idence over 6.053 ha of forc~t subsidence over 6.053 ha of forest land requin.:d

land r..:qnired for underground works. In lhe for underground works. Provision of

event of ~ubsidencc beyond permissible limits, Compen.satory Afforestation again.st 6.05J ha of

the user agency •NilJ be responsibie for the fore~t land required for undcrgr(;Und works has

damage and provide equivalent ncrn- forest already been kept in the EMP.

hmd along with funds for Compensatory

Afforestation for the same to the State fo!'est

Department within 6 months of its occurrence.

10 The forest land thus diwrted shall be non No acti(m required at this stage.

transferable. Whenever the forest land is not

req11irl·d, it shall be sw-rendered lo the Stare

Forest Department under intimation to this

Ministry.

11 The User Agency shall tak~ all measures to Suitable protection works as per i·equinm1ent at

avoid frequent road blockade due to landslide site is being provided to avoid frequent landslide.

etc. and shall provide breasts walls and

retaining walls wherever necessary.

12 Any other conditions that the Conservator of So far (dale 31..1 2.20 14) no additional

Forest (Cenlnil), Regional Office, Chandigarh conditions are conununicated.

m<1y impose from time lo time for Lhe

protection and improvement of flora and fauna

in the forest area. shall al:-.o be applicable.

13 All st.cps shall be taken to prevent l:mdslides to NccesRnry steps will he taken to prevent

ensun; slope sl<1bility and also to ensure that no lancl.:;Jidcs by ct'nstrnctlng Retaining walls,

damage to the roads, human life and flora& Gabions & other retaining structures wherever

fauna is caused. neces:rnry.

SAINJ IlEP (J 00 MW)-F,nvironment Mt,nitoring Repmt No. S-20 I 4/4 Page 23

3. Environment Clearance

Environmental Clearanc~~ for Sainj ( l 00 MW) HEP was accorded v idc Additional Direct()r Got MoEF

letter No. J-12011/30/2008-JA.l dated 4rh May, 2009.

Compliance status of conditions of Environment Clearantc is given in the following:

SN Safeguarding Compliam:e Status

mcasu re/Stipu lal ion

Par t A: Spccifi<' Conditions

i) Catchment Area Treatment PJan The funds in phased .manner (in five years) are being rel eased to

as has been proposed should be HP Forest Deptt. (CAMPA account) for implementing CAT

completed in 3 years. Plan. The total provision allocated for CAT Plan is Rs 111.54

miJlion.

Following payrricnt has been done in favour of forest Deptt:-

s. Amount Date Remarks N. l)(\posited

(in Rs.) l 5.20,75,000 3/04/2010 Rs. L 85. 14 lakh for o

vear and Rs. lakh for l sr year

335,61

2 2,75,~ 6,000 30/03/201 2 2'"' year implementation of CAT Plan

3 2,42,98,000 29/03/2013 3'u year implementation of CAT Jllan.

A sum of Rs. 48, 07,000/- has been utilized up to Dec-2014

against the approved APO as intimated by DFO. Shamshi vide

letter No. 4547 dated J ()/03/201 5. (Already IHtached as

Annexure)

ii) The land holding of project Stand!': submitted.

affocted persons whose land J8 R&R Policy of HPPCL is Iawst and ik; prcwisior1s are betlcr than

being acquired to be S\tbmitted to National policy. Wide publicity has been made through

this Ministry. The R&R package pamphl ets, letters, calendars. brochurl·s, banners, training cum

among N RRP - 2007 and awar~ness camps & with the help of nodal communil.y based

HPPCL R&R •.J<1'·kagc, · · t " org:a111za t10n.

whichever 1:; heller should be

t(>llowed for project affected

SAINJ HEP (100 MW)-Environmcnt Monitoring Repott No. S-201 4/4 Page 21·

persons. Adequate publicity of

the compensation package

Rhould he circulated in the

atfoctcd vmages.

iii) As per finding of the survey R&R Policy of Hl'PCL is being followed for declaration of

during the Eli\ study, no person landless and houseless person~. As per l<&R Policy of HPPCL,

is being rendere-0 landless or the P AF losing whole a,_,'l·kultute land or whose. balance

houseless · due to the laud agric\1lture land left afkr acquisition is less than 5 bighas is

acquisition by the proj<::Ct, ckclared landless and as per Nalio11al R&R Policy 2007, the PAF

however, if any person rendered losing more than 75% of land holding shall be declared landless.

landless a:s per definition of The provision of National R&R Polky 2007 (a µcrson losi1ig 75%

Nationul R&R Policy 2007 of land holding to be declitrcd landles~) is also folfilled io case of

(more than 75% of land holding Sainj HEP as all the persons losing more than 75% of lund are

acquired) shall be declared also declmcd landless as per UPPCL's R&R Policy.

landk:s.s and all con::;cquent

benefits as per the resettlement

& rehabilitation plan would be

released ro him/her.

iv) The conunitment made during Ts being fulfilled. A separnte section (section no. 4) is addi:d

tbe public hearing should he

fol filled.

v) During leall season 1 cumec Shall be released as per stipulated condition and aspect shnll also

water has to be released for be added in operatitlll manual.

mai.nlaining the aquati1.~ life rn

the downstn:am.

\~.) All the equipments which are The machinery being used for the project work is fully mollified.

likely to gencrnte high noise

levels arc to he fully mollified

(noise reduction measures).

Regular clwcks are being made lo limit their noise level as per the

permissible limits notified by tile manufactmer. (Already attached

1ts Annexur~ EMR-J)

SAINT HEP (1 00 MW)-Environmcnt Monitoring Repo1t No. S-2014/4 Page 25

vii) Consolidation and compila tion Seven No. sites have been identified for muck dumping m

of the muck should bG carried- comniltation wi th Forest department and pollution control Board.

out m the muck dumping sites

and the dumping sites should be

<ibove high :flood level The

proposed pl an for gt!nerated

muck of 0.805 Mm3 in the I • project i.e. about 0.283 Mnr 1s

proposed to reutiHze for the

construction material &. other

filling purposes and renrnining

0.523 Mm1of muck which gocs­

up 0.733 Mm3 (afler increased

volume) will be disposed of at 7

designatl,°;d dispos<1l an.:~as should

be s trictly implementc<.I.

