Environmental Monitoring Report – Part 3
# Semiannual Report January – June 2019 June 2019
INO: West Kalimantan Power Grid Strengthening
Project
Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development
Bank.
CURRENCY EQUIVALENTS (as of 30 June 2019)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $ 0.0000708215
$1.00 = Rp 14,120
NOTE
(i) In this report, "$" refers to United States dollars This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
PT PLN (PERSERO) UIP KALBAGBAR
Jl. Letjend Suprapto No. 50 G, Pontianak Kalimantan Barat
West Kalimantan Power Grid Strengthening Project
Semi-Annual Environmental Monitoring Report
January to June 2019
ADB Loan No. 3015-INO
AFD Loan No. CID102401B
Submitted by:
PT PLN (Persero)
July 2019
4.h Occupational and Community Health and Safety
Contractor’s Inspection Report
Contractor’s HSE Report
4.i Physical Cultural Resources
Contractor’s Monthly Report
No PACKAGE LOCATION DESCRIPTION MAGNITUDE OF IMPACTENVIRONMENTAL MONITORING AND
MANAGEMENT EFFORT
Project Package 6 : Design, Supply, Installation and Commissioning Of 150 Kv Overhead
West Kalimantan Power Grid Strengthening
PERIOD OF ENVIRONMENTAL
MONITORING
CONSTRUCTION PHASE PACKAGE 6
REPORT OF HEALTH SAFETY ENVIRONMENTAL (HSE) MONITORING
Transmission Line Tayan - Sanggau
PERIOD MARCH 2019
ENVIRONMENTAL PARAMETERS
IMPACT
PT. PLN (Persero )
l. Physical Cultural Resources Ditemukan, pada area tower 158 Desa
Palem Jaya Kecamatan Parindu ditemukan
makam yang dikeramatkan atau dituakan
oleh masyarakat setempat yang berdekatan
dengan area tower
sesuai dengan arahan dokumen IEE ADB
mengenai Physical Cultur Resources, Kontraktor
melakukan Koordinasi dan diskusi dengan
perangkat desa serta tokoh masyarakat setempat
terkait dengan hal ini. Hasil dari koordinasi dan
diskusi kontraktor dan masyarakat diminta untuk
melakukan upacara adat (Mudas) sebelum
melakukan pekerjaan didekat area tersebut. Hal
ini sudah dilakukan kontraktro dan masyarakat
pada bulan ini.
Sanggau 31 Maret 2019
Dibuat Oleh,
Dwi Agung Subroto Aris Pramudyo
HSE Enviro Project Manager
Disetujui Oleh,
Selama konstruksi / laporan setiap 1
bulan
ENVIRONMENT REPORT
APPENDIX 5
Findings on EMP Implementation
5.a Occupational and Community Health and Safety
Working at Height Procedure provided by UP3B Kalbar (Operational Phase)
INSTRUKSI KERJA
MEMANJAT TOWER / TIANG NOMOR: 9.001/IK/TRS.00.003/KOMISI-PDKB PUSAT/2018
PT PLN (PERSERO) KANTOR PUSAT KOMISI PDKB
2018
5.b EMP Incorporation into Detailed Project Design
UKL-UPL Document for Sanggau and Sekadau SS
PT. PLN (PERSERO) UNIT INDUK PEMBANGUNAN X
Jl. MT Haryono No. 384 Balikpapan Kalimantan Timur 76114
LOKASI:
KABUPATEN SANGGAU
PROPINSI KALIMANTAN BARAT
SANGGAU 2015
UPAYA PENGELOLAAN LINGKUNGAN HIDUP DAN
UPAYA PEMANTAUAN LINGKUNGAN HIDUP
PEMBANGUNAN SUTT 150 KV TAYAN - SANGGAU
GI TAYAN DAN GI SANGGAU
III
DAFTAR TABEL
