Environmental Noise Assessment Corder Park Pump Station Nelson City Council Report ref: 220423-108 21 June 2012 Revision 2
Transcript
  • Environmental Noise Assessment Corder Park Pump Station Nelson City Council

    Report ref:

    220423-108

    21 June 2012

    Revision 2

  • Document prepared by: Aurecon New Zealand Limited Level 4 139 Carlton Gore Road Newmarket Auckland 1149 New Zealand T: +64 9 520 6019 F: +64 9 524 7815 E: [email protected] W: aurecongroup.com

    Document control

    Document ID: Hm120614hm corder park environmental noise assessment V3.docx

    Rev No Date Revision details Typist Author Verifier Approver

    0 16/11/2011 DRAFT FOR INTERNAL REVIEW HM HM FMP

    1 14/06/2012 UPDATED REPORT FOR REVISED SITE LAYOUT HM HM FMP DW

    2 21/06/2012 MINOR UPDATE HM HM FMP DW

    A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original

    hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon.

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page i

    Contents

    1. Introduction 1

    2. Assessment of site 2

    3. Environmental noise criteria 3

    4. Schedule of Equipment 4

    5. Assessment of environmental noise emissions 7

    6. Conclusion 8

    Appendix A

    Equipment data sheets

    Appendix B

    Planning maps

    Appendix C

    Predicted noise contours

    Appendix D

    Noise monitoring results

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 1

    1. Introduction

    This report details the environmental noise assessment for the proposed pump station located at Corder Park in Nelson. The site is located adjacent Atawhai Drive/ State Highway 6 in Atawhai, Nelson. An aerial image showing the site location relative to the surrounding properties can be seen in Figure 1 below. Distances are provided to the location of the standby generator which is expected to be the dominant noise source on site.

    Figure 1 Aerial photo

    An existing pump station is currently located on the site which is to be converted to a storage chamber. The proposed development would include four new pumps located in a dry well of depth 5.3m. A generator is also located on site in a below ground Generator & Control Room. Cross sections of the development can be seen in the Aurecons drawings RC004 RC012.

    The development will be predominantly underground with batters to the west, south and east sides.

    Site location

    Existing exchange building

    Nearest resident

    Existing pump station

    Noise monitoring location

    Kindergarten

    60 m

    30 m

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 2

    2. Assessment of site

    A site visit was conducted on Tuesday 29 November 2011 to assess the site and install a noise logger to conduct unattended noise measurements.

    Noise measurements were taken over a 24 hour period using an ARL 316 Type 1 noise logger. The logger was installed approximately 20 metres from the roadway and 10 metres from the existing pump station on site. The location of the logger can be seen in Figure 2.

    Figure 2 Location of noise logger on site

    The noise environment on the site is dominated by sporadic high speed traffic on Atawhai Drive (State Highway 6) which is typically constant at all hours. Measurements were carried out in general accordance with the provisions of the relevant New Zealand Standards, NZS 6801:1977 Methods of Measuring Noise and NZS 6801:2008 Acoustics measurement of environmental sound. No rain was recorded over the measurement period, there were significant overcast periods. The logger was calibrated before and after measurements. A summary of the recorded noise logger data is shown below in Table 1. Full logging results can be seen in the Appendix D. It can be seen in the noise monitoring charts that noise levels are reasonably constant throughout the night time period, with only the period around 2.00am showing significantly reduced noise levels. Nose levels measured at the logger location are expected to be generally representative of the noise levels at the nearest residents.

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 3

    Table 1 Corder park noise logging results

    Corder Park Noise monitoring results 29/11/2011 30/11/2011

    L90, 15min dBA Leq,15 min dBA L10, 15 min dBA Lmax, 15 min dBA

    Daytime

    7.00am to 10.00pm

    46 66 70 81

    Night time

    10.00pm to 7.00am

    34 57 53 78

    The background (L90) noise levels measured at the monitoring location are considered to be representative of those at the residential and kindergarten receivers. However, as the nearest residence is approximately 80 metres further from the highway than the monitoring location, the Leq and L10 levels are expected to be approximately 14 dBA lower at the residence than the measured results.