Sr.No Dumpin~ sit(' Capacity of dumping site (nr')

I. Dumping ~ite No.- I at 116864.00 Niharni

'} Dumping site No.-2 al 1(1343 LOO Ka1taul

3. .Dumping site No.-3 at 41439.00 Sambha

4. Dumping site No.-4 at 231306.00 Km1ah

5. Dumping site No.-5 at 507035.00 Dhannehara

6. Dumping site No.-6 at 42323.00 Karehalla m:ar Surge Shaft.

7. Dumµing site No.-7 at 58(i86.00 Suind n'-'.ar TRT.

Total l'apncitv iu cum 1161084 The Muck dumping .sites arc being prcpan~d/con8tructed as per

norms of H.P. State Pollution Control Hoard for dumping.

Presently muck is being dumped in five dumping silcs o.oly and

protection works has been provided a t these dumping sitc8. The

contractor has spent an amount of Rs. 49.132 million for the

preparation of. dumping ~ites.

Proper moni toring and inspection is being carri ed oul by HPPCL

i:lltd HP SPCU. Copy of latest muck dumping report submiltcd to

H .. P State Poll ution Control Board. (Already atla.ched as Annexurc

EM H.-V)

!viii Atforestal.ion prognumrie in 96 Afforc.statiQn will be raisl~d and maintained over degraded ·forest

ha as proposed should he strictly land twice in extent to the forestland proposed to be diverted

taken-up. The proposed plan to which comes lo 96.00 ha, at the pn~jcct cost. Requisite funds to

ere ale Sainj Valley the tune of Rs.92, 49,636/- have been deposited with the 1-IP

Conservation Cell (SVCC) under Forest Depatiment dw-iug the month of Sept. Four No.

the aegis of Director; Great computers and one no. Vehicle has already provided l.o Forest

Himalayan National

(GHNP) should be adhered.

Park Department under this ph1n. Fifteen No. Home guard has been

deployed in Great Himalayan National Park al the proje::cl cost

during Oct, 2012 to ensure regulatory provisions lo prokel the

SA INJ H EP (I 00 MW) .. finvironment Monitoting Repo1t No. S-2014/4 Page 26

existing biodiversity.

ix) Green belt development a:; Sha I I be implemeu1·ed as per proposal nf Green nclt Deve lopment

proposed on the either side of the in consultarion with Forest Department. a fl'cr lhe rnmpletiou of

reservoir covering with 2-3 barrage. Matter has already been taken with Forest Deptt. for

layers of planlation in an area of tkvelopmcnt of nursery for plantation in project nrca.

40 ha. using about 18 different

plant species should be

implemented.

x) The fisheries managerncnt plan Fingerlings shall he stocked after the formation of Sainj rci;crvoir.

for stocking of fish n1 Sainj First in~tallment of Rs. 50.00 lacs lrns been rdeftscd during the

reservoir @20000 fingerlings! montJ1 of April, 2010 1.o the Stalt: Fisheiil:~ Dept!. for the

annum should be strktly implementation of Fisheries Management Plan vide Leu.er No.

adhered. The. construction of HPPCUSHEP/.F&A/Cash/20 I 0-11-34-37 dated 13/04/20 I 0.

additional rearing space tor fish

hatchling at Hamini Farm should

have separate bnys for rearing

carnivorous and herbiv<.)rous

Fisheric:.s Managcnrnnt Plan of Sainj 11 EP has been modified hy

H.P. Fisheries Department for native foh vide Director cutn­

warden of Fisheries office letter No. FSH-F (2)39/2008-ARC­

VUI-7 l l 9 dfttc<l 7/08/2009.

va1ieties of trout fishes A total budgc1 of Rs. 100 lacs is allocated for this purp()se & will

separate ly. The nalive fish as not be di vetted for other purpose.

reported in the labk No. 5.54 on

page 5~67 of EIA report ut SI.

No. 1 &2 Schzothorax

plagiostomus and Schzothorax

progasthus would also be reared

m the proposed hatch~ry as

committed m the letter dnlcd

19.3.2009. A tot.al budget of

R::i.100 lakh.s is allocated for tJ1is

purpose should not be diverted.

xi) a) Minimum downst.rcam tlow of Minimum one cumec water shall he released. This aspi.:ct shall

water necessary for the survival also be added in operation mamrnl later on.

of aquatic life and water holes

should be released even during

the lean season.

St\lN.T HEP (JOO MW).Environment Monitoring Repo1t No. S-2014/4 P<~ge 27

h) for conservation of floni and A provision of Rs. 25.4 mill ion for conservation of flora & fauna

fauna of the Wildlife sanctuary, of Wild Life Sanctu.ary has been made and a study is being

habitat improvement prc~jecl, c<irried out on the impact of this project on the GHNP in general

agency has to cornmit for the and flord & fauna of the.~ local area in particular by GH Pant

cost of th~ pr<)ject/ or for the Institute or Himalayan Environment and Development, Mohal,

commltancy charges involved, if Kuitu, HP.

any.

c) No blasting for construction No blasting for construction of rond/tunne.ls c1c is being done

of ro11d/tunnels de should be uuring winter season in the periphery of sancluary area i.e. 2.5 km

done during wiuter season in the of the area.

periphery of sanctuary area i.e.

2.5 km of the area

d) No labow· camps shall be set This condition is being complied with and labour camp has hcen

up 111 to periphery of Wildlife consCrucled outside the periphery of Wildlife Sanctuary areas i.e.

Sarictuary areas i.e. in the 2.5 km in the 2.5 km of the area. Labour camp i.s fully estabfohed near

of the area. The user ;igency comtrnction s ite.

should make such camps in the l .abour camp till date. ofreporting as under:-

adjoihing vi11ag(.'.s or somewhere

else and make ne~essary

arrangements for transport of the

labour to and fro from the

projecl site.

