+ All Categories
Home > Documents > Environmental Monitoring Report Part 3

Environmental Monitoring Report Part 3

Date post: 17-Feb-2022
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
49
Environmental Monitoring Report Part 3 # Semiannual Report January June 2019 June 2019 INO: West Kalimantan Power Grid Strengthening Project Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.
Transcript
Page 1: Environmental Monitoring Report Part 3

Environmental Monitoring Report – Part 3

# Semiannual Report January – June 2019 June 2019

INO: West Kalimantan Power Grid Strengthening

Project

Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development

Bank.

Page 2: Environmental Monitoring Report Part 3

CURRENCY EQUIVALENTS (as of 30 June 2019)

Currency unit – Indonesian rupiah (Rp) Rp1.00 = $ 0.0000708215

$1.00 = Rp 14,120

NOTE

(i) In this report, "$" refers to United States dollars This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Environmental Monitoring Report Part 3

PT PLN (PERSERO) UIP KALBAGBAR

Jl. Letjend Suprapto No. 50 G, Pontianak Kalimantan Barat

West Kalimantan Power Grid Strengthening Project

Semi-Annual Environmental Monitoring Report

January to June 2019

ADB Loan No. 3015-INO

AFD Loan No. CID102401B

Submitted by:

PT PLN (Persero)

July 2019

Page 4: Environmental Monitoring Report Part 3
Page 5: Environmental Monitoring Report Part 3
Page 6: Environmental Monitoring Report Part 3

4.h Occupational and Community Health and Safety

Contractor’s Inspection Report

Page 7: Environmental Monitoring Report Part 3
Page 8: Environmental Monitoring Report Part 3

Contractor’s HSE Report

Page 9: Environmental Monitoring Report Part 3
Page 10: Environmental Monitoring Report Part 3
Page 11: Environmental Monitoring Report Part 3
Page 12: Environmental Monitoring Report Part 3

4.i Physical Cultural Resources

Contractor’s Monthly Report

Page 13: Environmental Monitoring Report Part 3

No PACKAGE LOCATION DESCRIPTION MAGNITUDE OF IMPACTENVIRONMENTAL MONITORING AND

MANAGEMENT EFFORT

Project Package 6 : Design, Supply, Installation and Commissioning Of 150 Kv Overhead

West Kalimantan Power Grid Strengthening

PERIOD OF ENVIRONMENTAL

MONITORING

CONSTRUCTION PHASE PACKAGE 6

REPORT OF HEALTH SAFETY ENVIRONMENTAL (HSE) MONITORING

Transmission Line Tayan - Sanggau

PERIOD MARCH 2019

ENVIRONMENTAL PARAMETERS

IMPACT

PT. PLN (Persero )

l. Physical Cultural Resources Ditemukan, pada area tower 158 Desa

Palem Jaya Kecamatan Parindu ditemukan

makam yang dikeramatkan atau dituakan

oleh masyarakat setempat yang berdekatan

dengan area tower

sesuai dengan arahan dokumen IEE ADB

mengenai Physical Cultur Resources, Kontraktor

melakukan Koordinasi dan diskusi dengan

perangkat desa serta tokoh masyarakat setempat

terkait dengan hal ini. Hasil dari koordinasi dan

diskusi kontraktor dan masyarakat diminta untuk

melakukan upacara adat (Mudas) sebelum

melakukan pekerjaan didekat area tersebut. Hal

ini sudah dilakukan kontraktro dan masyarakat

pada bulan ini.

Sanggau 31 Maret 2019

Dibuat Oleh,

Dwi Agung Subroto Aris Pramudyo

HSE Enviro Project Manager

Disetujui Oleh,

Selama konstruksi / laporan setiap 1

bulan

ENVIRONMENT REPORT

Page 14: Environmental Monitoring Report Part 3

APPENDIX 5

Findings on EMP Implementation

Page 15: Environmental Monitoring Report Part 3

5.a Occupational and Community Health and Safety

Working at Height Procedure provided by UP3B Kalbar (Operational Phase)

Page 16: Environmental Monitoring Report Part 3

INSTRUKSI KERJA

MEMANJAT TOWER / TIANG NOMOR: 9.001/IK/TRS.00.003/KOMISI-PDKB PUSAT/2018

PT PLN (PERSERO) KANTOR PUSAT KOMISI PDKB

2018

Page 17: Environmental Monitoring Report Part 3

5.b EMP Incorporation into Detailed Project Design

UKL-UPL Document for Sanggau and Sekadau SS

Page 18: Environmental Monitoring Report Part 3

PT. PLN (PERSERO) UNIT INDUK PEMBANGUNAN X

Jl. MT Haryono No. 384 Balikpapan Kalimantan Timur 76114

LOKASI:

KABUPATEN SANGGAU

PROPINSI KALIMANTAN BARAT

SANGGAU 2015

UPAYA PENGELOLAAN LINGKUNGAN HIDUP DAN

UPAYA PEMANTAUAN LINGKUNGAN HIDUP

PEMBANGUNAN SUTT 150 KV TAYAN - SANGGAU

GI TAYAN DAN GI SANGGAU

Page 19: Environmental Monitoring Report Part 3

III

DAFTAR TABEL

NOMOR TEKS TABEL HAL

Tabel 1-1 Susunan Tim Studi UKL-UPL SUTT 150 kV Tayan-Sanggau 1-1

Tabel 2-1 Lokasi SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI

Sanggau

2-1

Tabel 2-2 Tipe Tower pada SUTT 150 kV Tayan - Sanggau, GI

Tayan dan GI Sanggau

2-5

Tabel 2-3 Rekapitulasi Tower 150 kV Tayan - Sanggau 2-6

Tabel 2-4 Nilai Jarak Bebas Minimum Vertikal Tiap Obyek 2-10

Tabel 2-5 Jarak Bebas Minimum Horizontal Dari Sumbu Vertikal 2-10

Tabel 2-6 Jumlah Tenaga Kerja Yang diperlukan 2-23

Tabel 2-7 Jenis dan Tipe Peralatan Yang digunakan 2-25

Tabel 2-8 Jenis Peralatan dan Bahan Yang digunakan 2-26

Tabel 2-9 Curah Hujan di Wilayah Sekitar SUTT 150 kV Tayan -

Sanggau

2-34

Tabel 2-10 Hasil Pengukuran Suhu Udara dan Kelembaban Udara di

Wilayah Studi

2-34

Tabel 2-11 Hasil Pengukuran Kualitas Udara dan Kebisingan di

Wilayah Studi

2-35

Tabel 2-12 Hasil Pengukuran Medan Magnet dan Medan Listrik di

Wilayah Studi

2-36

Tabel 2-13 Ambang Batas Pajanan Medan Listrik dan Medan

Magnet 50/60 Hz

2-36

Tabel 2-14 Ketinggian Lokasi Tower SUTT 150 kV Tayan - Sanggau 2-40

Tabel 2-15 Ringkasan Hasil Pemboran 2-48

Tabel 2-16 Ringkasan Nilai SPT pada masing-masing Titik Bor 2-49

Tabel 2-17 Hasil Uji Sondir 2-51

Page 20: Environmental Monitoring Report Part 3

IV

NOMOR TEKS TABEL HAL

Tabel 2-18 Kelas Tanah Berdasarkan Nilai Daya Dukung yang

diizinkan

2-55

Tabel 2-19 Jumlah Kelas Tanah dan Jumlah Tipe Pondasi Tower

Berdasarkan Sondir

2-55

Tabel 2-20 Ringkasan Hasil Uji Tanah 2-56

Tabel 2-21 Hasil Pengujian Kualitas Air Sungai di Areal Studi 2-61

Tabel 2-22 Hasil Pengujian Kualitas Air Tanah DI Areal Studi 2-62

Tabel 2-23 Wilayah Administrasi Lokasi SUTT 150 kV Tayan –

Sanggau, GI Tayan dan GI Sanggau

2-65

Tabel 2-24 Penduduk Kabupaten Sanggau Berdasarkan Golongan

Umur dan Jenis Kelamin

2-66

Tabel 2-25 Jumlah Penduduk Berdasarkan Jenis Kelamin, Sex Ratio,

Jumlah Desa, dan Kepadatan di Kecamatan Studi

2-66

Tabel 2-26 Penduduk Berdasarkan Jenis Kelamin dan Ratio Kelamin

Kecamatan Tayan Hilir Per Desa

2-67

Tabel 2-27 Penduduk di Kecamatan Tayan Hulu Berdasarkan Jenis

Kelamin, Ratio, dan Kepadatan Per Desa

2-67

Tabel 2-28 Penduduk Kecamatan Tayan Hulu Berdasarkan

Kelompok Umur

2-68

Tabel 2-29 Jumlah Pencari Pekerjaan Berdasarkan Bulan dan Jenis

Kelamin

2-69

Tabel 2-30 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja

Menurut Tingkat Pendidikan Yang ditamatkan di

Kabupaten Sanggau

2-69

Tabel 2-31 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja

Menurut Lapangan Usaha Utama di Kabupaten Sanggau

2-70

Tabel 2-32 Penduduk Berumur 15 Tahun Keatas Yang Bekerja

Menurut Lapangan Usaha di Kecamatan Tayan Hulu

2-70

Tabel 2-33 Banyaknya Sarana Pendidikan di Kecamatan Studi 2-71

Tabel 2-34 Banyaknya Sarana Pendidikan di Kecamatan Tanya Hilir

Menurut Desa

2-71

Page 21: Environmental Monitoring Report Part 3

V

NOMOR TEKS TABEL HAL

Tabel 2-35 Banyaknya Sarana Pendidikan di Kecamatan Tayan Hulu 2-72

Tabel 2-36 Banyaknya Murid dan Guru di Kecamatan Studi 2-72

Tabel 2-37 Banyaknya Murid dan Guru di Kecamatan Tayan Hilir

Tahun 2012

2-73

Tabel 2-38 Banyaknya Murid dan Guru di Kecamatan Tayan Hulu 2-73

Tabel 2-39 Banyaknya Sarana Ibadah di Kecamatan Tayan Hilir

Berdasarkan Desa

2-74

Tabel 2-40 Banyaknya Sarana Kesehatan Pemerintah di Kecamatan

Studi

2-75

Tabel 2-41 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hilir 2-75

Tabel 2-42 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hulu 2-75

Tabel 2-43 Banyaknya Tenaga Kesehatan di Kecamatan Studi 2-76