    Table 2 Predicted noise levels at residence

    Predicted noise levels at residence

    Leq, 15 min dBA L10, 15 min dBA

    Daytime

    7.00am to 10.00pm 52 56

    Night time

    10.00pm to 7.00am 43 39

    3. Environmental noise criteria

    The site is located in the Nelson City Council area and is subject to the conditions stipulated in the Nelson Resource Management Plan. The applicable planning maps and legends for the site can be seen in Appendix B.

    The site is zoned as Open Space Recreation with Coastal Environment and Scheduled Site overlays. The Nelson Resource Management Plan for Open Space Recreation Zones stipulates:

    OSr37.1: Noise levels measured at or within the boundary of any site in the residential zone must not exceed:

    Day time (7am to 10pm Monday to Friday and 9am to 10pm Saturdays Sundays and Public Holidays)

    L10 55 dBA

    Other times

    L10 45 dBA

    Lmax 75 dBA

    The site is expected to operate 24 hours a day, seven days per week and should therefore comply with the stricter other times criteria.

    It is generally accepted that noise emissions from emergency equipment may exceed the Management Plan levels by 5 dBA.

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 4

    4. Schedule of Equipment

    The following equipment is proposed on the site, the location of each item can be seen in Figure 3.

    Figure 3 Proposed site layout

    Figure 4 Proposed site cross section

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 5

    Table 3 Schedule of proposed equipment

    Item of equipment

    Number Location Further information Total sound pressure level, L10 dBA

    Pump 2 Underground Pump Room 797l/s, 50 Hz, 200kW,

    990rpm 77 @ 5 metres

    1

    Pump 2 Underground Pump Room 307l/s, 50Hz, 20kW,

    735rpm 67 @ 5 metres

    1

    Generator 1 Underground Generator and Control Room

    500 kVA 65 dBA @ 7 metres2

    75 dBA @ 7 metres3

    Transformer 1 External 500 kVA 41 dBA @ 5 metres4

    Notes: 1 Based on the speed and power rating of the pumps and the prediction procedure detailed in Engineering Noise Control, David

    A Bies and Colin H Hanson, Fourth Edition, Spoon Press 2009. 2POWERGen Super Silent Canopy Type, details in Appendix A

    3 POWERGen Soundproofed Type, details in Appendix A

    4 Based on AS/NZS 60076.10:2009 Standard Limit and the power rating of the transformer. Sound Power level of 63 dBA.

    Noise emissions from the odour control unit proposed to be located to the north of the new buildings are expected to be insignificant.

    Noise spectra for the various items of equipment have been assumed for this assessment based on the prediction methodology in Engineering Noise Control by Bies and Hanson (2009) and test data for comparable units provided by POWERGen. A summary of the maximum noise spectra are shown in Figure 5. All equipment suppliers must ensure that selected equipment does not exceed the specified values.

    Figure 5 Equipment sound power levels

    30

    35

    40

    45

    50

    55

    60

    65

    70

    75

    80

    85

    90

    95

    100

    105

    110

    32 63 125 250 500 1000 2000 4000 8000

    So

    un

    d p

    ow

    er

    leve

    l d

    B

    Frequency Hz

    Predicted sound power levels for equipment

    Generator

    Transformer

    20kW Pump

    200kW Pump

    Generator exhaust Super Silent Type

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 6

    Based on the equipment data, noise emission calculations are based on a maximum reverberant noise level of 90 dBA L10 in the Generator room (super silent model), and 112 dBA L10 in the pump room.

    The pumps are located in a 5.3 metre dry pit. The pit, together with the concrete roof provides significant acoustic shielding. Appropriate acoustic treatment will be provided to the access doors and hatches. Access hatches have been assumed to be minimum 3mm steel. It is understood that no ventilation openings are required for the pump room.

    The generator and control room is also to be located underground with a concrete roof. Doors are provided to the north side faade. Appropriate acoustic treatment will be provided to the access doors and ventilation openings in the form of acoustic seals and construction material to adequately control noise emissions. It has been assumed that ventilation inlet and exhaust ducts will be provided, with an area of 1m

    2 each. Attenuators will be provided to the ventilation air paths, and the genset will be fitted

    with appropriate acoustic exhaust silencers to achieve the environmental noise emission criteria. For the purposes of this assessment, it has been assumed that a 900mm long 50% open area attenuator will be required to both the intake and exhaust ventilation paths. Specification of these attenuators will be conducted in the detailed design stage when ventilation fans have been selected. Specification of the exhaust silencers will be developed with assistance from the generator supplier to ensure noise emissions from the exhausts does not exceed 65dBA at 7 metres.