.SN Name of Distance from Remarks

labour camp WildJife

Sanctuary

• .Jangla, Adit-1 Jkm approx.. -Contractor has provided the Bus Service (Company vehicle) for

the purpose of transport for transport. of the labour to and fro from

the project site.

e) During constmction period, Tlu·ee no. check rusts are being maintain<.:d to regulate movement

number of check poists shall be of for~t produce in consultation witb Forest Depitrtment

maintained m consultntion with

Forest Department, lo regulate

movement of forest produce at

llu.: ccist of user agency.

t) Excavated material, if any, All tl1e dumping mal'crials are dumped only m the specified

should he properly utilised for dumping areas, nol. in forest hmd or in UK peiiphcry of wild lifo

construction/ or dumpt'.d in ~anctuary areas.

speci !led sites only, it shou ld not

SAIN.I HEP (I 00 MW)-Environnient Monitoring Rcpmt No. S-2014/4 Pi:lge 2B

be thrown on the slopes or in.~ide

the fores tland or around

periphery of wildlife sanctunry

<1rea.

g) No tree felling in immnd 2.5 No tree~ felling w11l bi;: done around 2.5 km of the wildlift:'.

km uf the wildllfo sanctuary area sanctuary :uea.

should be done.

h) During execution if needed So far (31.12.201 4) No such additional condition has hccn

Chief Wildlife Warden/ imposed or communicated

Conservator of Forests, N ational

Park may stipulate any condition

which is necessary for the

protection/ welfare of flora nnd

Fauna.

Parl- ll: General Conditions

i) Adequate free fuel arrangement Fuel alTangement (LPG) has b~n made by contract.or for its labtlltr

should be made for the labour and staff free of cost. The deta il or fuel provided to the labourer

force engaged in fhe from July, 2014 to till Dec, 2014 is as below:-

construction work at pr«~ject

that in di scrfrni nate Sr. No. Jul-14 Aug- Sep t- Oct-14 Nov-

Jlcl·-1.J Total cost so 14 14 j4

felling nftrees is prevented. Nus. of Labour

620 582 587 554 508 437 3288

~lll!"al!ed

LPG 94 105 IOI 106 81 96 583 Cylindc.-

Total I' xpcnditurc

165440 184800 171!()(,3 175960 138429 14476!! 98746()

( in Rs.)

SAINJ HEP (100 MWHinviro11n1cnt Moni<uring Report No. S-2014/4 Page 29

ii) Fuel depot may be opened (ll LPG cylinders are hcing provided by the contractor to the labourers

the s ite to provide the fuel at the site. Two no. first Aid <.;'.:nters have been constrnctcd by the

(kerosene/wood/LPG). Medical contractor near constrnction sites and also provided two nos . well

foci Ii ties as well as rccreatioi1al equipped ambulance. Frequent health checkups are being done.

facilities should also he

prnvided to the labourers.

iii) All the labourers to be engaged Lahourcr:; to be engaged by the contractor are thoroughly

for constructjon works should examined by health personnel befor.e issuing them work permits.

be thoroughly examim:d by Proper F'irst Aid centers have been constructed by the contractor at

healll1

adequatdy

pernonncl

treated

and constrnction sires. Phannacists were appoint.e<l and frequent health

bcf()re chcd .. -ups arc being done.

issuing them work permit.

The detail of nKdical related expenses from July to Dec, 2014 is as

given helow :-

Sr. Nu. Jul-14 Aug- Sept- ()(C - 14

14 14

No.of pollen! 1261 1474 1262 RRR visi ted

l)j_q1r11snry

Exprmlilun on medicRI ~•n ff ond medicinr

140891 152181 146660 152699

(in Rs.)

iv) Restoration of constrnction are<l Shall be implemented at appropriate stage.

including dumping site of

excav<tted malcrials should be

ensured by leveling, filling up

of burrow pits , Jand::;caping etc.

The area should be properly

treated with sui1able plantation.

Nov- l)(c-Tobi

1<1 14

846 'J92 6721

111 416 124749 l532443

v) Financial provi~ion should be /\ provision of Rs 428.427 million has been kept in EMP. The

made in the to1al budget of the costs are inbuilt and additional costs have been taken in the revised

project for implementtttion of cost estimate of the DPR. However, i t is assured by the

the ;1.bove suggested saft:.:guard managerncnl that adequate fuud.s for 'implementation of EMP shall

measures. be available.

SAIN.f HEP (100 MW)-Environment Monitoring Report No. S-2014/4 Page 30

vi) Six monthly monitoring reports Report hcing suhmittcd regularly. Last report f(lr lhe period ending

should be submitted tu the JO. l l.2014 was filed vide DGM-II Sainj HEP letter

Ministry and ils Regional No.H.PPCL/OGM-TI/DR-9/2014-64-67 Dated 28/0512015.

Otiice, C handigarh f1.1r review.

5 Officials from Regional Office Shall be provided full corpon1tion, fo1;ilities and data during their

MOEF. Chandigarh who would inspection.

6.

be monitoring tJ1e

impleme.ntation of

environmental safeguards

should he given ti.111

cooperation, facilities and

documents ! data hy the project

pro11011ents

inspection.

drning

The res1)(ll1Sibility

implementation

thdr

of Agreed and being complie.d with.

or environmental S'afeguards rests

fully with the l limachal

Prndesh Power Corporation Ltd

& Guvernmen1 of Himachal

Pradesh.

7 The total amount of Rs. 41.87 The exact amount of EMP is 428.427 million and it will not he

Crores kept m the budgetary diverted for any othe.1; purpose.

provisions for implemenla1ion

of environmental management

plan should be s lric tly adhered

and not to be diverted for lilly

other purpose.

8 ln case of change in the SC(lpe Agreed

of the project, project would

require a fresh appraisal.

9 The Ministry reserves the right S:ifoguard measure.~ shall be implemented. as suggested and

to add additional safegu:~rd additional safeguard measures jf any suggested subsequently vviJl

measures subsequently, if also be implemented.