Tabel 2-44 Banyaknya Tenaga Medis di Kecamatan Tayan Hilir 2-76

Tabel 2-45 Banyaknya Tenaga Medis di Kecamatan Tayan Hulu 2-76

Tabel 2-46 10 Penyakit Terbanyak Kabupaten Sanggau 2-77

Tabel 3-1 Matriks Dampak Lingkungan Hidup Akibat Kegiatan

Pembangunan SUTT 150 kV Tayan - Sanggau, GI Tayan

dan GI Sanggau

3-3

Tabel 3-2 Matriks UKL-UPL Kegiatan Pembangunan SUTT 150 kV

Tayan - Sanggau, GI Tayan dan GI Sanggau

3-5

Page 22: Environmental Monitoring Report Part 3
Page 23: Environmental Monitoring Report Part 3
Page 24: Environmental Monitoring Report Part 3

APPENDIX 6

ADB Mission Findings

Page 25: Environmental Monitoring Report Part 3

6.a EHS Awareness

The awarness session on the IEE requirements

Page 26: Environmental Monitoring Report Part 3

Attendance List of In House Training for IEE Requirements

Page 27: Environmental Monitoring Report Part 3
Page 28: Environmental Monitoring Report Part 3

6.b Secondary Containment

Secondary Containment in Ngabang Substation

Page 29: Environmental Monitoring Report Part 3

6.c Waste Management

Warning sign of waste disposal prohibition in Ngabang Substation

Page 30: Environmental Monitoring Report Part 3

Solid Waste Management Procedure provided by UP3B Kalbar

Page 31: Environmental Monitoring Report Part 3

Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3

PROSEDUR PENGELOLAAN LIMBAH PADAT

NO. DOKUMEN : SMK3/UP3B/M/13

EDISI : 00

REVISI : 03

TANGGAL : 3 J uni 2019

PT. PLN (PERSERO) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN

SISTEM KALIMANTAN BARAT

SISTEM MANAJ EMEN K3

Page 32: Environmental Monitoring Report Part 3

6.d Natural vegetation Regrowth

Natural vegetation regrowth in T.77 Jelimpo Village, Angan Tembalang Sub-district

Page 33: Environmental Monitoring Report Part 3

6.e Vegetation Growth in Drainage System

Drainage system in the Tayan SS has been cleared so it can function properly

Page 34: Environmental Monitoring Report Part 3

6.f Temporary Drainage Channel

The length had been added to the temporary drainage channel and sediment trap towards southeast of the Sanggau SS

Page 35: Environmental Monitoring Report Part 3

6.g Sediment Trap

The sediment trap had been added to controll runoff

Page 36: Environmental Monitoring Report Part 3

6.h Geotechnical Assessment in Sekadau SS

Page 37: Environmental Monitoring Report Part 3

GI Sekadau

Analisa lereng galian untuk pembuatan elevasi datar Gardu induk SekadauDiketahui GI sekadau dibangun di areal berbukit sehingga dibutuhkan cut & fill untuk membuat lahandatar Switch yard dan gedung kontrol

Page 38: Environmental Monitoring Report Part 3

Data tanah :

Input program

Page 39: Environmental Monitoring Report Part 3

Hasil perhitungan nya

Dapat disimpulkan perhitungan lereng kemiringan GI Sekadau mempunyai Safety Factor 4.488

Page 40: Environmental Monitoring Report Part 3

6.i Preventing Land Slide

The use of turap in T.208 Lape Village, Package 6

The use of turap in T.127 Sei Ringin, Package 7

Page 41: Environmental Monitoring Report Part 3

6.j PT Krakatau Engineering provide a SOP related to

Soil Stockpiles and Rehabilitation Activities

Page 42: Environmental Monitoring Report Part 3
Page 43: Environmental Monitoring Report Part 3

6.k Mapping Study of Forestry Function areas towards the Location of 150 kV Tayan – Sanggau

Transmission Line

Page 44: Environmental Monitoring Report Part 3
Page 45: Environmental Monitoring Report Part 3

6.l SOP on the use of Tripod System

provided by PT Krakatau Engineering

Page 46: Environmental Monitoring Report Part 3
Page 47: Environmental Monitoring Report Part 3

6.m Body Harness Checklist Inspection

Page 48: Environmental Monitoring Report Part 3

Scanned with CamScanner

Page 49: Environmental Monitoring Report Part 3

Recommended