    The generator would be tested periodically during the daytime periods. It is expected that the only night time operation would be during an emergency.

    The transformer is located outside, to the south of the proposed new building.

    The site will be unoccupied and therefore negligible impact from increased traffic noise is expected.

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 7

    5. Assessment of environmental noise emissions

    A computational model of the site was developed using the environmental noise emission software SoundPLAN 6.4. The model incorporates noise sources, buildings, surrounding terrain and makes predictions of noise emissions to the surrounding receivers. Predicted noise contours are attached in Appendix C. Predictions of noise emissions have been made in general accordance with NZS6082:2008. As shown in the contours, noise emission levels at the site boundary are predicted to comply with the DP noise limit of 45 dBA L10.

    Noise propagation from the site was predicted using the ISO9613-2:1996 model under calm meteorological conditions.

    The predicted noise levels from the proposed development at the nearest sensitive receivers are shown below.

    Table 4 Predicted noise emission levels

    Location Standard Operation L10 dBA

    Emergency Operation L10 dBA

    District Plan noise limits L10 dBA

    Normal operation

    Day Night

    Kindergarten

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page 8

    6. Conclusion

    An acoustic assessment of the proposed pump station at Corder Park in Nelson has been conducted. The assessment included noise measurements on site and prediction of noise emissions from the proposed equipment.

    Noise emissions from the proposed site have been predicted using SoundPLAN 6.4 computational noise prediction software. Acoustic mitigation measures in the form of building construction and ventilation treatment for the Generator Room have been provided in order to reduce noise emissions from the site to within the Nelson City Plan requirements. Provided the suitable noise mitigation measures are incorporated into the design, noise emissions from the development can comply with the Nelson City Plan requirements.

  • Appendix A Equipment data sheets

  • heath.millerLine

    heath.millerLine

    heath.millerText Box0.5 MVA

  • Appendix B Planning maps

  • 32

    31

    30

    ATAW

    HAI D

    R

    ATAWHA

    I CRES

    WAS

    TNEY

    TER

    DODSON VLY RD

    RAINBOW DR

    WERNETH ST

    NOEL

    JONE

    S DR

    CLOVE

    LLY S

    T

    TUI GLEN RD

    JACKSON ST

    MARY

    BANK

    RD

    JOLLIE ST

    GIPPS ST

    WINT

    ON P

    L

    MANA

    HTS

    TRES

    ILLIAN

    AVE

    GLENBRAE ST

    DTR4

    DTE1

    Oldham

    Crk

    Nelson Haven

    Coastal Marine Area (CMA) Is,Unless Otherwise Zoned,All Areas Below AssumedMHWS (See Legend)

    MA

    P 4

    HE

    LP

    TIP

    : T

    he

    Leg

    end

    Slid

    es O

    ut

    Fro

    m T

    he

    Fro

    nt

    Co

    ver

    - F

    loo

    d T

    able

    Nea

    r F

    ron

    t P

    age

    39

    41

    40

    4

    3

    5

    1:5,000MAP 4

    Maps Generated by Nelson City Council's GIS SystemThis Publication is Copyright Reserved by Nelson City Council - Cadastral Information derived from the Crown Records System.

    CROWN COPYRIGHT RESERVED - Approved for internal reproduction by Nelson City Council

    NELSON RESOURCE MANAGEMENT PLAN

    OPERATIVE IN PART (EXCLUDING REGIONAL COASTAL PLAN)1 SEPTEMBER 2004

    heath.millerLine

    heath.millerText BoxSITE LOCATION

  • #

    #

    (((((((

    (((((((

    (((((((

    (((((((

    #

    #

    ##

    G

    !

    G

    1:5,0001:2,500 1:25,0001:10,000

    66kV ETL33kV ETL

    220kV ETL110kV ETL

    Marine ASCV

    Flood Overlay

    Launching Ramps

    Designation Area

    Grampians S.R.O.

    Services Overlay

    Map Limit Outlines

    Heritage Precincts

    Inundation Overlay

    Road To Be Stopped

    Nelson City Boundary

    Fault Hazard Overlay

    Conservation Overlay

    Wakefield Quay Precinct

    Land Management Overlay

    Potential Quarry Overlay

    Tahunanui Slump Core S.R.O.