SAINJ HEP (l 00 MW)-Environment Moni loring Repoit No. S-2014/4

found necessary aud to take

action induding revoking of

I.he clearance under the

provisions of the 'Environment

(Protection) Act, 1986, to

ensure effective

implemcnt~ition of the

suggested safeguard n1.easures

m a time- bound and

::;atisfactory 1nanner.

10 This clearance l.eltcr is valid for In terms of da.te the letter 1s valid up to 04-05-2019 for

a period of 10 years frvm the commencement of works. Constrm~ tion work has already been

date of issue of lhis letta for starlcd and shall be completed by year 2015.

commencement of construction

work:.

ll A ..:opy of the clearance letter Copy of the clearance letter has already been sent to concerne.d

will be marked to concerned Panchayats/ Local NGO vide letter No.HPPCL/Sr.Mgr.

Panchayat i local NGO, if any, (P&M)!Env. (Sainj)-1/09 dated 22i07/2009.

fr.om whom any suggesLion/

representution has been

received while processing lhc

proposal.

12 State Pollution Control Board ! Confirmed telephonically from SPCB that the letter has been

Committee should display a displayed at the Regional Office, District Industry Center and

copy of the clearance letter at Collectors Ofilce/Tehsildar's office.

the Regional Office, Di~trict

Industries Center and

Collector's ofJfoe/ Tehsi!dru·'s

office for 30 days.

13 The prc~ject proponent should Insertion m the News papi.:rs was alrt:ady made m two local

advertise at least 1n two Local newspapers.

newspapers widely circulated

m lb~ regjon around the

SAIN.T HEP (lOO MW)-.Environment Monitoring Rt:pt•it No. S-201414 Page 32

project, one of which shall be

in the vernacular language or the locality concerned

informing that the project has

been ai:corded cnvironmenlt1l

clearance and copies of

clearance letters are available

with the State Pollution Conh·o(

Board I Committee and may

also be seen at Website of the

Ministry of Environment and

Forests at http://

www.cnvfor.f!!c.in

SAINJ HEP (JOO MW)-Environmcnt Monitoring Repo1t No. S-2014/4 P<"ge 33

4. l~ulfillment of commitments of Public hearing

S. Statenu.~nt of Action taken

N. issues Response of Project Proponent

1 Rate ~,r That Pro_iect authority has made As decided by the competcnJ irnthority (Land

compensittion for <111 R&R package folkiwing the Acquisiti011 Oftkcr) the compensntion of

the land. houses National Relief and land tree,,. and strnclures disbursed among the

and trees acquired Rehabj\itation Policy 2007 and owners.

for the Project. on the relief proposed is heller than

the pattern of the package: envisaged in the

ADHPL and central policy.

NTPC

Dum).

2. Disturlrnnce

allowance

(Kol As r~gards compensation on the

pattern of ADHPL (Mlain­

Dhuhungan Hydro Power Lt.d) &

NTPC Knldam, it is clarified that

HPPCI, will pay as per the rates

fixed by the LAO (I .and

Acquisition Officer) and H.Pl'CL

docs not go 1n appeal against the

rate 1.1ppliec1 by LAO m the

award.

3. Pennanent job to As per availability of post and As per av;:iilability of po~t HPPCL shall give

4

all displaced and suitability of the persoru; preference to P J\F as per their eligibilily.

afl"ccrcd families. afkctcd, preference will be given

in the appoinlrnent.

Free training lo

youth.

A scholarship scheme would be Under Skill Up-gradation of local youth

introduced by the project Scheme (ITI Scheme) following no. of

proponent for the eligible candidate.« has been nominated for free

persons from Jlrojecl Affected. tsaining in JTI; .In addition, Sponsored

fomilies (PAF). candidates are given R.s. l 000/- pm

scholarship also.

AY 20011-09

01

Academic Y car (Nos. of ':nnctid:itcs nninin!lkd)

AY 2(1(~9-

lO

09

AV 2010 -IJ

10

AY 2011-12

08

AY 2011-1.l

07

AY 2013-.14

12

2014-15

SAINJ HEP (I 00 MW)-Environment Monitoring H.eporl No. !.l-2014/4 Page 34

5 Extension

Su ind- I<ra hi la

of It is not possible to make it as a

project road but it may be taken

project road up lo up under LADF (Local Arca

Development. Fund).

6. Land m lieu of Giving land in lieu of land is not

land. po::;sibk. However, retlU'n of

7 Return of surplus surplus land alter C(lllSlruction of

land afkr pr~ject can he considered. No

completion of the commitment can be give11 at this

Project. stage in this regard.

8 Widening of Widening & metalling of Sail\i- Widening of Sainj-Nculi road has been

Sainj-Neuli road, Neuli road shall b<.: got exi.:cuted completed.

before the start of through I lPPWD with the

construction of request to complete the. work

pr~ject. he fore co11mienceme11t of

construction of the project.

9. Construction of Not possible from pn~ject cost

road on right hank but can be La.ken up under the

of river Sainj. LADF.

10 Constn1ction of The demand for community

community

Centre al Neuli.

centse, modem village,

dispensaries, school, playground

11 All villages and drinking ·water may be met

should he adopted from LADF. Some of the

and developed as dumping ground, if found

modern villages.

12 Providing

dispensaries,

.suitable, can be:: leveled on

complc1ion of dumping and left

as play grol!nd. Regarding

middle school, firewo<.1d and fodder, project

p layground, safe proponent 1s paying cosl of

drinking water. Compensatory Afforestation ancl

fire wood, fodder Catch1.nent Arca Treatment to the

e tc. Forest Departmwt under which

suitable plnnt<itions ma.y be

raised.

SAINJ HEP (100 MW)-En vironmenl Monitoring Report No. S-2014/4

-

Page 35

l3 Families left with lt was intimated thnl tl1e prc~ject Oedaration of landless is being done as per

5 Bighas of land affoi;ted family m whose ctisc commhment.

should be balamx:. agriculture land left after

declared landless. acquisition is less than 5 bighas

v.'ill be declared as landless.