NOMOR TEKS TABEL HAL
Tabel 1-1 Susunan Tim Studi UKL-UPL SUTT 150 kV Tayan-Sanggau 1-1
Tabel 2-1 Lokasi SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI
Sanggau
2-1
Tabel 2-2 Tipe Tower pada SUTT 150 kV Tayan - Sanggau, GI
Tayan dan GI Sanggau
2-5
Tabel 2-3 Rekapitulasi Tower 150 kV Tayan - Sanggau 2-6
Tabel 2-4 Nilai Jarak Bebas Minimum Vertikal Tiap Obyek 2-10
Tabel 2-5 Jarak Bebas Minimum Horizontal Dari Sumbu Vertikal 2-10
Tabel 2-6 Jumlah Tenaga Kerja Yang diperlukan 2-23
Tabel 2-7 Jenis dan Tipe Peralatan Yang digunakan 2-25
Tabel 2-8 Jenis Peralatan dan Bahan Yang digunakan 2-26
Tabel 2-9 Curah Hujan di Wilayah Sekitar SUTT 150 kV Tayan -
Sanggau
2-34
Tabel 2-10 Hasil Pengukuran Suhu Udara dan Kelembaban Udara di
Wilayah Studi
2-34
Tabel 2-11 Hasil Pengukuran Kualitas Udara dan Kebisingan di
Wilayah Studi
2-35
Tabel 2-12 Hasil Pengukuran Medan Magnet dan Medan Listrik di
Wilayah Studi
2-36
Tabel 2-13 Ambang Batas Pajanan Medan Listrik dan Medan
Magnet 50/60 Hz
2-36
Tabel 2-14 Ketinggian Lokasi Tower SUTT 150 kV Tayan - Sanggau 2-40
Tabel 2-15 Ringkasan Hasil Pemboran 2-48
Tabel 2-16 Ringkasan Nilai SPT pada masing-masing Titik Bor 2-49
Tabel 2-17 Hasil Uji Sondir 2-51
IV
NOMOR TEKS TABEL HAL
Tabel 2-18 Kelas Tanah Berdasarkan Nilai Daya Dukung yang
diizinkan
2-55
Tabel 2-19 Jumlah Kelas Tanah dan Jumlah Tipe Pondasi Tower
Berdasarkan Sondir
2-55
Tabel 2-20 Ringkasan Hasil Uji Tanah 2-56
Tabel 2-21 Hasil Pengujian Kualitas Air Sungai di Areal Studi 2-61
Tabel 2-22 Hasil Pengujian Kualitas Air Tanah DI Areal Studi 2-62
Tabel 2-23 Wilayah Administrasi Lokasi SUTT 150 kV Tayan –
Sanggau, GI Tayan dan GI Sanggau
2-65
Tabel 2-24 Penduduk Kabupaten Sanggau Berdasarkan Golongan
Umur dan Jenis Kelamin
2-66
Tabel 2-25 Jumlah Penduduk Berdasarkan Jenis Kelamin, Sex Ratio,
Jumlah Desa, dan Kepadatan di Kecamatan Studi
2-66
Tabel 2-26 Penduduk Berdasarkan Jenis Kelamin dan Ratio Kelamin
Kecamatan Tayan Hilir Per Desa
2-67
Tabel 2-27 Penduduk di Kecamatan Tayan Hulu Berdasarkan Jenis
Kelamin, Ratio, dan Kepadatan Per Desa
2-67
Tabel 2-28 Penduduk Kecamatan Tayan Hulu Berdasarkan
Kelompok Umur
2-68
Tabel 2-29 Jumlah Pencari Pekerjaan Berdasarkan Bulan dan Jenis
Kelamin
2-69
Tabel 2-30 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja
Menurut Tingkat Pendidikan Yang ditamatkan di
Kabupaten Sanggau
2-69
Tabel 2-31 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja
Menurut Lapangan Usaha Utama di Kabupaten Sanggau
2-70
Tabel 2-32 Penduduk Berumur 15 Tahun Keatas Yang Bekerja
Menurut Lapangan Usaha di Kecamatan Tayan Hulu
2-70
Tabel 2-33 Banyaknya Sarana Pendidikan di Kecamatan Studi 2-71
Tabel 2-34 Banyaknya Sarana Pendidikan di Kecamatan Tanya Hilir
Menurut Desa
2-71
V
NOMOR TEKS TABEL HAL
Tabel 2-35 Banyaknya Sarana Pendidikan di Kecamatan Tayan Hulu 2-72
Tabel 2-36 Banyaknya Murid dan Guru di Kecamatan Studi 2-72