    Port Effects Control OverlayHeritage and Landscape Trees

    Tahunanui Slump Fringe S.R.O.

    Airport Effects Limit Overlay

    Port Nelson Ltd Coastal Permit

    Heritage and Landscape Woodland

    Airport Effects Control OverlayHeritage Building, Object, Place

    Airport Effects Advisory Overlay

    Bridge Location - (No Rules Apply)

    Public Car Parking Square and Places

    Proposed Road (IndicativeAlignment Only)

    Riparian Overlay (See App6and Zone Chapters)

    Outer Limit of AirportEffects Control Overlay

    Outer Limit of AirportEffects Advisory OverlayFloodpath Overlay (Also See Note 1,Flood Path Table)

    PLANNING MAPS LEGEND(LEFT HAND MAPS ONLY)NOTE 1: Flood Paths not defined on the Planning Maps are shown in a table in the front page of the PlanningMaps.OVERLAYS OVERLAYSAREAS OF SIGNIFICANT CONSERVATIONVALUE (ASCV)

    AIRPORT EFFECTS OVERLAYSSee Map A4.1for Extent of Overlays

    NATURAL HAZARD OVERLAYS

    SLOPE RISK OVERLAYS (S.R.O.)

    FLOOD HAZARD OVERLAYS

    PORT EFFECTS OVERLAY

    ELECTRICAL TRANSMISSION LINES (ETL)

    HERITAGE OVERLAYS

    DESIGNATIONS

    SYMBOLS

    MAP EXTENT SYMBOLS

    LEGEND

    : LEFT

    HAND

    MAPS

    !"$

    28 September 2009 Nelson Resource Management Plan

  • ATAW

    HAI D

    R

    ATAWHA

    I CRES

    WAS

    TNEY

    TER

    DODSON VLY RD

    RAINBOW DR

    WERNETH STNO

    EL JO

    NES D

    R

    TUI GLEN RD

    JACKSON ST

    MARY

    BANK

    RD

    JOLLIE ST

    GIPPS ST

    CR8

    NP37

    NP73

    Nelson Haven

    Coastal Marine Area (CMA) Is,Unless Otherwise Zoned,All Areas Below AssumedMHWS (See Legend)

    HE

    LP

    TIP

    : T

    he

    Leg

    end

    Slid

    es O

    ut

    Fro

    m T

    he

    Bac

    k C

    ove

    r -

    Flo

    od

    Tab

    le N

    ear

    Fro

    nt

    Pag

    eM

    AP

    4

    1:5,000

    NELSON RESOURCE MANAGEMENT PLAN

    OPERATIVE IN PART (EXCLUDING REGIONAL COASTAL PLAN)1 SEPTEMBER 2004

    Maps Generated by Nelson City Council's GIS SystemThis Publication is Copyright Reserved by Nelson City Council - Cadastral Information derived from the Crown Rrecords System.

    CROWN COPYRIGHT RESERVED - Approved for internal reproduction by Nelson City Council

    MAP 4

    39

    41

    40

    42

    4

    3

    576

    heath.millerLine

    heath.millerText BoxSITE LOCATION

  • RURAL

    1:5,0001:2,500 1:25,0001:10,000

    INDUSTRIAL

    RESIDENTIAL

    Leisure Area

    CONSERVATION

    Higher Density

    INNER CITY-FRINGE

    Scheduled Streets

    Landscape Overlay

    Map Limit Outlines

    INNER CITY -CENTRE

    View Shaft Overlay

    Lower Density Area

    SUBURBAN COMMERCIAL

    Archaelogical Sites

    Nelson City Boundary

    OPEN SPACE RECREATION

    Archaelogical Overlay

    Intense Development Area

    Lower Density Area (Stoke)

    Coastal Environment Overlay

    Lower Density Small Holdings Area

    Nayland Road South Industrial Area

    Higher Density Small Holdings Area

    Public Car Parking Squares and Places

    Scheduled Site (SEE Chapter 3and Zone Chapters)

    Assumed MHWS and Landward Boundary of the CMA (SEE Note 2)

    PLANNING MAPS LEGEND(RIGHT HAND MAPS ONLY)

    ZONES OVERLAYS

    HERITAGE OVERLAYS

    SYMBOLS

    NOTE 1: Zones are Represented on Right Hand Facing Sheet Only.NOTE 2: Mean High Water Springs (MHWS) as shown on these Planning Maps are indictative only. Where rulesin this Plan require MHWS to be located, This must be done by survey.