14 Free d ect1icity to l 00 uni ls per month as free Action wi II be taken when power 1s

the affect~d power will be given to each generated.

Villages. project affected family (PAF) as

per Government of India, Tariff

Resolurion dated 3 1.03.08.

15 Opening of ITI in No commitment was made to Industrial 'l'rainin}~ Institute (lTI), Sainj has

the area. open ITI m Village. Neuli. been adopted by HPPCL vide HP Govt.

However, Pr~ject Proponent will Notification No. EDN (TE)/\ (4)14/2007- Il

give scholarship to eligible Dated 24/02/2011.

persons from PAF for training.

J.6 Hindi copy of lt was c larified that as p er rules, No action needed.

EIA to I.he general the copies have been provided to

public of project lbe local village Pradhans as it is

affected ar~a. not possible to provide the same

to ca ch person.

l7 Employment and Proje.ct authority clarified that Seniority list of PAF's has been prepared on

s uitable jobs to one member of each project the basi~ of R&R policy and as & when any

the locals. affected family rendered landless fresh nxauitment clone by the rnam

will be provided employment in contructor of HPPCI, in ski lled/semi-skilled

lhe category of skilled/semi categork-.s they are given preference and

skilled workrmrn stil~jcct to !'!bout 54 people from PAF has been given

1~ Land

fulfilling lhe requisilc employment.

criteri a/qualification as and when In addition to this many schemes i.e. PAf

fresh recruitmt:uc is doni; in these Contrnclors scheme, works up to Rs.5.00

categories and it would be lacs reserved for PAF, Hiring of

ensured that lhc persons rendered vehick;,i;/(axis, Se lf Employment Scheme is

landless by the proje.<.;t eligible being implemented.

for employment are given chance

first.

Projc<.;t am~cted families As decided by thi..~ compct·tmt authorities the

SAlNJ HEP (I 00 MW)-Enviro111nent Monitoring Repo1t No. S-2014/4 Page 36

19

20

21

Compensalion rendered landless sh~ll be paid compensation of laud has been dishl1rscd

may be incrcused relief of Rs. 50,000/- per bigha among th<: land owners &. as per R&R policy

fro m Rs. 50,000/- which is over and above 1he Rs. 50000 to R!': . 250000 will be paid lo each

per bigba to Rs. compensation awarded by LAO. PAf rendered lanctle.ss depending upon the

I0.00 lacs per

bigha.

ls~uc of air

pollution as dm;t

ge110rated dlle to

vehicles and

vanous project

activities.

Loss to houses

and olher mral

sttuclures viz.

Gharats water

springs by the

construction work

and bJa::;ting.

Pollution of water

from tunnel

discharge

quantum of land acquired and balance with

PAF.

Water ~prinkling shall be curried Waler sprinkling is being done.

out and prefrn;nce in award ing

such work shall be gi vcn to

PAFs.

Shall he suitably compensated The videography/ photography of the

after k:chnical ~tudy. In rhis exi~1ing house:; and water sources/ Gharnts

regard, documel11ation including were canicd Olli and documenlation was

videogrnphy/ phntogrnphy of the done. In addition to this. a study on the

existing houses and water ground vibraliou & air over pressure due to

sources shall be carried ()\It

before starting !JK' construction

work.

Shall be taken care of as per

provisions rrntde in EMP.

blasting adjacent lo powerhouse complex,

I JR.T etc. has been conducted through NIRM,

Bangalore to suitably address the local

complaints.

The sedimentationiscliling tanks have been

provided for tunnel discharge.

22 Maintenance of These works are to be don~ Same as Sr. No. 5

footpaths.

23 Tender up to Rs.

50 (fifty) lacs to

be aw<1rded to

affeded public of

project area.

through J ,ADF.

Project proponent clarified that Data under compilation.

amount of such tenders is limited

to Rs . 5.0 (five) Jaos only.

24 Monthly meetings Meetings in this regard fire Meetings in this regard are being conducted

w1th project conducted by Di::- trict time to time by Distt Administration.

authorities. Administration as per practice.

25 Use of' The matter is being noted and Development fund is being provided through

SAfN.1 HF.:P (100 MW)-Environment Monitoring Rtpmt No. S-2014/4 Page 37

development fund

provided (By

Projecl

Authotities)

properly and

timely by

respective

departments for

the development

of Project atlcded

areas.

shal I bc addressed suitably by t11e JADA as per requiremcn t made by

concern l'd. Chajrman LADA time to t1rne an<l LADA is

keeping a watch on all the works.

26 Extension of date It \Vas clariGcd thal public

27

28

29

of Public Hearing. hearing meetiog has been

Same rate of ]and

compensation be

applied m the

entire Kullu Distt.

ls~me of muck

disposal m to the

river.

ContenLc; of RR

should not be

propmrn I on ly but

commitments.

conducted U1 line. with tlK

relevant procedure and it is not

possibk to postpone the same.

It was clarified that tlle land Same as Sr. No. l

compensation shall be made cts

per award of LAO.

Shall be taken care of as per the Necesi;ary Protection measures have been

provision made in the EMP, provi<kd to prevent the rolling of n1uck into

whiGh has a detail~.d n:tuck the river.

management. phm.

Project authorities clarified that R&R Plan ha~ been notified by Govt. of

provision made in RR .shall be Himachal Pradesh vide Notification No. Rev

forwarded to Govenunent for (PC) A (10)-7/2008 dated l91h Jan., 2009 and

final approval and the RR Plan is being implernenrcd in tolo.

approved finally shall be

implemented in toto.

30 Mentioning of un- Pn~ject authorities clarified that

inigated land in the paymen1 shall be made as per

the proposal for class of lalld as revenue record.

land being

acquirt:d whereas

SAINJ HEP (l 00 MW)-Environnwnt Moniloting Repott No. S-2014/4 Page 38

most of the land is

irrigall.:u.

