+ All Categories
Home > Documents > EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Date post: 16-Dec-2015
Category:
Upload: sherman-cunningham
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
19
EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report
Transcript
Page 1: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

EPAP Funding forDivision Midway Alliance

for Community Improvement

May 2013 Progress Report

Page 2: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

117th148th

North

Headquarters

Former Skuzzy Bldg

Local Print Shop

Bad Boy Auto

Duke’s Family Dining

1 of 7 Convenience stores in the area

Where is Division-Midway?

Page 3: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

EPAP Action Items Addressed

• Community Building 3.1

• Community Building 3.3

• Economic Development 2.2• Economic Development 3.1• Economic Development 4.2

Page 4: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

CB 3.1 –Survey Instruments & Tools for Community Conversations- Social Media

Page 5: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Dan McCue, School District

Communications Director

CB 3.1 –Survey Instruments & Tools for Community Conversations- Written Media (Emails, Newspaper)

Page 6: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

CB 3.1 –Survey Instruments & Tools for Community Conversations- Internal Media

Page 7: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Division Midway Alliance for Community Improvement

Neighborhood Survey: Division Street between 117th & 148th Avenues (Fred Meyer to Whistle Stop)

Thank you for taking a few minutes to complete this survey. Your answers will help us with our plans for creating more prosperity in our business district. Give a little or as much feedback as you like. Feel free to use the back page too.)

Where do you live? (cross streets OK . ie, 169th and SE Main)

______________________________________________________________________________

Where do you go for services (car/home, insurance, lawyer, health & beauty, Drs., social services, mechanic, dentist, etc)?

______________________________________________________________________________

______________________________________________________________________________

Where do you purchase your groceries? (name and location helpful)

______________________________________________________________________________

______________________________________________________________________________

What kind of stores would you shop in if they were on Division Street between 117th to 148th?

______________________________________________________________________________

______________________________________________________________________________

What services would you like to see on Division Street 117th to 148th?

______________________________________________________________________________

______________________________________________________________________________

On a scale of 1 to 10, how safe do you feel in your neighborhood?

Not Safe 1 2 3 4 5 6 7 8 9 10 very safe

Comments:

Location of Survey_______________________________________________________Date____________________

Resident Survey

Page 8: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

CB 3.3 Initiate “community conversations” at community forums and with existing groups to lay the foundation for community

identity.

Page 9: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Charter SchoolsChurchesParent Teacher OrgsAlternative Schools.Area Apartment Complexes

CB 3.3 Initiate “community conversations” at community forums and with existing groups to lay the foundation for community identity.

Page 10: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Basic Infrastructure & Design Elements

Storm Drains

•adjust or redesign to accommodate for adequate storm water runoff

•initiate a stewardship maintenance program

Sidewalks

•create infill where needed for better pedestrian access

•Street trees and shrubs installed for curb appeal

•install ramps as required by ADA

Crosswalks

•install Flashing Beacons to warn oncoming traffic

•coordinate bus stops to match up with crosswalks

•adjust traffic signals to accommodate for elderly, children, handicapped

EC 2.2 Identify and prioritize commercial nodes and commercial street frontages suitable for storefronts and/or main street

improvements

Page 11: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

•fill empty storefronts at Division Center and Division Plaza

•create curb appeal with landscaping, awnings, fresh paint

•mitigate stormwater runoff of parking lots and rooftops, tree islands

•increase lighting and attractive signage

•design safe pedestrian crossings from parking lot

EC 2.2 Identify and prioritize commercial nodes and commercial street frontages suitable for storefronts and/or main street improvements

Page 12: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

•Improve curb appeal for all businesses

•Improve sight lines for traffic and pedestrians

•Install ADA curb ramp

•increase lighting and attractive signage

•Update landscaping

•Improve parking design and aesthetics

EC 2.2 Identify and prioritize commercial nodes and commercial street frontages suitable for storefronts and/or main street improvements

Page 13: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Knecht’s

•level parking lot, create ADA parking

•Berm the landscape island to disguise parking lot

•Install lighting, street signage

•Upgrade landscape design to include trees, shrubs

Firestone

•New storefront design

•add additional landscaped areas

•disguise front parking lot

•install lighting, street signage

GoodYear

•New storefront design

•upgrade interior customer lounge

•add landscaped area

•disquise front parking lot

•install lighting, street signage

Petco

•new storefront design to conform to what most other stores look like

•install landscaping complete with tree and shrub islands

•redesign and stripe parking lot, include ADA parking

•mitigate stormwater runoff of parking lot and rooftop

Building Modernizations

EC 2.2 Identify and prioritize commercial nodes and commercial street frontages suitable for storefronts and/or main street

improvements

Page 14: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

•Create frequent opportunities to get expert training in IT, marketing, sales, etc.

•Offer low interest school loans to business owners

•Encourage a work or career center to move to the area, child care next door.

•Mentor business owners on running successful businesses•connect with, NW Family Services, Mercy Corps NW, MicroMentor, seminars, workshops

•Provide culturally diverse liaisons to help grow minority businesses

•Create a district list of businesses for purposes of shopping local

Technical Assistance

EC 3.1 Identify and develop strategy to remove barriers to small business development in East Portland

Page 15: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Enhance Curb Appeal •establish regulations for Signage

•Zoning variances

•eliminate driveways to ‘no where’

•add street furnishings, art

•enforce building color restrictions

•Electronic signs

EC 3.1 Identify and develop strategy to remove barriers to small business development in East Portland

Page 16: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Traffic Calming/Safety

•install tree islands and plant material along sidewalks•install flashing beacons on crosswalks •adjust timing of traffic signals to accommodate elderly, children, handicapped•create bicycle lane barriers, paint safe zones for cyclists•limit freight trucks to after hours use•Establish a positive police presence in the area•install roundabouts…just kidding!•Advertise expected changes in newspaper, businesses, post signage in area

EC 3.1 Identify and develop strategy to remove barriers to small business development in East Portland

Page 17: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Business to Service Connections

Happy Garden------------------ Craft 3Wireless City---------------------PSU, SCORE Kelli’s Café------------------------PDCTawakal Halal Market----------MESO, PDCSteve Souza----------------------PDC, Cartlandia

4.2 Develop and build relationships between the business community and other community organizations for mentoring,

skill building, fundraising, and development

Page 18: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Thank You EPAP!

Page 19: EPAP Funding for Division Midway Alliance for Community Improvement May 2013 Progress Report.

Jean DeMaster,Human Solutions& DMA Treasurer

Thank you Jean, You have been a lifesaver!

First Citizen Award


Recommended