    CAPITALS = ZONE

    Lower Case = Areas Within Zone

    MAP EXTENT SYMBOLS

    LE

    GE

    ND

    : R

    IGH

    T H

    AN

    D M

    AP

    S

    Bridge Location - (No Rules Apply)

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page i

    Appendix C Predicted noise contours

  • PUMPROOM

    WETWELL

    GEN.ROOM

    LEGEND:PREDICTED NOISE LEVELSLA10 dBA

    303540455055606570

    CLIENT

    NEALE PARK SEWER PUMPING STATIONUPGRADE OPTIONS - CONTRACT No. 3142

    DATE

    TITLE

    REVISION DETAILSDATEREV APPROVED

    CHECKED

    APPROVED

    PROJECTDRAWN DESIGNED

    220423.001PROJECT No.

    SCALE SIZE

    DRAWING No. REV

    A3Blenheim New Zealand

    89 Seymour Street (PO Box 186)

    Telephone: +64 3 520 6060

    Email: [email protected]

    NEW PUMPSTATION - CORDER PARKPREDICTED NOISE LEVELSEMERGENCY OPERATION APPENDIX C2 A

    1:750

    INFORMATIONNOT FOR CONSTRUCTIONLK HM

    A ISSUED FOR INFORMATION

    Cad F

    ile: P

    :\220

    423\C

    ADD\

    drgs

    \civ\f

    igure

    s\220

    423-

    appe

    ndix

    C.dw

    g P

    lot D

    ate: 9

    /12/20

    11 2:

    40:14

    p.m.

    N

    ame:

    Lindy

    Kidw

    ell

    Xre

    fs: 22

    0423

    -ADG

    _A3H

    S, 22

    0423

    -xr-2

    D-co

    rder

    , 220

    423-

    xr-cp

    -imag

    e

    0

    SCALE 1:750

    7.5 15 30m

  • PUMPROOM

    WETWELL

    GEN.ROOM

    LEGEND:PREDICTED NOISE LEVELSLA10 dBA

    303540455055606570

    CLIENT

    NEALE PARK SEWER PUMPING STATIONUPGRADE OPTIONS - CONTRACT No. 3142

    DATE

    TITLE

    REVISION DETAILSDATEREV APPROVED

    CHECKED

    APPROVED

    PROJECTDRAWN DESIGNED

    220423.001PROJECT No.

    SCALE SIZE

    DRAWING No. REV

    A3Blenheim New Zealand

    89 Seymour Street (PO Box 186)

    Telephone: +64 3 520 6060

    Email: [email protected]

    NEW PUMPSTATION - CORDER PARKPREDICTED NOISE LEVELS

    NORMAL OPERATION APPENDIX C1 A

    1:750

    INFORMATIONNOT FOR CONSTRUCTIONLK HM

    A ISSUED FOR INFORMATION

    Cad F

    ile: P

    :\220

    423\C

    ADD\

    drgs

    \civ\f

    igure

    s\220

    423-

    appe

    ndix

    C.dw

    g P

    lot D

    ate: 9

    /12/20

    11 2:

    40:14

    p.m.

    N

    ame:

    Lindy

    Kidw

    ell

    Xre

    fs: 22

    0423

    -ADG

    _A3H

    S, 22

    0423

    -xr-2

    D-co

    rder

    , 220

    423-

    xr-cp

    -imag

    e

    0

    SCALE 1:750

    7.5 15 30m

  • Environmental Noise Assessment

    Project 220423-108 | File Hm120614hm corder park environmental noise assessment V3.docx | Revision 1 Aurecon Page ii

    Appendix D Noise monitoring results

  • p 3

    Project Project No | File Hm120614hm corder park environmental noise assessment V3.docx | Select Date | Revision Revision

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    So

    un

    d P

    ress

    ure

    Le

    ve

    l, d

    BA

    Time

    Corder Park Pump Station, Atawhai Drive, Atawhai

    Tuesday 29/11/2011 Wednesday 30/11/2011

    Lmax

    L10

    Leq

    L90

  • p 4

    Project Project No | File Hm120614hm corder park environmental noise assessment V3.docx | Select Date | Revision Revision