31 Injustice has been Project authorities Assured that

made to the these issue~ wilJ bt~ suitably

people of area by attemicd and devdopment

Parbati HEP work/activities ure to be met

authorities, hence from Lhe provision under the

regular LADF.

employment to

the affected

people, provision

of suitable roads,

water supply

schemes,

construction of

community hall,

constrnclion of

Surya Narayan

temple be ma.de in

affected area.

32 Opening of Project authorities assured that Tender arc being invited as per prevailing

tenders at Neu Ii. the co1>ics of tender enqt1iries practice of 1 IPPCL. All out efforts are being

will be sent to all Panchayat m.:ide lo award small lender to local

33 Environment

Problems.

Pradhans of Project. affected area registered contractors.

and will also be displayed in the

office of Naib Tehsildar, Sainj.

Opening the site otllce of

HPPCL and thereby opening

small t·enders locally tn due

course was also committed.

Project authori1y intima1cd that Is beillg implemented.

most of the componenls of the

project are llJldergroun<.1 ' <:111d

there are lesser chan(;cs of

pollution; however, the

SAlNJ HEP (J 00 MW)-Environment Monitoring Rt'.port No. S-2014/4 Page 39

environmenlal concerns have

been taken can~ of in the EMP

which will be~ implemented

earnestly.

34 Awar<l of tenders Project author ity agreed to the Same as Sr. No. 23

up to Rs. 5.0 lacs propo:;al.

Lo lhe affected

public of the

prqject area

tlrrough limited

tendering.

35 Compens11tion of

land based on the

Projecl authority clari tied that As decided by th<.~ competent authorities

the rates of compensation shall (Land Acquisilio1i Officer) the compt?nsat.ion

negotiated rates be as decided by the I AO of land tree,s and structures disbursed among

directly between appointed by the Government.

Government and

owner of the land.

36 Provisio11 of Public facilities sh a ll be

public fai.;ilities providcd/cr~aled rn a phased

like water si1pply, mauner from J ADF.

roads, health

before the

conslructi011 work

of the pr~ject.

lhe owners.

SA !NJ HEP (I 00 MW)-Environment Monitoring R~po1t No. S·20 l 4/4 Page 10

"'· 5. ADB Stipulations/ safeguarding 1neasurcs (not covered above)

SN Product Parameter to be monifon~ C1mtpliancc Status

Activity/Stage

I 1. f:'.-quipmcnt layout Construction techniques and Sci~ntific blasting is hdng, don~. I he machinery

being used for the project work is fully mollified

and produces less noise pollution and vibrations.

K~<&lJ.l.!:!L ~~hRf1~- E.rc 2~ in.£._111~H:ill_ !Q_JimJ.t. .J.htir noise level is a::-; per the permissible limits

and

in;; ta I la ti ot1

2. Temporary

blockage of

drainage

machinery

Ternpnrary fill placement

(m:i)

BQti.1i\<.tLJ?.yJ,1~_.mmrn1E.!~t.m:.~~L (already .;.\..t.!:<.l. Ql_i.~q

i.!.~ ... annexur~ EMR~I)

No blockage so far and afl.crnativc measures has

been 1nade.

3. Power

twmd

Housci Seasonal start and finish Settling tanks has been provided al the adits.

major earthworks/ machine

constrnction

4. Storage

Chemicals and

materials.

explosives

5. Encroachmc:nl

into

farmland

6. Nuisance

Installed (P11, BOD/COD.

Suspc1icfod solidi;, other) No

significant water spillage

into nallahs /riwr is there.

from the constrnction

activHics.

of Location of hazardous Hazardous waste rm1te1ials an.: stored l:>cparately

nwtcrial storage; spiJl report to avoid pollution & Explosive materials handed

(typi.: of material spilled. over to third party for proper storage and

anwunt (Kg of m3 ) and 1naintctia11cc.

action taken to control and

clean up spili)

l!::;age of existing utilities, No such incident of cncroachmi.:nt happcned ti ll

Status of existing faci Ii ties, date.

Stlltus of facilities (earth

work in nr\ lmplcmentalion

of Crop compensation

(amount paid, dates, etc.)

to Contract Clauses, De8ign Being ensured through implementation of

SAJNJ HEP (100 MW)-Environmcnt Monitoring Repo1t No. S-201 4/4 Page 41

nearby

properti~

and layout, contract pwvisions.

Reinstatement of land status

(area affec ted,

Irnplemcntafion of Tree/

Crop compensation (amo\Jnl

paid)

7. Flooding hazards Contract Clauses (e.g., The excavated muck from ~~xcu vations is hcing

and dumped in designated dumping sites duly due to

construction

impediments

of

draitrnge

natural

8. Equipment

$ubmergcd

under llood

9. Inadequate

constru<.:tion

stage monitoring

suspemtcd solids

HOD/COD in receiving compacted and protected by providing Mone w ire

water) <:rate walls/reta1ning walls to prevent its slippage

in to rrntural drainage .system. Periodical check­

ups for BOD/COD &. ~uspei1dcd solids are bl.:ing

done by HP SJ>CB and St:uted1 Labs, Hyderab;,id.

(Already attached as annexure EMn-.YUIJ.

Store room levd to be above It is being ensured that tlie plant and equipments

HFL (elevation difference in arc stored approx. 50 m above HFL.

nwtters )

Trnini11g .schedules, Training to If PPCL personnel's relalcd with

Respective contract

checklists and remedial

actions taken thereof~

compliance report related to

envirnnmental asixx;ts for

the contracl.

en \.-lronmental monitoring lS being

given/organized from time to time.

SAINJ HEP (l 00 MW)-Environmcnt Moni todng Rcpo1t No. S-20 14!4 Page 1 2

6. Complaints received fron1 locals during the reporting period

Sr. Hate N.

J,ocatiou

where complaint was fikd

Name .. 'V, village of Complaint

complainant issue

l. 03/0112012 GM office Sh. Yan Singh S/o Damage

2. 5/01/2012

3. 16/02/2012

at Sarabai. Sh. Mani Ram, Viii. Ghasni,

GM office at Sanibni.