Tabel 2-37 Banyaknya Murid dan Guru di Kecamatan Tayan Hilir
Tahun 2012
2-73
Tabel 2-38 Banyaknya Murid dan Guru di Kecamatan Tayan Hulu 2-73
Tabel 2-39 Banyaknya Sarana Ibadah di Kecamatan Tayan Hilir
Berdasarkan Desa
2-74
Tabel 2-40 Banyaknya Sarana Kesehatan Pemerintah di Kecamatan
Studi
2-75
Tabel 2-41 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hilir 2-75
Tabel 2-42 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hulu 2-75
Tabel 2-43 Banyaknya Tenaga Kesehatan di Kecamatan Studi 2-76
Tabel 2-44 Banyaknya Tenaga Medis di Kecamatan Tayan Hilir 2-76
Tabel 2-45 Banyaknya Tenaga Medis di Kecamatan Tayan Hulu 2-76
Tabel 2-46 10 Penyakit Terbanyak Kabupaten Sanggau 2-77
Tabel 3-1 Matriks Dampak Lingkungan Hidup Akibat Kegiatan
Pembangunan SUTT 150 kV Tayan - Sanggau, GI Tayan
dan GI Sanggau
3-3
Tabel 3-2 Matriks UKL-UPL Kegiatan Pembangunan SUTT 150 kV
Tayan - Sanggau, GI Tayan dan GI Sanggau
3-5
APPENDIX 6
ADB Mission Findings
6.a EHS Awareness
The awarness session on the IEE requirements
Attendance List of In House Training for IEE Requirements
6.b Secondary Containment
Secondary Containment in Ngabang Substation
6.c Waste Management
Warning sign of waste disposal prohibition in Ngabang Substation
Solid Waste Management Procedure provided by UP3B Kalbar
Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3
PROSEDUR PENGELOLAAN LIMBAH PADAT
NO. DOKUMEN : SMK3/UP3B/M/13
EDISI : 00
REVISI : 03
TANGGAL : 3 J uni 2019
PT. PLN (PERSERO) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN
SISTEM KALIMANTAN BARAT
SISTEM MANAJ EMEN K3
6.d Natural vegetation Regrowth
Natural vegetation regrowth in T.77 Jelimpo Village, Angan Tembalang Sub-district
6.e Vegetation Growth in Drainage System
Drainage system in the Tayan SS has been cleared so it can function properly
6.f Temporary Drainage Channel
The length had been added to the temporary drainage channel and sediment trap towards southeast of the Sanggau SS
6.g Sediment Trap
The sediment trap had been added to controll runoff
6.h Geotechnical Assessment in Sekadau SS
GI Sekadau
Analisa lereng galian untuk pembuatan elevasi datar Gardu induk SekadauDiketahui GI sekadau dibangun di areal berbukit sehingga dibutuhkan cut & fill untuk membuat lahandatar Switch yard dan gedung kontrol
Data tanah :
Input program
Hasil perhitungan nya
Dapat disimpulkan perhitungan lereng kemiringan GI Sekadau mempunyai Safety Factor 4.488
6.i Preventing Land Slide
The use of turap in T.208 Lape Village, Package 6
The use of turap in T.127 Sei Ringin, Package 7
6.j PT Krakatau Engineering provide a SOP related to
Soil Stockpiles and Rehabilitation Activities
6.k Mapping Study of Forestry Function areas towards the Location of 150 kV Tayan – Sanggau
Transmission Line
6.l SOP on the use of Tripod System
provided by PT Krakatau Engineering
6.m Body Harness Checklist Inspection
Scanned with CamScanner