GM office

a.l Saraba1.

C hinahidi

Bzahara P.O.

Sub-Tehsil

Sainj. Di.::;tt Kullu (HP)

compensation

Sh. Mtihar Singh S/o Regarding

Sh. M.ani Ram, Vill. damage tci Matla, P.O. Suchain, house due Sub-Tehsil Sainj , blasting1

Distt Kullu (I IP)

Sh. Bhag Chand S/o Regarding

Sh. Chidu Rain VilL damage to Khi111diiri PO house due Bazahra, Sub-Tehsil blasting.

Sainj, Distt. Kullu (HP)

Action ti1kcn

of The compcnsat1011 as decided hy the. Rcwnue

authorities io .10111t

inspection has been paid.

Inspcctio.ns of hou::;e of Sh.

the Mohar Singh ha~ bee:n lo carrictl out by Consultant

Gculogist for Sa inj HEP ilnd it has hecn cnneluded that the most probable

cause of theses cracks is

faulty construction and improper fouwfation along.

the seepage due lo inadequate drninage

arrangement rei;ult.ing in

differential settlements.

Deputy Commissioner,

the Kutlu has constituted a to cormnil.lce for the

compensation nf damagc/losiiCS caused due

to the con!:'t ruction

activities of Sai~i IfEP vide

his O.ffice Order N<\ 2044-

48/DR/\ dated J7!07i2012

Joint inspection of damage

to 12 No. houses has been

carried out on daicd 28- I 0-

20JJ & 16/ 12/20l3 by the

above .::ornmiLlce. The

committee has decided to

1 The videogmphy/ photography of the existing houses and water sourcf-~s/ Gharats (Flourmiffs) had been carried out before tho construction work of Sain] HEP and study on the ground vibration & air over pressure due to blaslfn~1 adjace11t to powerhouse complex, HRT etc. has been condtJcted through NIRM, Bangalore.

SAJNJ HEJ> (J 00 MW)-Environment Monitoring Report No. S-2014/4 Page 1·3

\

4. 21/0'.Y2012 GM office at Sarabai.

Hitcshwcr Member, council

Paris had)

Singh, Regarding dust district and damage lo

(Zila the houses due

to construction

work

provide U1e compensation

evaluation.

-do-

apprnpriate

after

Rcgnlar water sprinkling is being done 111 neur the complaint art:\a and a 8tudy

on the ground vibration &

S. 04.04.2012 GM office Sh. Ma11gh1 Ram S/o Regarding

at Sarabai. Sh. Tu1u Ram Viii. crackR Matla PO Rupa, Sub- developed in the

Tehsil Sainj, Distt. house due to

Kullu (HP) blasting.

Same as Sr. No. 3

6. 12.04.2012 GM offii.;c Sh. Raj Kumar S/o Regarding

7.

8.

16.04.2012

20.04.2012 &

1 9106/'201 2

at Sarabai. Sh. Amar Cbaud Vill. damage to the Khain, PO Bazahra, house due to

-do-

Sub-Tehs il Sainj, hlasting. Distt. Ku.1\u (HP).

GM office Sh. Dhoop Singh S/o Regarding loss Compensation will be paid

at Sarabai. Sb. Sabju Chand Viii. due to closing of aflcr n.x:e1vmg the l\.fanaharn PO saw mill al' documents rcg<1rding lhe

Bazahra, Sub-Tehsil Samhha. ex.istence or saw mill

Sainj, Distt. Kullu required for the as8essment (HP). of the compensation from

the complainant

GM otlice Headmaster. Govt Regarding Inspection of school

at Sarabai. Middle School crackl' building has bl~en carried

Kartah. developed in the out by Consultant Geologi.st

school building for Sai1~ HEP atid it has due lo blasting. been concluded that the

most probable cause of

these~ cracks 1s faully construction and improper founcfa tio1i along lhe seepage due t.o inadequate

drainage arrangement resultjng in differential

scltlements. 1). 28.04.2012 GM office Sh. Thakur Dutt S/o Regarding

at Sarabai. Sh. Hari Ram Viii. crach Sam(.; as giwn in Sr No. 3 Jangla PO Razahra. developed in I.he Sub-Tehsil Saif\i, bathroom/toilet. Disu .. Kullu (HP).

10. 16.05.2012 GM office Sh. Dabe Ram S/o Regarding risk Wire Crates has ken

SAIN.I HEP (HIO MW)-Envi.ronrncnt Monitoring Rt::poit No. 5·2014/4 Page 14

at Sarnliai. Sh. Harfi Ram Vill. to the house due provided for the prnt.cction

Nafon PO Maj h;iu , to increase water of house/struclure of Sh.

Sub-Tchsil Sainj, level of nver Dabe Ram.

Distl. Kullu (H.P) Sainj.

forwarded by SDM,

.BmtJar, Distt. Kullu ll. 23/06/2012 OC office SrnL Beens Devi w/o Regarding The contractor has been

at Kullu Sh. Sushi! Kumar, damage lo the directed to dump t11e muck

Viii Kaitah, PO hotJsc due to from thc Surge Shaft wad Ropa, Sub Tehsil muck road construction in the

Sainj, Distt. Kullu, conslruction. designated dumping silt:: (HP) only.

12. 30i08/20 12 DC office Sh. I ,agan Chand, s/o Regarding

at Kuitu Sh. Naju Ram Viii. da1lluge to the

13. 3/10/2012

14. 11/12/2012

15. 12/ I J/201 2

GM Office at.

Sarabai

OM

Office at

Sarabai

GM Office at

Sarnbai

16. 16/0 1/2013 GM

Bhndludwar, PO PO house due lo Same as gi vun in Sr No. 3

Bazahra, Sub-Tehsil blasting

Sainj, Distt. Kulfo (HP).

Sh. Gu111 ~1 1 Ram s/o Rcgardi·ng

Sb. Bhajnu Ram, llamage tn the

Vill. Bhndh1dw1.1r, PO house d11i..: to

PO Ba7.ahra, Sub- blasting

Tehsil Sainj, Dislt. I<ullu (HP).

Snom water source

drinking w;Her supply

to <iSSS Shensher.

GPS Shensher, Vi IL

Chattcrndala, s~mogi ,

Bhrogi & Bazitharn

Regarding

Drying up of water source

Sh. Ses Ram s/o Sh. Damage of plant.

Amar Chand Viii. due to road

Dhern1edha, PO construction at

Ropa, Sub 'fehsi! Adit-TI

Sainj, Distt. Kullu, (HP)

Sh. Ses Ram Regarding

---do----

The waler source has lll'l:n

inspected by internal damage asscssmertl

committee of the project

and was found dried up .The estimate of new water

supply scheme is being

prepared for the GSSS

8hmsher, GPS Shensher,

Vilt. Chaiieradala, Sanogi,

Bhrogi & Bazalrnra.

An evaluation amounting to

R1l. 71,792/- frorn Dy.

Director, J Jorlicultun;

through SDM, Ban.jar has

b~en recei ved and lhc

arnount p<lid tu the

applicant for the damage

mid the requisite amount

paid to the appli~nt by the

project authority.

Sarne as givc.n in Sr. No. 3

SAINJ HEP (I 00 MW)-En vironment Mo11it0ri11g Repo1t No. S-2014/4 Page 4!)

Office al Vill. Khain, P.O damage 10 the

Sarabai Bazahra, SubTehsil house due to

Sainj, Distt. Kullu blasting

(H.P)

17. 30/01/2013 GM Sh. Tck Ram f:./o Sh. D<unage to The site of Gharnt was

Office at Kurma alias Ku rum Gharat due to inspected nnd compGnsation

S:irabai Dutt Viii. Jangla, blasting assessed by R&R Cd! and

P.O. Bazahara Sub- compensation paid

Tehsil Sainj, J)istt. aci;ordingly.

Kuitu (H.P)

18. 02/02/2013 CiM Sh. Govind Rani S/o Regarding Same as given in Sr. No. 3

Otliceat Sh. Bhagat Ram Vill. damage to the

Sarabai Jangla, PO Ba7.hara, flour mill drtc to

through Snb-Tehsil Sctinj, blasting

Ml.A J)istt. Kullu (H.P)

Bctnjar

19. 02/02/2013 GM Sh. M ohan Lal S/o Regarding ---do-----& Office at Sh. Kahan Chun<l damagG to the 15/02/20 l .1 Sarahai Yill. Chinahidi P.O. house due to

Bzahara Sub-Tchsil blasting

Sainj, Distt Kullu

(HP).

20. 02/02/2013 GM Villagers of Rua rd Regarding --do-----Office at G.P Deoridhar, Sub- damage to the

Sarahai Tehsil Sainj, Distt. l!ind due to through Kullu (H.P) b lasting

DC, Kullu

21. J 3/0~>./20 l 3 GM Sh. Krisl1an Dev S/o Regarding ---do----Office at Late 8h. Sarav Dyal damage. to Che Sarabai Shanna Vill. Jiwa PO house due to

Ra ila, Sub-Tehsil hlasting

Sa1t\i, Uistt. Kullu (H.P).

2Z. 19/02/2013 GM Sh. Ramesh Kumar ----do------ ---do-----Office at S/o Sh. Yan Dutt.

Sarabai Vill. Thuvad, PO Bazluira, Sub-Tehsil

Sainj Distt. Kullu (H.P).

24. 17.04.20.13 OM Gram P<Jnchayat, ----do--- ----do----Office at Shensher, Distt. Sarabai Kullu (H.P).

through

DC,Kullu

25. 16.04.2013 GM Uttam Ch!lnd '!!.lo Sh. Damage to crops ---do---01fa:e at Jhofa Ram Viii due lo crusher

SAIN.I HEP (I 00 MW)-Environment Monitoring Repoit No. S-201 4/4 Page 46

Sarabai Riyahda, P.O. through Bazhara, Sub-Tehsil DC, Kutlu Saiqj Distl. Kullu

(H.P).

26. 31.l0.2013 GM Hira Singh s/o Ra tu Regarding ------do-------Oflice at Rarn Vi IL damage 10 the

Sarnbai Dhamahidi, P.O. house due to

!'hrough Bazhara, Sub-Tchsil blasling DC, Kullu Sainj Distt. Kullu

(H.P).

27. 31.10.201.i GM Sangal Rttm Vi ii . Regarding ------do----Office at Dhamahid1, P.O. damage Lo the

Sarabai Bazhara, Sub-Tehsil house due lo

through Sainj Dislt. Kullu blasting DC, KulllJ (H.P).

28. 13.11.2013 GM Vll\agers of Bhali Regarding ------do------Office at Thauvi. Sub-Tehsil damage to U1e

Sarabai Sainj Distt. Kuitu temple due to

t11rough (H.P). blasting DC. Kullu

29 28.01.2014 GM Villagers of Re:garding Office at Shenshar, Sub- Tehsll damage to the In process

Sarabai Sainj Dist.t. Kullu houses due to through (H.P) clumping of DC, Kullu muck

30 20.11.2014 GM Leeladhar 131mrdwaj R<.:gmding Office at Vil I. Bazhara P.O. damage to the --------do----S;irabai Bazhara, Sub-Tehsil house due lo

through Sainj Distt. Kutlu construction of

DC, Kullu (II.P). project

SAIN T HEP (100 .M.W)-Environmcnt Monitoring Rcpo1t No. S-20 14/4

7. Others:-

No stipulatjons imposed so far.

48

8. Staffing Position

Following is the staff position for Environment Management in the projecl and Social and R&R management in Sainj HEP.

S.N. Re1)or.tin2 As-Ped Staff 1>0stcd I Environment Management staff One Assistant Engineer (Environment) for environment

related worl..:s 2 Social and R&R Management Two Junior Officer (R&R)

SA:INJ HEP (I 00 MW)-Environmi?t\t Monitoring Report No. S-~014/4 Page 1·9


Recommended